Top Banner
WHO WANTS TO BE A MILLIONAIRE? Producer: Laura Jones
21

Who Wants to be a Millionaire?

Dec 31, 2015

Download

Documents

kirsten-damia

Who Wants to be a Millionaire?. Producer: Laura Jones. Who Wants to be a Millionaire?. Hosted by: Noelle Woods. The Rules. The team that “claps” first will be recognized If the team answers the question correctly, it wins the prize for that question - PowerPoint PPT Presentation
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: Who Wants to be a Millionaire?

WHO WANTS TO BE A MILLIONAIRE?

Producer:Laura Jones

Page 2: Who Wants to be a Millionaire?

Hosted by:Noelle Woods

WHO WANTS TO BE A MILLIONAIRE?

Page 3: Who Wants to be a Millionaire?

• The team that “claps” first will be recognized• If the team answers the question correctly, it

wins the prize for that question• If the team answers the question incorrectly,

the opposing team wins the prize for that question

• The team with the most money wins!

The Rules

Page 4: Who Wants to be a Millionaire?

The Prizes1 - $1002 - $2003 - $5004 - $1,0005 - $2,0006 - $4,0007 - $8,000

8 - $16,0009 - $32,00010 - $64,00011 - $125,00012 - $250,00013 - $500,00014 - $1,000,000

Page 5: Who Wants to be a Millionaire?

Lifelines

You get three (3) lifelines! You may:

• Phone a friend• Text Norma• Ask the audience

Page 6: Who Wants to be a Millionaire?

Confident?Good… Lets

Start!

Page 7: Who Wants to be a Millionaire?

$100

Which of the following contracts requires governing board approval?

B Formal Construction

A Sole Source

C Piggyback

D All of the aboveD All of the above

Page 8: Who Wants to be a Millionaire?

Real property can be sold by which method?

B Sealed Bid

A Public Auction

C Upset Bid

D All of the aboveD All of the above

$200

Page 9: Who Wants to be a Millionaire?

What type of contract is installing a new carpet?

B Purchase Contract

A Service Contract

C Construction

D Professional Service

B Purchase Contract

$500

Page 10: Who Wants to be a Millionaire?

$1,000

Which of the following is not required by state law for formal purchase contracts?

B 5% bid bond/deposit

A Sealed bid

C Formal advertising

D Public bid opening

B 5% bid bond/deposit

Page 11: Who Wants to be a Millionaire?

$2,000

If a construction project is estimated to cost $340K, are Performance and Payment Bonds required?

B No

A Yes

C Maybe

D I don’t know

A Yes

Page 12: Who Wants to be a Millionaire?

$4,000

Authority to delegate approval of formal purchase contracts maybe given to:

B County Manager

A Purchasing Agent

C Finance Officer

D All of the aboveD All of the above

Page 13: Who Wants to be a Millionaire?

$8,000

Informal bids are due by 3:00PM on 9/25/14. When do bids become public record?

B After bids are opened

A After contract award

C Anytime, they are informal

D After the items are received

A After contract award

Page 14: Who Wants to be a Millionaire?

$16,000

Which of the following are exceptions to competitive bidding requirements?

B Change Order

A Trade-In

C Sole Source

D All of the aboveD All of the above

Page 15: Who Wants to be a Millionaire?

$32,000

Effective October 1, 2014, agencies are required to have a policy in place to pre-qualify bidders for construction or repair projects.

B No

A Yes

C Yes & No

D What are you talking about?

C Yes and No

Page 16: Who Wants to be a Millionaire?

$64,000

Which of the following cannot be considered when awarding a contract?

B Performance

A Quality

C Time specified for performance

D Local PreferenceD Local Preference

Page 17: Who Wants to be a Millionaire?

$125,000

Under state law, the three (3) bid rule applies to:

B Formal Purchase Contracts

A Formal Construction & Repair

C All Construction & Repair

D A & B Only

A Formal Construction & Repair

Page 18: Who Wants to be a Millionaire?

$250,000

Demolition is considered what type of contract?

B Construction or Repair

A Purchase

C Service

D Professional Service

C Service

Page 19: Who Wants to be a Millionaire?

$500,000

Which projects may be exempted from the QBS process? (qualification-based selection)

B Performance Specification

A All surveying under $500

C Any project approved by Board

D CM@R

B Fee is less than $50,000

Page 20: Who Wants to be a Millionaire?

$1,000,000

When performance or price competition for a product are not available or it is only available from one source, it is considered a:

B Single Source

A Sole Source

C Brand Specific Item

D Standardization Request

A Sole Source

Page 21: Who Wants to be a Millionaire?

Winner!Winner!Winner!Winner!