Top Banner
Winter 2013 End-of-Course Assessments Training Materials for School Technology Coordinators U.S. History Biology 1 Algebra 1 Geometry 1
29

Winter 2013 End-of-Course Assessments Training Materials for School Technology Coordinators

Feb 26, 2016

Download

Documents

shing

Winter 2013 End-of-Course Assessments Training Materials for School Technology Coordinators. U.S. History Biology 1 Algebra 1 Geometry. Overview. - PowerPoint PPT Presentation
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: Winter 2013 End-of-Course Assessments Training Materials for  School Technology Coordinators

Winter 2013End-of-Course Assessments

Training Materialsfor School Technology

CoordinatorsU.S. HistoryBiology 1Algebra 1Geometry

1

Page 2: Winter 2013 End-of-Course Assessments Training Materials for  School Technology Coordinators

Overview

These training materials are based on the 2013–2014 End-of-Course Assessments Test Administration Manual and are available at www.FLAssessments.com/EOC.

2

Page 3: Winter 2013 End-of-Course Assessments Training Materials for  School Technology Coordinators

OverviewThese training materials are designed to highlight important information regarding test administration policies and procedures.

Not all information from the test administration manual is included in this presentation, so it is imperative that school staff read and familiarize themselves with all information in the manual in addition to using these training materials.

3

Page 4: Winter 2013 End-of-Course Assessments Training Materials for  School Technology Coordinators

Test Administration Manual

4

One manual (2013–2014 EOC Manual) is provided for the Winter 2013, Spring 2014, and Summer 2014 administrations. Scripts and instructions for administering computer-based tests (CBT) are included in this manual. Scripts and instructions for administering computer-based and paper-based accommodations are located at www.FLAsessments.com/EOC.

Page 5: Winter 2013 End-of-Course Assessments Training Materials for  School Technology Coordinators

CBT Test Administrator Quick Reference Guide• The CBT Test

Administrator Quick Reference Guide (formerly Appendix D of the manual) has been removed from the manual and is available at www.FLAssessments.com/AdditionalResources.

• This guide lists possible error messages students may encounter, explanations for each message, and troubleshooting solutions.

5

Page 6: Winter 2013 End-of-Course Assessments Training Materials for  School Technology Coordinators

What’s NewNew TestNav ePAT Launcher and ePATs• Schools MUST uninstall the previous TestNav ePAT

Launcher (version 2.14) and TestNav ePAT content from any computer that it is currently installed on before downloading and installing the new Launcher and ePATs. 

• Once the uninstall process is complete, install the new version 2.17 ePAT Launcher on any computer that will run ePATs. 

• Note: The installation process has changed with the release of the new version of the ePAT Launcher.

• Detailed instructions on how to install the new ePAT Launcher have also been posted to the ePAT tab on the PearsonAccess home page (www.PearsonAccess.com/fl).  

6

Page 7: Winter 2013 End-of-Course Assessments Training Materials for  School Technology Coordinators

What’s New2013–2014 Technology Coordinator Guide – Version 2.0• Updated TestNav ePAT installation

instructions• Added information regarding

TestNav installation on Windows 8 workstations

• Added information regarding the anticipated release of new TestHear software that will be compatible with Windows 8

• Technology coordinators must familiarize themselves with all information in this guide prior to test administration.

• The guide is available at www.FLAssessments.com/AdditionalResources

7

Page 8: Winter 2013 End-of-Course Assessments Training Materials for  School Technology Coordinators

Test AdministrationSchedule• The Winter 2013 EOC testing schedule* is

December 2-20, 2013.– US History– Biology 1– Algebra 1 – Geometry

*For CBT, subjects must tested in this order. Testing for one subject must be completed in a school before testing for another subject may begin. − Paper-based accommodations for all subjects must be administered

during the first four days of the testing window to meet the accelerated return deadline to ensure timely reporting of results.

