WHITE BAY POWER STATION Robert Street, ROZELLE, NSW 2039 CONSERVATION MANAGEMENT PLAN VOLUME I EXECUTIVE SUMMARY prepared for The Sydney Harbour Foreshore Authority by a team led by Design 5 Architects Pty Ltd 5 Queen Street, Chippendale, NSW 2008 Phone: (02) 9319 1855 FINAL REPORT SECOND EDITION JULY 2011
55

White Bay Power Station CMP - thebayssydney.nsw.gov.au€¦ · White Bay PoWer Station ConServation ManageMent Plan - SeCond edition Final July 2011 deSign 5 - arChiteCtS voluMe i

Jul 20, 2020

Download

Documents

dariahiddleston
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: White Bay Power Station CMP - thebayssydney.nsw.gov.au€¦ · White Bay PoWer Station ConServation ManageMent Plan - SeCond edition Final July 2011 deSign 5 - arChiteCtS voluMe i

White Bay PoWer StationRobert Street, ROZELLE, NSW 2039

CONSERVATION MANAGEMENT PLANVOLUME I

EXECUTIVE SUMMARY

prepared forThe Sydney Harbour Foreshore Authority

by a team led byDesign 5 Architects Pty Ltd

5 Queen Street, Chippendale, NSW 2008Phone: (02) 9319 1855

FINAL REPORTSECOND EDITION JULY 2011

Page 2: White Bay Power Station CMP - thebayssydney.nsw.gov.au€¦ · White Bay PoWer Station ConServation ManageMent Plan - SeCond edition Final July 2011 deSign 5 - arChiteCtS voluMe i

Cover Image: White Bay Power Station from Robert Street, July 2010 (Design 5 - Architects)

Design 5 – Architects Pty Ltd ACN 090 066 194 ABN 22 090 066 1945 Queen Street, Chippendale, NSW 2008Tel (02) 9319 1855 Fax (02) 9319 0836

E-mail: [email protected]

This report has been produced at Design 5 – Architects and is the compilation of work by the following team:

First Edition

Lead Consultant Design 5 Architects

Primary areas of input:

Conservation planning co-ordination, conservation analysis, conservation policy and maintenance Design 5 Architects

Industrial and machinery heritage Godden Mackay Logan

Engineering Hughes Trueman

Planning and statutory considerations JBA Urban Planning

Conservation analysis & conservation policy Anne Warr Heritage Consultant

Social Significance Context Pty Ltd

Social Significance and History Meredith Walker Heritage Futures

Second Edition

Lead Consultant Design 5 Architects

Primary areas of input:

Conservation planning co-ordination, conservation analysis, conservation policy and maintenance Design 5 Architects

Engineering Hughes Trueman Mott Macdonald

Client body and review Sydney Harbour Foreshore Authority

Page 3: White Bay Power Station CMP - thebayssydney.nsw.gov.au€¦ · White Bay PoWer Station ConServation ManageMent Plan - SeCond edition Final July 2011 deSign 5 - arChiteCtS voluMe i

White Bay PoWer Station ConServation ManageMent Plan - SeCond edition Final July 2011deSign 5 - arChiteCtS voluMe i - exeCutive SuMMary - Page 1

Contents

Volume I executIVe summary

The Brief 5

History 7 White Bay Power Station 7 White Bay Hotel 8

Cultural Significance 9

Issues, Opportunities & Policies arising 11 Generally 11 Context and Setting 12 Heritage Machinery Generally 13 GradingofSignificance 15 SpecificElements; 32

TheCoalHandlingShedandExternalConveyor 32 TheChimneyStacksandAshHandlingSystem 32 BoilerHouse 33 TurbineHallandPumpHouse 38 AdministrationBlock 41 1912–1927SwitchHouse 41 1948ControlRoomandSwitchHouse 43 LandscapingandSiteGenerally 44 BillboardsandSignage 44 WhiteBayHotelsite 44

The Burra Charter 45

Condition of the place 45

Heritage Listings 47

Statutory Controls 47

Planning Issues 47

Access and Accessibility 49

Interpretation 49

Future Use and Development 49

Management and Maintenance of the place 52

Adoption, Implementation and Review 52

Further Research 53

Page 4: White Bay Power Station CMP - thebayssydney.nsw.gov.au€¦ · White Bay PoWer Station ConServation ManageMent Plan - SeCond edition Final July 2011 deSign 5 - arChiteCtS voluMe i

White Bay PoWer Station ConServation ManageMent Plan - SeCond edition Final July 2011voluMe i - exeCutive SuMMary - Page 2 deSign 5 - arChiteCtS

Structure of the Report

TheWhiteBayPowerStationConservationManagementPlanisarrangedinFiveVolumesinahierarchyasdemonstratedbythefollowingdiagram.Theresultsoftheinvestigationsofthebuildingfabricsurvey,structuralconditionassessmentandmachinerysurveyinventoryandconservationstrategyarecontainedinthreeVolumes(III-V).

TheinformationinthesethreeVolumesissummarisedinVolumeIIandinformstheAssessmentofCultural(Heritage)SignificanceandtheManagementPolicieswhichresultfromtheseAssessments.

VolumeIistheExecutiveSummarywhichgivesabroadoverviewofthewholereportandsummarisesthemostimportantPoliciesfortheconservationoftheWhiteBayPowerStation.

NostrategiesshouldbedevisednoranyworkcarriedoutrelyingsolelyontheinformationcontainedinVolumeI.ReferencemustbemadefirstlytoVolumeIIandthenthevolumecontainingtherelevantdetail.Thatreferenceshouldalsobenotedagainstanysuchstrategyorworkinstruction.

Volume I exeCutive SuMMary

Volume II ConServation

ManageMent Plan

Volume III BuIldIng

FaBrIc surVey (&ConditionReport)

Volume IV structural condItIon assessment

(&MaintenanceSchedule)

Volume V machInery surVey

InVentory (&Conservation

Strategies)

Page 5: White Bay Power Station CMP - thebayssydney.nsw.gov.au€¦ · White Bay PoWer Station ConServation ManageMent Plan - SeCond edition Final July 2011 deSign 5 - arChiteCtS voluMe i

White Bay PoWer Station ConServation ManageMent Plan - SeCond edition Final July 2011deSign 5 - arChiteCtS voluMe i - exeCutive SuMMary - Page 3

summary contents oF whole report

Volume I executIVe summary

The Brief

CulturalSignificance

Issues,Opportunities&Policiesarising

ConservationPolicy

Volume II the conserVatIon management plan

Introduction

Investigationofculturalsignificance

Assessmentofculturalsignificance

Statementofculturalsignificance

Issues,opportunities,&policiesarising

Volume III archItectural FaBrIc surVey & condItIon report

Coal Handling Shed

BoilerHouse

PumpHouse

Turbine Hall

Administration&StaffAccommodation

1912-1927SwitchHouse

1948ControlRoom&SwitchHouse

Volume IV structural condItIon report & maIntenance schedule

Introduction

Structuralconditionissues

Repair&MaintenanceSchedule

TypicalRepairSpecifications

Maintenance&MonitoringRecommendations

Detailedspecialistinvestigationsrequired

Page 6: White Bay Power Station CMP - thebayssydney.nsw.gov.au€¦ · White Bay PoWer Station ConServation ManageMent Plan - SeCond edition Final July 2011 deSign 5 - arChiteCtS voluMe i

White Bay PoWer Station ConServation ManageMent Plan - SeCond edition Final July 2011voluMe i - exeCutive SuMMary - Page 4 deSign 5 - arChiteCtS

Volume V machInery surVey InVentory & conserVatIon schedules

Introduction

ContextualHistory

DescriptionofFabric

SignificanceAssessment

Constraints&Opportunities

appendIces ATheBurraCharter1999

BHeritageListings

CBibliography&References

DSupplementaryIllustrations

ESocialSignificanceReportbyContextPtyLtd-Nov2002

Page 7: White Bay Power Station CMP - thebayssydney.nsw.gov.au€¦ · White Bay PoWer Station ConServation ManageMent Plan - SeCond edition Final July 2011 deSign 5 - arChiteCtS voluMe i

White Bay PoWer Station ConServation ManageMent Plan - SeCond edition Final July 2011deSign 5 - arChiteCtS voluMe i - exeCutive SuMMary - Page 5

executIVe summary

The BriefThesubjectofthisreportistheWhiteBayPowerStationandtheformerWhiteBayHotelwhichissituatedattheheadofWhiteBayinRozelle,NSW2039asshownintheLocationPlanbelow.

WhiteBayPowerStationhasbeen thesubjectof several reportsandassessments in themid-1990s, includingtheWhiteBayPowerStationAssetManagementPlanpreparedbyPacificPowerinMay1995.Anumberofthesereportsaddressedvariousheritageissuesandaspectsofsignificance.

The management and ownership of the place was transferred to the Sydney HarbourForeshoreAuthority(SHFA)intheyear2000.In2002SHFAengagedateamofconsultantslead by Design – 5 Architects to prepare a Conservation Management Plan (CMP) toestablish the exact nature of the cultural significance of the place and to put in placepoliciestosafeguardthatsignificanceandguidefuturedevelopmentandchangestotheplace.EarlierreportsanddocumentationwerereviewedaspartofthepreparationfortheCMP.ThefinalCMP,datedJanuary2004,wasadoptedbySHFAandendorsedbytheNSWHeritageCouncil on28 January2004.This endorsement expiredon28 January2009. Inearly2010,SHFAacquiredthesiteoftheformerWhiteBayHotel(destroyedbyfireon5September,2008). In June2010SHFAcommissionedDesign -5 to reviewandrevise theCMPforthesite.

WhiteBayPowerStationislistedontheRegisteroftheNationalEstate(019512),theNSWStateHeritageRegister(01025),SydneyRegionalEnvironmentPlanNumber26(Item11ontheHeritageRegister),theSydneyHarbourForeshoreAuthorityS.170Register(Draft)and the Register of theNationalTrust ofAustralia(NSW). There has beenno development or majorchangesonthesitesincethe2004report.

This revised ConservationManagement Plan willform a key componentfor a process of calling forExpressions of Interestfor the future use andredevelopmentoftheplace.

This revised CMP is tomeet the standards setdown by the AustraliaICOMOS Burra Charterand the NSW Heritage Office CMP Guidelines sothat endorsement of theHeritage Council may beobtainedforthereport.

White Bay Power Station LOCATIONPLAN

Page 8: White Bay Power Station CMP - thebayssydney.nsw.gov.au€¦ · White Bay PoWer Station ConServation ManageMent Plan - SeCond edition Final July 2011 deSign 5 - arChiteCtS voluMe i

White Bay PoWer Station ConServation ManageMent Plan - SeCond edition Final July 2011voluMe i - exeCutive SuMMary - Page 6 deSign 5 - arChiteCtS

White Bay Power StationSITE PLAN + CROSS SECTION

NB: This shows the legal boundary (curtilage) for the site. For visual curtilage refer to page 12.

Page 9: White Bay Power Station CMP - thebayssydney.nsw.gov.au€¦ · White Bay PoWer Station ConServation ManageMent Plan - SeCond edition Final July 2011 deSign 5 - arChiteCtS voluMe i

White Bay PoWer Station ConServation ManageMent Plan - SeCond edition Final July 2011deSign 5 - arChiteCtS voluMe i - exeCutive SuMMary - Page 7

History

White Bay Power StationBeforethearrivaloftheBritishin1788,theareaaroundthesubjectpartoftheharbourwasoccupiedbytheCadigalbandoftheEoranation.TheBritishoccupationoftheareacoupledwiththedecimatingeffectsofsmallpoxandotherdiseases,forcedAboriginalpeopletoabandonmostoftheseareas.

In1800WilliamBalmainwasgrantedbytheCrown550acresonRozelleBay,northofGlebeandacrossJohnston’sBaythusgivinghisnametothatarea.Withthespreadofindustryalongtheshoreline in themiddleyearsof the19thCentury, therewasconsiderablepressuretosubdividethelandforworkershousing and related facilities to service such industries astheAbattoirsonGlebe Island,W.BellAllen’sboilingdownworks, timbermilling inRozelleBayandCowan& Israel’sSoapandCandlefactoryontheAnnandaleforeshores.

By1855,subdivisionwaswellestablishedaroundtheheadofWhiteBaywhichwasstillamudflat.In1890adykewasbuiltfromBalmainacrossthemudflattoGlebeIslandandthelandattheheadofthebayreclaimed.MullensStreetwasextendedandhousingbuilt. The future siteof theWhiteBayPowerStationwassubdividedforhousingduringtheseyears.Sometime after 1910 the site was progressively resumed for thepurposesofbuildingthepowerstation. Itwasclearedandconstructionofthepowerstationbeganin1912.

White Bay Power Station was built by the NSW RailCommissionersoriginallytoprovidepowerforthegrowingrailnetwork.Asdemandforpowerincreasedacrossthecity,itgraduallyproducedmoreandmoreelectricityforgeneralusealongwiththeotherPowerStationsatUltimo,PyrmontandBalmainuntilthemoreefficientpowerstationsbuiltonthecoalfieldsoutsideSydneytookoversupplyinthelatterhalfofthe20thcentury.Thisallowedthecitypowerstationstobecloseddown.Pollutionfromthesehadalwaysbeenaproblem.

ThePowerStationwasbuiltintwostages.Thefirstpartwasbuiltbetween1912and1917andconsistedofaBoilerHouse(standingroughlywherethepresentonestands)andpartoftheTurbineHallandSwitchHousebehindit.Thisfirstphasecomprisedthenorthernhalfofthetotaldesign.Thesecondphase saw the completion of the Turbine Hall and SwitchHouse to thepresent lengthand thebuildingof thesecondBoilerHouse. After the SecondWorldWar thefirst boilerhouse was demolished and it was replaced in two stagesbetween1950and1958withthepresentBoilerHouse.

By the 1970s, demand for power from White Bay haddiminishedtosuchanextentthatthesecondboilerhousewas

c. 1930(Courtesy of PowerHouse Museum archive)

c. 1920(Courtesy of PowerHouse Museum archive)

c. 1920(Courtesy of PowerHouse Museum archive)

1913(Courtesy of PowerHouse Museum archive)

1912(Courtesy of PowerHouse Museum archive)

Page 10: White Bay Power Station CMP - thebayssydney.nsw.gov.au€¦ · White Bay PoWer Station ConServation ManageMent Plan - SeCond edition Final July 2011 deSign 5 - arChiteCtS voluMe i

White Bay PoWer Station ConServation ManageMent Plan - SeCond edition Final July 2011voluMe i - exeCutive SuMMary - Page 8 deSign 5 - arChiteCtS

pulled down and the turbines sold off. The power stationceased generating power on Christmas Day 1983. It wasdecommissionedandremainedstaticafteritclosed,althoughitwasstillusedasanelectricitysub-stationforanumberofyears.

Difficulties with public safety and ongoing maintenancemeantthatinthelate1980sandearly1990sthepowerstationwasstrippedofeverythingexceptthoseelementsspecificallyidentifiedforheritageconservation.Thisincludedacomplete‘slice’ of the power generation operational systems. Eventheseitemswerethemselvesheavilyaffectedbytheremovalofallasbestosinsulationandlagging,especiallythesurvivingboiler.

InAugust2000,WhiteBayPowerStationwassoldbyPacificPowertotheSydneyHarbourForeshoreAuthoritywhoarenowseekingtopreservetheculturalsignificanceoftheplaceandfindaviablefutureforit.

White Bay HotelThe formerWhite BayHotel onVictoria Road and locatedadjacent to the south boundary of the power station, wasconstructed in 1916 by Tooth and Co. Brewers. This hotelwasthesecondhotelbuiltnearthesitefollowingresumptionoflandanddemolitionofthefirsthotelin1915tobuildthePowerStation.

ThefirstWhiteBayHotelwasconstructedinthemidtolate1860sandwasoriginallylocatedapproximately100msouthalong Victoria Road on the corner of Lilyfield Road (thenknownasWesternRoadandAbattoirRoadrespectively).In1910,thesitewasresumedbytheCommissionerofRailwaysandin1915,thehotelwasdemolishedtobuildnewraillinesservicing the Power Station. As compensation, a parcel oflandalongVictoriaRoadwasprovidedforanewhotel.

