Page 2
West Sylvan Baseball Fields 1
Project Description
The project is located at 8111 SW West Slope Drive. The proposed are of work is 5.3 acres and will
improve 176,800sf sports fields and 54,463sf of program area supporting the sporting the sports fields,
including hitting facility, restrooms, concessions, dugouts, pressbox, bleachers and walking path.
Existing Site Conditions
The existing site is developed and maintained as a natural grass sports field with clay infield for baseball
and softball. A cider walking path is located at the perimeter of the sports fields.
The site generally slopes from east to west. The existing sports fields are gently sloped at 1.5%, and
beyond the field the slope steepens to approximately 15%.
Per the Web Soil Survey provided by NRCS, the site soil is Cornelius and Kinton silt loams, hydrologic soil
group C. Infiltration testing has been conducted for the project, and preliminary test results show a
0in/hr infiltration rate.
Stormwater Management Requirements
City of Beaverton has adopted the current version of the Clean Water Service Design and construction
Standards.
Water Quantity Control Requirements
The development shall incorporate techniques for mitigating its impacts on the public stormwater
system (Section 4.02.1, CWS R&O 19-5)
On-Site facilities shall be constructed be constructed when there is an identified downstream deficiency,
identified regional detention site within the boundary of the development, or when required by District-
adopted watershed management plan. (Section 4.02.2, CWS R&O 19-5)
Hydromodification Approach Requirements
New developments which create and/or modify 1,000sf or greater of impervious area, are required to
implement or fund techniques to reduce impacts to the downstream receiving water body. (Section
4.03.1, CWS R&O 19-5)
Water Quality Treatment Requirements
New developments which create and/or modify 1,000sf or greater of impervious area, are required to
implement permanent water quality approached to reduce contaminants enter the storm and surface
water system. (Section 4.04.1, CWS R&O 19-5)
Hydromodification Assessment
Using the Hydomodification Map the reach-specific risk level and development class are determined to
be High Risk Level in a Developed area.
The project size is large, greater than 80,000sf.
Page 3
West Sylvan Baseball Fields 2
This project falls within Category 3. Category 3 has the option for peak-flow matching detention and
LIDA or Flow Duration Curve Matching Detention.
This project will use peak-flow matching and LIDA to meet the hydromodification requirements.
The following are the design storms to be used in peak-flow hydrologic analysis:
Storm Event Precipitation Depth (inches)
2year, 24 hour 2.50
5year, 24 hour 3.10
10year, 24 hour 3.45
25year, 24 hour 3.90
The peak-flow matching requirement is such that the post-development runoff rates do not exceed the
pre-development runoff rates as shown in the table below. Pre-development is defined as the project
site’s surface condition prior to the proposed development (Section 1.03.56, CWS R&O 19-5).
Post-Development Peak Runoff Rate Pre-Development Peak Runoff Rate Target
2year, 24 hour 50% of the 2year, 24 hour
5year, 24 hour 5year, 24 hour
10year, 24 hour 10year, 24 hour
Page 4
West Sylvan Baseball Fields 3
Stormwater Management Calculations
Areas
Total 231,263sf, 5.31 acres
Synthetic Turf 179,550sf, 4.12 acres
Natural Grass / Landscape 5,875sf, 0.13 acres
Impervious 23,136sf, 0.53 acres
Gravel 22,699sf, 0.52 acres
Water Quality
The design storm to be used in water quality evaluation is 0.36inches over 3hours.
Water Quality Flow:
Project Area: 231,263sf (5.31acre) Impervious Area
��� =0.36�ℎ�����(��)
12���3ℎ��60
�ℎ�
�60����
WQF = 0.64cfs
Vegetated Swale Calculations:
Swale Bottom Width, 9.0ft
Side Slopes, 4H:1V
Swale Longitudinal Slope, 0.005
Using Civil Tools to Calculate Velocity, 0.19fps
Required Swale length:
0.19fps x 9min x 60sec/min = 103LF (design
length is 115LF)
Page 5
West Sylvan Baseball Fields 4
Detention
Using Peak Flow Matching approach to determining the required detention, the SBUH method was used
to determine the peak flows.