Note: No testing on December 12; Secondary Early Release Day.Any deviation from the test administration schedule requires written approval from the Florida Department of Education (FDOE) prior to implementation. 8

Page 9: Winter 2013 End-of-Course Assessments Training Materials for  School Technology Coordinators

Test SecurityPer Test Security Statute, s. 1008.24, F.S., and Florida State Board Rule, 6A-10.042, FAC, inappropriate actions by school or district personnel can result in student or classroom invalidations, loss of teaching certification, and/or involvement of law enforcement.Examples of prohibited activities include the following:• Reading or viewing the passages or test items before, during,

or after testing• Revealing the passages or test items• Copying the passages or test items• Explaining or reading passages or test items for students• Changing or otherwise interfering with student responses to

test items• Copying or reading student responses• Causing achievement of schools to be inaccurately measured

or reported9

Page 10: Winter 2013 End-of-Course Assessments Training Materials for  School Technology Coordinators

Technology CoordinatorBefore TestingChecklist Read the 2013–2014 Technology Coordinator Guide and relevant

portions of the test administration manual. Read the Test Administration Policies and Procedures and the Florida

Test Security Statute and Rule in Appendix C of the 2013–2014 EOC Manual, and sign the Florida EOC Test Administration and Security Agreement.

Ensure all workstations meet the minimum requirements posted at www.FLAssessments.com/MinimumSpecs.

Confirm TestNav 6.9 software has been installed on all computers to be used for testing.

Install TestHear on all computers to be used for testing students requiring accommodated CBT forms.

Ensure all student workstations have successfully loaded the Infrastructure Trial.

Meet with the school assessment coordinator to discuss this computer-based administration and to walk through test administration procedures. 10

Page 11: Winter 2013 End-of-Course Assessments Training Materials for  School Technology Coordinators

Technology CoordinatorBefore TestingChecklist Discuss and design plans with the school assessment

coordinator for handling possible technical interruptions during testing.

Run the TestNav System Check to determine the amount of bandwidth needed for testing.

Evaluate the testing locations in the school to ensure availability of sufficient electrical outlets and network jacks.

Ensure appropriate security protocols are used. Ensure you are aware of the applications that must be disabled

prior to testing. Confirm that the computers used for test administration have

the appropriate required version of a standard Internet browser based on the operating system and that the pop-up blocker is disabled (see Appendix B of the 2013–2014 EOC Manual).

Ensure the school has a high-speed connection to the Internet AND the connection is not over-allocated.

11

Page 12: Winter 2013 End-of-Course Assessments Training Materials for  School Technology Coordinators

Technology CoordinatorBefore TestingChecklist If a firewall is used, confirm the appropriate

destination/port/protocol combinations are allowed through the firewall.

Ensure that any proxy servers have been checked to confirm that the appropriate URLs are not blocked.

Confirm that Internet content filters are configured to allow the specific IP addresses required for administering computer-based tests.

Ensure Proctor Caching computers have been set up properly. Ensure a printer is available for printing the Student

Authorization Tickets and Session Rosters (color is not required).

Analyze the network to determine whether network bottlenecks exist.

Confirm that student computers and the Proctor Caching computer have not been updated with any additional software and will not be updated before testing begins.

12

Page 13: Winter 2013 End-of-Course Assessments Training Materials for  School Technology Coordinators

Technology CoordinatorBefore TestingChecklist Confirm that test content has been cached for all scheduled

test sessions. Test content is available one week prior to the first day of the test administration window.

Verify that the performance of your Internet connection is consistent with expected levels of performance for computer-based testing.

Alert your Internet Service Provider to your computer-based testing window, and also confirm that no scheduled maintenance or outages are planned during that entire window.

Verify, as needed, that no high bandwidth network activity other than computer-based testing will be occurring during the computer-based testing window.

If using wireless network connections for computer-based testing, ensure that all computers can effectively communicate with their access point from the testing location and all security measures have been properly enabled. 13

Page 14: Winter 2013 End-of-Course Assessments Training Materials for  School Technology Coordinators

Technology CoordinatorBefore TestingChecklist Ensure that laptops are connected to AC power. If batteries

must be used, ensure that they are fully charged and have the capacity to last for the entire test session (160+ minutes).

Ensure that each computer station is equipped with a keyboard and mouse (or other pointing device).

Disable instant messaging, email notification, screen savers, power savers, and remote desktop.

Disable or delay anti-virus, auto-scan and/or auto-update, system restore utilities, Windows Security Firewall, web content filtering, or other software that may impact CPU speed or scan/block information transferred between the workstation and the servers.

