Top Banner
Wind to power Nico Pleeging | Manager Business Development Tebodin bv April 12, 2013 | Hannover Messe
21

Wind to power - Bilfinger · 2013-04-12 · Annual onshore and offshore installations page 8 source: EWEA 2012 Annual growth rate 11% 2012 record year for offshore wind Offshore wind

May 22, 2020

Download

Documents

dariahiddleston
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: Wind to power - Bilfinger · 2013-04-12 · Annual onshore and offshore installations page 8 source: EWEA 2012 Annual growth rate 11% 2012 record year for offshore wind Offshore wind

Wind to power

Nico Pleeging | Manager Business Development

Tebodin bv

April 12, 2013 | Hannover Messe

Page 2: Wind to power - Bilfinger · 2013-04-12 · Annual onshore and offshore installations page 8 source: EWEA 2012 Annual growth rate 11% 2012 record year for offshore wind Offshore wind

Tebodin, part of the Bilfinger Group

page 2

Bilfinger

Building and

Facility

Bilfinger

Construction

Bilfinger

Power

Bilfinger

Concessions

Bilfinger

Industrial

Technologies

Bilfinger

Industrial

Services

Tebodin

Bilfinger

Engineering and

Services

Bilfinger

Industrial

Acquired in 2012

Page 3: Wind to power - Bilfinger · 2013-04-12 · Annual onshore and offshore installations page 8 source: EWEA 2012 Annual growth rate 11% 2012 record year for offshore wind Offshore wind

Tebodin, consultants & engineers

page 3

Service Capability

Design & Engineering

Project Management

Procurement

Construction Management

Consultancy

Key Business Facts

Founded in 1945, The

Hague, the Netherlands

4,300 consultants &

engineers,

World-wide presence with

50 offices in 23 countries

Long-term relationship with

clients (75% of turnover is

repetitive business)

Turnover 2012 : € 270 mln

(fee-based)

Page 4: Wind to power - Bilfinger · 2013-04-12 · Annual onshore and offshore installations page 8 source: EWEA 2012 Annual growth rate 11% 2012 record year for offshore wind Offshore wind

Our markets

page 4

Oil & Gas

Chemicals

Health & Nutrition

Energy & Utilities

Infrastructure

Property

Industrial

Page 5: Wind to power - Bilfinger · 2013-04-12 · Annual onshore and offshore installations page 8 source: EWEA 2012 Annual growth rate 11% 2012 record year for offshore wind Offshore wind

Design & Engineering

Conceptual, Basic and Detailed Design and Engineering in:

Civil, Structural and Architectural | Building services | Pipelines and infrastructure | Electrical |

Instrumentation and Process Control | Energy | Piping | Logistics | Mechanical | Process

Project Management

Management of EPCm services | Estimating and Cost Control | Scheduling and Progress Control |

Quality and Safety Assurance | Commissioning Management and Assistance | Program

Management

Procurement

Project Purchasing | European Tenders | (Non) Production Related Purchasing | Performance

Based Maintenance / Tendering | Contract Management

Construction Management

Quality, Health, Safety and Environment (QHSE) Management | Site Management | Construction

Supervision | Planning, Cost and Progress Control

Consultancy

Asset Management & Maintenance | Environment | Energy | Logistics | Safety & Risk

Management| Site Selection & Due Diligence | Compliance Management | Permitting | Feasibility |

Certifications

Our services in more detail

page 5

Page 6: Wind to power - Bilfinger · 2013-04-12 · Annual onshore and offshore installations page 8 source: EWEA 2012 Annual growth rate 11% 2012 record year for offshore wind Offshore wind

It’s a new world out there and the

solutions to complex global energy

and environmental challenges

already exist today (C. Kjaer, EWEA

02/2013)

Wind will play a significant role. Let

Bilfinger Tebodin support you.

Wind will play a significant role

Page 7: Wind to power - Bilfinger · 2013-04-12 · Annual onshore and offshore installations page 8 source: EWEA 2012 Annual growth rate 11% 2012 record year for offshore wind Offshore wind

Net changes in EU installed power capacity in 2000 – 2012

page 7

Only gas exceeds wind

European power sector

continues to move away

from traditional sources

to renewables

Renewables share in the

EU power mix already

totals to 34%

Wind (106 GW) on

target with NREAPs for

2012 (107,6 GW)

source: EWEA 2012

Page 8: Wind to power - Bilfinger · 2013-04-12 · Annual onshore and offshore installations page 8 source: EWEA 2012 Annual growth rate 11% 2012 record year for offshore wind Offshore wind

Annual onshore and offshore installations

page 8

source: EWEA 2012

Annual growth rate 11%

2012 record year for

offshore wind

Offshore wind

represents 10% of

annual EU wind market

and is expected to grow

substantially

Total capacity 106 GW

produces 231 TWh

(7% of EU consumption)

Page 9: Wind to power - Bilfinger · 2013-04-12 · Annual onshore and offshore installations page 8 source: EWEA 2012 Annual growth rate 11% 2012 record year for offshore wind Offshore wind

Market share of EU Member states

2012

page 9

Newer EU Member

states are speeding up

Poland (2,5GW) and

Romania (1,9GW) are

taking the lead.

source: EWEA 2012

Page 10: Wind to power - Bilfinger · 2013-04-12 · Annual onshore and offshore installations page 8 source: EWEA 2012 Annual growth rate 11% 2012 record year for offshore wind Offshore wind