Area CN
Pre-Developed 5.31 acres 79
Developed
Synthetic Turf 98 179,550sf, 4.12 acres
Natural Grass / Landscape 90 5,875sf, 0.13 acres
Impervious 98 23,136sf, 0.53 acres
Gravel 91 22,699sf, 0.52 acres
Peak Flows:
Storm Event Pre-Developed Required Developed Released Elevation Storage
2yr 0.535 0.27 2.938 0.263 102.82 26,588
5yr 0.935 0.935 3.714 0.604 102.95 27,531
10yr 1.192 1.192 4.166 0.848 103 27,846
The following pages include the report from Hydraflow Hydrographs.
Page 6
WEST SYLVANBASEBALL FIELDS
EXISTING CONDITIONS
Page 7
SD
[][]
[][]
[]
[]
[]
00
00
[][]
[][]
[][]
00
STMSTM
STMSTM
STMSTM
STM STM STM STM STM STM STM STM STM
STM STM STM STM STM
STMSTM
STMSTM
STMSTM
STM
WEST SYLVANBASEBALL FIELDS
STORMWATERMANAGEMENT OPTION 1
Stormwater Management Option 1Summary:
Design Approach- LIDA & Peak FlowMatching Detention
Areas: Total Area of Improvements, 5.31 acres Synthetic Turf, 4.12 acres Landscape, 0.13 acres Impervious, 0.53 acres Gravel, 0.52 acres
Stormwater Management LIDA Swale, 2,360sf UG Detention, 28,900 cf
Synthetic Turf
Natural Grass / Landscape
Impervious(bldg, dugout, concrete, asphalt)
Gravel
LIDA Swale
UG Detention
0
SCALE: 1" = 60'
30 60 120
HHPR, BOR-19A, 09/16/2019
Page 8
WEST SYLVANBASEBALL FIELDS
STORMWATERMANAGEMENT
Details
30 ML impermeableliner
Drain rock
Non-woven geotextile
Growing medium
3H: 1V max. side slopes(4:1 without side shelf)
Subgrade
Jute matting
Choker Course 9”3”
UG Detention
Vegetated Swale
Vegetated Swaleand
UG Detention
Page 9
Hydraflow Table of Contents BOR19A Option1 Hydraflow.gpw
Hydraflow Hydrographs Extension for Autodesk® Civil 3D® 2019 by Autodesk, Inc. v2020 Monday, 09 / 16 / 2019
Hydrograph Return Period Recap............................................................................. 1
2 - YearHydrograph Reports................................................................................................................... 2
Hydrograph No. 1, SBUH Runoff, Pre-Developed................................................................... 2TR-55 Tc Worksheet............................................................................................................ 3
Hydrograph No. 3, SBUH Runoff, Turf..................................................................................... 4Hydrograph No. 4, SBUH Runoff, Natural Grass..................................................................... 5Hydrograph No. 5, SBUH Runoff, Impervious.......................................................................... 6Hydrograph No. 6, SBUH Runoff, Gravel................................................................................. 7Hydrograph No. 7, Combine, Developed................................................................................. 8Hydrograph No. 9, Reservoir, Detained Flows......................................................................... 9
Pond Report - Underground Detention.............................................................................. 10
5 - YearHydrograph Reports................................................................................................................. 11
