Page 1
Westinghouse Proprietary Class 3 © 2013 Westinghouse Electric Company LLC. All Rights Reserved.Westinghouse Proprietary Class 3 © 2013 Westinghouse Electric Company LLC. All Rights Reserved.
August 2013
Carlos LeipnerVice President, Latin America
Westinghouse Overview and AP1000®
Plant Update
AP1000 is a trademark or registered trademark of Westinghouse Electric Company LLC, its affiliates and/or its subsidiaries in the United States of America and may be registered in other countries throughout the world. All rights reserved. Unauthorized use is strictly prohibited. Other names may be trademarks of their respective owners.
Page 2
Westinghouse Proprietary Class 3 © 2013 Westinghouse Electric Company LLC. All Rights Reserved.
Westinghouse Electric Company
● Incorporated in 1886 by George Westinghouse
● Responsible for some of the world’s most important achievements:
– AC technology
– 1st commercial radio broadcast
– USS Nautilus
– 1st camera on the moon
– Commercial nuclear power
USS Nautilus
George
Westinghouse
World’s first pressurized water reactor
Page 3
Westinghouse Proprietary Class 3 © 2013 Westinghouse Electric Company LLC. All Rights Reserved.
The Only Company Solely Focused on
Commercial Nuclear Technology
• Only advanced generation passive technology design certified in multiple countries
• Eight units under construction, with first of eight additional units to start in 2014
Nearly 50 percent of the nuclear power plants in operation
worldwide are based on Westinghouse technology
Page 4
4
Westinghouse Proprietary Class 2 © 2013 Westinghouse Electric Company LLC. All Rights Reserved.
Nuclear Power PlantsSpecializing in the development and delivery of new nuclear power plant projects
Automation and Field ServicesA global field services and instrumentation and control solutions provider, focused on delivering industry-leading operations solutions and better outage services worldwide
Nuclear FuelA single-source fuel provider for PWR, BWR, VVER and AGR reactors worldwide
Westinghouse Business Structure
Engineering, Equipment and Major ProjectsFocused on ensuring new and operating plant success by providing technically superior engineering, hardware and services that enhance plant safety, ensure plant reliability, extend plant life and improve plant performance
Page 5
Westinghouse Proprietary Class 3 © 2013 Westinghouse Electric Company LLC. All Rights Reserved.
18 countries, 60+ sites worldwide!
Westinghouse Locations
Page 6
Westinghouse Proprietary Class 3 © 2013 Westinghouse Electric Company LLC. All Rights Reserved.
Long-Term Nuclear Market Fundamentals Are Strong
• Carbon-constrained world• Replacement of aging infrastructure
• Development of emerging economies• Intermittent renewable energy delivery• Natural gas dependence and volatility
Additional 250 GW by 2030
Page 7
Westinghouse Proprietary Class 3 © 2013 Westinghouse Electric Company LLC. All Rights Reserved.
Americas
Argentina
Brazil
Canada
Chile
Mexico
United States
Asia
China
India
Indonesia
Malaysia
South Korea
Vietnam
EMEA
Belarus
Bulgaria
Czech Republic
Egypt
Finland
France
Hungary
Morocco
Netherlands
Poland
Romania
Russia
Saudi Arabia
Slovakia
Slovenia
South Africa
Spain
Sweden
Turkey
UAE
Ukraine
United Kingdom
Global Interest in New Plants Continues…
Active Near-Term Opportunities
Westinghouse New Plant Activity
Page 8
Westinghouse Proprietary Class 3 © 2013 Westinghouse Electric Company LLC. All Rights Reserved.
V.C. SUMMER
VOGTLE
HAIYANG
SANMEN
AP1000 Plant Global Project Delivery
● Eight AP1000 units under construction worldwide- Four units in China- Four units in the United States
Page 9
Westinghouse Proprietary Class 3 © 2013 Westinghouse Electric Company LLC. All Rights Reserved.
