Top Banner
presented to Windsor Town Council presented by Simon Andrews, Graphic Solutions David Kelley, Project Manager
33

Windsor townwide master plan

Jul 04, 2015

Download

Documents

Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: Windsor townwide master plan

presented to

Windsor Town Council

presented by

Simon Andrews, Graphic Solutions

David Kelley, Project Manager

Page 2: Windsor townwide master plan

STAKEHOLDERS GROUP

• Glenda Castelli, Windsor Certified Farmers Market• Mitch Conner, ArchiLOGIX & Planning Commissioner• Lee Hodo, Russian River Valley Winegrowers Association • Robert (Bob) Kennedy, Shiloh Center• Amanda Lee, Okini Design• Gary Quackenbush, Windsor Chamber of Commerce • Kelli Riveras, Windsor Village• John Reyes, Windsor Chamber of Commerce & Visitor’s Center• Dennis Rutkowski, Old Downtown Business Association

Page 3: Windsor townwide master plan

TOWN OF WINDSOR TEAM

• Christa Johnson, Assistant Town Manager• David Kelley, Town Manager’s Office• Donna Legge, Parks & Recreation Department• Pauletta Cangson, Planning & Building Department• Diane Johnson, Town Manager’s Office

Page 4: Windsor townwide master plan

BACKGROUND

• Economic Development Strategic Plan (EDSP)

• AIA / Sustainable Design Assessment Team (SDAT)

Page 5: Windsor townwide master plan
Page 6: Windsor townwide master plan
Page 7: Windsor townwide master plan
Page 8: Windsor townwide master plan
Page 9: Windsor townwide master plan
Page 10: Windsor townwide master plan

PROGRAM OBJECTIVES

• Brand/Identity

• Connectivity

• Sustainability

Page 11: Windsor townwide master plan

Research Images

Page 12: Windsor townwide master plan

Sign Location Plan

Page 13: Windsor townwide master plan

Existing Entry Monument Sign with Banners

Page 14: Windsor townwide master plan

Entry Monument with Electronic Display

Page 15: Windsor townwide master plan

Entry Monument with Electronic Display

Page 16: Windsor townwide master plan

Entrance to Town along Old Redwood Highway

Page 17: Windsor townwide master plan

Entry Monument

Page 18: Windsor townwide master plan

Railroad Bridge Entry ID

Page 19: Windsor townwide master plan

Overhead Gateway

Page 20: Windsor townwide master plan

Median Gateway

Page 21: Windsor townwide master plan

Vehicular Directional Sign

Page 22: Windsor townwide master plan

Sign Schedule

Page 23: Windsor townwide master plan

Interpretive Signs

Page 24: Windsor townwide master plan

Kiosk Concepts

Page 25: Windsor townwide master plan

Blade Sign

Page 26: Windsor townwide master plan

Street Name Sign

Page 27: Windsor townwide master plan

Highway 101 Entry Monument

Page 28: Windsor townwide master plan

Banner & Billboard

Page 29: Windsor townwide master plan

Entry Monument with Electronic (LED) Display

Entry Monument with Electronic Display

• Replaces Town Banner Program• Reduces cost to Applicants • Saves Staff time (long-term)• Enhances aesthetic appearance of major entrance to Town• Reduces disposal of banners

Page 30: Windsor townwide master plan

Next Steps

Next Steps:• Council designate role of the Planning Commission

Informational Presentation ? Design Review ? Approval Body ?

• Provide Direction to Staff on Implementation of Master Plan

• Staff prepares Bid Specifications for Entry Monument Sign

• Prepare agreement with Exchange Bank for New Sign

• Include funding for Implementation of the Wayfinding Signage Master Plan in the Proposed FY 2011-13 budget and 5-year CIP

Page 31: Windsor townwide master plan

Questions

Staff Recommendation:

• By Motion, Approve Master Plan!

Page 32: Windsor townwide master plan

Questions

Questions and Comments

Page 33: Windsor townwide master plan