Hydrograph No. 1, SBUH Runoff, Pre-Developed................................................................. 11Hydrograph No. 3, SBUH Runoff, Turf................................................................................... 12Hydrograph No. 4, SBUH Runoff, Natural Grass................................................................... 13Hydrograph No. 5, SBUH Runoff, Impervious........................................................................ 14Hydrograph No. 6, SBUH Runoff, Gravel............................................................................... 15Hydrograph No. 7, Combine, Developed............................................................................... 16Hydrograph No. 9, Reservoir, Detained Flows....................................................................... 17
10 - YearHydrograph Reports................................................................................................................. 18
Hydrograph No. 1, SBUH Runoff, Pre-Developed................................................................. 18Hydrograph No. 3, SBUH Runoff, Turf................................................................................... 19Hydrograph No. 4, SBUH Runoff, Natural Grass................................................................... 20Hydrograph No. 5, SBUH Runoff, Impervious........................................................................ 21Hydrograph No. 6, SBUH Runoff, Gravel............................................................................... 22Hydrograph No. 7, Combine, Developed............................................................................... 23Hydrograph No. 9, Reservoir, Detained Flows....................................................................... 24
Page 10
Hydrograph Return Period Recap
1
Hyd. Hydrograph Inflow Peak Outflow (cfs) Hydrograph
No. type hyd(s) Description
(origin) 1-yr 2-yr 3-yr 5-yr 10-yr 25-yr 50-yr 100-yr
1 SBUH Runoff ------ ------- 0.535 ------- 0.935 1.192 1.544 ------- ------- Pre-Developed
3 SBUH Runoff ------ ------- 2.374 ------- 2.976 3.325 3.774 ------- ------- Turf
4 SBUH Runoff ------ ------- 0.049 ------- 0.068 0.080 0.094 ------- ------- Natural Grass
5 SBUH Runoff ------ ------- 0.305 ------- 0.383 0.428 0.485 ------- ------- Impervious
6 SBUH Runoff ------ ------- 0.211 ------- 0.288 0.333 0.392 ------- ------- Gravel
7 Combine 3, 4, 5,6
------- 2.938 ------- 3.714 4.166 4.745 ------- ------- Developed
9 Reservoir 7 ------- 0.263 ------- 0.604 0.848 1.369 ------- ------- Detained Flows
Proj. file: BOR19A Option1 Hydraflow.gpw Monday, 09 / 16 / 2019
Hydraflow Hydrographs Extension for Autodesk® Civil 3D® 2019 by Autodesk, Inc. v2020
Page 11
Hydrograph Report
Hydraflow Hydrographs Extension for Autodesk® Civil 3D® 2019 by Autodesk, Inc. v2020 Monday, 09 / 16 / 2019
Hyd. No. 1
Pre-Developed
Hydrograph type = SBUH Runoff Peak discharge = 0.535 cfsStorm frequency = 2 yrs Time to peak = 490 minTime interval = 2 min Hyd. volume = 16,142 cuftDrainage area = 5.310 ac Curve number = 79Basin Slope = 0.0 % Hydraulic length = 0 ftTc method = TR55 Time of conc. (Tc) = 30.80 minTotal precip. = 2.50 in Distribution = Type IAStorm duration = 24 hrs Shape factor = n/a
2
0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560
Q (cfs)
0.00 0.00
0.10 0.10
0.20 0.20
0.30 0.30
0.40 0.40
0.50 0.50
0.60 0.60
0.70 0.70
0.80 0.80
0.90 0.90
1.00 1.00
Q (cfs)
Time (min)
Pre-Developed
Hyd. No. 1 -- 2 Year
Hyd No. 1
Page 12
TR55 Tc Worksheet3
