Top Banner
Wind Turbine in Freiamt / Black Forest … the end of the rainbow?
36

Wind Turbine in Freiamt / Black Forest … the end of the rainbow?

Dec 25, 2015

Download

Documents

Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: Wind Turbine in Freiamt / Black Forest … the end of the rainbow?

  

Wind Turbinein Freiamt / Black Forest

… the end of the rainbow?

Page 2: Wind Turbine in Freiamt / Black Forest … the end of the rainbow?

  

Stakeholder Management in Wind Energy Projects

Dr. Josef Pesch

Managing Director, fesa GmbH, FreiburgCEO, fesa Energy Coop, Freiburg

Regional Vice-Chair of German Wind Energy Association

Page 3: Wind Turbine in Freiamt / Black Forest … the end of the rainbow?

  

fesa e.V. 1995roof of stadium SC Freiburg93.6 kWp ca. 90,000 kWh/a158 shareholders

fesa GmbH 2006Freiburg Solar B 31365 kWp >400,000 kWh/a80 shareholders

© fesa GmbH

Page 4: Wind Turbine in Freiamt / Black Forest … the end of the rainbow?

  

Citizens´ Participation Projects fesa (and partners)

Solar, Wind, Hydro, Wood, Efficiency, Energy Saving(Status end of 2011)

Installed Capacity: > 48 MW (45 MW wind; 2 MW pv)

Production 2011: 62 GWh (2000: 2 GWh)

Prediction for 2012 > 63 GWh

Total Investment (1994-2012): > 66 €m

Equity raised (1994-2012): > 23 €m

Power by the people!

fesa Association founded by citizens in 1994

Motto: “We know what to do, but we still have to do it – and if we join forces, we can move renewables.”

Page 5: Wind Turbine in Freiamt / Black Forest … the end of the rainbow?

  

Page 6: Wind Turbine in Freiamt / Black Forest … the end of the rainbow?

  

6

Milestones of Wind Development

• Site evaluation• Site assessment, first financial model• Contracts on land use and access• Preparation of planning permission• Surveys & studies• Planning permission• Construction planning, grid connection,

financing• Placing orders for equipment incl. turbines• Construction• Commissioning• Take over by investors• Operation

Page 7: Wind Turbine in Freiamt / Black Forest … the end of the rainbow?

  

Everybody has a stake …

1. Frameworknational incentives for renewables, planning regulations,

grid access

2. Internalsite evaluation, site assessment, technological decisions,

permission management, project finance

3. Externallocal residents, local authorities, land owners, planning

officers, grid operators, power companies

4. Financialinvestors, banks, development finance, local participation

5. Realisationaccess roads, foundations, local content

6. Operationmaintainance, access, local residents

Page 8: Wind Turbine in Freiamt / Black Forest … the end of the rainbow?

  

Central vs decental: multiplication of stake holders

Page 9: Wind Turbine in Freiamt / Black Forest … the end of the rainbow?

  

1. Framework- national incentives for renewables- planning regulations- grid access

• National motivation

• Natural monopoles / Ownership of infrastructure

• Planning priorities & organisation (central vs local)

• Know your allies

• Know your enemies

• Vested interests

=> KISS (keep it simple, stupid)

Page 10: Wind Turbine in Freiamt / Black Forest … the end of the rainbow?

  

German Feed-In Law of 1990

Page 11: Wind Turbine in Freiamt / Black Forest … the end of the rainbow?

  

2. Internal

• site evaluation => Does it look like a project?

• site assessment => wind, access, ownership, restrictions, grid

• technological decisions => turbine, connection point, layout

• development finance => Who takes the risk?

• permission management => permission requirements, zoning, surveys

Typical permission requirements• Noise Study• Shading Study• Turbulence Study• Landscape Management Study• Visualisation Study• Natural Environment Study (birds, bats, other animals)• Environmental Impact Study• Cultural Impact Study (cultural heritage impact)• Permissions by land owners for site, access roads, power lines• Implications for Tourism

Page 12: Wind Turbine in Freiamt / Black Forest … the end of the rainbow?

  

Where wind turbines can be located

Page 13: Wind Turbine in Freiamt / Black Forest … the end of the rainbow?

  

Total hight 100 m 140 m 170 m

capacity 2000 kW 2000 kW 2000 kW

Rotor diameter 80 m 80 m 90 m

Hub Height 60 m 100 m 125 m

Production 4.4 Mio. kWh/a 5.2 Mio. kWh/a 6.5 Mio. kWh/a

Capacity factor 2,200 h/a 2,600 h/a 3,250 h/a

Increasing yield: raising hub height & rotor diameter

Page 14: Wind Turbine in Freiamt / Black Forest … the end of the rainbow?

  

Shade Study

Noise Impact

Page 15: Wind Turbine in Freiamt / Black Forest … the end of the rainbow?

