  • 8/14/2019 Wind Farm Control

    1/22

    ECPE Seminar Renewable Energies. Kassel 9 - 10 February 2006

    WIND FARM CONTROL

    Experince from a 160 MW wind farm

    Poul Srensen, Ris National LaboratoryJesper R. Kristoffersen, Elsam Engineering

  • 8/14/2019 Wind Farm Control

    2/22

    Wind farm control - Experience from a 160 MW wind farm - ECPE seminar 9 - 10 Feb 2006, Kassel

    Overview

    Wind power development in Denmark Danish grid codes control requirements The first large offshore wind farm operational

    experience

    Simulation of wind farm control with power systemsupport

  • 8/14/2019 Wind Farm Control

    3/22

    Wind farm control - Experience from a 160 MW wind farm - ECPE seminar 9 - 10 Feb 2006, Kassel

    Wind energy development in Denmark

    Horns Rev

    Nysted

    Wind power instaled in DK: West almost 2400 MW East 743 MW

  • 8/14/2019 Wind Farm Control

    4/22

    Wind farm control - Experience from a 160 MW wind farm - ECPE seminar 9 - 10 Feb 2006, Kassel

    Transmission backbone and interconnections

    550 MW DC

    Kilde: www.nordel.org

    1000 MW DC

    600 MW DC

    1200 MW AC

    800 MW AC

    1700 MW AC 1300 MW AC

    http://www.nordel.org/http://www.nordel.org/
  • 8/14/2019 Wind Farm Control

    5/22

    Wind farm control - Experience from a 160 MW wind farm - ECPE seminar 9 - 10 Feb 2006, Kassel

    Wind turbine / wind farm grid connection requirements

    D E F U K

    R - 7 7 : m a x i

    n r u s h c

    u r r e n t, r

    e a c t i v e

    p o w e r c

    o m p

    1987

    s t e a d y s

    t a t e v o l t a g e

    i n t e r v a l

    / t h e r m

    a l l i m i t a

    t i o n

    2 0 0 1 I E

    C 6 1 4 0 0

    - 2 1 : f l i c

    k e r, h a r

    m o n i c s

    F i r s t T S

    O r e q u i r e m

    e n t s : f a u

    l t r i d e t h

    r o u g h

    N e w T S

    O r e q u i r e

    m e n t s : p

    o w e r c o

    n t r o l

    1999 2001 2004

    The first (distribution system power quality) requirements weremainly concerned the local voltage quality

    New (TSO) grid codes with requirement to power system controland stability

  • 8/14/2019 Wind Farm Control

    6/22

    Wind farm control - Experience from a 160 MW wind farm - ECPE seminar 9 - 10 Feb 2006, Kassel

    Grid code requirements power control

    Power

    Time

    Absolute power limitation

    Power

    Time

    Balance control

    Power

    Time

    Ramp rate limitation

    Power

    Time

    Delta control

    The above shown power control options are all implemented in the Horns Rev wind farm

  • 8/14/2019 Wind Farm Control

    7/22

    Wind farm control - Experience from a 160 MW wind farm - ECPE seminar 9 - 10 Feb 2006, Kassel

    0

    0.1

    0.2

    0.3

    0.4

    0.5

    0.6

    0.7

    0.8

    0.9

    1

    0 100 200 300 400 500 600

    Time [s]

    P o w e r

    [ p u . ]

    P ref,wf

    Delta control

    Power

    P avail

    f s f s+ f d f d +

    P del P avail P del P del

    Frequency

    Secondary control Delta control provides TSO

    and owner with constantpower reserve

    Primary control Reserve can be utilised in

    automatic frequency control(droop and dead band)

  • 8/14/2019 Wind Farm Control

    8/22

    Wind farm control - Experience from a 160 MW wind farm - ECPE seminar 9 - 10 Feb 2006, Kassel

    Horns Rev wind farm

    Horns Rev

    Rdsand

    Denmark

    Horns Rev wind farm:- Owned by Elsam- First large offshore wind farm in the world, 15-20 km from coast- 80 wind turbines (Vestas V80 2MW doubly-fed), total installed power 160MW- Annual energy production 600.000 MWh = 2% of Danish electricity consumption

  • 8/14/2019 Wind Farm Control

    9/22

    Wind farm control - Experience from a 160 MW wind farm - ECPE seminar 9 - 10 Feb 2006, Kassel

    Wind Farm Main Controller

    With the WFMC the wind farm acts as a power plant.