Hydraflow Hydrographs Extension for Autodesk® Civil 3D® 2019 by Autodesk, Inc. v2020
Hyd. No. 1
Pre-Developed
Description A B C Totals
Sheet FlowManning's n-value = 0.150 0.011 0.011Flow length (ft) = 300.0 0.0 0.0Two-year 24-hr precip. (in) = 2.50 0.00 0.00Land slope (%) = 1.50 0.00 0.00
Travel Time (min) = 29.95 + 0.00 + 0.00 = 29.95
Shallow Concentrated FlowFlow length (ft) = 100.00 0.00 0.00Watercourse slope (%) = 1.50 0.00 0.00Surface description = Unpaved Paved PavedAverage velocity (ft/s) =1.98 0.00 0.00
Travel Time (min) = 0.84 + 0.00 + 0.00 = 0.84
Channel FlowX sectional flow area (sqft) = 0.00 0.00 0.00Wetted perimeter (ft) = 0.00 0.00 0.00Channel slope (%) = 0.00 0.00 0.00Manning's n-value = 0.015 0.015 0.015Velocity (ft/s) =0.00
0.000.00
Flow length (ft) ({0})0.0 0.0 0.0
Travel Time (min) = 0.00 + 0.00 + 0.00 = 0.00
Total Travel Time, Tc .............................................................................. 30.80 min
Page 13
Hydrograph Report
Hydraflow Hydrographs Extension for Autodesk® Civil 3D® 2019 by Autodesk, Inc. v2020 Monday, 09 / 16 / 2019
Hyd. No. 3
Turf
Hydrograph type = SBUH Runoff Peak discharge = 2.374 cfsStorm frequency = 2 yrs Time to peak = 474 minTime interval = 2 min Hyd. volume = 33,960 cuftDrainage area = 4.120 ac Curve number = 98Basin Slope = 0.0 % Hydraulic length = 0 ftTc method = User Time of conc. (Tc) = 5.00 minTotal precip. = 2.50 in Distribution = Type IAStorm duration = 24 hrs Shape factor = n/a
4
0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560
Q (cfs)
0.00 0.00
1.00 1.00
2.00 2.00
3.00 3.00
Q (cfs)
Time (min)
Turf
Hyd. No. 3 -- 2 Year
Hyd No. 3
Page 14
Hydrograph Report
Hydraflow Hydrographs Extension for Autodesk® Civil 3D® 2019 by Autodesk, Inc. v2020 Monday, 09 / 16 / 2019
Hyd. No. 4
Natural Grass
Hydrograph type = SBUH Runoff Peak discharge = 0.049 cfsStorm frequency = 2 yrs Time to peak = 478 minTime interval = 2 min Hyd. volume = 722 cuftDrainage area = 0.130 ac Curve number = 90Basin Slope = 0.0 % Hydraulic length = 0 ftTc method = User Time of conc. (Tc) = 5.00 minTotal precip. = 2.50 in Distribution = Type IAStorm duration = 24 hrs Shape factor = n/a
5
0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560
Q (cfs)
0.00 0.00
0.01 0.01
0.02 0.02
0.03 0.03
0.04 0.04
0.05 0.05
0.06 0.06
0.07 0.07
0.08 0.08
0.09 0.09
0.10 0.10
Q (cfs)
Time (min)
Natural Grass
Hyd. No. 4 -- 2 Year
Hyd No. 4
Page 15
Hydrograph Report
Hydraflow Hydrographs Extension for Autodesk® Civil 3D® 2019 by Autodesk, Inc. v2020 Monday, 09 / 16 / 2019
Hyd. No. 5
Impervious
Hydrograph type = SBUH Runoff Peak discharge = 0.305 cfsStorm frequency = 2 yrs Time to peak = 474 minTime interval = 2 min Hyd. volume = 4,369 cuftDrainage area = 0.530 ac Curve number = 98Basin Slope = 0.0 % Hydraulic length = 0 ftTc method = User Time of conc. (Tc) = 5.00 minTotal precip. = 2.50 in Distribution = Type IAStorm duration = 24 hrs Shape factor = n/a
6
0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560
Q (cfs)
0.00 0.00
0.05 0.05
0.10 0.10
0.15 0.15
0.20 0.20
0.25 0.25
0.30 0.30
0.35 0.35
0.40 0.40
0.45 0.45
0.50 0.50
Q (cfs)
Time (min)
Impervious
Hyd. No. 5 -- 2 Year
Hyd No. 5
Page 16
Hydrograph Report
Hydraflow Hydrographs Extension for Autodesk® Civil 3D® 2019 by Autodesk, Inc. v2020 Monday, 09 / 16 / 2019
Hyd. No. 6