AP1000 Plant’s Innovative Safety Features
● Passive Safety-Related Systems– Use “passive” processes only; no active
pumps, diesels …
– One-time alignment of valves– No support systems required after
actuation
– Greatly reduced dependency on operator
actions
● Active Defense in Depth-Related Systems
– Reliably support normal operation– Redundant equipment powered by onsite
diesels
– Minimize challenges to passive safety systems
– Not necessary to mitigate design basis accidents
All Critical Station BlackoutResponse Features
FAIL SAFE
All Critical Station BlackoutResponse Features
FAIL SAFE
Page 10
Westinghouse Proprietary Class 3 © 2013 Westinghouse Electric Company LLC. All Rights Reserved.
Modular Construction Allows More To Be Done in Parallel Result: Shorter Construction Schedule
Page 11
Westinghouse Proprietary Class 3 © 2013 Westinghouse Electric Company LLC. All Rights Reserved.
AP1000 Plant Modular Construction
An Innovative Approach Unique in our Industry
● Improved Quality Control and Efficiency● Reduced Construction Schedule and Optimized Costs
Page 12
Westinghouse Proprietary Class 3 © 2013 Westinghouse Electric Company LLC. All Rights Reserved.
AP1000 Plant Modular Construction
An Innovative Approach Unique in our Industry
● Improved Quality Control and Efficiency● Reduced Construction Schedule and Optimized Costs
Page 13
Westinghouse Proprietary Class 3 © 2013 Westinghouse Electric Company LLC. All Rights Reserved.
2009 to 2013
Sanmen Site Progress: Time Lapse View
Westinghouse Proprietary Class 2
Page 14
Westinghouse Proprietary Class 3 © 2013 Westinghouse Electric Company LLC. All Rights Reserved.
14
China AP1000® Plant Delivery: Highlights
• Major equipment delivered and installed at
Sanmen Unit 1 and Haiyang Unit 1 includes:
• Reactor Vessel
• Steam Generators
• Reactor Vessel Internals
• Polar Crane
• Integrated Head Package
• Containment Vessel Top Head (CVTH) set at
Sanmen Unit 1 in January 2013 and Haiyang Unit
1 in March 2013
• Digital I&C delivery in progress
• Potential Sanmen operators completed simulator
training; Haiyang operators started simulator
training in July
• Technology transfer well advanced
Sanmen Site – June 2013
©2013 Sanmen Nuclear Power Company, Ltd. All rights reserved.
Haiyang Unit 1 – June 2013
©2013 Shandong Nuclear Power Company, Ltd. All rights reserved.
Westinghouse Proprietary Class 2
Page 15
Westinghouse Proprietary Class 3 © 2013 Westinghouse Electric Company LLC. All Rights Reserved.
AP1000 U.S. Design & Licensing Milestones
● U.S. Nuclear Regulatory Commission (NRC) approved amended design in December 2011 in 5-0 vote
● Combined construction and operating licenses (COLs) issued by U.S. NRC in February 2012 for Vogtle 3&4 site and March 2012 for V.C. Summer 2&3 site
Page 16
Westinghouse Proprietary Class 3 © 2013 Westinghouse Electric Company LLC. All Rights Reserved.
U.S. NRC Review and Approval
AP1000 Licensing Certification: A Thorough Review
Page 17
Westinghouse Proprietary Class 3 © 2013 Westinghouse Electric Company LLC. All Rights Reserved.
17
Westinghouse Proprietary Class 2
U.S. AP1000® Plant Delivery: Highlights
• First nuclear concrete (FNC) placement
completed in March 2013 for V.C. Summer
Unit 2 and Vogtle Unit 3
• CR10 module, the support structure for the
Containment Vessel Bottom Head (CVBH),
installed in April 2013 at V.C. Summer Unit 2
and Vogtle Unit 3
• CVBH installed May 22 at V.C. Summer Unit 2
and June 1 at Vogtle Unit 3
• Assembly of CV rings and condensers for
initial units in progress at both sites
• Cooling towers under construction at both
sites
• Component and module fabrication
proceeding
© 2013 Georgia Power Company. All rights reserved.
Vogtle Site – July 2013
V.C. Summer Turbine Components – June 2013
© 2013 Georgia Power Company. All rights reserved.
© 2013 South Carolina Electric & Gas. All rights reserved.