    The wind farm is able to participate in both primary (frequency) andsecondary (balance/power) control

    Developed by Elsam Engineering A/S

    VestasOnline

  • 8/14/2019 Wind Farm Control

    10/22

    Wind farm control - Experience from a 160 MW wind farm - ECPE seminar 9 - 10 Feb 2006, Kassel

    Operational Experiences

    Power fluctuations18/1-2005 - 5 min mean

    0

    20

    40

    60

    80

    100

    120

    140

    160

    00:00 06:00 12:00 18:00 00:00

    Time [HH:MM]

    P o w e r

    [ M W ]

    Horns Rev

    Onshore

  • 8/14/2019 Wind Farm Control

    11/22

  • 8/14/2019 Wind Farm Control

    12/22

    Wind farm control - Experience from a 160 MW wind farm - ECPE seminar 9 - 10 Feb 2006, Kassel

    Operational Experiences

    Shutdown because of high wind speed

    -500

    0

    500

    1000

    1500

    2000

    02:30:00 02:35:00 02:40:00 02:45:00 02:50:00 02:55:00 03:00:00

    T u r

    b i n e p o w e r [

    k W

    -50

    0

    50

    100

    150

    200

    T o t a l p o w e r

    [ M W ]WFMC power

    reservation for

    frequency control

  • 8/14/2019 Wind Farm Control

    13/22

    Wind farm control - Experience from a 160 MW wind farm - ECPE seminar 9 - 10 Feb 2006, Kassel

    Operational Experiences

    Control

    0

    20

    40

    60

    80

    100

    120

    140

    160

    180

    00:00 01:00 02:00 03:00 04:00 05:00 06:00 07:00 08:00

    Time [hh:mm]

    P o w e r

    [ M W ]

    Possible power

    Setpoint

    Actual power

  • 8/14/2019 Wind Farm Control

    14/22

    Wind farm control - Experience from a 160 MW wind farm - ECPE seminar 9 - 10 Feb 2006, Kassel

    Operational Experiences

    Control

    0

    20

    40

    60

    80

    100120

    140

    160

    180

    12:00 13:00 14:00 15:00 16:00 17:00 18:00 19:00 20:00

    Time [hh:mm]

    P o w e r

    [ M W ]

    Setpoint

    Possible power

    Actual power

  • 8/14/2019 Wind Farm Control

    15/22

    Wind farm control - Experience from a 160 MW wind farm - ECPE seminar 9 - 10 Feb 2006, Kassel

    Operational Experiences

    Control

  • 8/14/2019 Wind Farm Control

    16/22

    Wind farm control - Experience from a 160 MW wind farm - ECPE seminar 9 - 10 Feb 2006, Kassel

    Operational Experiences

    Control

    -100

    -50

    0

    50

    100

    150

    04:00 04:30 05:00 05:30 06:00 06:30 07:00 07:30 08:00

    Time [HH:MM]

    P o w e r

    [ M W ]

    Horns Rev production

    Error

    Order from Eltra

  • 8/14/2019 Wind Farm Control

    17/22

    Wind farm control - Experience from a 160 MW wind farm - ECPE seminar 9 - 10 Feb 2006, Kassel

    Wind turbine control Doubly-fed induction

    generators: rotor currentcontrol

    Pitch control on windturbine blades Power / speed control

    strategy simple androbust maximum powerpoint tracking

    Simulation model wind turbine power control

    Wind turbine controller Wind turbine controller Wind turbine controller

    Powercontrol

    meas

    Speedcontrol

    pitch

    genref P

    max

    ~~

    ref P

    +

    +

    PCC

  • 8/14/2019 Wind Farm Control

    18/22

    Wind farm control - Experience from a 160 MW wind farm - ECPE seminar 9 - 10 Feb 2006, Kassel

    Simulation model - wind farm power control

    Wind turbine controller Wind turbine controller Wind farm controller Operator Wind turbine controller

    Powerreference

    setting

    P balance P

    Ramp rate settings

    Dispatchcontrol

    Powercontrol

    wf ref P

    wf

    meas P

    meas

    Speedcontrol

    pitch

    genref P

    ref

    Speedoptimum

    ~~

    measu

    inst avail P

    +

    ref P

    PCC

  • 8/14/2019 Wind Farm Control

    19/22

    Wind farm control - Experience from a 160 MW wind farm - ECPE seminar 9 - 10 Feb 2006, Kassel

    Simulation model - wind farm power control

    Wind turbine controller Wind turbine controller Wind farm controller Operator Wind turbine controller

    Powerreference

    setting

    P balance P

    Ramp rate settings

    Dispatchcontrol

    Powercontrol

    wf ref P

    wf

    meas P

    meas

    Speedcontrol

    pitch

    genref P

    ref

    Speedoptimum

    ~~

    measu

    inst avail P

    +

    ref P

    Droop settingsDeadband settings

    wf ref P 0

    meas f

    wf ref P

    PCC

  • 8/14/2019 Wind Farm Control

    20/22

    Wind farm control - Experience from a 160 MW wind farm - ECPE seminar 9 - 10 Feb 2006, Kassel

    350.0280.0210.0140.070.000.00 [s]

    21.00

    18.00

    15.00

    12.00

    9.00

    6.00

    350.0280.0210.0140.070.000.00 [s]