Gravel
Hydrograph type = SBUH Runoff Peak discharge = 0.211 cfsStorm frequency = 2 yrs Time to peak = 476 minTime interval = 2 min Hyd. volume = 3,040 cuftDrainage area = 0.520 ac Curve number = 91Basin Slope = 0.0 % Hydraulic length = 0 ftTc method = User Time of conc. (Tc) = 5.00 minTotal precip. = 2.50 in Distribution = Type IAStorm duration = 24 hrs Shape factor = n/a
7
0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560
Q (cfs)
0.00 0.00
0.05 0.05
0.10 0.10
0.15 0.15
0.20 0.20
0.25 0.25
0.30 0.30
0.35 0.35
0.40 0.40
0.45 0.45
0.50 0.50
Q (cfs)
Time (min)
Gravel
Hyd. No. 6 -- 2 Year
Hyd No. 6
Page 17
Hydrograph Report
Hydraflow Hydrographs Extension for Autodesk® Civil 3D® 2019 by Autodesk, Inc. v2020 Monday, 09 / 16 / 2019
Hyd. No. 7
Developed
Hydrograph type = Combine Peak discharge = 2.938 cfsStorm frequency = 2 yrs Time to peak = 474 minTime interval = 2 min Hyd. volume = 42,091 cuftInflow hyds. = 3, 4, 5, 6 Contrib. drain. area = 5.300 ac
8
0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560
Q (cfs)
0.00 0.00
1.00 1.00
2.00 2.00
3.00 3.00
Q (cfs)
Time (min)
Developed
Hyd. No. 7 -- 2 Year
Hyd No. 7 Hyd No. 3 Hyd No. 4 Hyd No. 5
Hyd No. 6
Page 18
Hydrograph Report
Hydraflow Hydrographs Extension for Autodesk® Civil 3D® 2019 by Autodesk, Inc. v2020 Monday, 09 / 16 / 2019
Hyd. No. 9
Detained Flows
Hydrograph type = Reservoir Peak discharge = 0.263 cfsStorm frequency = 2 yrs Time to peak = 1398 minTime interval = 2 min Hyd. volume = 41,556 cuftInflow hyd. No. = 7 - Developed Max. Elevation = 102.82 ftReservoir name = Underground Detention Max. Storage = 26,588 cuft
Storage Indication method used.
9
0 600 1200 1800 2400 3000 3600 4200 4800 5400 6000
Q (cfs)
0.00 0.00
1.00 1.00
2.00 2.00
3.00 3.00
Q (cfs)
Time (min)
Detained Flows
Hyd. No. 9 -- 2 Year
Hyd No. 9 Hyd No. 7 Total storage used = 26,588 cuft
Page 19
Pond Report 10
Hydraflow Hydrographs Extension for Autodesk® Civil 3D® 2019 by Autodesk, Inc. v2020 Monday, 09 / 16 / 2019
Pond No. 1 - Underground Detention
Pond Data
UG Chambers -Invert elev. = 100.00 ft, Rise x Span = 3.75 x 6.40 ft, Barrel Len = 150.00 ft, No. Barrels = 11, Slope = 0.00%, Headers = No
Stage / Storage Table
Stage (ft) Elevation (ft) Contour area (sqft) Incr. Storage (cuft) Total storage (cuft)
0.00 100.00 n/a 0 00.38 100.38 n/a 3,954 3,9540.75 100.75 n/a 3,914 7,8681.13 101.13 n/a 3,833 11,7021.50 101.50 n/a 3,708 15,4101.88 101.88 n/a 3,535 18,9452.25 102.25 n/a 3,305 22,2502.63 102.63 n/a 3,006 25,2563.00 103.00 n/a 2,614 27,8703.38 103.38 n/a 2,075 29,9453.75 103.75 n/a 1,163 31,108
Culvert / Orifice Structures Weir Structures
[A] [B] [C] [PrfRsr] [A] [B] [C] [D]
Rise (in) = 12.00 2.50 0.00 0.00
Span (in) = 12.00 2.50 0.00 0.00
No. Barrels = 1 1 0 0
Invert El. (ft) = 100.00 100.00 0.00 0.00
Length (ft) = 50.00 0.00 0.00 0.00
Slope (%) = 5.00 0.00 0.00 n/a
N-Value = .013 .013 .013 n/a
Orifice Coeff. = 0.60 0.60 0.60 0.60
Multi-Stage = n/a Yes No No
Crest Len (ft) = 3.14 0.00 0.00 0.00
Crest El. (ft) = 102.85 0.00 0.00 0.00
Weir Coeff. = 3.33 3.33 3.33 3.33
Weir Type = 1 --- --- ---
Multi-Stage = Yes No No No
Exfil.(in/hr) = 0.000 (by Wet area)
TW Elev. (ft) = 0.00
Note: Culvert/Orifice outflows are analyzed under inlet (ic) and outlet (oc) control. Weir risers checked for orifice conditions (ic) and submergence (s).