Page 18
Westinghouse Proprietary Class 3 © 2013 Westinghouse Electric Company LLC. All Rights Reserved.
U.S. AP1000 Plant Progress: Vogtle Site
Photos © 2013 Georgia Power Company. All rights reserved.
Page 19
Westinghouse Proprietary Class 3 © 2013 Westinghouse Electric Company LLC. All Rights Reserved.
Long lead orders placed
48 months, then 36 months later units
Typical AP1000 Construction Schedule
Page 20
Westinghouse Proprietary Class 3 © 2013 Westinghouse Electric Company LLC. All Rights Reserved.
Local Content & Technology Transfer
Page 21
Westinghouse Proprietary Class 3 © 2013 Westinghouse Electric Company LLC. All Rights Reserved.
Summary of Key Conclusions AP1000 Plant Response to Extreme Events• Westinghouse assessment concluded that AP1000 Plant maintains all safety
limits
• The AP1000 Plant passive design assures
– Containment integrity
– No fuel damage (both spent fuel and reactor)
– No radiological release as a result of the event
AP1000 achieves and maintains Safe Shutdown, protects public health and
safety, and prevents loss of utility investment.
[…], as has been pointed out to me by Japanese colleagues as they reflect
upon Fukushima, had the plant been operating AP1000 reactors, it is likely
that the outcome would have been very different. The AP1000’s passive
safety systems provide the ability to maintain core cooling for at least 72
hours with little human intervention. 72 hours to make repairs, transport
emergency equipment, and take other actions in response to the earthquake
and tsunami that assaulted the Fukushima site would have made a very
significant difference.
US NRC Commissioner William D Magwood
Page 22
Westinghouse Proprietary Class 3 © 2013 Westinghouse Electric Company LLC. All Rights Reserved.
Westinghouse Small Modular Reactor Plant Design
Steam
Generator
Reactor Core
Safety and simplicity. Proven technologies in an innovative package.
Page 23
Westinghouse Proprietary Class 3 © 2013 Westinghouse Electric Company LLC. All Rights Reserved.
Principles for a Strong Safety Culture
1. Everyone is personally responsible for nuclear safety.
2. Leaders demonstrate commitment to safety.
3. Trust permeates the organization.
4. Decision-making reflects safety first.
5. Nuclear technology is recognized as special and unique.
6. A questioning attitude is cultivated.
7. Organizational learning is embraced.
8. Nuclear safety undergoes constant examination.
It is fundamental to focus on Operational Excellence
Page 24
Westinghouse Proprietary Class 3 © 2013 Westinghouse Electric Company LLC. All Rights Reserved.
How can you prepare for the future?
� Build a strong academic record
� Learn the basic science and fundamentals of engineering
� Explore across technical disciplines
� Get involved in projects
� Develop leadership and experience
� Practice teamwork
� Get involved in professional organizations
� Build a network
� Learn about industry trends, challenges and opportunities
� Get involved in community service and activities
� Make a difference . . . Even in social networks
� Maintain a balanced personal and professional life
� Focus on Excellence!
� Have fun!
Page 25
Westinghouse Proprietary Class 3 © 2013 Westinghouse Electric Company LLC. All Rights Reserved.
Westinghouse Prepared to Support Brazil on Meeting its Challenges
• Westinghouse is committed to continue providing ongoing technical support to operating fleet in Brazil
• Post Fukushima, the industry understands that the AP1000 Plant achieves and maintains safe shutdown, protects public health and safety, and prevents loss of utility investment.
• A Worldwide fleet approach for standard nuclear design provides maximum efficiencies for long-term, competitive electricity generation
• The AP1000 Plant assures licensing, cost and schedule certainty
• Significant supply chain opportunities for regional industry to support both plant equipment manufacture and construction workforce
Westinghouse: Partnering with Brazil to provide safe, reliable,
competitive nuclear generation for years to come!
Page 26
Westinghouse Proprietary Class 3 © 2013 Westinghouse Electric Company LLC. All Rights Reserved.
Obrigado! Questions?
Please visit us at:
http://www.westinghousenuclear.com/