Page 1: Westside Subway Extension Final EIS/EIR - Metromedia.metro.net/.../westside/images/Community_Update_JFL_2011_0… · Westside Subway Extension Final EIS/EIR ... Purpose of Tonight’s

Westside Subway Extension Final EIS/EIRJanuary 2011 Community Update Meetings

Page 2: Westside Subway Extension Final EIS/EIR - Metromedia.metro.net/.../westside/images/Community_Update_JFL_2011_0… · Westside Subway Extension Final EIS/EIR ... Purpose of Tonight’s

Purpose of Tonight’s Meeting

• Background information on planning to date

• Clarify Locally Preferred Alternative (LPA) under study

• Describe Final EIS/EIR process• Subway construction overview

Future meetings to address:•Geotechnical investigation findings•Station locations and alignments•Station portal locations•Additional construction details

Page 3: Westside Subway Extension Final EIS/EIR - Metromedia.metro.net/.../westside/images/Community_Update_JFL_2011_0… · Westside Subway Extension Final EIS/EIR ... Purpose of Tonight’s

Latest Developments

• October 28, 2010: Metro Board of Directors– Approved Draft EIS/EIR– Selected “Locally Preferred Alternative” (LPA)

• Metro Board selection of LPA at conclusion of Draft EIS/EIR part of the federal approval & funding process

• Identifies the project to proceed into Final EIS/EIR/PE– Authorized start of Final EIS/EIR

• January 4, 2011: Federal Transit Administration (FTA)– Granted permission for LPA to enter “Preliminary Engineering” (PE)

• Signifies project is well positioned for acceptance into federal “New Starts”funding program

Page 4: Westside Subway Extension Final EIS/EIR - Metromedia.metro.net/.../westside/images/Community_Update_JFL_2011_0… · Westside Subway Extension Final EIS/EIR ... Purpose of Tonight’s

Where We are in the Process

Draft EIS/EIR Final EIS/EIR/PE

18 Months 12 MonthsAnticipated completion

by 2022

We Are Here

Final Design/ Construction

18 Months

Alternatives Analysis

17 Alternatives• Modes• Alignments

5 Subway Alternatives

LPA: Purple Line to Westwood/VA The Project

= Metro Board Decision Point

Page 5: Westside Subway Extension Final EIS/EIR - Metromedia.metro.net/.../westside/images/Community_Update_JFL_2011_0… · Westside Subway Extension Final EIS/EIR ... Purpose of Tonight’s

How We Got Here

• Alternatives Analysis (2007-08) studied:– Need for a transit improvement, alternate

modes of travel, mode required to meet demand, numerous alignments, what alignment to build first

• Draft EIS/EIR (2009-10) studied:– Comparative evaluation of 5 alternatives,

what’s “buildable” within funding constraints, preliminary ridership data, construction issues, locating stations & portals, impacts & potential mitigation measures

• Outreach included:– 57 meetings hosted by Metro, attended by

more than 3,600 people, received over 4,200 comments in all forms

Page 6: Westside Subway Extension Final EIS/EIR - Metromedia.metro.net/.../westside/images/Community_Update_JFL_2011_0… · Westside Subway Extension Final EIS/EIR ... Purpose of Tonight’s

Locally Preferred Alternative (LPA) being Studied in Final EIS/EIR

Page 7: Westside Subway Extension Final EIS/EIR - Metromedia.metro.net/.../westside/images/Community_Update_JFL_2011_0… · Westside Subway Extension Final EIS/EIR ... Purpose of Tonight’s

• Socioeconomics– Environmental Justice

– Economic/Fiscal Impacts

– Communities/Neighborhoods

• Geotechnical– Seismic

– Soils/Gassy Ground

– Hazardous Materials

Issues Studied in Draft EIS/EIR (2009-10)

5 subway alternatives assessed for benefits & impacts of:• Transportation

– Traffic

– Transit

– Parking

• Land Use

• Air Quality/Greenhouse Gases

• Noise & Vibration

• Safety & Security

• Historic Resources

• Archaeology/Paleontology

Both construction & operations impacts were assessed

Page 8: Westside Subway Extension Final EIS/EIR - Metromedia.metro.net/.../westside/images/Community_Update_JFL_2011_0… · Westside Subway Extension Final EIS/EIR ... Purpose of Tonight’s