CoincidingwiththeclosureoftheWhiteBayPowerStationin1982,thedeclineofthehotelwasassured.Roaddevelopmentsaround the site, including the busyVictoriaRoad andCityWestLink,allbut landlockedtheHotel frompassing trade.The hotel subsequently closed in 1992. Following years ofdereliction,andatleastoneproposalfortheredevelopmentinto mixed use restaurant, bar and offices, the White BayHotelwasdestroyedbyfireinSeptember2008.ThesiteofthehotelwasacquiredbySHFAinJune2010anddebriscleared.

c. 1960(Courtesy of Pacific Power archive)

2010(Design 5 - Architects)

White Bay Power Station & Hotel, 1930(City of Sydney Archives, Citation no. SRC352, digital file 020\020600)

White Bay Hotel, 2000, billboard advertising. (National Library of Australia, image no. nla.pic-

White Bay Hotel demolition, 2008 (Source: Peter Fletcher Available through Wikimedia Commons, file: White Bay Hotel.jpg)

Page 11: White Bay Power Station CMP - thebayssydney.nsw.gov.au€¦ · White Bay PoWer Station ConServation ManageMent Plan - SeCond edition Final July 2011 deSign 5 - arChiteCtS voluMe i

White Bay PoWer Station ConServation ManageMent Plan - SeCond edition Final July 2011deSign 5 - arChiteCtS voluMe i - exeCutive SuMMary - Page 9

DiagramofOperation(fromvol.VofthisCMP)

Cultural SignificanceWhiteBayPowerStationwasthelongestsurvivingSydneypowerstationandistheonlyonetoretainarepresentativesetofmachineryanditemsassociatedwiththegenerationofelectricityintheearlyandmidtwentiethcentury.Itretainswithinitsfabric,andinthebodyofassociatedpictorial,writtenarchivesandreportsandoralhistoryrecordings,evidenceforthedevelopmentoftechnologyandworkpracticesforthegenerationofelectricalpowerfromcoalandwater.ThisdevelopmentofpowergenerationatWhiteBaycontributedtotheexpansionoftheeconomyofSydneyandNewSouthWales.

Asaresultof itsremarkablyintactsurvival, itretainstheuniqueabilitytodemonstrate,by its location, massing, design, machinery and associated archives, the influence anddominancethatearlypower-generatingtechnologyexertedonthelivesandurbanfabricof innercities in thefirsthalfof the20th century. Theextant itemswithin thesurvivingoperationalsystemsareofanimpressivescaleandexhibitahighdegreeofcreativeandtechnicalachievementintheirdesignandconfiguration.Theyencompassallaspectsofthegenerationofelectricalpower,andrepresentallphasesfromtheinter-warperiodthroughto themore sophisticated technologies of themid 20th century. They are of exceptionaltechnicalsignificancewithresearchpotentialtoyieldinformationnotavailablefromanyothersource.

AestheticallyWhiteBayPowerStationcontainsinternalandexternalspacesofexceptionalsignificance.Thesespacesincluderawindustrialspacesofascale,qualityandconfigurationwhichisbecomingincreasinglyrareandwhichinspirevisitorsandusersalike.Externallyit is awidely recognised and highly visible landmark,marking the head ofWhite BayandthesouthernentrytotheBalmainPeninsulaanditsindustrialwaterfront.Itretainsa

Page 12: White Bay Power Station CMP - thebayssydney.nsw.gov.au€¦ · White Bay PoWer Station ConServation ManageMent Plan - SeCond edition Final July 2011 deSign 5 - arChiteCtS voluMe i

White Bay PoWer Station ConServation ManageMent Plan - SeCond edition Final July 2011voluMe i - exeCutive SuMMary - Page 10 deSign 5 - arChiteCtS

powerfulphysicalpresenceandindustrialaestheticandisthemostimportantsurvivingindustrialbuildinginthearea.

WhiteBayPowerStationhasstrongandspecialassociationsand meanings for the local community, for former powerstationworkersand forotherswhohaveused the site, andis of high social significance. It is a potent symbol of thearea’s industrial origins and working traditions, aspects ofcommunity identity that are stronglyvalued todaybybotholderandnewresidents.Itisoneofthefewsurvivingfeaturesintheareathatprovidethissymbolicconnection.

Itistheonlycoalbasedindustrialstructure,dependantonawaterside location to surviveadjacent to theharbour in theSydneyRegion.Italsoformspartofacloselyrelatedgroupof large scale industrial structures and spaces (White BayContainer Terminal, Glebe Island Silos, Container TerminalandAnzac Bridge)which alongwith theWhite BayHotel,defineamajorentrypointtothecityfromthewest.

It is of exceptional cultural significance to the state ofNewSouthWales.

The formerWhite BayHotel played an integral part of thelandmark identity of the White Bay Power Station. TheHotelwasbuiltin1916,replacinganearlierhotelofthesamename,builtinthe1860slocatedapproximately100mfurthersouth. Thehotelhashadastronglyworkingclasstraditionand had strong associationwith theworkers ofWhite BayPowerstationdatingfrom1917andothernearbyindustriesdating from the 1860s. TheWhite Bay Hotel site containslittleheritagesignificancefollowingitsdestructionbyfireandsubsequentclearingofthesite.

Entertainment Hall(Courtesy of Pacific Power archive)

Entertainment Hall(Courtesy of Pacific Power archive)

Winding of Turbine c. 1930(Courtesy of PowerHouse Museum archive)

1948 Control Room(Courtesy of Eitel Camilleri (former employee) private collection)

Turbine Hall c.1930(Courtesy of PowerHouse Museum archive)

Page 13: White Bay Power Station CMP - thebayssydney.nsw.gov.au€¦ · White Bay PoWer Station ConServation ManageMent Plan - SeCond edition Final July 2011 deSign 5 - arChiteCtS voluMe i

White Bay PoWer Station ConServation ManageMent Plan - SeCond edition Final July 2011deSign 5 - arChiteCtS voluMe i - exeCutive SuMMary - Page 11

Issues, Opportunities and Policies ArisingGENERALLY

The issues and opportunities presented by the place, itslocation, condition, statutory controls and its culturalsignificance,andthepoliciesandguidelineswhicharisefromthese,arediscussed in full inSection5ofVolume IIof thisreport.

TheWhite Bay Power Station is of exceptional significancetoNewSouthWalesandtheSydneyregionasaremarkablyintact surviving urban power station from the 20th century.This intactness is dependent upon the retention of the fullsuiteofstructures,spacesandmachinerywhichcomprisethecomplete“slice”ofthepowergenerationprocessfromcoalhandlingtopowerreticulation.

It is a significant landmark in the area and to local communities, marking the borderbetweentheindustrialwaterfrontareastoitseastandthesuburbstoitswestandnorth.Itcontainsstructures,machineryandspacesofexceptionalsignificance,bothinternallyandexternallyandhasstrongcontextualassociationswithotherformerandcurrentindustrialandinfrastructuresitesinthearea.

It is thereforeessential that inordertoretainandrespect thisculturalsignificancethoseelementswhichembodyandorsupportthissignificanceareretainedandconserved.Forthesetosurviveinthelongterm,theplacemustbeadaptedforanappropriatenewuseoruses.Suchusesmustretainandrespectthesignificantelementsandattributesoftheplace.

Most importantly, the integrity of those structures, spaces, elements and machinerywhichcomprisethecompleterepresentative‘slice’ofthepowergenerationprocessfromcoalhandlingtopowerreticulationmustberetainedandrespectedinanyfutureuseordevelopmentonthesite.

Thesitemustretainauseoruses,whichallowreasonablepublicaccessto,andinterpretationof,thosesignificantspaces,elementsandmachinerythatrepresentthecomponentpartsofthepowergenerationprocess.Suchaccessshouldnotplacesignificantfabricorqualitiesoftheseareasatriskofalteration,damageorremoval.

Theaesthetic(includingthesensoryaspectsofvisual,aural&tactile)qualitiesoftheinternalandexternalspacesandelementsofexceptionalandhighsignificancemustberetainedandrespected,viz.thevisual&spatialqualitiesoftheTurbineHall.

Thesignificanthistoric,technicalandcontextualassociationsbetweentheWhiteBayPowerStationandotherplacesmustberetainedandrespected,viz.itsrelationshiptotheportandrailways.

Theprincipalandexceptionalspacesofthebuildingshouldhouseauseoruseswhicharepreferably inspiredbyand respond to the character andqualityof the spacesand theirsignificant elements. Alluses should respect thequalities, characterandsignificanceofthosespacesandelementsintheirfitoutandpresentation.

Anynewinterventions,alterationsandadditionstosignificantareasmustbeexceptionallywelldesignedbyarchitectswithprovenexperienceofworkinginarchitecturallysensitiveenvironments.

No. 1 Turbine and former Employees (Design 5 - Architects)

Page 14: White Bay Power Station CMP - thebayssydney.nsw.gov.au€¦ · White Bay PoWer Station ConServation ManageMent Plan - SeCond edition Final July 2011 deSign 5 - arChiteCtS voluMe i

White Bay PoWer Station ConServation ManageMent Plan - SeCond edition Final July 2011voluMe i - exeCutive SuMMary - Page 12 deSign 5 - arChiteCtS

Anyproposalforchangetotheplacemustbeconsideredwithregardtoitsimpactonthesignificanceoftheplace,itsspacesandelements. Aschangeswillbenecessaryinorderto adapt the place for a newuse or uses, thesemust be assessed in the broadest sensetodeterminewhether theproposed changes respond to and support the significanceoftheplaceandwhetherornot theyare reversible. Inprinciple, thosechangeswhichareminimal,withleastimpact,arepreferredtothosewithgreaterimpactonthesignificanceoftheplace,itsspacesandelements.

CONTEXT AND SETTING

In order to retain the visibility and prominence of theWhite Bay Power Station as a harbourside landmark, itshouldnotbesubstantiallyobscuredbyanydevelopmentonnearbysites.

Any development being proposed in the vicinity of theWhite Bay Power Station must carefully consider itsbulk,scaleandplacementinordertorespectthevisibilityand prominence of the power station as a harboursidelandmark.

ThoseviewsfrommajoraxialapproachessuchasAnzacBridge,GlebePointRoad,JohnstonStreetAnnandale, CityWest Link,Victoria Road (fromnorthwest),Mullens Street andRobertStreetmustbemaintainedassubstantiallyunobstructedviews.AnynewstructuresinthevicinityoftheWhiteBayPowerStationmustnotsubstantiallymaskthevisibilityofthepowerstationorthreatenitslandmarkqualitiesasthemajorfocalelementintheseviews.

Generalandchangingviews towardsWhiteBayPowerStation fromtheharbour,majorparksandpublicareasofthesouthernedgeofBalmainandRozelle,GlebePoint,PyrmontPoint,ObservatoryHillandDarlingHarbour,aswellasfromtheHarbourBridge,AnzacBridge,CityWestLinkroad,TheCrescentandVictoriaRoad,shouldberetainedsubstantiallyunobstructedbyotherlargeelements,existingorfuture.Suchelementsshouldbesitedsoastobeseenaspartofitsindustrialcontext,framingthepowerstationandstrengtheningitsmaritimerelatedindustrialcharacter.

NeighbouringCouncilsandauthorities shouldbe informedof theneed to respect theseviews and negotiations should beundertaken with them to ensure thatrelevant planning legislation is put inplacetoensurethispreservation.

ThemostvisiblecomponentsofWhiteBay Power Station are the 2 chimneystacks. These are visible above otherbuildings even when the other partsof the power station are not seen.They are seen on axis fromanumberof important approaches and are apowerfulmarkerofplace.Theyshouldboth be retained as they are a crucialelement in the identity and landmarkqualitiesoftheplace.

The long pitched roofs to the 1953

VisualcurtilageformedbymajoraxialandgeneralviewstoWhiteBayPowerStation(ReferFigure5.1.2.1inVolumeII)

Anzac Bridge (Design 5 - Architects)

Page 15: White Bay Power Station CMP - thebayssydney.nsw.gov.au€¦ · White Bay PoWer Station ConServation ManageMent Plan - SeCond edition Final July 2011 deSign 5 - arChiteCtS voluMe i

White Bay PoWer Station ConServation ManageMent Plan - SeCond edition Final July 2011deSign 5 - arChiteCtS voluMe i - exeCutive SuMMary - Page 13

sectionoftheBoilerHouse,theTurbineHallandSwitchHouse,withventedridgesandgabledendsshouldalsoberetainedaselementsvisiblefromafar.

The coal handling unit, specifically the elevator tower, inclined shaft conveyor and themotorroomandtransferhouseatitstopendattachedtotheBoilerHouseareprominentanddistinctive, andclearly identify the industrialnatureof thebuildingandshouldberetained.Therustedfinishhasalsobeenidentifiedassignificant.

Sincethe2004assessment,theextentofrustisnowthreateningtheintegrityandweathertightnessofsomebuildings.Whiletreatmentofexistingmaterialwithrustconverters,stabilizingtreatmentsorpatchrepairsispreferred,inmanycasesfullorpartialreplacementofmetalcladdingisnowtheonlypracticaloption.Theextentofcompletere-sheetingorisolatedpatch replacements should be considered on a case-by-casebasis inaccordancewiththerelevantpoliciescontainedinthisCMP.

Eachelevationofthepowerstationcomplexpresentsadifferent characteristic of theplace and relates in a

differentwaytoitscontext.Theeastandnorthelevationsaremassiveanddramaticintheirscale and their relationship to the surrounding areas. These are visible and appreciatedfromsomedistanceandthisaspectoftheplaceshouldberetainedandrespected.

Thewestandsouthelevationsareseenas lessdramaticbutequallyas important in theidentityoftheplace.Theiroverallmassing,configurationandvisibilityshouldberetainedandrespected.

The remnant landscapedelementsandassociatedstructures from thepowerstationuseshouldalsoberetainedandconserved.

HERITAGE MACHINERY GENERALLY

WhiteBayPowerStationretainsextantcomponentsofeightoperationalsystemswhicharearepresentativesampleonlyoftheoriginalmachineryatWhiteBayPowerStation.ThesesystemsaredescribedinSection3.4ofVolumeIIofthisreport.Inmostinstancesthereisasingleextantitemwhereoncethereweremultipleexamples.Thesenowrareitemsareintegralto,andenhancetheoverallsignificance ofWhite Bay Power Station. No itemmay beremovedwithoutdepletingtheintegrityofthepowerstation.Theymustbe retained in situandconserved inaccordancewiththeguidelinessetoutintheInventorysheetsinVolumeVofthisreport.Theycannot,andmustnot,beadaptedforanewfunction.

TheopportunitiesavailableatWhiteBayfortheseoperationalsystemsandtheirassociatedcomponentelementsareintheirinterpretability andeducative ability to contribute to anunderstandingof thehistoricaldevelopmentandfunctionoftheWhiteBayPowerStationasanindustrialsitewhichplayedasignificantroleinthegenerationofelectricalpowerinSydneyandintheexpansionofSydney’selectricrailnetwork.Thismustbeinterpretedtofutureusersoftheplaceandalsotothevisitingpublic.

Various disparate items outside these major pieces of machinery (for which inventorysheetshavebeenprepared),whichhavetheabilitytocontributetotheinterpretabilityof

Victoria Road (Design 5 - Architects)

No. 1 Turbine (Design 5 - Architects)

Page 16: White Bay Power Station CMP - thebayssydney.nsw.gov.au€¦ · White Bay PoWer Station ConServation ManageMent Plan - SeCond edition Final July 2011 deSign 5 - arChiteCtS voluMe i

White Bay PoWer Station ConServation ManageMent Plan - SeCond edition Final July 2011voluMe i - exeCutive SuMMary - Page 14 deSign 5 - arChiteCtS

themachineryatWhiteBayPowerStation,arethosesmallermovableelementswhichmaynothavebeenspecificallyidentifiedashavinganassociationwithaparticularoperationalsystem. Such itemsasare tobe found in theBoilerHouse, theTurbineHouseand theSwitchHouseandespeciallyintheoldControlRoomandtheBatteryRoominclude:

• allsignage,includinglabelsandtags;

• switchboardsandassociatedswitchesetc;

• powerpointsandassociatedelectricalequipment;

• metersanddials;

• cabling;

• valving;and

• tables,tanksandsinksassociatedwiththeBatteryRooms.

These small and, in some cases apparently nondescript,itemscontributetoanunderstandingofthesignificanceandoperationalroleoftheeightoperationalsystemsatWhiteBayPowerStation.

The extant machinery, that is the single representativesampleofthecomplexesretainedatWhiteBayPowerStationgenerally,exceptforpartsoftheSwitchHouse,occupiesthenorthernsectionof thebuildings inwhichtheyarehoused.Hencethemachineryassociatedwithcoalhandlingislocatedat the northern end of the CoalHandling Shed, the boiler,pulverisingmills andassociatedmachinery and equipmentishoused in thenorthern sectionof theBoilerHouse. Theturbo-alternatorset,thecondensersandassociatedmachineryand equipment are in the northern section of the TurbineHall.Theequipmentassociatedwiththein-houseelectricalsupplyandthepowerreticulationsystemarenot,generally,soconvenientlylocated.