0.00 0.50 1.00 1.50 2.00 2.50 3.00 3.50 4.00
Stage (ft)
0.00 100.00
1.00 101.00
2.00 102.00
3.00 103.00
4.00 104.00
Elev (ft)
Discharge (cfs)
Stage / Discharge
Total Q
Page 20
Hydrograph Report
Hydraflow Hydrographs Extension for Autodesk® Civil 3D® 2019 by Autodesk, Inc. v2020 Monday, 09 / 16 / 2019
Hyd. No. 1
Pre-Developed
Hydrograph type = SBUH Runoff Peak discharge = 0.935 cfsStorm frequency = 5 yrs Time to peak = 486 minTime interval = 2 min Hyd. volume = 24,327 cuftDrainage area = 5.310 ac Curve number = 79Basin Slope = 0.0 % Hydraulic length = 0 ftTc method = TR55 Time of conc. (Tc) = 30.80 minTotal precip. = 3.10 in Distribution = Type IAStorm duration = 24 hrs Shape factor = n/a
11
0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560
Q (cfs)
0.00 0.00
0.10 0.10
0.20 0.20
0.30 0.30
0.40 0.40
0.50 0.50
0.60 0.60
0.70 0.70
0.80 0.80
0.90 0.90
1.00 1.00
Q (cfs)
Time (min)
Pre-Developed
Hyd. No. 1 -- 5 Year
Hyd No. 1
Page 21
Hydrograph Report
Hydraflow Hydrographs Extension for Autodesk® Civil 3D® 2019 by Autodesk, Inc. v2020 Monday, 09 / 16 / 2019
Hyd. No. 3
Turf
Hydrograph type = SBUH Runoff Peak discharge = 2.976 cfsStorm frequency = 5 yrs Time to peak = 474 minTime interval = 2 min Hyd. volume = 42,891 cuftDrainage area = 4.120 ac Curve number = 98Basin Slope = 0.0 % Hydraulic length = 0 ftTc method = User Time of conc. (Tc) = 5.00 minTotal precip. = 3.10 in Distribution = Type IAStorm duration = 24 hrs Shape factor = n/a
12
0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560
Q (cfs)
0.00 0.00
1.00 1.00
2.00 2.00
3.00 3.00
Q (cfs)
Time (min)
Turf
Hyd. No. 3 -- 5 Year
Hyd No. 3
Page 22
Hydrograph Report
Hydraflow Hydrographs Extension for Autodesk® Civil 3D® 2019 by Autodesk, Inc. v2020 Monday, 09 / 16 / 2019
Hyd. No. 4
Natural Grass
Hydrograph type = SBUH Runoff Peak discharge = 0.068 cfsStorm frequency = 5 yrs Time to peak = 476 minTime interval = 2 min Hyd. volume = 980 cuftDrainage area = 0.130 ac Curve number = 90Basin Slope = 0.0 % Hydraulic length = 0 ftTc method = User Time of conc. (Tc) = 5.00 minTotal precip. = 3.10 in Distribution = Type IAStorm duration = 24 hrs Shape factor = n/a
13
0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560
Q (cfs)
0.00 0.00
0.01 0.01
0.02 0.02
0.03 0.03
0.04 0.04
0.05 0.05
0.06 0.06
0.07 0.07
0.08 0.08
0.09 0.09
0.10 0.10
Q (cfs)
Time (min)
Natural Grass
Hyd. No. 4 -- 5 Year
Hyd No. 4
Page 23
Hydrograph Report
Hydraflow Hydrographs Extension for Autodesk® Civil 3D® 2019 by Autodesk, Inc. v2020 Monday, 09 / 16 / 2019
Hyd. No. 5
Impervious
