This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
R il d C titi St t S ttl WA W t & T t ti St d H f d WARailroad Competitive Strategy - Seattle, WA
Multimodal Feasibility Study – Chicago IL
WastebyRail Market Study - Newark, NJWaste & Transportation Study - Hanford, WA
Multimodal Trans. Study – Portland, OR
Transportation Optimization Study – Thurston County, WA
Multimodal Feasibility Study – Chicago, IL
Waste Market & Trans. Cost Study – San Diego, CAWaste Operations & Trans. Study – Provo, UT
Waste Market & Transportation Study - Tulsa, OK
Multimodal Waste Trans. Study - Juneau, AK WastebyRail Cost Study – La Paz, AZ
Multimodal Waste Trans. Study - Kodiak, AKMultimodal Trans. Study – Oahu, HI
This document is solely for the use of client personnel. No part of it may be circulated, quoted, or reproducedfor distribution outside the client organization without prior written approval from WIH Resource Group, LLC.
R il d C titi St t S ttl WARailroad Competitive Strategy - Seattle, WA
• Development of Railroad Negotiations Strategy to gain reciprocal site access for City Intermodal Facility (IMF).
• Assessed rail rate issues relative to potential STB filing• Developed WastebyRail Operational Plan
• Logistical Analysis of Current Operations• Logistical Analysis of Current Operations• Equipment Payload Improvement• WastebyRail Intermodal Facility Siting Study
This document is solely for the use of client personnel. No part of it may be circulated, quoted, or reproducedfor distribution outside the client organization without prior written approval from WIH Resource Group, LLC.
M lti d l T St d P tl d ORMultimodal Trans. Study – Portland, OR
• Transportation Procurement Document Development for Metro• Evaluation of Waste by Truck, Rail and Barge • Multiple Transportation Scenario Valuation Modeling• Backhaul Evaluation, Assessment and Recommendations
This document is solely for the use of client personnel. No part of it may be circulated, quoted, or reproducedfor distribution outside the client organization without prior written approval from WIH Resource Group, LLC.
Multimodal Transportation Operational Plan• Backhaul Program Feasibility Study
• WastebyRail Program Feasibility Study• Transportation Simulation Modeling• Railroad Rate Negotiations for Private Client• Equipment Needs Assessment & Cost Model• Backhaul Market Study• Integrated Transportation and Disposal Cost Analysis
Waste Operational & Trans. Study – Provo, UT
• Transfer Trucking Fleet Evaluation• Waste Management Optimization for Solid Waste District• Waste Management Optimization for Solid Waste District• Equipment Utilization & Payload Improvement• Transfer Station Operational Assessment• Transfer Station Facility Siting Study & Logistical Analysis
This document is solely for the use of client personnel. No part of it may be circulated, quoted, or reproducedfor distribution outside the client organization without prior written approval from WIH Resource Group, LLC.
WastebyRail Market Study - Newark, NJWaste & Transportation Study - Tulsa, OK
• Evaluation of Proposed Waste Transportation System• WastebyRail Operational Assessment for Private Client• Equipment Utilization Evaluation
• Waste & Transportation Sourcing for WTE Plant• Transportation Contract Negotiations for Private WTE Client• Critical Transportation Price Point Evaluation Equipment Utilization Evaluation
• Intermodal Container Needs Assessment• WastebyRail Program Viability Recommendations• Long Term Railroad Contract Evaluation
This document is solely for the use of client personnel. No part of it may be circulated, quoted, or reproducedfor distribution outside the client organization without prior written approval from WIH Resource Group, LLC.