Although itmay be possible that an itemor piece ofmachinerymay be relocated, thisshouldnotbeundertakenwithoutconsiderationofitstotalenvironment.Inthemajorityofinstancesanitemwillnotbeabletobemoved,orrelocated.Ifanitemmustbemovedthismaynotbedonewithouttheassociatedmachineryandequipmentthatcompriseitstotalenvironment.

Some items of themachinery and elements associatedwith the power reticulation andelectrical supply systems, may be moved to facilitate interpretation but only if reallynecessaryandonlyafterfullassessmentoftheimpacthasbeenmade.

Allmachineryelementsareinneedofcleaningandconservation.Thisshouldbecarriedoutbysuitableprofessionallyqualifiedpersons.

Equipment in Control Room(Design 5 - Architects)

Page 17: White Bay Power Station CMP - thebayssydney.nsw.gov.au€¦ · White Bay PoWer Station ConServation ManageMent Plan - SeCond edition Final July 2011 deSign 5 - arChiteCtS voluMe i

White Bay PoWer Station ConServation ManageMent Plan - SeCond edition Final July 2011deSign 5 - arChiteCtS voluMe i - exeCutive SuMMary - Page 15

GRADING OF SIGNIFICANCE

The general principle underpinning the guidelines and policies in this ConservationManagementPlan is that spaces, elements and itemswithin areas of significance are tobe conserved in amanner which retains and respects their significance. Generally thisalsomeansthattheyshouldbeconservedintheircurrentstateand,whenapplyingthisprincipletoobjectsanditems,theyaretoremainintheirpresentpositionunlessremovaltoanotherlocationiscoveredbyaseparatepolicyforthatelement.

The machinery elements in each space are assessed separately and their grading ofsignificancecanbefoundinVolumeVofthisreport.

The following general statements taken from Section 5 of the report summarize moredetailedpolicieswhichhave been formulated to guideworks on theplace. Theyhavebeen formulated to ensure that the integrity and significanceof the spaceor element isnot compromised and that any negative impact isminimised. The significance of eachmachineryelementmustberespectedandconsidered in itsownright, regardlessof thegradingofitsenclosingspace.ThesepolicieshavebeenfurtherrefinedforspecificelementsbyspecificpolicieslaterinSection5ofVolumeIIofthisreport.ReferenceshouldbemadetotherelevantdrawingswhichfollowthistextshowingtheGradingsofSignificanceforallstructuresandspacesonthesite.

Grade 1: Exceptional SignificanceThese spaces, structures or elements are of exceptional cultural significance. They play a crucial role in supporting the significance of the place and should be retained in their existing configuration. Theyareessentialtoanunderstandingofthesignificanceoftheplaceanddemonstratetheprocessofpowergeneration.Survivingoriginalmachinery,fabricandfinishesshouldbeconservedinsituandtheintegrityofthespacesorelementsretainedandrespected.Theyshouldnotbeobscurednortheirsignificancediminished.Theappreciationofthespatialqualityanddetailofthesespacesshouldnotbeobscuredordiminished.Thedesignintentandintegrityoftheoriginalworkshouldalsoberespectedandnotobscured.Any proposed use must focus on in situ preservation and interpretation as the primary objective.

Examples:

Coal Handling Tower

BoilerNo.1 TurbineHall–spaceandmachinery

ControlRoom–totalenvironmentAll images (Design 5 - Architects)

Grade 2: High SignificanceThese spaces, structures or elements are of high cultural significance and retain a high degree of significant fabric. They play an important role in strengthening and supporting the significance of the place, but less than that for Grade 1.Insomecasestheirreducedsignificancemayresultfromtheabsenceofsignificantmachinery.Wherethesespacesorelementsformpartofaspaceofhighersignificanceorcontainmachineryorequipmentelementsofhighersignificance,anyactionmustrespect

Page 18: White Bay Power Station CMP - thebayssydney.nsw.gov.au€¦ · White Bay PoWer Station ConServation ManageMent Plan - SeCond edition Final July 2011 deSign 5 - arChiteCtS voluMe i

White Bay PoWer Station ConServation ManageMent Plan - SeCond edition Final July 2011voluMe i - exeCutive SuMMary - Page 16 deSign 5 - arChiteCtS

thathighersignificance.Retentionofsurvivingsignificantfabricinsituispreferredtorelocationorremoval.Adaptation and alteration of these spaces and elements is possible and new elements may be introduced which alter them as long as the integrity of the spaces and fabric and their original design intent is respected and, if possible, strengthened.Evidenceofremovedsignificantmachineryshouldberetainedinsitu.Relocationorremovaloftheseelementsmaybeconsideredbutonlyifitisnecessaryinordertoachieveretentionandconservationofqualitiesandaspectsofspaceandelementsofhighersignificance.

Examples:

Ashhandlingyardbetween Boiler Houseandchimneys

BoilerHouse–spacesformerlyoccupiedbyBoilers2,3and4

BoilerHousefloor-spacesformerlyoccupiedbyBoilers2,3and4

Turbine Hall – platformareaswhereturbinegeneratorshavebeenremovedAll images (Design 5 - Architects)

Grade 3: Moderate SignificanceThese spaces, structures or elements retain some integrity but are of lesser cultural significance. They play a moderate role in supporting the significance of the place. Significantfabricmayhavebeenalteredorobscured.Wherethesespacesorelementsformpartofaspaceofhighersignificance,anyactionmustrespectthathighersignificance.These spaces and elements can be adapted and changed for other uses, and new openings made, but fabric or machinery of higher significance should be retained in situ in accordance with their ranking.Thequalitiesandintegrityofthespacesorelementsshould,ifpossible,berespected.Adaptation of these spaces or elements would be preferred to their loss or removal.Relocationorremovalofevidenceofremovedmachinerymaybeconsideredtoallowadaptivereuseofthespacehoweverretentionandadaptationwouldalwaysbethepreferredoption.

Examples:

South-westTransformerYard

CoalWashtank 1948SwitchHousetoplevel

White Bay Hotel site, 2010 (plinth and archaeology)

All images (Design 5 - Architects)

Page 19: White Bay Power Station CMP - thebayssydney.nsw.gov.au€¦ · White Bay PoWer Station ConServation ManageMent Plan - SeCond edition Final July 2011 deSign 5 - arChiteCtS voluMe i

White Bay PoWer Station ConServation ManageMent Plan - SeCond edition Final July 2011deSign 5 - arChiteCtS voluMe i - exeCutive SuMMary - Page 17

Grade 4: Little/Neutral SignificanceThese spaces, structures or elements retain only minor or neutral significance and may be retained or adapted substantially. Elementsorfabricofhighersignificanceshouldberetainedifpossible.Adaptationispreferredtocompleteremoval.

Examples:

PumpHousesouthend

Formerlockerroomlevel2,AdminBuilding

1948SwitchHousegroundlevelsouthendAll images (Design 5 - Architects)

Grade 5: IntrusiveThese spaces, structures or elements are of no significant value. They may be either removed or altered substantially.

Examples:

1948SwitchHousecorridortoplevel

1948SwitchHousegroundlevelnorthendAll images (Design 5 - Architects)

Inallcaseselementssharedbetweenthesespacesandotherspacesofhighersignificanceshouldbetreatedinaccordancewiththehigherrankingasitaffectsthathigherrankedspaceorelement.Likewise,spaceswhichcontainmachineryorequipmentofhighersignificance,shouldbetreatedinaccordancewiththehigherranking.

ForexampleintheBoilerHouse,overalllistedasaGrade1building,newfabricandfloorsmaybe introduced into theGrade 2 areas for, say, anofficeor retail use so long as thesurvivingboiler(Grade1)iskeptandinterpreted.

NOTE:

Thefollowingdrawingswhichshowgradesofsignificanceforallthecomponentsofthesiteandspaces,appearinSection3ofVolumeII.TheirfigurenumbersareastheyappearinthisVolume.

Page 20: White Bay Power Station CMP - thebayssydney.nsw.gov.au€¦ · White Bay PoWer Station ConServation ManageMent Plan - SeCond edition Final July 2011 deSign 5 - arChiteCtS voluMe i

White Bay PoWer Station ConServation ManageMent Plan - SeCond edition Final July 2011voluMe i - exeCutive SuMMary - Page 18 deSign 5 - arChiteCtS

ROBERT

MUL

LENS

RAILWAY TRACKS

RAILWAY SIDING

RAILW

AY S

IDIN

G

VICTORIA ROAD

CRES

CENT

COAL CONVEYOR

CONVEYOR

COAL

STREET

SWIT

CH H

OUS

E TR

ANSF

ORM

ER A

LLEY

TURB

INE

HALL

PUM

P HO

USE

BOIL

ERHO

USE

SITE

OF

BOIL

ER H

OUS

ENO

. 2

RAIL

WAY

CO

RRID

OR

COAL YARD

CHIM

NEYS

ASHHANDLING

TOWER

NORTHYARD

3WESTYARD

CONT

ROL

ROO

M

NORTHWESTYARD

SOUTHWESTYARD

SOUT

H TR

ANSF

ORM

ER Y

ARD

NORT

H TR

ANSF

ORM

ER Y

ARD

AMENITIESBLOCK

COAL

WAS

H PI

T

NORTHERNPENSTOCK

ADM

INST

AFF

ACCO

M.

UPPERSOUTHYARD

MIDSOUTHYARD

RAIL

WAY

CUT

TING

RAIL

WAY

CO

RRID

OR

ASH

HAND

LING

YA

RD

SOUTHERNPENSTOCK(railway land)

3

2

1

3

1

2

43

33

2

2

12

4

1

1

2

COAL

HAN

DLIN

G

SHED

1

1

11

1

SWIT

CH H

OUS

E TR

ANSF

ORM

ER A

LLEY

3 3

2

3

2

VICTORIAROADENTRY

ROBERTSTREETENTRY

KITCHENCANTEEN

0 20 40 60m

WHITEBAY

HOTEL

3

1

SITE

BO

UNDA

RY

SITE BOUNDARY

RAILW

AY S

IDIN

G

ROBERT STREETSW

ITCH

HOUS

E

12

2

Figure3.8.2/1GradingofSignificance

SITEPLAN

Page 21: White Bay Power Station CMP - thebayssydney.nsw.gov.au€¦ · White Bay PoWer Station ConServation ManageMent Plan - SeCond edition Final July 2011 deSign 5 - arChiteCtS voluMe i

White Bay PoWer Station ConServation ManageMent Plan - SeCond edition Final July 2011deSign 5 - arChiteCtS voluMe i - exeCutive SuMMary - Page 19

Figure3.8.2/2Key Sectional Diagrams.NumbersrefertoLevels.

123 G123 G

123 G123

231

MEZ

ZAN

INE

CO

NVE

YOR

G

TRAN

SFER

TOW

ER

CO

NTR

OL

RO

OM

CO

AL

HAN

DLI

NG

SH

ED

SWIT

CH

H

OU

SETU

RBI

NE

HAL

LPU

MP

HO

USE

BOIL

ER

HO

USE

ASH

H

AND

LIN

G

TOW

ER

PLAT

FOR

M

GR

OU

ND

MEZ

ZAN

INE

BASE

MEN

T

MEZ

Z.

TRAN

SF.

ALLE

Y

SEC

TIO

N

G123

ADM

IN /

STAF

F AC

CO

M.

CAB

LE

TUN

NEL

TUR

BIN

E H

ALL

AND

PU

MP

HO

USE

G

3

11

2

G

Page 22: White Bay Power Station CMP - thebayssydney.nsw.gov.au€¦ · White Bay PoWer Station ConServation ManageMent Plan - SeCond edition Final July 2011 deSign 5 - arChiteCtS voluMe i

White Bay PoWer Station ConServation ManageMent Plan - SeCond edition Final July 2011voluMe i - exeCutive SuMMary - Page 20 deSign 5 - arChiteCtS

HOPPERS BELOW MESH GRATES

CHG.1CHG.2

CHB.1

CHG.3

CHG.4

LINE OF CRANEABOVE (DOTTED)

LINE OF CRANEABOVE (DOTTED)

CONTROLROOM

VOID

ELEV

. A

ELEV

. B

ELEV

. B

ELEV

. A

ELEV

. B

ELEV

. A

ELEV

. B

ELEV

. A CH1.1CH2.1

CH4.1

CH3.1

2 2 22

2

33

1

2

COAL LOADER SHED

ELEV

. A

ELEV

. B

STAIRWELL

COAL HANDLING SHED

GROUND & UPPER LEVELS PLAN

KEY

EV.

EV.FXT.

EV. SW.

EQ.SW.

SWBO.

FXT.

O.

OW

OD.

RELOC. Evidence of

Evidence of fixture

Evidence of Switch

Equipment Switch

Switchboard

Machinery / Electrical or Equipment Fixture

Original Item

Original Window

Original Door

Relocated Item

05

1015

20m

0 5 10 15 20m

3

STAIRWELLSTAIRWELL

2

COAL HANDLING SHEDGROUND LEVEL PLAN

COAL HANDLING SHEDTOWER LEVEL PLAN

COAL HANDLING SHEDTRANSFER LEVEL PLAN

COAL HANDLING SHEDPLATFORM LEVEL PLAN

COAL HANDLING SHEDMEZZANINE LEVEL PLAN

Figure 3.8.2/3Coal Handling Shed

1

1

1

1

1

1

1

1

TOWER LEVEL

TRANSFER LEVEL

PLATFORM LEVEL

MEZZANINE LEVEL

0 5 10 15 20m

BOILER HOUSEASH HANDLINGTOWER

CHIMNEYSCOAL HANDLING SHED

Figure3.8.2/4CoalConveyor

Page 23: White Bay Power Station CMP - thebayssydney.nsw.gov.au€¦ · White Bay PoWer Station ConServation ManageMent Plan - SeCond edition Final July 2011 deSign 5 - arChiteCtS voluMe i

White Bay PoWer Station ConServation ManageMent Plan - SeCond edition Final July 2011deSign 5 - arChiteCtS voluMe i - exeCutive SuMMary - Page 21

UP

BHG.4B2 2 2 1

12223

3

3

2 2 2 1

BHG.3B BHG.2B BHG.1B

BHG.1ABHG.2ABHG.3ABHG.4A

5BHG.6

BHG.5

BHG.7 BHG.8

BH1.1BH1.2BH1.3BH1.4

CONTROL ROOM

BH1.5

BH1.6

BH1.7

1

NO. 2BOILER VOID

NO. 1BOILEREQUIPMENT

NO.3 BOILER VOID

NO. 4BOILER VOID

ADJACENT TOPUMP HOUSELEVEL 2

ADJACENT TOPUMP HOUSEGROUND LEVEL

VOIDVOIDVOIDVOID

0 5 10 15 20m

4

1

BOILER HOUSEGROUND LEVEL PLAN

BOILER HOUSELEVEL 1 PLAN

Figure3.8.2/5BoilerHouseLowerLevels

Page 24: White Bay Power Station CMP - thebayssydney.nsw.gov.au€¦ · White Bay PoWer Station ConServation ManageMent Plan - SeCond edition Final July 2011 deSign 5 - arChiteCtS voluMe i

White Bay PoWer Station ConServation ManageMent Plan - SeCond edition Final July 2011voluMe i - exeCutive SuMMary - Page 22 deSign 5 - arChiteCtS

2

2

2 2

3

2

2 21

3

2

EXISTING BOILER

2

0 5 10 15 20m

2

1

BOILER HOUSEMEZZANINE LEVEL PLAN

BOILER HOUSECONVEYOR LEVEL PLAN

Figure3.8.2/6BoilerHouseUpperLevels

Page 25: White Bay Power Station CMP - thebayssydney.nsw.gov.au€¦ · White Bay PoWer Station ConServation ManageMent Plan - SeCond edition Final July 2011 deSign 5 - arChiteCtS voluMe i

White Bay PoWer Station ConServation ManageMent Plan - SeCond edition Final July 2011deSign 5 - arChiteCtS voluMe i - exeCutive SuMMary - Page 23

33

3

33

3 333

3

3 3

PHG.

10

PHG.

9 PHG.

8

PHG.

7

PHG.

7

PHG.

6

PHG.

1C

PHG.

5PHG.

4PH

G.3

PHG.

2

PHG.