Comments/Questions Received During Draft EIS/EIR Comment Period

• Public Comment Period:– September 3, 2010 – October 18, 2010– 5 Public Hearings– Comments from nearly 800 individuals

• Responses to these comments will be provided in Final EIS/EIR• Most frequently heard comments related to Locally Preferred

Alternative (LPA):– Station locations

• Century City• Westwood/UCLA• Westwood/VA Hospital

– Beverly Hills to Westwood tunnel alignment– Accelerate construction schedule– Build as much as possible– Station access issues– Construction impacts– Technical issues e.g. traffic & noise impacts

Page 9: Westside Subway Extension Final EIS/EIR - Metromedia.metro.net/.../westside/images/Community_Update_JFL_2011_0… · Westside Subway Extension Final EIS/EIR ... Purpose of Tonight’s

Activities During Final EIS/EIR & PE

Complete environmental clearance & Preliminary Engineering (PE):• Further geotechnical investigation• Potential minor alignment adjustments• Select location for 3 westernmost stations• Refine details for all stations (e.g. portal

locations)• Begin development of station art program• Refine cost estimates for federal grant• Identify potential construction staging locations• Identify property for possible acquisition• Develop mitigation program• Respond to comments on Draft EIS/EIRNote: All decisions made by the Metro Board ofDirectors at conclusion of the Final EIS/EIR

Page 10: Westside Subway Extension Final EIS/EIR - Metromedia.metro.net/.../westside/images/Community_Update_JFL_2011_0… · Westside Subway Extension Final EIS/EIR ... Purpose of Tonight’s

Additional Geotechnical Investigations

• Build on tests performed during Draft EIS/EIR• Provide further soil & seismic information

along LPA• Types of testing

– Soils testing– Fault evaluation– Noise & vibration testing

• Work began in December 2010 & will take approximately 4 - 6 months

• Results will assist with:– Remaining station & alignment recommendations– Determining subway construction techniques

Borings provide information about soil & where soil layers have shifted indicating a fault

Page 11: Westside Subway Extension Final EIS/EIR - Metromedia.metro.net/.../westside/images/Community_Update_JFL_2011_0… · Westside Subway Extension Final EIS/EIR ... Purpose of Tonight’s

Subway Construction Overview

Page 12: Westside Subway Extension Final EIS/EIR - Metromedia.metro.net/.../westside/images/Community_Update_JFL_2011_0… · Westside Subway Extension Final EIS/EIR ... Purpose of Tonight’s

Subway Construction Overview

• Tunnels bored by tunnel boring machines (TBMs) with little surface impact

– Main impact where TBMs lowered into or extracted from the ground & where earth is removed

– Likely at station locations

• Stations & crossover tracks built excavating from above either off-street or under “decked-over” streets

– Street closures at beginning & end of construction– Allows for utility relocation, initial excavation & decking

installation, then decking removal & street restoration

• Ventilation shafts & power sub-stations may also require surface construction if not located at stations

Page 13: Westside Subway Extension Final EIS/EIR - Metromedia.metro.net/.../westside/images/Community_Update_JFL_2011_0… · Westside Subway Extension Final EIS/EIR ... Purpose of Tonight’s

21st Century Subway Tunneling

• New generation “closed face” TBMs maintain pressure in surrounding earth

• Reduces risk of settlement

• Excellent experience on recent 1.8 mile tunnel for Metro Gold Line Eastside Extension– No measurable surface subsidence

– No substantiated property damage claims“Closed-face” TBM maintains pressure in

surrounding earth to reduce settlement risk

“It is possible to tunnel and operate a subway along the Wilshire Corridor safely”(APTA Peer Review, 2005)

Page 14: Westside Subway Extension Final EIS/EIR - Metromedia.metro.net/.../westside/images/Community_Update_JFL_2011_0… · Westside Subway Extension Final EIS/EIR ... Purpose of Tonight’s

