Why Best Practice isn’t enough W E B I N A R PROJECT MANAGEMENT Andy West www.ilxgroup.com
17

Why Best Practice in Project Management is not enough?

Apr 15, 2017

Download

Business

ILX Group
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: Why Best Practice in Project Management is not enough?

   

Why Best Practice isn’t enough

W E B I N A R

PROJECT MANAGEMENT

Andy West

www.ilxgroup.com

Page 2: Why Best Practice in Project Management is not enough?

B E S T P R A C T I C E I S N O T E N O U G H W E B I N A R

Introduction

Andy West

An experienced and professional Project & Change Management Skills Trainer with experience across a range of market sectors.

Involved in a number of projects covering the design and implementation of business systems and training solutions within a number of organisations.

Page 3: Why Best Practice in Project Management is not enough?

B E S T P R A C T I C E I S N O T E N O U G H W E B I N A R

Purpose of this Webinar

• To consider the difficulties in embedding and using PRINCE2® in organisations

• To suggest some reasons for the lack of success and to suggest strategies to improve success.

Page 4: Why Best Practice in Project Management is not enough?

B E S T P R A C T I C E I S N O T E N O U G H W E B I N A R

What is PRINCE2?

A Management Method with four Integrated Elements of:

• 7 Principles (guiding obligations and good practices)

• 7 Themes (raw materials of project management knowledge)

• 7 Processes (step-wise progression through a project)

• Tailoring to the project environment (flexibility)

Page 5: Why Best Practice in Project Management is not enough?

B E S T P R A C T I C E I S N O T E N O U G H W E B I N A R

What PRINCE2 doesn’t do

• Specialist aspects of the Project• Detailed techniques in project management• Leadership advice or people skills

Page 6: Why Best Practice in Project Management is not enough?

B E S T P R A C T I C E I S N O T E N O U G H W E B I N A R

What is PRINCE2 supposed to provide

• Best Practice model • Set of documents• Guidance on

embedding & tailoring

Page 7: Why Best Practice in Project Management is not enough?

B E S T P R A C T I C E I S N O T E N O U G H W E B I N A R

Embedding & Tailoring

Embedding is organisation based and focuses on:• Process responsibilities• Standards (templates, definitions)• Integration with business processes • Process assurance• Scaling rules/guidance• Training and development• Tools

Tailoring is project based and focuses on:• Adapting the themes (through the strategies and controls)• Incorporating specific terms/language• Revising the Product Descriptions for the management

products• Revising the role descriptions for the PRINCE2 project roles• Adjusting the processes to match the above

Page 8: Why Best Practice in Project Management is not enough?

B E S T P R A C T I C E I S N O T E N O U G H W E B I N A R

Embedding Difficulties

• Bureaucratic• Don’t like ‘rules’• Baby and bath water• Change in language

Page 9: Why Best Practice in Project Management is not enough?

B E S T P R A C T I C E I S N O T E N O U G H W E B I N A R

Tailoring Difficulties

• How big is this Project?• How risky is this Project?• What techniques should I use this time?• Where do I find guidance?

Page 10: Why Best Practice in Project Management is not enough?

B E S T P R A C T I C E I S N O T E N O U G H W E B I N A R

Results of poor embedding or tailoring

• Lots of training, little use• Disaffected Staff• Poor Control• Heroic or Robotic Project Management

Page 11: Why Best Practice in Project Management is not enough?

B E S T P R A C T I C E I S N O T E N O U G H W E B I N A R

Embedding Strategies

• Implement as a Project• Look for business

reasons• Retain current language• Keep it simple• Be wary of formal

standards

Page 12: Why Best Practice in Project Management is not enough?

B E S T P R A C T I C E I S N O T E N O U G H W E B I N A R

Tailoring Strategies

• PRINCE2 Guidance• Project Assessment• Knowledge is shared

Page 13: Why Best Practice in Project Management is not enough?

B E S T P R A C T I C E I S N O T E N O U G H W E B I N A R

PRINCE2 isn’t Project Management

• And Project Management isn’t just PRINCE2• Remember the techniques, leadership, specialist

knowledge• Senior management support

Page 14: Why Best Practice in Project Management is not enough?

B E S T P R A C T I C E I S N O T E N O U G H W E B I N A R

A final thought…

Every project is unique…

How you deal with each project should be too.

Page 16: Why Best Practice in Project Management is not enough?

B E S T P R A C T I C E I S N O T E N O U G H W E B I N A R 16

Enjoyed this presentation?

Find out more visi t ing our website www.i lxgroup.com, giving us a cal l on

+44 (0) 1270 611 600 or send an emai l to

Individuals enquir ies [email protected] enquir ies ben.green@i lxgroup.com

Further your knowledge by finding out the impact change has had on the Middle Manager and the

influence the middle manager has on change

Page 17: Why Best Practice in Project Management is not enough?

   

I L X G R O U P7 t h F l o o r9 5 A l d w y c hL o n d o n W C 2 B 4 J FP h o n e : + 4 4 2 0 7 3 7 1 4 4 4 4w w w. i l x g r o u p . c o m

Thank you for your attention