Future outlook > Wind to Power!

page 10

Clients confirm this picture in their indiv.

company strategies

Page 11: Wind to power - Bilfinger · 2013-04-12 · Annual onshore and offshore installations page 8 source: EWEA 2012 Annual growth rate 11% 2012 record year for offshore wind Offshore wind

Tebodin’s experience > 1 GW

page 11

Completed wind farm projects:

Conceptual designs (520 MW)

Building permits designs (350 MW)

Procurement & Construction mgt. (110 MW)

Execution designs (86 MW)

Construction (86 MW)

France, Romania, Poland, Netherlands

GDF Suez, EDF, Green Bear, Polish Energy

Partners, Enel, E-On, Eolfi/ Veolia, Braila

Page 12: Wind to power - Bilfinger · 2013-04-12 · Annual onshore and offshore installations page 8 source: EWEA 2012 Annual growth rate 11% 2012 record year for offshore wind Offshore wind

Related project experience

page 12

36 MW wind park in Petten (NL)

Scope of work:

Permitting

Contracting land owners

Engineering of grid connection

Procurement

Project management

Various consultancy studies for the dutch

energy research center (ECN) in Petten.

NL, 2000 – 2001 ECN | Netherlands

Page 13: Wind to power - Bilfinger · 2013-04-12 · Annual onshore and offshore installations page 8 source: EWEA 2012 Annual growth rate 11% 2012 record year for offshore wind Offshore wind

Related project experience

page 13

17 turbines and 110 MW power plant

in the South-East of Romania

Scope of work:

Construction management

Project management

Enel | Romania

Page 14: Wind to power - Bilfinger · 2013-04-12 · Annual onshore and offshore installations page 8 source: EWEA 2012 Annual growth rate 11% 2012 record year for offshore wind Offshore wind

Related project experience

page 14

30 MW wind park at Krasin, Poland

Conceptual design, including site

development plan, access roads and place

assembly and electricity networks medium

voltage.

Infrastructure design, including turbine

foundations, roads and intersections,

medium voltage electrical network and

substation medium voltage / high voltage

for a 30 MW (10 turbines x 3 MW each)

windpark at Krasin.

PL, 2011

GDF Suez (Norvento) | Poland

Page 15: Wind to power - Bilfinger · 2013-04-12 · Annual onshore and offshore installations page 8 source: EWEA 2012 Annual growth rate 11% 2012 record year for offshore wind Offshore wind

Related project experience

page 15

30 MW wind park at Watkowa,

Poland for Energia Polska (subsidiairy

of GDF Suez)

Scope of work:

Owner’s engineer

PL, 2010

Energia Polska, Poland

Page 16: Wind to power - Bilfinger · 2013-04-12 · Annual onshore and offshore installations page 8 source: EWEA 2012 Annual growth rate 11% 2012 record year for offshore wind Offshore wind

Related project experience

page 16

47,5 MW wind park at Gemenele,

Romania for Braila Wind, a subsidiairy

of GDF Suez.

Scope of work:

Project management

Procurement (tender design & built)

Design management

Construction management

Obtaining the production license

RO, 2012GDF Suez (Braila) | Romania

Page 17: Wind to power - Bilfinger · 2013-04-12 · Annual onshore and offshore installations page 8 source: EWEA 2012 Annual growth rate 11% 2012 record year for offshore wind Offshore wind

Related project experience

page 17

Several projects for GreenBear

in Poland

Civil, architectural, and structural

engineering including road design and

permitting of a 48 MW wind farm at

Linowo.

Consultancy services, conceptual design

and building permit design

for a 44 MW wind farm near Toruń.

PL, 2009 – 2010

GreenBear | Poland

Page 18: Wind to power - Bilfinger · 2013-04-12 · Annual onshore and offshore installations page 8 source: EWEA 2012 Annual growth rate 11% 2012 record year for offshore wind Offshore wind

Related project experience

page 18

30 MW wind farm in Bukowsko,

Krosno region in Poland for Martifer

Renewables

Scope of work:

Site supervision

cost estimate

design verification

Commissioning / start-up & hand

PL, 2009 Martifer Renewables | Poland

Page 19: Wind to power - Bilfinger · 2013-04-12 · Annual onshore and offshore installations page 8 source: EWEA 2012 Annual growth rate 11% 2012 record year for offshore wind Offshore wind

Related project experience

page 19

38 MW wind park at Skurpie, Poland

The contract comprises concept and design

for roads, platform installation and

foundations for the wind turbine park.

Tebodin also designed the electrical

infrastructure of the wind farm.

PL, 2011 Polish Energy Partners | Poland

Page 20: Wind to power - Bilfinger · 2013-04-12 · Annual onshore and offshore installations page 8 source: EWEA 2012 Annual growth rate 11% 2012 record year for offshore wind Offshore wind

Related project experience

page 20

58 MW wind park in Udanin (Poland)

for Eolfi, a subsidiairy of Veolia

Environment

Tebodin provided the conceptual and

detailed design (including permitting

procedures) for road, medium/high voltage

electrical lines & grids, foundations design,

water-drainage for the whole facility and

geological study.

PL, 2011Eolfi (Veolia), Poland

Page 21: Wind to power - Bilfinger · 2013-04-12 · Annual onshore and offshore installations page 8 source: EWEA 2012 Annual growth rate 11% 2012 record year for offshore wind Offshore wind