Metro’s Existing Red/Purple Line Subway Tunnels

• Run under multiple private properties including:– Commercial– Office– Single-family residential– Multi-family residential

• Mostly 50’ - 70’ below ground– Some as shallow as 30’– Hundreds of feet under Santa

Monica Mountains

• No noise/vibration complaints since subway opened

Page 15: Westside Subway Extension Final EIS/EIR - Metromedia.metro.net/.../westside/images/Community_Update_JFL_2011_0… · Westside Subway Extension Final EIS/EIR ... Purpose of Tonight’s

Construction Issues Common for all Westside Subway Extension Stations

Challenges of building in dense, mature urbanenvironment:• Location of station box (60’ x 650’)• Location of crossover tracks (60’ x 400’)

– Generally appended to station box• Location of station portal(s) • Construction staging location(s)• TBM insertion, removal & soil handling

locations– Combine with station locations where possible– Potentially needed at 3 - 4 station locations

• Need to secure property for all listed above• Defining haul routes

Engineering, design & real estate will determine many decisions

Staging for Vermont/Santa Monica station during Metro Red Line construction (1990’s)

Page 16: Westside Subway Extension Final EIS/EIR - Metromedia.metro.net/.../westside/images/Community_Update_JFL_2011_0… · Westside Subway Extension Final EIS/EIR ... Purpose of Tonight’s

Station Portals

• Metro will build/fund:– 2 portals at Westwood/UCLA station– 1 portal at all other stations

• Typically located where construction staging occurs

• Metro can provide opportunities for additional portals provided by private sector

• Can be integrated into an existing building• Initial portal requires space for:

– Stairs– Escalators– Elevators

• Additional portals may not include all of the above

– Map case– Pylon sign

Page 17: Westside Subway Extension Final EIS/EIR - Metromedia.metro.net/.../westside/images/Community_Update_JFL_2011_0… · Westside Subway Extension Final EIS/EIR ... Purpose of Tonight’s

• Most need about 1 acre

• About 3 acres needed at stations where TBMs are launched/removed & for soils processing

• Prefer 2 staging sites per station, allowing 2 access points for faster station construction

• Prefer off-street staging locations immediately adjacent to station box to ease construction and reduce impacts

• Possible to stage in street, but reduces travel lanes

Need to Secure Construction Staging Sites at Station Locations

Off-street construction staging at Hollywood & Highland

On-street construction staging at 7th & Flower

Page 18: Westside Subway Extension Final EIS/EIR - Metromedia.metro.net/.../westside/images/Community_Update_JFL_2011_0… · Westside Subway Extension Final EIS/EIR ... Purpose of Tonight’s

Subway Construction Details

Page 19: Westside Subway Extension Final EIS/EIR - Metromedia.metro.net/.../westside/images/Community_Update_JFL_2011_0… · Westside Subway Extension Final EIS/EIR ... Purpose of Tonight’s

Crossover Structures• Allows trains to switch to other tracks

– At end stations to reverse trains– Allows service between stations to continue

with “single-tracking” when needed

• Generally appended to stations resulting in longer station box

• “Non-station” crossover structure planned between UCLA & VA Hospital stations– Reduces construction impacts to Wilshire Bl– Working with GSA and Caltrans to locate

under front lawn of Federal Building & in Caltrans property

Page 20: Westside Subway Extension Final EIS/EIR - Metromedia.metro.net/.../westside/images/Community_Update_JFL_2011_0… · Westside Subway Extension Final EIS/EIR ... Purpose of Tonight’s

Mid-Line Ventilation Structures

• Typical station spacing allows for sufficient venting at stations

• Mid-line ventilation structures needed when stations are further apart– Between Western & La Brea at Crenshaw– Between Century City & Westwood

• Location(s) to be determined• Not in single-family residential area

Page 21: Westside Subway Extension Final EIS/EIR - Metromedia.metro.net/.../westside/images/Community_Update_JFL_2011_0… · Westside Subway Extension Final EIS/EIR ... Purpose of Tonight’s