  

3. External

• local residents => information, share holders, local opposition

• local authorities => information, local value generation

• land owners => private / public / envy management

• planning officers => objective & subjective criteria

• grid operators => high resistance: technical barriers or partnership

• power companies => power purchase, partnership

Page 16: Wind Turbine in Freiamt / Black Forest … the end of the rainbow?

  

To get the power to the consumer

Page 17: Wind Turbine in Freiamt / Black Forest … the end of the rainbow?

  

Top Down: Conventional Grid Management

Grid load management is relatively simple.

Page 18: Wind Turbine in Freiamt / Black Forest … the end of the rainbow?

  

Renwables - Power from all around; flow in all directions

Grid load management becomes very complex.

Page 19: Wind Turbine in Freiamt / Black Forest … the end of the rainbow?

  

4. Financial

• Investors (equity) => state/private, regional/international

• Banks (debt) => experience in wind

• local participation=> coops vs NIMBYs

• Power shift: Bi-directional flow of (urban) money (rural) power

My wind turbine

= local income in rural areas

Someone’s wind turbine.

Alien, anonymus.

Page 20: Wind Turbine in Freiamt / Black Forest … the end of the rainbow?

  

5. Realisation

• local content => road building, construction

• construction of access roads => local contractors

• internal grid construction => local contractors

• transport route => obstacles on the way

• foundation input => local contractors

• crane availability / hire => local?

What local support qualifications and skills are available (and can be helpful) to the project?

Page 21: Wind Turbine in Freiamt / Black Forest … the end of the rainbow?

  

Source: juwi

Meeting stakeholders en route …

Local authorities must be informed and residents be aware of what is coming and blocking their roads.

Page 22: Wind Turbine in Freiamt / Black Forest … the end of the rainbow?

  

Be connected … to local farmers & authorities

• regional contracting

• no permanent damage to farming

Page 23: Wind Turbine in Freiamt / Black Forest … the end of the rainbow?

  

Road construction for heavy loads

regional contracting, regional incomeimproved infrastructure

Page 24: Wind Turbine in Freiamt / Black Forest … the end of the rainbow?

  

Foundations and electrical connection with local input

Local contractors for concrete and electrics

Page 25: Wind Turbine in Freiamt / Black Forest … the end of the rainbow?

  

Heavy construction equipment: cranes and other lifting gear

Local skill development

Page 26: Wind Turbine in Freiamt / Black Forest … the end of the rainbow?

  

6. Operation

• Connection => grid operators

• Commissioning => grid operators / investors

• Test phase => manufacturers / O&M

• Take over => investors

• Operation & Maintenance => O&M agents / local?

• Access for maintenance and repair => O&M agents / local?

• Local resident management => Operators?

• Tourism / Visitor Management => tourist office

Page 27: Wind Turbine in Freiamt / Black Forest … the end of the rainbow?

  

29

Operational Management: Remote Control

Page 28: Wind Turbine in Freiamt / Black Forest … the end of the rainbow?

  

Rotor blade inspection & maintenance

What skills are available?

Page 29: Wind Turbine in Freiamt / Black Forest … the end of the rainbow?

  

Damage to gear boxes

Replacement and repair in Vietnam – or abroad?

Page 30: Wind Turbine in Freiamt / Black Forest … the end of the rainbow?

  

32

Professional O&M

• Operational control (24 h / 7/7 / 365)

• Routine maintenance & safety

• Breakdown management

• Production and revenue management

Page 31: Wind Turbine in Freiamt / Black Forest … the end of the rainbow?

  

Page 32: Wind Turbine in Freiamt / Black Forest … the end of the rainbow?

  

Everybody has a stake in wind projects

• Local residents and international investors

• Engineers and tourism managers

• Banks and grid operators

• Turbine manufacturers and electricity consumers

• …

Professional project management is to keep everybody happy.

(Within reason!)

Page 33: Wind Turbine in Freiamt / Black Forest … the end of the rainbow?

  

Transformation to renewables …

Page 34: Wind Turbine in Freiamt / Black Forest … the end of the rainbow?

  

Vision for Vietnam

Vietnam has a large wind resource.Is 100% possible here?

A simplified calculation:Power consumption in Vietnam: 101 TWh p.a.On a good site 2,600 full load hrs are possible.

Enercon E-126 7.5 MW @2.600 hrs = 19.5 GWh5,180 wind turbines = 101 TWh

Plus: Vietnam has sun (67 GW = 100%) and bio energies …

(Oil, coal, and natural gas are too valuable to be burnt quickly!)

Page 35: Wind Turbine in Freiamt / Black Forest … the end of the rainbow?

  

The pot of gold at end of the rainbow:advantages to renewable communities

• basic production of clean (CO2-free) energy• local participation => local income• income for land owners from land rent• income from taxes• money saved for energy “imports”• advantages for local industry: power at defined prices

Global climate and resource protection and local income.

Page 36: Wind Turbine in Freiamt / Black Forest … the end of the rainbow?

  

If you have questions, do not hestitate to contact

Dr. Josef Pesch

fesa GmbHWippertstr. 2D-79100 FreiburgGermany

=> [email protected]