1BPH

G.1A

05

1015

20m

33

CABL

E

TUNN

EL

REFE

R TO

SOU

TH

END

PLAN

REFE

R TO

NOR

TH

END

PLAN

PUMP

HOU

SE -

GRO

UND

FLOO

R PL

AN (

SOUT

H EN

D)

PUMP

HOU

SE -

GRO

UND

FLOO

R PL

AN (

NORT

H EN

D)

Figure3.8.2/7PumpHouseGroundLevel

Page 26: White Bay Power Station CMP - thebayssydney.nsw.gov.au€¦ · White Bay PoWer Station ConServation ManageMent Plan - SeCond edition Final July 2011 deSign 5 - arChiteCtS voluMe i

White Bay PoWer Station ConServation ManageMent Plan - SeCond edition Final July 2011voluMe i - exeCutive SuMMary - Page 24 deSign 5 - arChiteCtS

44

44

4PH2.5

PH2.4

PH2.3

PH2.2

PH2.1

TURIBNE HALL, LEVEL 2

PUMP HOUSE, LEVEL 3

ADJACENT

44

3PH1.2B

PH1.2A

PH1.1

13

3

PH3.3

PH3.2

PH3.1

PUMP HOUSE, LEVEL 2

ADJACENT

TURIBNE HALL, LEVEL 3

05

1015

20m

SITE OF BOILER HOUSE No.2

BOILER HOUSE LEVEL 1

REFER TO ADMIN. BUILDING

GROUND LEVEL

PUMP HOUSE - LEVEL 1 PLAN

PUMP HOUSE - LEVEL 2 PLAN

PUMP HOUSE - LEVEL 3 PLAN

Figure3.8.2/8PumpHouseLevels1-3

Page 27: White Bay Power Station CMP - thebayssydney.nsw.gov.au€¦ · White Bay PoWer Station ConServation ManageMent Plan - SeCond edition Final July 2011 deSign 5 - arChiteCtS voluMe i

White Bay PoWer Station ConServation ManageMent Plan - SeCond edition Final July 2011deSign 5 - arChiteCtS voluMe i - exeCutive SuMMary - Page 25

22

2

22

1

THGA.1

THGB.1

THGC.1

THGC.1

THGD.1

THGE.1

THGA.2

2

3

05

1015

20m

CABLE

TUNNEL

SWITCH HOUSE TRANSFORMER ALLEY

PUMP HOUSE

SWITCH HOUSE TRANSFORMER ALLEY

PUMP HOUSE GROUND FLOOR

REFER TO NORTH

END PLAN

TURBINE HALL - GROUND FLOOR PLAN (SOUTH END)

TURBINE HALL - GROUND FLOOR PLAN (NORTH END)

Figure3.8.2/9Turbine HallGroundLevel

Page 28: White Bay Power Station CMP - thebayssydney.nsw.gov.au€¦ · White Bay PoWer Station ConServation ManageMent Plan - SeCond edition Final July 2011 deSign 5 - arChiteCtS voluMe i

White Bay PoWer Station ConServation ManageMent Plan - SeCond edition Final July 2011voluMe i - exeCutive SuMMary - Page 26 deSign 5 - arChiteCtS

22

2

VOID

VOID

PLATFORM

TH2E.1

TH2D.1

TH2C.1

VOID

PUMP HOUSE, LEVEL 2

TURBINE HALL, LEVEL 3

ADJACENT

3

32

TH1C.1

TH1B.1

TH1A.1

2TH3B.1

VOID

VOID

TH3A.1

1VOID

VOID

VOID

VOID

VOID

TH3B.3 (above)

2

TH3B.2

PUMP HOUSE, LEVEL 3

05

1015

20m

TURIBNE HALL, LEVEL 3

TURBINE HALL, LEVEL 2

ADJACENT

TURBINE HALL - LEVEL 1 PLA

(NO LEVEL 1 AT SOUTH END)

TURBINE HALL - LEVEL 2 PLAN

TURBINE HALL - LEVEL 3 PLAN

Figure3.8.2/10Turbine HallGroundLevel

Page 29: White Bay Power Station CMP - thebayssydney.nsw.gov.au€¦ · White Bay PoWer Station ConServation ManageMent Plan - SeCond edition Final July 2011 deSign 5 - arChiteCtS voluMe i

White Bay PoWer Station ConServation ManageMent Plan - SeCond edition Final July 2011deSign 5 - arChiteCtS voluMe i - exeCutive SuMMary - Page 27

Figure3.8.2/11Administration/StaffAccom.GroundandLevel1

05

1015

20m

ASG.1

TURBINE HALL, LEVEL 2

ASG.5

ASG.4

MAIN

STOREROOM

ASG.4

ASG.3

AS1.6AS1.5

AS1.4

AS1.1

AS1.7

AS1.8

AS1.9

AS1.3

AS1.10

AS1.2

LOCKER ROOM

TOILETS

LOCKER ROOM

DINING ROOM

TURBINE HALL

4

3

3

3

3

3

34

2

43

44

44

4

CANTEEN KITCHEN

ASG.2

4

ADMIN + STAFF ACCOM. - LEVEL 1

ADMIN + STAFF ACCOM. - GROUND

Page 30: White Bay Power Station CMP - thebayssydney.nsw.gov.au€¦ · White Bay PoWer Station ConServation ManageMent Plan - SeCond edition Final July 2011 deSign 5 - arChiteCtS voluMe i

White Bay PoWer Station ConServation ManageMent Plan - SeCond edition Final July 2011voluMe i - exeCutive SuMMary - Page 28 deSign 5 - arChiteCtS

Figure3.8.2/12Administration/StaffAccom.Level2and3

05

1015

20m

TURBINE HALL

AS2.1

AS2.3

AS2.4

AS2.5

AS2.6

AS2.2

AS2.9

AS2.8

AS2.7

AS3.3

AS3.4

AS3.5

AS3.6

AS3.8

AS3.7

AS3.9

AS3.11

AS3.10

AS3.12

AS3.13

AS3.15

AS3.16

AS3.17

AS3.1

AS3.21

AS3.20

AS3.19

AS3.2

AS3.14

AS3.18

33

4

1 4

3

33

4

32

3 3

44

4

4

44

4

44

4

3 42

2

4

2

2

ADMIN + STAFF ACCOM. - LEVEL 3 PLA

ADMIN + STAFF ACCOM - LEVEL 2 PLAN

05

1015

20m

ASG.1

TURBINE HALL, LEVEL 2

ASG.5

ASG.4

MAIN

STOREROOM

ASG.4

ASG.3

AS1.6AS1.5

AS1.4

AS1.1

AS1.7

AS1.8

AS1.9

AS1.3

AS1.10

AS1.2

LOCKER ROOM

TOILETS

LOCKER ROOM

DINING ROOM

TURBINE HALL

4

3

3

3

3

3

34

2

43

44

44

4

CANTEEN KITCHEN

ASG.2

4

ADMIN + STAFF ACCOM. - LEVEL 1

ADMIN + STAFF ACCOM. - GROUND

Page 31: White Bay Power Station CMP - thebayssydney.nsw.gov.au€¦ · White Bay PoWer Station ConServation ManageMent Plan - SeCond edition Final July 2011 deSign 5 - arChiteCtS voluMe i

White Bay PoWer Station ConServation ManageMent Plan - SeCond edition Final July 2011deSign 5 - arChiteCtS voluMe i - exeCutive SuMMary - Page 29

SHG

.2B

33

33

34 2

2

4

3

22

44

44

44

SHG

.3SH

G.4

SHG

.5SH

G.6

SHG

.7SH

G.8

SH

G.9

SHG

.10

SHG

.11

SHG

.2A

SHG

.1

SHG

.12

SHG

.13C

SHG

.13D

SHG

.13E

SHG

.13B

SHG

.13A

3

33

33

3SH

1.8

SH1.

9SH

1.10

SH1.

11SH

1.12

3 3

33

42 SH1.

6

SH1.

1 SH1.

7

SH1.

13

SH1.

15

SH1.

14

SH1.

2

4R

QP

ON

ML

KJ

IH

GF

ED

CA

BSH

1.5

A-R

SH1.

4SH

1.3

4

3

05

1015

20m

0 5 10 15 20m

43

SWIT

CH

HO

USE

TR

ANSF

OR

MER

ALL

EY

3

TUR

BIN

E H

ALL

ADJO

ININ

G

SWIT

CH

HO

USE

G

RO

UN

D L

EVEL

PLA

N

SWIT

CH

HO

USE

LE

VEL

1 PL

AN

Figure3.8.2/13SwitchHouseGroundandLevel1

Page 32: White Bay Power Station CMP - thebayssydney.nsw.gov.au€¦ · White Bay PoWer Station ConServation ManageMent Plan - SeCond edition Final July 2011 deSign 5 - arChiteCtS voluMe i

White Bay PoWer Station ConServation ManageMent Plan - SeCond edition Final July 2011voluMe i - exeCutive SuMMary - Page 30 deSign 5 - arChiteCtS

22

22

1

4

44

44

42 3

4M

EZZA

NIN

E

12

21

23

3

3

2

4 4 3

2SH3.

15

SH3.

14

SH3.

13

1

SH3.

12SH

3.11

SH3.

10

SH3.

8

SH3.

1

SH3.

9

SH3.

7SH3.

6SH

3.5

SH3.

2

SH3.

3SH

3.4

SH2.

14SH

2.13

SH2.

12SH

2.11

SH2.

10

SH2.

1

SH2.

9

SH2M

.1

SH2.

8SH

2.7

SH2.

6SH

2.5

SH2.

4

SH2.

3

SH2.

2

05

1015

20m

TUR

BIN

E H

ALL

ADJO

ININ

G

TUR

BIN

E H

ALL

ADJO

ININ

G

4

3

SWIT

CH

HO

USE

LE

VEL

2 PL

AN

SWIT

CH

HO

USE

LE

VEL

3 PL

AN

Figure3.8.2/14SwitchHouseLevels2and3

Page 33: White Bay Power Station CMP - thebayssydney.nsw.gov.au€¦ · White Bay PoWer Station ConServation ManageMent Plan - SeCond edition Final July 2011 deSign 5 - arChiteCtS voluMe i

White Bay PoWer Station ConServation ManageMent Plan - SeCond edition Final July 2011deSign 5 - arChiteCtS voluMe i - exeCutive SuMMary - Page 31

CABLE CHAMBER

REACTOR FLOOR

25 CYCLE SWITCH HOUSE

BUS FLOOR

CABLE ROOM

SWITCH FLOOR

CONTROL ROOM

5

45

5

CSG

.2A

CSG

.2B

CSG

.1

21

11

2 4

31

CS1

.2

CS1

.1

CS1

.3/2

CS1

.3/2

CS2

.1C

S2.2

SUB FLOOR AREA

BUS FLOOR

EAST

CABLE CHAMBER

CABLE CHAMBER

05

1015

20m

CS2

.54 4

2

5

CS2

.6

CS2

.3

CS2

.4

CO

NTR

OL

RO

OM

LE

VEL

1 PL

ANC

ON

TRO

L R

OO

M

LEVE

L 2

PLAN

CO

NTR

OL

RO

OM

LE

VEL

3 PL

AN

Figure3.8.2/15ControlRoom

Page 34: White Bay Power Station CMP - thebayssydney.nsw.gov.au€¦ · White Bay PoWer Station ConServation ManageMent Plan - SeCond edition Final July 2011 deSign 5 - arChiteCtS voluMe i

White Bay PoWer Station ConServation ManageMent Plan - SeCond edition Final July 2011voluMe i - exeCutive SuMMary - Page 32 deSign 5 - arChiteCtS

specIFIc elements

The Coal Handling Shed and External Conveyor

TheCoalHandlingShedanditsassociatedelevatorsandoverheadconveyorhavean iconicquality in thevisual identificationof thefunctionoftheWhiteBayPowerStation.Theoverheadconveyorprovides a visual and physical connection to the Boiler House.Their configuration, form, texture and, if possible, their rustingsteelsurfaces,shouldallbeconserved.TheseelementsshouldbeconservedandadaptedinaccordancewithPoliciesinSection5ofVolumeII.

This shed and its attached structures are almost entirely incorrugatedsteel,muchofwhichisinvariousstagesofdecayandsomeisapproachingfailure.

Thepresent rustedfinishhas alsobeen identifiedas significant,however itsuncheckeddeteriorationisallowingwatertoenterandthreatentheinternalstructure.Inmanycases,rustedcladding(andinsomeareasroofing)isnowbeyondrepairandwillrequirefullorpartialreplacementsoasnottoriskthefurtherdeteriorationofstructureandinteriors.Re-sheetingwithnewmaterialshouldbeconsideredonacasebycasebasis,whereexistingsheetsarebeyondrepair.Considerationofnewmaterialforreplacementsheets(galvanisedorzincalume)shouldbebasedonanalysisoflocation,visibilityandthecompatibilityoftheareabeingreplaced.

The Coal Handling Shed should be retained as evidence of one of the site’s principaloperational systems and conserved as such. Themachinery and equipment should beretainedinthenorthernpartoftheshedandanoverheadcraneistobemovedtodefinethespaceandtoenhancetheunderstandingandprocessesofcoalhandlingforinterpretation.The machinery and equipment is to be retained and conserved in situ to enhance anunderstandingoftheoperationofthepowerstationinitsentirety.

Thenorth5baysshouldberetainedasexistingforinterpretationpurposes.

A new light industrial use could be accommodated at the south endwhich retains railtracks,gratinganddoesnotrequirepartitionsorliningstoexistingstructure.Thecrude‘shed’charactermustbemaintained.

Boththenorthandsouthendsremainopenasarailcorridorandthisshouldberetainedtorespectandnotconfusethesignificanceofthestructure.Iftheseopeningsaretobeblockedtoprovideweatherprotection,theyshouldremainclearlyasopenableandpreferablynotsolidoropaquepanels.

Aspartof thestructuralrepairof thebuildingthe largebasementareasnowfilledwithwatershouldbepermanentlydrainedandallstructuresandfabricconservedandrepaired.

The Chimney Stacks and Ash Handling System

Thetwoextantchimneystacks,withtheashtower,aretheremindersoftheendprocessofthegenerationofelectricalpowerthroughcoalfiringandsteamraising.Theintactnessofthisprocesshasbeensignificantlydepletedbytheremovaloftheprecipitatorsandtheinductionfansaspartofthesitedecontaminationprocess.

Coal Elevator(Design 5 - Architects)

Page 35: White Bay Power Station CMP - thebayssydney.nsw.gov.au€¦ · White Bay PoWer Station ConServation ManageMent Plan - SeCond edition Final July 2011 deSign 5 - arChiteCtS voluMe i

White Bay PoWer Station ConServation ManageMent Plan - SeCond edition Final July 2011deSign 5 - arChiteCtS voluMe i - exeCutive SuMMary - Page 33

Ash Tower(Design 5 - Architects)

The two chimney stacks are amajor contributing element to thevisual identity of the White Bay Power Station and should beretainedinsituandconservedandinterpretedasanintegralpartofthesignificanceofthepowerstation.

Theashtowerisastrongvisualelementintheidentityofthepowerstationandshouldberetainedandconservedinsituandinterpretedaspartoftheoperationalsystemoftheplace.

Boiler House

TheBoilerHouseisalargemasonrystructure,thefirstfloorofwhichisessentiallyavoidbrokenupbywalkways.Thevoidsidentifythelocationoftheotherthreeoriginalboilers,whiletheupperfloors,whichhadoriginallyconsistedofmetalopen-gridflooring,havebeenremovedexceptwheretheseareassociatedwiththeextantboilerandthecoalhoppers.Themagnitudeoftheinternalspaceissuchthatthereisenormouspotentialforadaptivere-useofthisstructure.

The BoilerHouse should be conserved and adapted inaccordancewithPoliciesinsection5ofVolumeII.

TheBoilerHouseisanexceptionallysignificantstructureandspacewithexceptionallysignificantmachinery,anditcanbeadaptedforanewuseorusesasshownonFigures5.1.7/1,2,3&4.

Keyissuesregardingadaptationandre-useinclude:

retain full height space at least in part andparticularlywithin2.5mofglasscurtainwall.

retainfullheightviewofNumber1BoilerbyretainingvoidofNumber2Boiler.

retainexistingvoidbetween1stlevelandundersideofcoalhoppersalongwestsideinthepositionsofNumbers1and2Boilers.

retainallwalls(especiallyoriginal1914BoilerHousewall)asunpaintedmasonry.Retainallevidenceoffixingsandsignage.

opportunitiesforadaptivere-useareavailablethroughtheinsertionofdistinctivefabricinthevoidsinthefloors,andforadditionalfloorstobeaddedthatrespectandenhancethespacesaroundtheextantboilerandassociatedequipment.