Special Construction Measures

• Paleontological work– Same process used for LACMA parking garage– Remove fossils from approximately top 35’ of soil– Box & store fossils for Page Museum staff– Tunnels are expected to be deeper than fossil area

• Gassy ground– Employ special handling methods to:

• Isolate workers from gases within tunnel• Separate soil allowing for different types of disposal

if needed

– Potential open air construction area for improved ventilation

– Enhanced monitoring & safety measures

Page 22: Westside Subway Extension Final EIS/EIR - Metromedia.metro.net/.../westside/images/Community_Update_JFL_2011_0… · Westside Subway Extension Final EIS/EIR ... Purpose of Tonight’s

Crenshaw Construction IssuesNO STATION PLANNED AT THIS LOCATION

• Metro-owned property on SW corner potentially used for construction staging

• Permanent ventilation structure likely

Page 23: Westside Subway Extension Final EIS/EIR - Metromedia.metro.net/.../westside/images/Community_Update_JFL_2011_0… · Westside Subway Extension Final EIS/EIR ... Purpose of Tonight’s

La Brea Station Construction Issues

• Located under Wilshire between Detroit & Sycamore

• Longer station box to accommodate crossover tracks

• Potential TBM launch site & soil processing location

• Metro-owned property on NW corner to be used for staging & portal location

• Additional construction staging on SW corner desired

• Special measures likely needed for gassy ground

Page 24: Westside Subway Extension Final EIS/EIR - Metromedia.metro.net/.../westside/images/Community_Update_JFL_2011_0… · Westside Subway Extension Final EIS/EIR ... Purpose of Tonight’s

Fairfax Station Construction Issues

• Station box to be located under Wilshire from Ogden to west of Fairfax

• Possible portal sites– Adjacent to Johnies (NW corner)– At LACMA West/May Co Building (NE corner)– Between Orange Grove & Ogden (South side)

• Staging areas desired on both north & south sides of Wilshire

• Special measures for:– Paleontological work– Gassy ground

Page 25: Westside Subway Extension Final EIS/EIR - Metromedia.metro.net/.../westside/images/Community_Update_JFL_2011_0… · Westside Subway Extension Final EIS/EIR ... Purpose of Tonight’s

La Cienega Station Construction Issues

• Located under Wilshire from La Cienega almost to San Vicente

• Longer station box to accommodate crossover tracks east of station

• Potential TBM launch site & soils handling location

• Identify properties for portal location & staging areas

• Staging areas desired on both north & south sides of Wilshire

Page 26: Westside Subway Extension Final EIS/EIR - Metromedia.metro.net/.../westside/images/Community_Update_JFL_2011_0… · Westside Subway Extension Final EIS/EIR ... Purpose of Tonight’s

Rodeo Station Construction Issues

• Station box currently planned between El Camino & Reeves– May move east depending on staging location(s)

• Identify properties for portal location & staging areas

Page 27: Westside Subway Extension Final EIS/EIR - Metromedia.metro.net/.../westside/images/Community_Update_JFL_2011_0… · Westside Subway Extension Final EIS/EIR ... Purpose of Tonight’s

Century City Station Construction Issues: Option #1: Santa Monica Bl/Ave of the Stars

• Located under middle of Santa Monica between Century Park East & West

• Station may need to move east to avoid fault zone– Geotechnical investigations ongoing

• Longer station box to accommodate crossover tracks east of station

• Probable TBM launch site• Limited staging area in Santa Monica Bl median

– Investigating additional staging sites near Century Park East and Constellation

• Portal location on SE or SW corner of Ave of the Stars/Santa Monica Bl

• May shift station box toward north side of Santa Monica Bl to ease traffic during construction

Page 28: Westside Subway Extension Final EIS/EIR - Metromedia.metro.net/.../westside/images/Community_Update_JFL_2011_0… · Westside Subway Extension Final EIS/EIR ... Purpose of Tonight’s

Century City Station Construction Issues: Option #2: Constellation Bl/Ave of the Stars

• Located under Constellation between Century Park East & West

• Longer station box to accommodate crossover tracks east of station

• Probable TBM launch site• Identify staging locations:

