Top Banner
Wind energy team
13

Wind energy team. Members Irene Shonle Dennis Kaan Mike Kostrzewa, PE, Director, CSU Wind Application Center Rebecca Cantwell, Colorado Harvesting Energy.

Dec 19, 2015

Download

Documents

Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: Wind energy team. Members Irene Shonle Dennis Kaan Mike Kostrzewa, PE, Director, CSU Wind Application Center Rebecca Cantwell, Colorado Harvesting Energy.

Wind energy team

Page 2: Wind energy team. Members Irene Shonle Dennis Kaan Mike Kostrzewa, PE, Director, CSU Wind Application Center Rebecca Cantwell, Colorado Harvesting Energy.

Members

• Irene Shonle

• Dennis Kaan

• Mike Kostrzewa, PE, Director, CSU Wind Application Center

• Rebecca Cantwell, Colorado Harvesting Energy network

Page 3: Wind energy team. Members Irene Shonle Dennis Kaan Mike Kostrzewa, PE, Director, CSU Wind Application Center Rebecca Cantwell, Colorado Harvesting Energy.

What is the potential of wind?

• The U.S. Department of Energy has announced a goal of obtaining 6% of U.S. electricity from wind by 2020

• Wind power could provide 20% of U.S. electricity needs by 2030

Page 4: Wind energy team. Members Irene Shonle Dennis Kaan Mike Kostrzewa, PE, Director, CSU Wind Application Center Rebecca Cantwell, Colorado Harvesting Energy.

Colorado is 11th best state for wind resource

Page 5: Wind energy team. Members Irene Shonle Dennis Kaan Mike Kostrzewa, PE, Director, CSU Wind Application Center Rebecca Cantwell, Colorado Harvesting Energy.

8th in nation for installed wind projects

Page 6: Wind energy team. Members Irene Shonle Dennis Kaan Mike Kostrzewa, PE, Director, CSU Wind Application Center Rebecca Cantwell, Colorado Harvesting Energy.

Overview of wind

Page 7: Wind energy team. Members Irene Shonle Dennis Kaan Mike Kostrzewa, PE, Director, CSU Wind Application Center Rebecca Cantwell, Colorado Harvesting Energy.

Is my site windy enough?

• Evaluating resource is first and most important step– Anemometer loan

program data– www.engr.colostate.edu/AL

P/ALP_Sites.htm

– Wind map

Page 8: Wind energy team. Members Irene Shonle Dennis Kaan Mike Kostrzewa, PE, Director, CSU Wind Application Center Rebecca Cantwell, Colorado Harvesting Energy.

Turbine siting important

• Tower height• Trees/other objects

need to be at least 300 feet away

Page 9: Wind energy team. Members Irene Shonle Dennis Kaan Mike Kostrzewa, PE, Director, CSU Wind Application Center Rebecca Cantwell, Colorado Harvesting Energy.

Scale of wind

• Small wind: for home owners, small businesses to offset electrical usage

• Big wind – leasing land to a wind developer can provide farmers/ranchers with steady income – 95% of land still useable – Need at least 60 acres per

megawatt

Page 10: Wind energy team. Members Irene Shonle Dennis Kaan Mike Kostrzewa, PE, Director, CSU Wind Application Center Rebecca Cantwell, Colorado Harvesting Energy.

Emerging – Community wind

• Municipalities, large organizations own their own turbines– Local jobs, local benefits

• Only example in CO right now is of Lamar and Springfield “piggybacking” onto large wind farm– Presence of large farm allowed these towns to buy

five 1.5 MW turbines

• NECO wind in Sedgwick, Philips, and Logan Counties will soon construct 400 MW Farm

Page 11: Wind energy team. Members Irene Shonle Dennis Kaan Mike Kostrzewa, PE, Director, CSU Wind Application Center Rebecca Cantwell, Colorado Harvesting Energy.

Potential issues

• Zoning – Varies by county, municipality

• Wildlife

• Noise

• Viewshed

• Transmission (big wind only)

• Difficult to find good information, independent testing

Page 12: Wind energy team. Members Irene Shonle Dennis Kaan Mike Kostrzewa, PE, Director, CSU Wind Application Center Rebecca Cantwell, Colorado Harvesting Energy.

To learn more:– Come to agent training in spring (TBA)

• February? Eastern Plains?

– In-depth resources on website• http://www.ext.colostate.edu/energy/wind.html

– New fact sheets• Small wind - finished• Big wind -under review• Understanding wind resources -under

development

Page 13: Wind energy team. Members Irene Shonle Dennis Kaan Mike Kostrzewa, PE, Director, CSU Wind Application Center Rebecca Cantwell, Colorado Harvesting Energy.

Upcoming from team

• Working on national wind curriculum with 8 other states– Wind webinars– more fact sheets on eXtension

• Small wind turbine to be installed outside Gilpin Extension Office