Asmuchofthesignificantmachineryandevidenceofevolutionanduseisconfinedtothenorthandwestandaroundtheperimeter,thehugespacetheyencloseisbothanassetandanopportunity.Beforetheboilerswereremovedthisvastspacewasfullofmachineryandopengridwalkways.Thesignificanceofthespaceandthemachinerycouldstillberetainedandrespectedifsomeofthisvoidwereonceagainfilledwithamachine-likestructure.Toassist interpretationandrespectthesignificantscaleandrhythmoftheplace, thesenewstructuresshouldbeofsteelandglasswithnomasonry.

Potentialfordaylighttopenetratefulldepthofspacewheremachineryhasbeenremovedshouldbe explored,particularly between “solid” areas of formerboilers to be retained.Survivingobscureglassshouldberetainedandmissingpanesreplacedbymatchingnewglass. Newstructures inside thisbuildingshouldhaveasenseandaestheticofbeingamachine-likestructure.

Boiler House(Design 5 - Architects)

Page 36: White Bay Power Station CMP - thebayssydney.nsw.gov.au€¦ · White Bay PoWer Station ConServation ManageMent Plan - SeCond edition Final July 2011 deSign 5 - arChiteCtS voluMe i

White Bay PoWer Station ConServation ManageMent Plan - SeCond edition Final July 2011voluMe i - exeCutive SuMMary - Page 34 deSign 5 - arChiteCtS

Theintentofanynewfloorspaceorstructuresintheseareasshouldbetointerpretthemassandvoidsoftheoriginalboilermachineryandtheirverticalcontinuityfromfloortoroof.

The extant Babcock and Wilcox boiler, the pulverising mills and the various items ofmachineryandequipmentassociatedwiththesteamraisingandthecoalhandlingsystemshousedintheBoilerHouse,occupythenorthernsectionofthebuilding.Theboilerhousecontrolroom,however,iscentrallylocatedagainstthewestwallonthefirstfloorwhereitshouldberetainedasadiscretetotalenvironment.TheintegrityoftheBabcockandWilcoxboilerhasbeencompromisedbytheremovalofelementssuchasthefurnaceandtheironsheetandasbestoscladding.Althoughtheremovalofintegralelementsdetractsfromanunderstandingoftheoriginalfunctionandprocess,itallowsforamorevividinterpretationoftheboileroperation.

The significance of the extant machinery and equipment housed in the Boiler Houseis such thatno itemmaybe removedwithoutdepleting the integrityof thewhole. Allmachineryandassociatedequipmentistoberetainedinsituandconserved,maintainedandinterpreted.

Page 37: White Bay Power Station CMP - thebayssydney.nsw.gov.au€¦ · White Bay PoWer Station ConServation ManageMent Plan - SeCond edition Final July 2011 deSign 5 - arChiteCtS voluMe i

White Bay PoWer Station ConServation ManageMent Plan - SeCond edition Final July 2011deSign 5 - arChiteCtS voluMe i - exeCutive SuMMary - Page 35

UP

CONTROL ROOM

NO. 2BOILER VOID

NO. 1BOILEREQUIPMENT

NO.3 BOILER VOID

NO. 4BOILER VOID

ADJACENT TOPUMP HOUSELEVEL 2

ADJACENT TOPUMP HOUSEGROUND LEVEL

VOIDVOIDVOIDVOID

0 5 10 15 20m

BOILER VOID OVER BOILER VOID OVER BOILER VOID OVER BOILER EQUIPMENTOVER

NEW OPENINGS PERMITTED NO ALTERATIONS TO EXISTING OPENINGS

NO ALTERATIONS TO EXISTING OPENINGS

NO

ALT

ERAT

ION

S TO

EXI

STIN

G O

PEN

ING

S

NO

ALT

ERAT

ION

S TO

EXI

STIN

G O

PEN

ING

S

NEW OPENINGS PERMITTED NO ALTERATIONS TO EXISTING OPENINGS

NO ACCESS THROUGH WALL PERMITTED

NO

NEW

OPE

NIN

GS

PER

MIT

TED

NO

ALT

ERAT

ION

S TO

EXI

STIN

G O

PEN

ING

S

TO REMAIN AS EXISTING ALL ACCESS POINTS TO USE EXISTING OPENINGS

WHERE NECESSARY RE-FINISH REMOVED PULVERISORPLINTHS AND INDICATE WITH SCRIBED EDGES

MIN

IMAL

OPE

NIN

GS

PER

MIT

TED

TO R

EMAI

N

AS E

XIST

ING

UNHATCHED AREA> PLINTHS MAY BE REMOVED> FILL VOIDS WITH GLASS, STEEL MESH OR SOLID METAL PLATE> BOILER OPENINGS MAY BE ENCLOSED (GLAZED OR SOLID WALLS) MIN 75% VOID FOR 1m CLEARANCE WITHIN PERIMETER OF EXISTING VOID

UNHATCHED AREA> MAINTAIN AS VISUALLY OPEN EXCEPT FOR CLEAR GLAZED SCREENS> MAINTAIN MIN. 50% PLINTHS. REMOVED PLINTHS TO BE INDICATED BY SCRIBED EDGES> BOILER VOIDS MAY BE ENCLOSED (GLAZED OR SOLID WALLS) MIN 75% VOID FOR 1m CLEARANCE WITHIN PERIMETER OF EXISTING VOID

HATCHED AREA> AREA TO REMAIN AS EXISTING> PLINTHS TO REMIAN AS EXISTING> FILL CABLE TRAYS WITH CONCRETE OR STEEL MAINTAINING SCRIBED EDGES WHERE REQUIRED> PLANT TO BE MAINTAINED

HATCHED AREA> AREA TO REMAIN AS EXISTING> PLINTHS TO REMIAN AS EXISTING> FILL CABLE TRAYS WITH CONCRETE OR STEEL MAINTAINING SCRIBED EDGES WHERE REQUIRED> PLANT TO BE MAINTAINED

BOILER HOUSEGROUND LEVEL PLAN

BOILER HOUSELEVEL 1 PLAN

TakenfromVolumeIIFigure5.1.7/1AreasofpotentialdevelopmentBoilerHouseLowerLevels

Page 38: White Bay Power Station CMP - thebayssydney.nsw.gov.au€¦ · White Bay PoWer Station ConServation ManageMent Plan - SeCond edition Final July 2011 deSign 5 - arChiteCtS voluMe i

White Bay PoWer Station ConServation ManageMent Plan - SeCond edition Final July 2011voluMe i - exeCutive SuMMary - Page 36 deSign 5 - arChiteCtS

EXISTING BOILER

0 5 10 15 20m

NO NEW OPENINGS

NO ALTERATIONS PERMITTED

NO

NEW

OPE

NIN

GS

PER

MIT

TED

NO

NEW

OPE

NIN

GS

MIN

IMAL

OPE

NIN

GS

PER

MIT

TED

TO R

EMAI

N

AS E

XIST

ING

ZONE FOR INFILL CORE DEVELOPMENT & VERTICAL CONNECTION

ZONE FOR INFILL CORE DEVELOPMENT & VERTICAL CONNECTION

VOID TO REMAINAS EXISITNG EXISTING BOILER

NEW OPENINGS PERMITTED NO NEW OPENINGS

NO ACCESS THROUGH WALL PERMITTED

NO

NEW

OPE

NIN

GS

PER

MIT

TED

NO

NEW

OPE

NIN

GS

TO REMAIN AS EXISTING ALL ACCESS POINTS TO USE EXISTING OPENINGS

MIN

IMAL

OPE

NIN

GS

PER

MIT

TED

TO R

EMAI

N

AS E

XIST

ING

MAINTAIN AS MIN 25%VOID ABOVE

MIN. 1m CLEARANCE

ZONE FOR INFILL CORE DEVELOPMENT & VERTICAL CONNECTION

ZONE FOR INFILL CORE DEVELOPMENT & VERTICAL CONNECTION

VOID TO REMAINAS EXISITNG

UNHATCHED AREA• MAINTAIN EXISTING VOIDS AND STRUCTURE ABOVE* ZONE OF REMOVED BOILERS MAY BE ENCLOSED (GLAZED OR SOLID WALLS) MIN. 75% VOID FOR 1m CLEARANCE

HATCHED AREA• TO REMAIN AS EXISTING

UNHATCHED AREA• BOILER OPENINGS MAY BE ENCLOSED(GLAZED OR SOLID WALLS)MIN. 75% VOID FOR 1m CLEARANCE

HATCHED AREA• TO REMAIN AS EXISTING

ZONE FOR LIGHTWEIGHTGLASS OR METAL BRIDGE

MAINTAIN AS MIN 25% VOID MAINTAIN AS MIN 75% VOID WITHLIGHTWEIGHT BRIDGE/S TO CURTAIN WALL

ZONE FOR LIGHTWEIGHTGLASS OR METAL BRIDGECONNECTIONS TO CORE

MAINTAIN AS MIN 50%VOID ABOVE

ZONE FOR LIGHTWEIGHTGLASS OR METAL BRIDGE

MAINTAIN EXISTING VOIDS AND STRUCTURE ABOVE

BOILER HOUSEMEZZANINE LEVEL PLAN

BOILER HOUSECONVEYOR LEVEL PLAN

TakenfromVolumeIIFigure5.1.7/2AreasofpotentialdevelopmentBoilerHouseUpperLevels

Page 39: White Bay Power Station CMP - thebayssydney.nsw.gov.au€¦ · White Bay PoWer Station ConServation ManageMent Plan - SeCond edition Final July 2011 deSign 5 - arChiteCtS voluMe i

White Bay PoWer Station ConServation ManageMent Plan - SeCond edition Final July 2011deSign 5 - arChiteCtS voluMe i - exeCutive SuMMary - Page 37

TakenfromVolumeIIFigure 5.1.7/3AreasofpotentialdevelopmentBoilerHouse

TakenfromVolumeIIFigure5.1.7/4AreasofpotentialdevelopmentBoilerHouse

Page 40: White Bay Power Station CMP - thebayssydney.nsw.gov.au€¦ · White Bay PoWer Station ConServation ManageMent Plan - SeCond edition Final July 2011 deSign 5 - arChiteCtS voluMe i

White Bay PoWer Station ConServation ManageMent Plan - SeCond edition Final July 2011voluMe i - exeCutive SuMMary - Page 38 deSign 5 - arChiteCtS

Turbine Hall & Pump House

TheTurbineHallandPumpHousecomprisetwoparallelspaces,eachthefullheightandlengthofthebuilding.ThePumpHouseisanarrowspacebetweentheBoilerHouseandtheTurbineHallbutbuiltcontiguouslywith,andopeningdirectlyonto,thelatter.

The Turbine Hall and Pump House should be conserved andadaptedinaccordancewithPoliciesinSection5ofVolumeII.

The northern section of the Pump House with its denseconfigurationofsignificantmachineryprovideslittleopportunityforanewuseotherthaninterpretation.Existingpaintedfinishesshouldberetainedinthissection.

ThesouthernsectionofthePumpHousecouldbeeitherretainedasasinglespacewithpartialfloorsaddedwithin it,ordivided intoseparate levelsandspaces.Allfinishesmayberetainedorremovedinthissection.

The configuration of the TurbineHall consists of a series of partial, or brokenupfloorspaces,someofwhicharemezzaninesratherthancompletefloors,uptothefirstfloorleveloftheextantturbo-alternatorset.Thespaceabovethemainturbineplatformiscompletelyopengivingauniquely largeand longspaceofgreataesthetic significance. Theceilingsoarsabovewithaseriesofthreeoverheadgantrycranes.

TheParsonsturbo-alternatorsetisavitalcomponentpartofthepowergeneratingsystematWhiteBay.InadditionthePumpHouseandTurbineHallretainssinglerepresentativeitems and elements associated with the cooling and feedwater systems and includesthe condensers, the high pressure feedwater pumps, the condensate pump and sluicegates.Interpretationofthefeedwaterandcoolingwatersystemswouldcontributetoanunderstandingoftheoperationofthesteamraisingsystem.AlloftheseextantitemsandassociatedelementsarelocatedinthenorthernsectionoftheTurbineHall.

ThesignificanceofthemachineryandassociatedequipmentintheTurbineHallmustbemaintainedbytheirretentioninsituandconservation,maintenanceandinterpretation.

The TurbineHall is an exceptionally significant structure and spacewith exceptionallysignificantmachinery,anditcanbeadaptedforanewuseorusesasshownonFigures5.1.7/5&6.

Keyissuesregardingadaptationandre-useinclude:

• retainvoidaboveturbineplatformlevelforfulllengthoftheTurbineHall

• retain1950turbineplatform.Potentialtoinfillselectedsectionsofvoidswhere#2unithasbeenremovedwithsteelsheettoprovideadditionalfloorareaifrequired.

• retainremainingsectionsofearlier(lower)turbineplatform(southof1950platform).Potentialtoextendthisovervoidtosouthendofhallinnewanddifferentmaterial,ortoconstructnewatahigherlevel.Definition/evidenceofexistingvoidstoberetained.

• retainabilityofatleastoneandpreferablyallthreegantrycranestooperatealongfulllengthofhallformaintenanceandadaptiveusepurposes.

• potential to temporarily divide hall space using curtain type partitions or screenssuspendedfromgantrycranes, installedandremovedasrequired. Thesemaybeofflexibleorrigidmaterial,transparentoropaqueandshouldremaininplaceforatotalofmorethan6monthsinayear.

Turbine Hall(Design 5 - Architects)

Page 41: White Bay Power Station CMP - thebayssydney.nsw.gov.au€¦ · White Bay PoWer Station ConServation ManageMent Plan - SeCond edition Final July 2011 deSign 5 - arChiteCtS voluMe i

White Bay PoWer Station ConServation ManageMent Plan - SeCond edition Final July 2011deSign 5 - arChiteCtS voluMe i - exeCutive SuMMary - Page 39

1917

1927

05

1015

20m

GROUND FLOOR

LEVEL 1

LEVEL 3

LEVEL 2

NEW OPENINGS PERMITTED BETWEEN STRUCTURAL PIERS

AA

MAINTAIN ACCESS

MAINTAIN ACCESS

NEW OPENINGS PERMITTED TO BOTH SIDES OF PUMP HOUSE

BOILER HOUSE

ADJACENT

NEW OPENINGS PERMITTED

NO NEW OPENINGS PERMITTED

NO NEW OPENINGS PERMITTED

NEW

OPE

NIN

GS

PER

MIT

TED

BET

WEE

N S

TRU

CTU

RAL

PIE

RS

LARGER

OPENING

POSSIBLE

NEWOPENINGSPOSSIBLE

TO REMAINEXISTING

NEWOPENINGSPOSSIBLE

MAINTAIN CORRIDOR

DASHED AREAS MAY

BE ENCLOSED

MAINTAIN ALL CONNECTIONS

TO BOILER HOUSE

DASHED AREAS MAY

BE ENCLOSED OR SUBDIVIDED

MAINTAIN RAIL TRACKS

AS EXISTING

TURBINE HALL

PUMP HOUSE

HAT

CH

ED A

REA

>

TO R

EMAI

N A

S EX

ISTI

NG

>

PLIN

THS

TO B

E M

AIN

TAIN

ED

> VO

IDS

FRO

M P

LAN

T TO

BE

CO

VER

ED W

ITH

STE

EL M

ESH

OR

PLA

TE

> PL

ANT

TO B

E M

AIN

TAIN

ED

UN

HAT

CH

ED A

REA

A

> SM

ALL

PLIN

THS

< 1m

HIG

H

M

AY B

E R

EMO

VED

>

REM

OVE

D P

LIN

THS

TO B

EIN

DIC

ATED

BY

SCR

IBED

ED

GES

>

VOID

S TO

BE

CO

VER

ED W

ITH

STEE

L M

ESH

OR

PLA

TE O

R F

ILLE

D

W

ITH

CO

NC

RET

E, M

AIN

TAIN

ING

SCR

IBED

ED

GES

UN

HAT

CH

ED A

REA

B

> SU

PPO

RT

BLO

CKS

MAY

BE

RED

UC

ED O

R R

EMO

VED

>

REM

OVE

D P

LIN

THS

TO B

E

IND

ICAT

ED B

Y SC

RIB

ED E

DG

ES

UN

HAT

CH

ED A

REA

A

> SM

ALL

PLIN

THS

< 1m

HIG

H

M

AY B

E R

EMO

VED

>

REM

OVE

D P

LIN

THS

TO B

EIN

DIC

ATED

BY

SCR

IBED

ED

GES

>

VOID

S TO

BE

CO

VER

ED W

ITH

STEE

L M

ESH

OR

PLA

TE O

R F

ILLE

D

W

ITH

CO

NC

RET

E, M

AIN

TAIN

ING

SCR

IBED

ED

GES

>

VOID

S AB

OVE

LEV

EL 1

TO

BE

RET

AIN

ED W

ITH

OU

T FI

XED

PAR

TITI

ON

S O

VER

3m

HIG

H

HAT

CH

ED A

REA

• T

O R

EMAI

N A

S EX

ISTI

NG

• P

LIN

THS

TO B

E M

AIN

TAIN

ED

• VO

IDS

FRO

M P

LAN

T TO

BE

CO

VER

ED W

ITH

STE

EL M

ESH

OR

PLA

TE

• PLA

NT

TO B

E M

AIN

TAIN

ED

• MAI

NTA

IN V

OLU

ME

HIG

H L

EVEL

BAL

CO

NIE

S PO

SSIB

LE

IN A

CC

OR

DAN

CE

WIT

H P

OLI

CIE

S

SOUTH

NORTH

TURBINE HALL AND PUMP HOUSE

SECTION AA

TURBINE HALL AND PUMP HOUSE

GROUND FLOOR PLAN

TakenfromVolumeIIFigure5.1.7/5AreasofpotentialdevelopmentTurbineHall/PumpHouseLowerLevel