    2.10

    1.80

    1.50

    1.20

    0.90

    0.60

    0.30

    350.0280.0210.0140.070.000.00 [s]

    1700.00

    1600.00

    1500.00

    1400.00

    1300.00

    350.0280.0210.0140.070.000.00 [s]

    20.00

    16.00

    12.00

    8.00

    4.00

    -0.00

    -4.00

    D I g

    S I L E N T

    Wind -WT1Wind -WT2Wind -WT3

    Measured power - WT1Measured power - WT2

    Measured power - WT3

    Generator speed - WT1Generator speed - WT2Generator speed - WT3

    Pitch angle - WT1Pitch angle - WT2Pitch angle - WT3

    [ M W

    ]

    [ m / s

    ]

    [ r p m

    ]

    [ d e g

    ]

    [sec]

    350.0280.0210.0140.070.000.00 [s]

    21.00

    18.00

    15.00

    12.00

    9.00

    6.00

    350.0280.0210.0140.070.000.00 [s]

    2.10

    1.80

    1.50

    1.20

    0.90

    0.60

    0.30

    350.0280.0210.0140.070.000.00 [s]

    1700.00

    1600.00

    1500.00

    1400.00

    1300.00

    350.0280.0210.0140.070.000.00 [s]

    20.00

    16.00

    12.00

    8.00

    4.00

    -0.00

    -4.00

    D I g

    S I L E N T

    Wind -WT1Wind -WT2Wind -WT3

    Measured power - WT1Measured power - WT2

    Measured power - WT3

    Generator speed - WT1Generator speed - WT2Generator speed - WT3

    Pitch angle - WT1Pitch angle - WT2Pitch angle - WT3

    [ M W

    ]

    [ m / s

    ]

    [ r p m

    ]

    [ d e g

    ]

    [sec]

    DFIG power control wind turbines

  • 8/14/2019 Wind Farm Control

    21/22

    Wind farm control - Experience from a 160 MW wind farm - ECPE seminar 9 - 10 Feb 2006, Kassel

    Wind farm power control

    350.0280.0210.0140.070.000.00 [s]

    6.506.00

    5.50

    5.00

    4.50

    4.00

    3.50

    350.0280.0210.0140.070.000.00 [s]

    2.20

    2.00

    1.80

    1.60

    1.40

    1.20

    1.00

    350.0280.0210.0140.070.000.00 [s]

    2.20

    2.00

    1.80

    1.60

    1.40

    1.20

    350.0280.0210.0140.070.000.00 [s]

    2.40

    2.00

    1.60

    1.20

    0.80

    0.40

    D

    I g S I L E N T

    Dispatch reference power - WT1

    Dispatch reference power - WT2

    Dispatch reference power - WT3

    Available power - WT1

    Available power - WT2

    Available power - WT3

    Wind farm available power Wind farm PCCmeasured power

    [ M W

    ]

    [ M W

    ]

    [ M W

    ]

    [ M W

    ]

    [sec] 350.0280.0210.0140.070.000.00 [s]

    6.506.00

    5.50

    5.00

    4.50

    4.00

    3.50

    350.0280.0210.0140.070.000.00 [s]

    2.20

    2.00

    1.80

    1.60

    1.40

    1.20

    1.00

    350.0280.0210.0140.070.000.00 [s]

    2.20

    2.00

    1.80

    1.60

    1.40

    1.20

    350.0280.0210.0140.070.000.00 [s]

    2.40

    2.00

    1.60

    1.20

    0.80

    0.40

    D

    I g S I L E N T

    Dispatch reference power - WT1

    Dispatch reference power - WT2

    Dispatch reference power - WT3

    Available power - WT1

    Available power - WT2

    Available power - WT3

    Wind farm available power Wind farm PCCmeasured power

    [ M W

    ]

    [ M W

    ]

    [ M W

    ]

    [ M W

    ]

    [sec]

  • 8/14/2019 Wind Farm Control

    22/22

    Wind farm control - Experience from a 160 MW wind farm - ECPE seminar 9 - 10 Feb 2006, Kassel

    Conclusions

    Operational experience (Elsam) The controller includes a number of control possibilities to enable Elsam to use

    the wind farm as a wind power plant in a similar way as Elsam uses theconventional power stations to keep the power equilibrium as agreed on theNordic electric power market.

    The controller makes the wind farm able to participate in primary/frequencycontrol in the same way as conventional power stations

    The advanced control functions in the WFMC are almost indispensable formaintaining balance in the grid, irrespective of whether this is done by a largeproducer responsible for balancing his own production or by the responsiblesystem operator for other producers

    Simulation models (Ris / Aalborg University) Models for wind turbine and wind farm controls are developed in power system

    simulation tool DIgSILENT. The models can be used to stydy the dynamic interaction of wind farms with

    power plant characteristics with a complex power system.