128 Project Order Map Showing 2014 Enrollment Projections for 2022 as a Percentage of Schools’ Capacities Building Facts Map Legend >140% 130%-139% 120%-129% 110%-119% 100%-109% 90%-99% < 89% Priority Funding Area William B. Wade 132.1% William A. Diggs 100.8% J. P. Ryon 92.5% Eva Turner 139.9% Dr. Samuel Mudd 118.3% Daniel of St. Thomas Jenifer 156.8% C. Paul Barnhart 121.2% Berry 148.5% Arthur Middleton 108.7% 22 Kindergarten Wing Addition k Security Upgrades Needed High Traffic Site Constricted Site Worn Finishes Efficient Circulation Wade Elementary School was originally constructed in 1989, and received a kindergarten wing addition in 2002. Interior finishes are in fair condition, and floors show wear from high-intensity use. VCT floors in the addition may have had installation issues, and show an inordinate amount of wear. The gym is adorned with hard surfaces which are not conducive to athletic activity. Skylights and clerestories provide natural light in corridors, but may be susceptible to leaking issues. Circulation is clear and efficient. Exterior cladding is in fair condition, and shows some staining. Mechanical systems are in fair condition, and the domestic water system requires a back-flow preventer. Electrical systems are in good condition, but security upgrades are required. The site is constricted by a number of relocatables as well as a water tower. The site is located along a heavily trafficked road. William B. Wade Elementary School Hard Surfaces