Page 42: White Bay Power Station CMP - thebayssydney.nsw.gov.au€¦ · White Bay PoWer Station ConServation ManageMent Plan - SeCond edition Final July 2011 deSign 5 - arChiteCtS voluMe i

White Bay PoWer Station ConServation ManageMent Plan - SeCond edition Final July 2011voluMe i - exeCutive SuMMary - Page 40 deSign 5 - arChiteCtS

TURBINE HALL AND PUMP HOUSE

LEVEL 2 AND 3 PLAN

1917

1927

VOID

TURBINE HALL AND PUMP HOUSE

LEVEL 1 PLAN

05

1015

20m

NO NEW OPENINGS PERMITTED

NEW OPENINGS POSSIBLE

NEW OPENINGS POSSIBLE ON LEVEL 1

NO NEW OPENINGS PERMITTED

NEW

OPE

NIN

GS

POSS

IBLE

TO

MAX

50%

OF

BAYS

BET

WEE

N S

TRU

CTU

RAL

PIE

RS

NO NEW OPENINGS

UN

HAT

CH

ED A

REA

A

• EXI

STIN

G L

EVEL

S TO

BE

RET

AIN

ED

• VO

IDS

MAY

BE

FILL

ED W

ITH

CO

NC

RET

E

MAI

NTA

ININ

G S

CR

IBED

ED

GES

• V

OID

S M

AY B

E C

OVE

RED

WIT

H

STEE

L M

ESH

/ PL

ATE

OR

GLA

SS

• HO

BS M

AY B

E R

EMO

VED

M

AIN

TAIN

ING

SC

RIB

ED E

DG

ES

• MAI

NTA

IN E

XIST

ING

50%

OPE

NIN

GS

BETW

EEN

PU

MP

HO

USE

AN

D

TUR

BIN

E H

ALL

HAT

CH

ED A

REA

• T

O R

EMAI

N A

S EX

ISTI

NG

• V

OID

S TO

REM

AIN

AS

EXIS

TIN

G

• OPE

NIN

GS

TO R

EMAI

N A

S EX

ISTI

NG

UN

LESS

OTH

ERW

ISE

NO

TED

DASHED AREA MAY BE ENCLOSED

OR SUBDIVIDED

PUMP HOUSE

TURBINE

HALL

RESPECT CONFIGURATIONS OF ORIGINAL

OPENINGS AND RETAIN ORIGINAL ELEMENTS

SOME NEW OPENINGS POSSIBLE ABOVE

EXISTING TO SAME WIDTH

BOILER HOUSE ADJOINING

STAIR TO REMAIN

AS EXISTING

MAINTAIN ACCESS TO

ADMINISTRATION BUILDING

OPT

ION

1

• FLO

ATIN

G P

LATF

OR

M

WIT

HIN

VO

ID

• BR

IDG

E C

ON

NEC

TIO

NS

TO A

DM

IN.

POSS

IBLE

• R

ETAI

N P

ERIM

ETER

AC

CES

S O

PTIO

N 2

• F

LOAT

ING

PLA

TFO

RM

NO

H

IGH

ER T

HAN

LEV

EL 3

• M

AIN

TAIN

FU

LL E

XTEN

T O

F

VOID

BEL

OW

AN

D

PER

IMET

ER A

CC

ESS

STEEL

PLATFORM

MAINTAIN ACCESS TO

ADMINISTRATION BUILDING

STAIR TO REMAIN

AS EXISTING

NEW OPENINGS PERMITTED

BOILER HOUSE ADJOINING

PUMP HOUSE

TURBINE

HALL

TakenfromVolumeIIFigure5.1.7/6AreasofpotentialdevelopmentTurbineHall/PumpHouseUpperLevels

Page 43: White Bay Power Station CMP - thebayssydney.nsw.gov.au€¦ · White Bay PoWer Station ConServation ManageMent Plan - SeCond edition Final July 2011 deSign 5 - arChiteCtS voluMe i

White Bay PoWer Station ConServation ManageMent Plan - SeCond edition Final July 2011deSign 5 - arChiteCtS voluMe i - exeCutive SuMMary - Page 41

TURBINE HALL AND PUMP HOUSE

LEVEL 2 AND 3 PLAN

1917

1927

VOID

TURBINE HALL AND PUMP HOUSE

LEVEL 1 PLAN

05

1015

20m

NO NEW OPENINGS PERMITTED

NEW OPENINGS POSSIBLE

NEW OPENINGS POSSIBLE ON LEVEL 1

NO NEW OPENINGS PERMITTED

NEW

OPE

NIN

GS

POSS

IBLE

TO

MAX

50%

OF

BAYS

BET

WEE

N S

TRU

CTU

RAL

PIE

RS

NO NEW OPENINGS

UN

HAT

CH

ED A

REA

A

• EXI

STIN

G L

EVEL

S TO

BE

RET

AIN

ED

• VO

IDS

MAY

BE

FILL

ED W

ITH

CO

NC

RET

E

MAI

NTA

ININ

G S

CR

IBED

ED

GES

• V

OID

S M

AY B

E C

OVE

RED

WIT

H

STEE

L M

ESH

/ PL

ATE

OR

GLA

SS

• HO

BS M

AY B

E R

EMO

VED

M

AIN

TAIN

ING

SC

RIB

ED E

DG

ES

• MAI

NTA

IN E

XIST

ING

50%

OPE

NIN

GS

BETW

EEN

PU

MP

HO

USE

AN

D

TUR

BIN

E H

ALL

HAT

CH

ED A

REA

• T

O R

EMAI

N A

S EX

ISTI

NG

• V

OID

S TO

REM

AIN

AS

EXIS

TIN

G

• OPE

NIN

GS

TO R

EMAI

N A

S EX

ISTI

NG

UN

LESS

OTH

ERW

ISE

NO

TED

DASHED AREA MAY BE ENCLOSED

OR SUBDIVIDED

PUMP HOUSE

TURBINE

HALL

RESPECT CONFIGURATIONS OF ORIGINAL

OPENINGS AND RETAIN ORIGINAL ELEMENTS

SOME NEW OPENINGS POSSIBLE ABOVE

EXISTING TO SAME WIDTH

BOILER HOUSE ADJOINING

STAIR TO REMAIN

AS EXISTING

MAINTAIN ACCESS TO

ADMINISTRATION BUILDING

OPT

ION

1

• FLO

ATIN

G P

LATF

OR

M

WIT

HIN

VO

ID

• BR

IDG

E C

ON

NEC

TIO

NS

TO A

DM

IN.

POSS

IBLE

• R

ETAI

N P

ERIM

ETER

AC

CES

S O

PTIO

N 2

• F

LOAT

ING

PLA

TFO

RM

NO

H

IGH

ER T

HAN

LEV

EL 3

• M

AIN

TAIN

FU

LL E

XTEN

T O

F

VOID

BEL

OW

AN

D

PER

IMET

ER A

CC

ESS

STEEL

PLATFORM

MAINTAIN ACCESS TO

ADMINISTRATION BUILDING

STAIR TO REMAIN

AS EXISTING

NEW OPENINGS PERMITTED

BOILER HOUSE ADJOINING

PUMP HOUSE

TURBINE

HALL

• potential to constructhigher level observationplatformsalong east, south andwestwalls, as long as these are clearly adiscretenewelement, attached to thewall, andextendnofurtherthan2mintothevoid,andarebelowgantrycranelevel,toallowtheircontinuedoperation.

• potential to insert new levels and enclosed spaces below 1920s and 1950s turbineplatformlevelssouthofNo.1turbinemachinery.

Administration Block

From the completion of the 1920s extensions until the closure ofWhite Bay Power Station, this area housed the administrationand main staff facilities. Apart from steel lockers, lunch tables,bathroomsandthelaboratories,verylittlesignificantfitoutremains.Somesignificantspacesremainbutingeneralthesecanbeadaptedfor newuses. It is important in understanding thewholeWhiteBayPowerStationstorythatevidencefortheuseoftheseareasforadministrationandamenitiesisretainedandrespected.Howeverthiscancoexistwithanewuse.

Thedamagedandmissingelementsof thepolished joineryintheMainEntryandpublicareasshouldbereconstructedtotheiroriginaldetailasthiswasthepublic“FrontDoor”ofthewholestation.ThisoriginalentryfromVictoriaRoadshouldideallybereinstatedasamajorentry.

TheAdministrationBlockshouldbeconservedandadaptedinaccordancewithPoliciesinSection5ofVolumeII.

Evidence in the way of fixtures and fittings in the Laboratory should be retained forinterpretationandmaybeavailableforsomenewandcompatibleuse.

Therelationshipbetween theseofficesand theTurbineHalland their largeoverlookingwindowsshouldberetained.

1912 - 1927 Switch House

Built in twostages, thefirstofbrick in1912-1917, and thesecondofreinforcedconcretein1927,thisstructurehasbeenmuchalteredandreconfiguredovertime.

The building’s west and south elevations were, and stillremain,oneofthemostvisibleelementsfromVictoriaRoad.Itisthe‘publicface’ofthepowerstation.

It retains a small number of highly significant spacesincluding the remains of the original 1917 control room.Some highly significant machinery and fittings remain insitufromthepowerreticulation,electricalsupplyandauxiliarypowersupplysystems.

Thegroundlevelarearetainsnosignificantmachineryexceptatthenorthend.Apartfromtheareaswhichhousesignificantmachinery,allotherspacesonthislevelmaybeadaptivelyreused.Theexistingworkshopareaatthenorthendretainselementsfromelsewhereonthesiteaswellasmuchwritten(onthewalls)evidenceoftheearlieruse.Theseshouldbe

Victoria Road Entry(Design 5 - Architects)

1920s Switch Gear(Courtesy of PowerHouse Museum archive)

Page 44: White Bay Power Station CMP - thebayssydney.nsw.gov.au€¦ · White Bay PoWer Station ConServation ManageMent Plan - SeCond edition Final July 2011 deSign 5 - arChiteCtS voluMe i

White Bay PoWer Station ConServation ManageMent Plan - SeCond edition Final July 2011voluMe i - exeCutive SuMMary - Page 42 deSign 5 - arChiteCtS

retainedinanyadaptation.

The1917 lift and stairwell is a significant elementwhich shouldbe retained, conservedandmaintainedasanoperationalelement.AlthoughtheexistingliftcageandenclosurenolongercomplieswiththeBCAitshouldnotberemoved. Itshouldbebroughtuptocurrentcompliancestandardsusingglassliningsorotherclearlymodernandpreferablytransparentelementstoenableongoinguse. Allolddoorplates,tiles,signsanddisplayboxesinthisareashouldberetainedandconserved.

Thefirstfloorlevelpresentlyadmitslittledaylightinsomeareasduemainlytoalterationsforlaterequipment.Thenorthernmostofthesewiredoorandconcreteenclosureswithitscircleofsupportblocksshouldberetainedandtheremainderoftheseenclosurescouldberemovedorreconfigurediftheycannotbeadapted.Earlierwindowopeningscouldbere-opened.

Thisfloorretains,inpartofthesouthernsection,veryearlyswitchgear(fromthelate1920s)whichshouldberetainedinsitu,completewithallitsattendantcabling,timberandglasscoversetc.Theexistingchainwireenclosuresshouldalsoberetainedtothesouthandnorthofthisintactspacetoretainthesenseoflimitedaccess.Thetiledfloorshouldberetainedandconserved.

Theotherelements inthissouthernsecondfloorsectionwhichhavetheemptyconcreteenclosuresforthisswitchgearshould,ifatallpossible,beretainedandadaptedforanewuseinacreativemannerwhichrespondstotheirconfiguration.Theircompleteremovalshouldonlybeconsideredasalastresort.

Thethirdfloorretainsthespaceandremainingevidenceoftheoriginalcontrolroomanditslayout.Italsoretainsthemorerecentplatformsusedbytheworkersforcarpetbowls.ThisshouldremainasasinglespaceandthewindowsandrelationshiptotheTurbineHallretained.Thetimberandglasspartitionstothewestshouldalsoberetainedalongwiththeassociatedfitoutwherethisispossible.

TheMotorGeneratorRoomonthisfloorisofexceptionalsignificanceandretainsitsoriginalmachinery.

TheWorkshopandBatteryRoomadjacentretainevidenceinthefloorforbothhavingoncebeenbatteryroomshowevertheonlyremainingbatteriesareinthesouthernmostroom.Whilethesearesomewhatisolatedfromothersignificantspacesthebatteriesclosetothemotor generator room, situated on the lead floorwith its sink and perimeter drainageallowsadegreeofinterpretationwhichwouldbediminishediftheyweremoved.Otherusescouldbeintroducedintothisspaceaslongasthebatteries,sinkandleadfloorwereretainedandavailableforinterpretation.

TheWorkshoparearetainssomesignificantelementsbutcouldbeadaptedtohousemoreusewhichpreferablyallowedthedrillsetc.toremaininplace.

The1912-1917and1927SwitchHousesshouldbeconservedandadaptedinaccordancewithPoliciesinSection5ofVolumeII.

Thisbuildingcontainssomesignificantspaces,machineryandfitoutelementsbutingeneralthespacescanbeadaptedfornewuses.

Significantspacesincludethefollowingwhichshouldberetainedinsituandconservedastotalenvironments:

• Thesecondfloor(inpartofthesouthernsection)retainsveryearlyswitchgearcompletewithallitsattendantcabling,timberandglasscoversetc.

Page 45: White Bay Power Station CMP - thebayssydney.nsw.gov.au€¦ · White Bay PoWer Station ConServation ManageMent Plan - SeCond edition Final July 2011 deSign 5 - arChiteCtS voluMe i

White Bay PoWer Station ConServation ManageMent Plan - SeCond edition Final July 2011deSign 5 - arChiteCtS voluMe i - exeCutive SuMMary - Page 43

• TheMotorGeneratorRoom to the southof theoriginalcontrolroomonthetoplevelretainsallofitssignificantmachineryandequipment in situ.This space shouldberetainedandconservedwithoutalteration.

The1917liftandstairwellisasignificantelementwhichshouldbe retained, conserved and maintained as an operationalelement.

The 1927 Entertainment Hall on the top level should beretainedandconserved,includingitsstage,paintedmurals,fittingsandfurniture.Itmaybeadaptedforuseasasocialactivityspace,eitherforprivateorpreferablypublicuseandkeptinitsexistingconfigurationwithitssimpleandbarefinishes.

TheSwitchHouseTransformerAlleyshouldbekeptasanopenspacebutcouldberoofedwithaclearmaterialandadaptedtohouselifts,stairsandotherequipment.

1948 Control Room & Switch House

Thisadditionwasbuiltaspartofthemajorupgradein1948-1950which installed thenewboilers and turbines. It is thereforepartof the slice of operational systems that survive from this period.Thecontrolroomsurviveswithitsoriginalequipmentandcablingroom.However,theadjacentswitchhousehasbeencleanedout.

The1948ControlRoom&SwitchHouseshouldbeconservedandadaptedinaccordancewithPoliciesinSection5ofVolumeII.

This building contains spaces and machinery of exceptional significance toWhite BayPowerStationaswellasspaceswhichcanaccommodateconsiderableadaptation.

