Top Banner
Priority Actions for Laubach Park include: 1 - Manage stormwater and improve water quality of the spring-fed pond and of Trout Creek; 2 - Relieve overcrowding of athletic fields; 3 - Relocate pavilion, restrooms, and playground to improve access and deter vandalism; 4 - Provide ADA access to all facilities; and 5 - Provide a 0.60 mile perimeter walking path and walking loop pathways. WILLIAM H. LAUBACH PARK MASTER PLAN Site Development Drawing For: Salisbury Township, Lehigh County, PA Revised 05/24/16
2

WILLIAM H. LAUBACH PARK MASTER PLAN Site Development … · Priority Actions for Laubach Park include: 1 - Manage stormwater and improve water quality of the spring-fed pond and of

Feb 22, 2020

Download

Documents

dariahiddleston
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: WILLIAM H. LAUBACH PARK MASTER PLAN Site Development … · Priority Actions for Laubach Park include: 1 - Manage stormwater and improve water quality of the spring-fed pond and of

Priority Actions for Laubach Park include:

1 - Manage stormwater and improve water quality of the spring-fed pond and of Trout Creek; 2 - Relieve overcrowding of athletic fields; 3 - Relocate pavilion, restrooms, and playground to improve access and deter vandalism; 4 - Provide ADA access to all facilities; and 5 - Provide a 0.60 mile perimeter walking path and walking loop pathways.

WILLIAM H. LAUBACH PARK MASTER PLAN Site Development Drawing For: Salisbury Township, Lehigh County, PA

Revised 05/24/16

Page 2: WILLIAM H. LAUBACH PARK MASTER PLAN Site Development … · Priority Actions for Laubach Park include: 1 - Manage stormwater and improve water quality of the spring-fed pond and of

Site Development Drawing For: Salisbury Township, Lehigh County, PA

Priority Actions for Franko Farm include: 1 - Provide athletic facilities to meet current and future needs of the Township's athletic and recreational programs; 2 - Provide ADA access to all facilities: 3 - Provide a 0.75 mile paved walking loop and additional grass pathways; and 4 - Manage vegetation by removal of invasive plants, installation of high quality forest plants and restoration of PPL easement land.

FRANKO FARM RECREATION AREA MASTER PLAN

Revised 05/24/16