– Off-street options:• NE corner Constellation/Ave of the Stars• East side of Century Park East

– Possible use of Constellation Ave for staging• Identify portal locations:

– JMB (NE corner)– Century Plaza Hotel (SW corner)– Westfield (mall entrance west of Ave of the

Stars)

Page 29: Westside Subway Extension Final EIS/EIR - Metromedia.metro.net/.../westside/images/Community_Update_JFL_2011_0… · Westside Subway Extension Final EIS/EIR ... Purpose of Tonight’s

Westwood/UCLA Station Construction Issues

• Station box issues:– Off-street at UCLA Lot 36 location more challenging

due to approval of hotel at Wilshire/Gayley– Focus now on location under Wilshire between

Westwood & Veteran• Staging location at Lot 36 preferred• Metro plans to build 2 portals:

– On UCLA Lot 36 near Wilshire/Gayley– At Westwood Bl intersection

• May be possible to deck only north side of Wilshire– Reduces temporary traffic impacts– Facilitates access from off-street staging location– May require some sidewalk closure during

construction

Page 30: Westside Subway Extension Final EIS/EIR - Metromedia.metro.net/.../westside/images/Community_Update_JFL_2011_0… · Westside Subway Extension Final EIS/EIR ... Purpose of Tonight’s

Westwood/VA Hospital Station Construction Issues

• Southern station option:– Station box & construction staging on hospital

parking lot as close as possible to Wilshire Bl– Need to provide replacement parking for hospital

patients & visitors

• Northern station option:– Station box & construction staging on theater

parking lot or grassy area as close as possible to Wilshire Bl

– Need replacement parking– Complicates future subway extension west

• Potential TBM launch site & earth removal location

• Develop circulation plans to ease station access for subway patrons & separate from VA visitors

Page 31: Westside Subway Extension Final EIS/EIR - Metromedia.metro.net/.../westside/images/Community_Update_JFL_2011_0… · Westside Subway Extension Final EIS/EIR ... Purpose of Tonight’s

Station Area Advisory Groups

• Providing input for the 4 stations in City of Los Angeles and 2 stations in City of Beverly Hills

• Will meet in February, April & June 2011– Mid-Wilshire: La Brea & Fairfax stations– Beverly Hills: La Cienega & Rodeo stations– West: Century City & UCLA stations

• Potential discussion topics – Station design, art & construction– Urban design near stations

• All meetings open to the public• About 10 people per station

– Area residents, businesses & property owners– Currently soliciting members based on input from

City and County officials

Page 32: Westside Subway Extension Final EIS/EIR - Metromedia.metro.net/.../westside/images/Community_Update_JFL_2011_0… · Westside Subway Extension Final EIS/EIR ... Purpose of Tonight’s

Where We Go From Here

2011

2012 2013 2022Responses to Comments

Mitigation Measures

Page 33: Westside Subway Extension Final EIS/EIR - Metromedia.metro.net/.../westside/images/Community_Update_JFL_2011_0… · Westside Subway Extension Final EIS/EIR ... Purpose of Tonight’s

• Monday, January 24 – LACMA West

• Wednesday, January 26 –Westwood United Methodist ChurchLive web-cast of this meeting available at metro.net/westside

• Monday, January 31 – Roxbury Park, Beverly Hills

Three Community Update Meetings

All meetings 6pm-8pm. Content will be identical.

Page 34: Westside Subway Extension Final EIS/EIR - Metromedia.metro.net/.../westside/images/Community_Update_JFL_2011_0… · Westside Subway Extension Final EIS/EIR ... Purpose of Tonight’s

metro.net/westside

[email protected]

Jody Litvak, Regional Communications

[email protected]

213.922.1240

David Mieger, Project Director

[email protected]

213.922.3040

Information line: 213.922.6934

Facebook.com/WestsideSubwayExtension

Twitter.com/WestsideSubway

Contact us

Page 35: Westside Subway Extension Final EIS/EIR - Metromedia.metro.net/.../westside/images/Community_Update_JFL_2011_0… · Westside Subway Extension Final EIS/EIR ... Purpose of Tonight’s

Questions?