The1948ControlRoomretainsmachinery,fittings,furniture,documents,partsandfinisheswhich are all in situ and in context with considerable interpretation ability. Securityto this area and the spaces below should be improved and the spaces fully securedagainstunauthorisedentry. Thisspaceshouldberetainedandconserved in itsexisting

configuration with all machinery, fittings, furniture, documents,signageandfinishesinsitu.Itshouldbeinterpretedalongwiththecable spacesbelow,asa significantpartof thepower reticulationsystemandnot adapted for newuses. Nootheruse or functionshouldbeintroducedunlessitallowsalloftheexistingelementstoremainwithoutriskofdamage.

TheCableRoomandadjacentTunnelsarean integralpartof theControlRoomaboveandretaintheoriginalandlatercablingwhichconnectsittotherestofthepowerstation.Theymustberetainedandconserved in theirentiretyexcept for thepossibleremovaloftherecentgreyspraypainting.

Thedesignandworkmanshipoftheveryearlypyrotenaxtypecablingisofextraordinarilyfinequalityandshouldberetainedwithlabels,tagsandfixingsinitsentiretyintheseareas.

Whilenosignificantequipmentsurvivesintheadjacentswitchhouse,thelabyrinthandemptyconcreteenclosuresfortheformerbusbarscreatesvisuallyexcitingspaceswhichcouldandshouldinspireaverycreativeapproachtoadaptivere-useintheseareas.Thecabletrayscanberetainedandreused,adaptedorfilledasrequired.AccessmaybemadetonewbalconiesoradjacentstructuresaslongasthehighlysignificantControlRoomfabric

1927 Switch House(Design 5 - Architects)

Control Room(Design 5 - Architects)

Bus Bar Enclosures(Design 5 - Architects)

Page 46: White Bay Power Station CMP - thebayssydney.nsw.gov.au€¦ · White Bay PoWer Station ConServation ManageMent Plan - SeCond edition Final July 2011 deSign 5 - arChiteCtS voluMe i

White Bay PoWer Station ConServation ManageMent Plan - SeCond edition Final July 2011voluMe i - exeCutive SuMMary - Page 44 deSign 5 - arChiteCtS

andspacestothenortharerespected.

Thetransformeryardcouldbeadaptedtoaccommodatenewuses.Thisareaistraversedbyrailtracksforthemovementoftransformersandequipment. Thesetracksshouldberetainedasshouldthebladewallswhichoriginallyseparatedthetransformers.Thespacesbetweenthesecouldbeadaptedfornewuses.ThelinearityandorderofthisareashouldberespectedinanynewworkaswellastherelationshipofthisareatotheSwitchHousesandControlRoom,thedistributiontunnelsandsurvivingpowerpoles.

Landscaping and Site Generally

Thisisadegradedindustriallandscapewithnumerousremnantsofearliersiteshedsandotherstructures,Whileinoperationtheonlyarea which would have had any soft landscape elements wouldhavebeentheareanorthwestofthe1948SwitchHouseandControlRoomanditsadjacentTransformerYards.Thisareawasthe‘frontgarden’ of the Power Station andwas plantedwith various fruittreesandshrubs,tendedbytheworkersthemselves.Allotherareaswerehardindustrialsurfacesandserviceandstorageareas.

The Landscaping and Site Generally should be conserved andadaptedinaccordancewithPoliciesinsection5ofVolumeII.

Thoseareasofthesitewhichoriginallyactedasorhousedstorageorindustryrelatedfacilitiesshouldremainashardlandscapeareas.Softlandscapingshouldbeconfinedtothoseareaswhichwerelandscapedassuchi.e.northandwestofthe1948ControlRoomandSwitchHouseandtheirattendanttransformeryards.

New landscaping should be inspired by and respond to the place and incorporateinterpretationofremnantbuildingelementsandremovedstructures.

Visualandphysicallinkswithinandthroughthesiteshouldberespectedandretainedandmaybeenhancedbynewstructuresandaccessways.

Billboards and Signage

ItisrecommendedthatoneoftheexistingbillboardsonVictoriaStreetbeusedasaninformation/interpretationboardforthePowerStation.Theothertwocouldremaininuseforgeneraladvertising.

A further billboard type of signmay be allowed on RobertStreet opposite Mullens Street for interpretation only. Nolarge signage elements should be attached to the buildingpermanently and definitely none should break the existingskylineprofileofthebuildings.

White Bay Hotel Site

TheWhiteBayHotelwascloselyassociatedwiththedevelopmentoftheadjacentWhiteBayPowerStationandotherlocalindustries.AnynewuseforthesiteshouldrelatetotheWhiteBayPowerStationtoVictoriaRoadandnotturnitsbacktoit.

SW Transformer Yard(Design 5 - Architects)

Victoria Road billboards(Design 5 - Architects)

Page 47: White Bay Power Station CMP - thebayssydney.nsw.gov.au€¦ · White Bay PoWer Station ConServation ManageMent Plan - SeCond edition Final July 2011 deSign 5 - arChiteCtS voluMe i

White Bay PoWer Station ConServation ManageMent Plan - SeCond edition Final July 2011deSign 5 - arChiteCtS voluMe i - exeCutive SuMMary - Page 45

Thereisanopportunitytoconstructanewstructureonthesitewithasimilarlandmarkqualitytotheformerhotelinawaythatinterpretsitsroleintheurbanapproachsequencetothecity.AnynewstructureoruseshouldsitcomfortablyinrelationtotheWhiteBayPowerStationsiteadjacentandnotdominateit.

AreusethatislinkedtotheWhiteBayPowerStationandallowspublicaccesstotheWhiteBayHotelsiteispreferred.Privateusessuchasfordwellingsisleastpreferred.

Alterationoftheretainingwallsmayincludepartialremovaloflatersections,however,thereadingofthesurviving“platform”oftheWhiteBayHotelshouldberetainedandremainidentifiable.

The site (including potential for archaeology and the retaining walls) should be fullyrecorded(photographicallyandmeasureddrawings)priortoanysitedisturbancethatmayinvolvepartialremovalornewstructures.

the Burra charter

Thefutureconservation,adaptivere-useworks,andallotherworkstoWhite Bay Power Station shouldbecarriedout inaccordancewith theprinciplesandprocessessetout intheAustraliaICOMOSBurraCharter1999.Theconservationandadaptivere-useoftheWhiteBayPowerStationmustbebasedonarespectfortheexistingfabric,itspastuse,associations andmeanings. This requires a cautious approach of changing asmuch asnecessaryandaslittleaspossible.

Spacesrankedofexceptional,highandmoderatesignificanceatWhiteBayPowerStation mustbefullyrecordedphotographicallyinblackandwhiteforarchivalpurposesbeforeanyinterventionorworkscommence.Thosespacesrankedashavingonlylittlesignificancerequireageneralphotographonlyinblackandwhiteforarchivalpurposes.

Acopyof thisreportandallreportsandrecords,photographicorotherwise,relatingtoWhite Bay Power Station shouldbeplaced inapermanentarchiveandbeavailable forpublicinspection.

Allworks toWhiteBayPowerStationmustbedirected, supervisedandcarriedoutbypersons with appropriate knowledge, skills and experience in the conservation andadaptationofsuchelements.

condItIon oF the place

AninspectionwascarriedoutonthestructurebyHughesTruemanin2002andareportprepared.Thesitewasagaininspectedin2010,andthereportwasrevised.ThisreportisfoundasVolumeIVofthisConservationManagementPlan.

Thepowerstationwasoriginallydesignedfor industrialusewithfacility tohandleandstorelargequantitiesofcoalandsafelyandreliablyreticulatewater,steamandelectricity.

Consequently construction is robust andmany components could be expected to haveextensivereservecapacityforadaptivere-use.

Inadditionthefacilityislikelytohavebeenwellbuiltandmaintained.Consequentlythemajorityofdeteriorationnotedprobablyrelatestothelasttwentyyearsorsosinceclosure.

Muchofthedamageevidentresultsfromingressofwaterfromfailedwindowsorroofsor from blocked or failed stormwater systems or drainage, as well as lack of regular

Page 48: White Bay Power Station CMP - thebayssydney.nsw.gov.au€¦ · White Bay PoWer Station ConServation ManageMent Plan - SeCond edition Final July 2011 deSign 5 - arChiteCtS voluMe i

White Bay PoWer Station ConServation ManageMent Plan - SeCond edition Final July 2011voluMe i - exeCutive SuMMary - Page 46 deSign 5 - arChiteCtS

maintenance.Sitesecurityisalsoanissueandmuchglassbreakagehasbeenduetovandalism.

Theloadcapacityofallfloorsshouldbeassessedforspecificfutureuseproposals.Therehasbeensignificantdeteriorationinsomeareasoftimberflooringduetotermitesandtheingressofwater.SuchareasincludethefloortotheinclinedconveyorshaftfromCoalLoadertotheBoilerHouseandtheupperflooroftheAdministrationbuilding.

Lossofcross-sectionalareaandsectionstrengthofsteelcolumnsislocallyevidentatsomebaseconnectionsduetoexcessivecorrosion.ThisissignificantintheBoilerHouseandCoalLoader.Thereismuchevidence of corrosion to steel connections, roof andwall cladding,steelreinforcementinsomeconcreteelementsandsteelgrateflooring.Inadditiontherearelargeundergroundareaswhichretainbothstructureandmachinerybutarenowfilledwithwaterandsufferingcorrosion.

Guyropesforthetwochimneysshouldbeimmediatelyinvestigatedtodetermineifrepairsarerequired.Thechimneysthemselvescouldnotbeinspectedaspartofthisreportandwillrequireaspecialisedassessmentwithspecialaccessequipment.

The issues andworks identified in theHughes Trueman structural report (Volume IV)should form the basis of a prioritisedwork schedule and this should be progressivelyimplementedtoensurethesurvivalandstructuralintegrityofWhiteBayPowerStation.

Worksshouldbebroadlyprioritisedasfollows:

1Weatherproofingofroofsandrepairofroofdrainagesystem

2RemovaloffailedconcretewatertankoverAdministrationSection

3Birdproofingofallopenings

4Upgradingofsiteandbuildingsecurity

5Weatherproofingofopeningsinwalls

6Structuralrepairs

AllworksshouldbecarriedoutinaccordancewiththerecommendationsintheHughesTruemanreportandalsoinaccordancewithotherpoliciesinthisCMP.

Themachinerywhich remainswithin theWhite Bay complex is largely in a stable butdeterioratedcondition.Asmuchofthefabricofthemachineryissteel,corrosionisanongoingproblemandlittlemaintenancehasbeencarriedoutformanyyears.Aprogramofcatchuprepairandongoingmaintenanceisnecessarytoconservetheseitemsforthelongterm.

Allsignificantitemsofmachineryandequipmentmustbecleanedand conserved in accordance with the findings of a conditionassessmentforeachelement,consistentwiththerecommendationsintheGoddenMackayLoganreport(VolumeV).

Since2004topresent,therehavebeenseveralinstancesofvandalismandattemptedtheftinsidetheAdministrationBuilding,SwitchHouseandtheControlRoom.Thebuildingsareparticularlyvulnerableatgroundlevelandalongthesouthernedges.Perimeterandinternalsecurityhavebeenstrengthened,however theseshouldbe furtherenhancedtoprotectthisuniqueandexceptionallysignificantasset/

Failed water tank over Admin. section(Design 5 - Architects)

Coal Handling Shed(Design 5 - Architects)

Page 49: White Bay Power Station CMP - thebayssydney.nsw.gov.au€¦ · White Bay PoWer Station ConServation ManageMent Plan - SeCond edition Final July 2011 deSign 5 - arChiteCtS voluMe i

White Bay PoWer Station ConServation ManageMent Plan - SeCond edition Final July 2011deSign 5 - arChiteCtS voluMe i - exeCutive SuMMary - Page 47

property.

The issues andworks identified in theHughes Trueman structural report (Volume IV)should form the basis of a prioritisedwork schedule and this should be progressivelyimplementedtoensurethesurvivalandstructuralintegrityofWhiteBayPowerStation.

herItage lIstIngs

WhiteBayPowerStationislistedonthefollowingregisters:

• NSWStateHeritageRegister(SHR)(ItemNo.01015)

• SydneyHarbourForeshoreAuthorityS.170Register

• SydneyRegionalEnvironmentPlan(SREP)No.26(Item11)

• RegisteroftheNationalEstate(ItemNo.019512)

• NationalTrustRegister(classifieditem)

statutory controls

AnychangesproposedtotheplacewillrequiretheconsentoftheNSWHeritageCouncilandthestateplanningbody,NSWDepartmentofPlanningandInfrastructure.

Compliance with the various access, egress and safetyrequirementsandthe‘deemtosatisfy’clausesoftheBuildingCodeofAustralia(BCA)maydiminishmanyofthevaluesandqualitiesoftheplacebychangestothefabricorbyadditionalcompartmentalisation or isolation. A fire engineeringassessmentof the riskof thebuildingand itsproposedusesshouldbecarriedoutandasolutionformulatedwhichretainsandrespectsthesignificantattributesoftheplace.

AnyproblemsorissueswithcomplianceshouldbereferredtotheFireAccessandServicesAdvisoryPanel (FASAP)at theHeritageOfficeforadviceandassistancewithachievingappropriatesolutionstoaddressthevariousBCArequirements.

plannIng Issues

Thesiteisadiscreteurban‘island’,distinctinusefromsurroundinglanduses.Tothenorthof thesiteacrossRobertStreet isacontained industrialprecinctofwarehouseand lightindustrialuses,beyondwhich is theresidential suburbofBalmain. Mostof thisarea iswithintheBalmainConservationArea.

Immediately to thewest is the formerWhiteBayHotel site. ThewhiteBayHotelwasformerlyidentifiedasaheritageitemlistedontheLeichhardtLocalEnvironmentalPlan2000.Furtherwest,acrossVictoriaRoad,isthepredominantlylowriseresidentialsuburbofRozellepartofwhichiswithintheBalmainConservationArea.ImmediatelytothesouthofthepowerstationaregoodsrailwaylinesservingtheBaysPrecinctandtheCityWestLinkRoad,bothofwhicharewithinthePortandEmploymentZoneunderSREP26.TotheimmediateeastofthesiteistheGlebeIslandandWhiteBayMasterPlanarea.

WBPS from Victoria Road(Design 5 - Architects)

Page 50: White Bay Power Station CMP - thebayssydney.nsw.gov.au€¦ · White Bay PoWer Station ConServation ManageMent Plan - SeCond edition Final July 2011 deSign 5 - arChiteCtS voluMe i

White Bay PoWer Station ConServation ManageMent Plan - SeCond edition Final July 2011voluMe i - exeCutive SuMMary - Page 48 deSign 5 - arChiteCtS

Whileamasterplanhasnotbeenpreparedforthepowerstationsite,theGlebeIslandandWhiteBayMasterPlanhasbeenadoptedformuchoftherestoftheWhiteBayandGlebeIslandarea.

ThemasterplanprovidesforthepossiblecontinueduseoftheraillineconnectionthroughRozelleYard.Thisraillinehasalsobeenidentifiedasapossibleadditiontothecommuterlightrailsystem,shouldtheneedariseforaninterchangewithanyfuturemetrostationattheWhiteBaysite.

Recent changes to the bays precinct, including ceasing of car imports to Glebe Island,approvaloftheSydneymetropassingthroughthesite(onhold),theproposalforacruisepassengerterminalandongoingcommercialmaritimeactivitiesinRozelleandBlackwattlebays,havebeenacatalystforre-evaluatingthefutureofthebaysprecinct.

AprocessoflocalconsultationforthefutureuseandplanningofthepowerstationbeganinJune2009withtheestablishmentoftheCommunityReferenceGroup(CRG).Thiswasestablishedasthefirstoftwostageprocessforcommunityconsultations.On1March2010,theCRGmade theirsubmission to theMinisterofPlanning,outliningobjectives for theBaysPrecinctwhichprovidetheframeworkformoredetailedprinciples.

AlltheobjectivesprovidedbytheCRGhaverelevancetotheWBPSsite,withsomehavingspecial relevance in regard to form, shape anddesign for anynewuse. Theprincipalsoverwhelmingly endorsed retention of theWBPS site as a significant heritage itemandrecognized the need for viable and suitable reuse of a public nature and the ability tocontributeandengagewithoverallobjectivesofanyrevitalizationoftheBaysPrecinct.

