Page 1: Westray Community

Westray Community

Securing sustainability

Sam Harcus

Page 2: Westray Community

Island of Westray

Page 3: Westray Community

Reasons for Development

0

500

1000

1500

2000

2500

1881 1901 1921 1941 1961 1981 2001

Page 4: Westray Community

Development and Renewables

Page 5: Westray Community

Development and Renewables

1%

31%

49%

19%

Energy Use on Westray 25GWh

PlanesFerry 50%OilsElectricity Use

• Electricity worth circa £500k• Liquid fuels worth £569k assuming

50p/litre average.• Feed in Tariffs and Renewable Heating

Incentives additional income.

• Grid constraints and lack of alternatives mean we are already fuel switching from liquid fuels to electricity.

• Energy responsible for 7,210 tonnes CO2 per annum.

Page 6: Westray Community

Community Development and Renewables

Page 7: Westray Community

Private Development and Renewables

Page 8: Westray Community

Community Turbine

“Resource to Revenue”• Initial idea to the community• Fund an initial study• Suitable sites, away from

– Protected zones– Away from inhabited property– Flight paths– Telecoms– Availability of land

Page 9: Westray Community

Community Turbine

• Potential site negotiated with land owner• Community Consultation• Keeping in contact with statutory consultees• Planning permission• Grid Connection

Page 10: Westray Community

Community Turbine

Westray Renewable Energy Ltd– Trading Company

• 2 directors from Development Trust• 3 from the community• advisors

Page 11: Westray Community

Community Turbine

• Obtain a quote for a suitable turbine• Funding for £1.8M total project cost

– Pre-development HICEC– Big Lottery ”GCA” – £761k– Remainder Triados Bank

Page 12: Westray Community

Construction

Page 13: Westray Community

Community Turbine

• Enercon E44, – 44m blade diameter and – 45m hub height

• High energy low turbulence site• Power Purchase by Smartest Energy

Page 14: Westray Community

Performance of turbine

2009 October

November

December

2010 January

February

March

AprilMay June

0

50

100

150

200

250

300

350

400

450

Power produced (MWHrs)

Page 15: Westray Community

Scottish Green Energy Awards 2009“Best Community Initiative”

Page 16: Westray Community

“Waiting for wind in Orkney”

Page 17: Westray Community

Thank you