Top Banner
WINDCHILL STEP CONNECTOR FOR AP242 AFNET UPDATE On behalf of Kedar Oak Sr. Director, Product Management 17/10/2018
8

WINDCHILL STEP CONNECTOR FOR AP242 AFNET UPDATEdownload.afnet.fr/AP242DAY18/StepAP242Day18-04-10-PTC.pdf · Windchill 11.1 M010 PDM information Implementation Format Level of implementation

Apr 27, 2020

Download

Documents

dariahiddleston
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: WINDCHILL STEP CONNECTOR FOR AP242 AFNET UPDATEdownload.afnet.fr/AP242DAY18/StepAP242Day18-04-10-PTC.pdf · Windchill 11.1 M010 PDM information Implementation Format Level of implementation

WINDCHILL STEP CONNECTOR FOR AP242AFNET UPDATE

On behalf of Kedar OakSr. Director, Product Management

17/10/2018

Page 2: WINDCHILL STEP CONNECTOR FOR AP242 AFNET UPDATEdownload.afnet.fr/AP242DAY18/StepAP242Day18-04-10-PTC.pdf · Windchill 11.1 M010 PDM information Implementation Format Level of implementation

2

FULLY INTEGRATED CONNECTED PLM

ROLE & TASK BASED

APPLICATIONS

PLATFORM

Windchill Connected(Navigate, Digital Twin, AR Design Review, Requirements)

Marketplace(Partner/OEM)

ENTERPRISE DOMAIN

APPLICATIONS

MES/ SCM

SIMULATION

ERP MRO CRMDEVICE CLOUD

MFG SUPPLIERS CUSTOMERSCONNECTED PRODUCTS

& MACHINES

CLOUD | HYBRID | ON-PREM

Source Data

Powered by:

Extend PLM: Contextualize/Synthesize/Orchestration/Engage

MBSECAD BOMREQ

& TEST

(Lifecycle Management including CAD-Data,

BOM,Change)

Windchill Core(Systems

& Software)

Page 3: WINDCHILL STEP CONNECTOR FOR AP242 AFNET UPDATEdownload.afnet.fr/AP242DAY18/StepAP242Day18-04-10-PTC.pdf · Windchill 11.1 M010 PDM information Implementation Format Level of implementation

3

PTC FOCUS ON OPENNESS

• Active participation in

industry initiatives / Groups

• Interoperability

agreements

• Strong partners

ecosystem

Page 4: WINDCHILL STEP CONNECTOR FOR AP242 AFNET UPDATEdownload.afnet.fr/AP242DAY18/StepAP242Day18-04-10-PTC.pdf · Windchill 11.1 M010 PDM information Implementation Format Level of implementation

4

• CPO Certification based on– Written response with supporting

artifacts

– 2 Days on site audit and interviews

• The Audit and certification criteria covered – Interoperability

– Infrastructure

– Extensibility

– Interfaces

– Standards

– Architecture

PTC AWARDED “CODE OF PLM OPENNESS” CERTIFICATE

“Openness is both in PTC strategy and people’s DNA”

The auditors from TUV Informationstechnik Gmbh

Page 5: WINDCHILL STEP CONNECTOR FOR AP242 AFNET UPDATEdownload.afnet.fr/AP242DAY18/StepAP242Day18-04-10-PTC.pdf · Windchill 11.1 M010 PDM information Implementation Format Level of implementation

55

AFNET & PROSTEP IVIP STEP AP242 BENCHMARK - RESULT

Page 6: WINDCHILL STEP CONNECTOR FOR AP242 AFNET UPDATEdownload.afnet.fr/AP242DAY18/StepAP242Day18-04-10-PTC.pdf · Windchill 11.1 M010 PDM information Implementation Format Level of implementation

PDM functional capabilities supported by the STEP AP242 interface

Date, Author 7

Windchill 11.1 M010

PDM informationImplementation Format Level of implementation

P21- AIM XML BO M. Pilot IF test COTS

"As Designed" PDM product structure ✓ ✓ ✓

Nested PDM product structure X ✓ ✓

Assembly validation properties (* as per PDMIF) ✓ ✓ ✓

Lifecycle management ✓ ✓ ✓

Document structure X X X

Person and organization ✓ ✓ ✓

Date and Time ✓ ✓ ✓

Classification ✓ ✓ ✓

Material properties X X X

Customized PDM properties ✓ ✓ ✓

Configuration management - based on effectivities ✓ ✓ ✓

Configuration management - based on specifications ✓ ✓ ✓

Page 7: WINDCHILL STEP CONNECTOR FOR AP242 AFNET UPDATEdownload.afnet.fr/AP242DAY18/StepAP242Day18-04-10-PTC.pdf · Windchill 11.1 M010 PDM information Implementation Format Level of implementation

8

• Support for JAVA 11

• Support future test rounds of PDMIF, tentative scope is as below

• Support for Ed2 schema.

STEP CONNECTOR FOR AP242 ROADMAP

Test Round 7 scope (Q3 Q4 2018) – Results of the Full scope of VDA UC2 Weekly Delivery Update

Cycle Use case • Multi IDs on parts

• Combined with DAIMLER Use case: Multi-lingual on part name

– CONF4: Combined scope of CONF1, CONF2, CONF3 • Create 2 files: revision eff. / occurrence effectivities

• Add more specification, categories

• Multiples versions of same part in same file

– CUST: include “real-world” UDA (from Daimler-Renault-Nissan)

– Complete “harmonization of PDM Properties / UDA v1”

Test Round 8 or 9’s Test Cases scopes (2019)– Requirements from UG:

• As-built product structure

• Visual Issue management (VIM)

• Elementary-TC of Delta Change

– Proposals from IG, taken from general experience what information is typically exchanged in industry use: • Possibly: Evolution of Test Cases of previous Test rounds

• Test multiple versions in one file, incl. part version relationship

• Nested files with Configuration management

• Sharing of documents between parts

• Handling Mirrored parts

• Versioning of ProductClass

• Approval status relationship (workflow)

• ProductConfiguration

PTC Confidential, subject to change

Page 8: WINDCHILL STEP CONNECTOR FOR AP242 AFNET UPDATEdownload.afnet.fr/AP242DAY18/StepAP242Day18-04-10-PTC.pdf · Windchill 11.1 M010 PDM information Implementation Format Level of implementation