In2009, thePremierannouncedaproposal foranewCruisePassengerTerminal (CPT),locatedatWhiteBayno.5,inaccordancewithrecommendationsfromthePassengerCruiseTerminalSteeringCommittee,subjecttoplanningapproval.TheCPTwillbeconstructedandoperatedbySydneyPortsCorporation.TheproposalhasreceivedplanningapprovalinaccordancewithPart3AoftheEnvironmentalandAssessmentAct1979.

TheplanningapplicationforaCBDmetrorailwayhasbeenapproved,however in2010thePremierannouncedthatitwouldbeputonindefinitehold(howevertheapprovalandprotectionofcorridorsfortheproposedmetroremaininplace).Aspartofthisproposal,the White Bay precinct would be used as a major construction site to support tunnelconstruction, tunnel spoil removal and rail systems installation. It is intended that thismetrowillformacentralspinetowhichothermetroswouldlinkorinterchange.

Anyproposal toadaptivelyre-usetheWhiteBayPowerStationsitemustbeconsideredwithregardto theobjectivescontainedinSREP26. That is, toencourageamixofnon-residentiallanduseswhichgenerateemploymentopportunities,particularlyinrelationtoportandmaritimeusesandtheworkingindustrialnatureoftheBaysPrecinctgenerally,andtheplacespecifically.

Uses could include light industrial commercial, institutional, entertainment and hoteluses.ResidentialusesasdefinedinSREP26arenotpermitted.AnyproposedusemustbeconsistentwithpoliciesinSection5ofVolumeII.

UseswhichwouldresultinthecreationofabufferbetweentheresidentialareasinBalmainand the adjoining industrial, maritime and port related activity and traffic within theBaysprecinctwouldbehighlydesirableaswellasthosethatutilisetheexistingrailwayinfrastructureandprovideahighdegreeofpublicaccessibilitytothesite.

Page 51: White Bay Power Station CMP - thebayssydney.nsw.gov.au€¦ · White Bay PoWer Station ConServation ManageMent Plan - SeCond edition Final July 2011 deSign 5 - arChiteCtS voluMe i

White Bay PoWer Station ConServation ManageMent Plan - SeCond edition Final July 2011deSign 5 - arChiteCtS voluMe i - exeCutive SuMMary - Page 49

NW Transformer Yard(Design 5 - Architects)

access & accessIBIlIty

All public access points should preferably utilise historical orsignificantentrypoints. Newentrypoints shouldbe located tostrengthenandnotconfuseanunderstandingofthesignificanceoftheplace.

Thedesignandconfigurationofanyfutureaccesspointsshouldbeconsistentwith the former industrialuseof theplaceandbeclearlymarkedwithoutcompetingwithorconfusingthecharacterandsignificanceoftheplace.

PedestrianaccesstothesiteisviatheoriginalbridgetothemainentryofVictoriaRoad(thisentryisnowlockedforsecurity)andthesinglemajorentryfromRobertStreet.

Pedestrianaccesstothesiteshouldbeencouragedbutdependingonfutureuseshouldbecontrolled.

Theexistingvehicularentryisasignificantone,historicallyandprovidesadramaticentrytothesitealmostonaxiswiththerailwayline.Ifvehicularaccessisrelocatedforreasonsofsafetyitmustavoidthebrickpumpingstationsiteandshouldalsoretainspaceonthesitetomanoeuvrelargetrucksandheavyequipment.

RailaccesscouldbereinstatedalongitsoriginalroutebothforinterpretationpurposesaswellasservicingandmaintenancewhichwouldneedtobenegotiatedwithbothSydneyPortsandtheStateRailAuthority.Issuesofaccesssecuritywillalsorequireaddressingtoensuresafetyandsecurityofboththepowerstationandneighbouringsites.

WhiteBayPowerStationwaslocatedclosetotheharbourforaccesstoitswaterforcoolinginthecondensersanditwouldbedesirabletoestablishanaccesstothewaterifthiswerepossible. Thiswouldbedependant on the appropriateness ofwaterfront access to anyfutureuseofthepowerstation.

InterpretatIon

AnInterpretationStrategyshouldbecommissionedasthefirststageofanInterpretationPlan,asan integratedaspectof thedevelopmentandconservationofWhiteBayPowerStation.

Agooddealofadditionalinformationisavailableintheformofplansandearlyphotographs(heldatthePowerHouseMuseum).Moresuchevidencemaycometolightinthecourseoftime.

TheinformationandrecordingsgatheredfromtherecentOralHistoryprojectshouldbeincorporatedintotheinterpretationoftheplace.

Future use and deVelopment

ArangeoffutureusesmaybeconsideredasappropriateforWhiteBayPowerStationandmaybeconsideredsinglyorincombination.

Theyinclude:

• Interpretation/Museumuse

Page 52: White Bay Power Station CMP - thebayssydney.nsw.gov.au€¦ · White Bay PoWer Station ConServation ManageMent Plan - SeCond edition Final July 2011 deSign 5 - arChiteCtS voluMe i

White Bay PoWer Station ConServation ManageMent Plan - SeCond edition Final July 2011voluMe i - exeCutive SuMMary - Page 50 deSign 5 - arChiteCtS

• ALL RL HEIGHTS TO (A.H.D.)AUSTRALIAN HEIGHT DATUM• HATCH AREAS TO HAVEMAX. 75% BUILT UPON AREA• NEW BUILDING MASS TO BE BALANCED WITH OPEN SPACE LANDSCAPE AND RECREATION AREAS

ROBERT

MUL

LENS

RAILWAY T

RACKS

RAILW

AY SI

DING

VICTORIA ROAD

CRES

CENT

COAL CONVEYOR

CONVEYOR

COAL

STREET

SWIT

CH H

OUS

E TR

ANSF

ORM

ER A

LLEY

SWIT

CHHO

USE

PUM

P HO

USE

BOIL

ERHO

USE

SITE

OF

BOIL

ER H

OUS

ENO

. 2

RAIL

WAY

CO

RRID

OR

COAL YARD

CHIM

NEYS

ASHHANDLING

TOWER

NORTHYARD

WESTYARD

CONT

ROL

ROO

M

NORTHWESTYARD

SOUTHWESTYARD

NORT

H TR

ANSF

ORM

ER Y

ARD

AMENITIESBLOCK

NORTHERNPENSTOCK

ADM

INST

AFF

ACCO

M.

RAIL

WAY

CUT

TING

RAIL

WAY

CO

RRID

OR

SOUTHERNPENSTOCK(railway land)

COAL

HAN

DLIN

GSH

ED

SWIT

CH H

OUS

E TR

ANSF

ORM

ER A

LLEY

EXISTINGROBERTSTREETENTRY

0 20 40 60m

FORMERWHITE

BAYHOTEL

SITE

BO

UNDA

RY

SITE BOUNDARY

RAILW

AY

SIDIN

G

ROBERTSTREET

VARIOUS HATCHES DENOTE SITES FOR POTENTIAL DEVELOPMENT

MAX. HEIGHT3 STOREYS(TO RL 15.0)

• MAINTAIN PREFERABLYMIN. 8m ABOVE COAL WASH PIT TO UNDERSIDE OF NEW STRUCTURE

• ACCESS TO NEWSTRUCTURES MAY BRIDGE COAL WASH PIT

MAX. HEIGHT4 STOREYS(TO RL 18.0)

MAX. HEIGHT(TO RL 36.7)

• UNDERSIDE OF NEW STRUCTURE MIN. 8m ABOVE GROUND.• MAX. OVERALLHEIGHT TO RL 22.0

• MAINTAIN VIEWS THROUGH AT LOWERLEVEL• BREAK ROOF FORM ABOVE THIS ZONE

THIS VOLUME ON THEFOOTPRINT OF BOILERHOUSE No. 2 TO BEBUILT STRICTLY INACCORDANCE WITH THEPOLICY GUIDELINES

• MAINTAIN AREA AS ANOPEN SPACE CORRIDORAT GROUND LEVEL

• UNDERSIDE OF NEW STRUCTURE MIN. 8m ABOVE GROUND.• MAX. OVERALLHEIGHT: 16m

POSSIBLE NEW ENTRYPOINT

POSSIBLE NEW ENTRYPOINT

MAX HEIGHTTO RL 10.0

AREA MAY BECOVERED IN CLEAR GLASS

MAX. HEIGHT 1m BELOW TOP OF BLADE WALLS

AREA MAY BECOVERED INCLEAR GLASS

NEW STRUCTURETO FINISH AT ORBELOW LEVEL OFVICTORIA ROAD

MAINTAIN VOIDTO RL 4.0 OVERPENSTOCK

ALIG

NMEN

T O

F NE

W S

UPPO

RT S

TRUC

TURE

VIEWS THROUGH TOBE MAINTAINED ATLOWER LEVEL

MAINTAIN EXISTINGVIEW CORRIDOR TOENTRY EVEN IF MAINENTRY IS RELOCATED

TURB

INE

HALL

MAX HEIGHTTO RL 12.0

(OPE

N BE

LOW

)

MAX. HEIGHT5 STOREYS(TO RL 22.0)

UPPERSOUTHYARD

MIDSOUTHYARD

2m WIDE SECTIONMAX. 15m HEIGHTOVERALL

NEW STRUCTURE INTHE SCALE AND BULK

OF FORMER WHITEBAY HOTEL

Figure5.10.2.1WHITEBAYPOWERSTATIONFutureDevelopmentOptionsSite Plan

Page 53: White Bay Power Station CMP - thebayssydney.nsw.gov.au€¦ · White Bay PoWer Station ConServation ManageMent Plan - SeCond edition Final July 2011 deSign 5 - arChiteCtS voluMe i

White Bay PoWer Station ConServation ManageMent Plan - SeCond edition Final July 2011deSign 5 - arChiteCtS voluMe i - exeCutive SuMMary - Page 51

• Industrial/Workshopuse

• Bulkygoods/retailuse

• Venueandfilmlocation

• Educationuse

• Commercial/officeuse

• Interchangefacilityforrapidmasstransitsystem

Whiletheimpactofeachusewillrequirecarefulconsiderationandmanagement, anyusemust respect the significanceofWhiteBayPower Station and the requirement that its significantmachineryandassociatedspacesmustbeavailableforinterpretation.

Residential use is considered inappropriate due to both site contamination levels, thesignificanceof theplaceand theproximityof theportoperation. It isalsonotallowedunderthePlanningInstruments.

Thoseuseswhichhaveleastimpactonthesignificanceoftheplacearepreferredtothosewhichhavelargeimpactorinvolveconsiderablechange.Thoseuseswhichareinspiredbyandsupportthesignificanceoftheplacearepreferredtothosewhichdonot.

Redevelopment of the Power Stationmust take into account all the Policies containedherein.ThesePoliciesaredesignedtoallowformaximumflexibilitycommensuratewithretaining,preservingandconservingtheCulturalSignificanceofthisquiteexceptionalsite.

Newstructuresmaybeconstructedonthesiteinaccordancewiththefollowingprinciples.TheseareexpressedgraphicallyinFigure5.10.1.1andshowallstructurestotheirmaximumsize,howevernotallshouldexistatthesametime.Newbuildingmassesmustbebalancedwithopenspace,landscapeandrecreationareastoachievetheoptimumdevelopment.

• respectsignificantvistasandviewstoandfromWBPSandwithinsite

• respectclarity,formandtexturesofthoseelementswhichdefineWBPSidentity

• respectaxialityofexistingbuildings.Ifusingadifferentalignmentfornewwork,thismustrespectandretainviewandvistasandintegrityofexistingaxesandstructure

• retaindominanceofchimneys

• retaindominanceofBoilerHousefromandtotheeast

• newstructure(s)maybe insertedwhereprecipitators removed,particularly atnorthendwhichmayconnecttochimneystacksandassistintheirstructuralstability.Theformofconnectionshouldemulateoriginalconnections. Theyshouldnotblock thelightintotheBoilerHouse

• new structures should leave clearheightbeneath andno lower than lower steelhorizontal on ashhandlingunit

• anewbuildingtosimilarheightof1958BoilerHouseshouldbe constructedon the siteofBoilerHouse#2.AccesstodaylightforlaboratoryinAdminwingmustberetained. Thenewstructuremay interconnect intoPumpHousevianewopenings. Thisvolumeshould

Boiler House and Stacks(Design 5 - Architects)

Chimney Stacks(Design 5 - Architects)

Page 54: White Bay Power Station CMP - thebayssydney.nsw.gov.au€¦ · White Bay PoWer Station ConServation ManageMent Plan - SeCond edition Final July 2011 deSign 5 - arChiteCtS voluMe i

White Bay PoWer Station ConServation ManageMent Plan - SeCond edition Final July 2011voluMe i - exeCutive SuMMary - Page 52 deSign 5 - arChiteCtS

bereinstatedasamajorpriorityasitwillrestoretheformalmassingandbalanceofthewholepowerstation.

• lowlevelstructureseastofcoalhandlingshedmaybebuilt

• lowlevelstructuressouthofAdminBuilding,nohigherthanVictoriaRoadfootpathlevelmaybebuilt.Structuresshould“front”thepowerstationwithsimpleelevationstoRobertStreet

• viewofrearofWhiteBayHotelfromwithinsitetoeastshouldberetained

• originalrailcorridorfromthecuttingthroughtoCoalHandlingshedshouldberetained

• linkstothePenstocksshouldberetainedifpossible(northernoneatleast)

• new structures should respect the significance and form ofWBPS. They should becontemporaryindesigntodistinguishthemfromtheearlierworkatthesametimeasbeinginspiredbyandreflectingtheindustrialcharacteroftheplace.Preferredmaterialsaresteelandglasswithminimummasonryelements.

management and maIntenance oF the place

AConservationCommitteeshouldbeappointedbySHFAtoprovideon-goingadvicetoSHFAontheimplementationoftheCMPandtheprotectionoftheheritagesignificanceofthesite.

ThereshouldbecontinuityofrelevantandexperiencedconservationadviceforallaspectsofchangestoWBPS.

Consultantadviceandcontractualworkshouldbelimitedtofirmsorpersonswithprovenexpertiseintherelevantfieldandexperienceonheritagebuildings/structures.

Proposals for change should be subject to an established decision-making process thatincorporatesrelevantadvice.

adoptIon, ImplementatIon and reVIew

ThepoliciessetoutinSection5ofVolumeIIofthisCMPshouldbeappliedirrespectiveoftheusetowhichtheplace,oritsparts,areput.

AllvolumesofthisCMPshouldformpartofanytenderdocumentspreparedforseekingexpressionsof interest forWhiteBayPowerStation.TheCMPshouldnotbeusedinanabridgedformat.

TheCMPshouldbeendorsedbytheHeritageCouncilofNSWbeforebecomingpartofanytenderdocuments.

MasterPlansor anyplanswhich set the framework for the futureofWhiteBayPowerStationshouldbedevelopedinresponsetothisCMPandinconjunctionwithappropriateconservationadvice.

TheendorsedCMPshouldbeadoptedbyallauthoritiesandbodiesinvolvedinplanningandapprovalprocessesforWhiteBayPowerStation,andusedasabasisforassessmentofanyproposalforchange.

SHFAshouldensurethatthisCMPbemadepubliclyavailable.

Page 55: White Bay Power Station CMP - thebayssydney.nsw.gov.au€¦ · White Bay PoWer Station ConServation ManageMent Plan - SeCond edition Final July 2011 deSign 5 - arChiteCtS voluMe i

White Bay PoWer Station ConServation ManageMent Plan - SeCond edition Final July 2011deSign 5 - arChiteCtS voluMe i - exeCutive SuMMary - Page 53

This ConservationManagement Plan document should be reviewed every 10 years orsoonerif

• themanagementstructureoftheplacechanges,

• adaptivere-useanddevelopmenthasbeenundertakeninaccordancewithpoliciesinthisCMP

• newphysicalordocumentaryevidencechangestheknownsignificanceoftheplace.

Further research

The opportunity should be taken for archaeological research around the site beforedevelopment work is done. Information on the location of earlier structures and onwork practices and conditions may be found by suchinvestigation.

ThesitewasoccupiedbyhousingbeforethedevelopmentofthePowerStationandthereispotentialforinformationtobegatheredaboutthisperiodinitsevolution.

WhilemuchofthesitewascutandfilledforthePowerStation,someevidencemaysurvive.

If and when the opportunity arises, research shouldbe carried out on the Aboriginal and early Europeanoccupationofthesite,togiveamorethoroughunderstandingofitshistoricalcontext.

AnOralHistoryrecordingexperiencesofformerworkersofthePowerStation,commissionedbySHFAhasbeencompleted.ThisshouldbereadinconjunctionwiththisConservationManagementPlananditshouldbeusedtoinformandbepartofanInterpretationStrategy.

Distant View(Design 5 - Architects)