During testing, ensure that students not testing and teachers refrain from using any streaming media or other high-bandwidth applications while students are testing.

14

Page 15: Winter 2013 End-of-Course Assessments Training Materials for  School Technology Coordinators

Technology CoordinatorBefore TestingChecklist Ensure student workstations and the user profiles and logins

being used for testing allow full permissions (read-/write-/modify-access) to the TestNav\Temp, TestNav\Logs, and gh\TestHearPearson\Data directories.

Ensure that the primary and secondary save locations are set for student response files and that students have read-/write-access to these locations.

Ensure that test administrators are familiar with how to access TestNav and TestHear software from student workstations and how to access the student comment forms. The student comment form will be available at: www.FLAssessments.com/EOCStudentCommentForm.

On each day of testing, confirm that the Proctor Caching computer and Proctor Caching software are turned on and remain running.

15

Page 16: Winter 2013 End-of-Course Assessments Training Materials for  School Technology Coordinators

Technology CoordinatorBefore Testing

Proctor Caching• Instructions for installing the Proctor Caching software are

provided in the 2013–2014 Technology Coordinator Guide. • Computers used for Proctor Caching do not need to be server-

class machines but should meet the system requirements.N Proctor Caching can run on either a Windows or a Mac operating

system, and each can support both Windows- and Mac-based testing workstations.

• Each testing computer must be configured to refer to a Proctor Caching computer to obtain test content.– If more than one computer is being used for Proctor Caching, be

sure to specify the IP address of the correct Proctor Caching computer during the TestNav installation process.

– For example: if there are 80 computers that will be used for testing and two Proctor Caching computers, 40 of the testing computers may be configured to link to Proctor Caching computer A, and the remaining 40 may link to Proctor Caching computer B.

16

Page 17: Winter 2013 End-of-Course Assessments Training Materials for  School Technology Coordinators

Technology CoordinatorBefore TestingProctor Caching Security• Proctor Caching software stores a copy of the test content on

the local hard drive of the machine on which it runs.• Test content transmitted and stored by the Proctor Caching

computer is in encrypted format.• “Purge cache” function deletes all encrypted test content from

the hard drive of the Proctor Caching computer.−FDOE and Pearson require that test content be purged at

the end of each administration window.

Proctor Caching Computer Placement• Proctor caching can be implemented at either the lab or the

school level.• Proctor caching computers should be located as close as

possible on the network to the student workstations. 17

Page 18: Winter 2013 End-of-Course Assessments Training Materials for  School Technology Coordinators

Technology Coordinator Before TestingTestNav ePATs• Students are required to participate in a practice test using

an ePAT. • The ePATs must be downloaded and installed on the

computer workstation that will be used for the practice test. • To access a TestNav ePAT, download and install the ePAT

Launcher. The Launcher is used to deliver the individual practice tests. You only need to install the Launcher once on each machine.

• Next, download the TestNav ePAT content. The TestNav ePAT content and the Launcher must be saved in the same file folder.

• Instructions for installing and running TestNav ePATs are provided in the 2013–2014 Technology Coordinator Guide.

18

Page 19: Winter 2013 End-of-Course Assessments Training Materials for  School Technology Coordinators

Technology Coordinator Before TestingTestHear ePATs• Students are required to participate in a practice test using

the TestHear accommodated ePAT for the specific form or form combination that they will use during testing.

• Each accommodated ePAT must be downloaded and installed on the computer workstation that will be used for the practice test.

• TestHear ePATs will only operate on Windows PC workstations and on Macintosh workstations that have Mac OS X 10.5 or later installed and are running Windows (e.g., via Boot Camp).

• Instructions for installing and running TestHear ePATs are provided in the 2013–2014 Technology Coordinator Guide.

19

Page 20: Winter 2013 End-of-Course Assessments Training Materials for  School Technology Coordinators

Technology CoordinatorBefore TestingTestNav• Installation instructions are provided in the 2013–

2014 Technology Coordinator Guide.• Once TestNav has been properly installed and

tested, it should continue to run successfully on student workstations through the test administration, as long as no incompatible software updates are made.

• There are two options for installing TestNav.N File ShareN Local Install

20

Page 21: Winter 2013 End-of-Course Assessments Training Materials for  School Technology Coordinators

Technology CoordinatorBefore Testing

Pros ConsFile Share

+ Single point of installation and configuration changes+ Easier to implement in a large-scale testing environment+ Centralized single location for log files

- Adds a single potential point of failure

Local + Quicker launch time+ Limits potential points of failure

- Increases installation time (Note: System automation tools, such as SMS [Windows] and Apple Remote Desktop [Mac] can make local installs much easier) - Requires that configuration changes be made on each machine

21

Page 22: Winter 2013 End-of-Course Assessments Training Materials for  School Technology Coordinators

Technology CoordinatorBefore TestingTestHear• TestHear software must be installed locally on all

computers that will be used by students requiring accommodated CBT forms (e.g., large print, zoom, screen reader, color contrast, assistive devices).

• Instructions for downloading and installing TestHear are provided in the 2013–2014 Technology Coordinator Guide.

• TestHear will only operate on Windows PC workstations and on Macintosh workstations that have Mac OS X 10.5 or later installed and are running Windows (e.g., via Boot Camp).

• TestHear does not resize the screen resolution, so monitors must be adjusted to 1024 x 768 prior to testing.

22

Page 23: Winter 2013 End-of-Course Assessments Training Materials for  School Technology Coordinators

Technology CoordinatorDuring TestingChecklist Ensure Proctor Caching software is running on all Proctor

Caching computers.• Turn on Proctor Caching software

N Windows: go to Start>All Programs>Proctor Caching>Proctor Caching

N Mac: once Proctor Caching is initiated it will not have to be restarted unless it has been manually stopped

Adjust monitors that are not correctly displaying test items with shading.

Monitor each testing room to ensure that there are no technical issues.

Be available during testing to answer questions from test administrators.

23

Page 24: Winter 2013 End-of-Course Assessments Training Materials for  School Technology Coordinators

Technology CoordinatorDuring Testing

24

Monitor Display and Shading• To ensure students will see all of the content in the

test, students are asked to confirm that they can see the 15% shading on the Test Group Code screen when they first log in to the test.

• If students cannot see the shading, they must exit the test and their monitor settings must be adjusted.

• General instructions for adjusting monitor settings are provided in the 2013–2014 Technology Coordinator Guide. The steps for changing contrast and brightness settings will vary depending on the manufacturer and model of each individual monitor.

Page 25: Winter 2013 End-of-Course Assessments Training Materials for  School Technology Coordinators

Technology CoordinatorAfter TestingChecklist Purge test content from the Proctor Caching

computer(s). Instructions for purging test content from the Proctor Caching computers can be found in the 2013–2014 Technology Coordinator Guide.

Complete the Technology Coordinator Comment Form at www.FLAssessments.com/EOC.

25

Page 26: Winter 2013 End-of-Course Assessments Training Materials for  School Technology Coordinators

Appendices

Appendices in the 2013–2014 EOC Manual include:• Appendix A—Accommodations• Appendix B—Pearson Support and PearsonAccess• Appendix C—Test Security Statute and Rule• Appendix D—Forms, Cover Sheets, Checklists,

Signs

26

Page 27: Winter 2013 End-of-Course Assessments Training Materials for  School Technology Coordinators

Pearson Support and PearsonAccessContact Pearson Support at:

• 1-877-847-3043 (Monday–Friday, 7:00 am–8:30 pm ET)• [email protected]

Appendix B in the 2013–2014 EOC Manual provides the following information:

• PearsonAccessNUser accounts (FDOE distributed instructions for setting up

user accounts to district assessment coordinators.)NBrowser requirementsNLogging in for the first timeNResetting passwords

• Training CenterNTest Setup Exercise

27

Page 28: Winter 2013 End-of-Course Assessments Training Materials for  School Technology Coordinators

Comment Forms

28

• After testing, test administrators, school coordinators, and technology coordinators are encouraged to complete the appropriate comment form located at www.FLAssessments.com/EOC.

• FDOE and Pearson appreciate feedback from district and school personnel.

Page 29: Winter 2013 End-of-Course Assessments Training Materials for  School Technology Coordinators

Thank you for ensuring secure and successful administrations of the EOC assessments this

year.

29