Hydrograph type = SBUH Runoff Peak discharge = 0.383 cfsStorm frequency = 5 yrs Time to peak = 474 minTime interval = 2 min Hyd. volume = 5,517 cuftDrainage area = 0.530 ac Curve number = 98Basin Slope = 0.0 % Hydraulic length = 0 ftTc method = User Time of conc. (Tc) = 5.00 minTotal precip. = 3.10 in Distribution = Type IAStorm duration = 24 hrs Shape factor = n/a
14
0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560
Q (cfs)
0.00 0.00
0.05 0.05
0.10 0.10
0.15 0.15
0.20 0.20
0.25 0.25
0.30 0.30
0.35 0.35
0.40 0.40
0.45 0.45
0.50 0.50
Q (cfs)
Time (min)
Impervious
Hyd. No. 5 -- 5 Year
Hyd No. 5
Page 24
Hydrograph Report
Hydraflow Hydrographs Extension for Autodesk® Civil 3D® 2019 by Autodesk, Inc. v2020 Monday, 09 / 16 / 2019
Hyd. No. 6
Gravel
Hydrograph type = SBUH Runoff Peak discharge = 0.288 cfsStorm frequency = 5 yrs Time to peak = 476 minTime interval = 2 min Hyd. volume = 4,086 cuftDrainage area = 0.520 ac Curve number = 91Basin Slope = 0.0 % Hydraulic length = 0 ftTc method = User Time of conc. (Tc) = 5.00 minTotal precip. = 3.10 in Distribution = Type IAStorm duration = 24 hrs Shape factor = n/a
15
0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560
Q (cfs)
0.00 0.00
0.05 0.05
0.10 0.10
0.15 0.15
0.20 0.20
0.25 0.25
0.30 0.30
0.35 0.35
0.40 0.40
0.45 0.45
0.50 0.50
Q (cfs)
Time (min)
Gravel
Hyd. No. 6 -- 5 Year
Hyd No. 6
Page 25
Hydrograph Report
Hydraflow Hydrographs Extension for Autodesk® Civil 3D® 2019 by Autodesk, Inc. v2020 Monday, 09 / 16 / 2019
Hyd. No. 7
Developed
Hydrograph type = Combine Peak discharge = 3.714 cfsStorm frequency = 5 yrs Time to peak = 474 minTime interval = 2 min Hyd. volume = 53,474 cuftInflow hyds. = 3, 4, 5, 6 Contrib. drain. area = 5.300 ac
16
0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560
Q (cfs)
0.00 0.00
1.00 1.00
2.00 2.00
3.00 3.00
4.00 4.00
Q (cfs)
Time (min)
Developed
Hyd. No. 7 -- 5 Year
Hyd No. 7 Hyd No. 3 Hyd No. 4 Hyd No. 5
Hyd No. 6
Page 26
Hydrograph Report
Hydraflow Hydrographs Extension for Autodesk® Civil 3D® 2019 by Autodesk, Inc. v2020 Monday, 09 / 16 / 2019
Hyd. No. 9
Detained Flows
Hydrograph type = Reservoir Peak discharge = 0.604 cfsStorm frequency = 5 yrs Time to peak = 756 minTime interval = 2 min Hyd. volume = 52,930 cuftInflow hyd. No. = 7 - Developed Max. Elevation = 102.95 ftReservoir name = Underground Detention Max. Storage = 27,531 cuft
Storage Indication method used.
17
0 600 1200 1800 2400 3000 3600 4200 4800 5400 6000
Q (cfs)
0.00 0.00
1.00 1.00
2.00 2.00
3.00 3.00
4.00 4.00
Q (cfs)
Time (min)
Detained Flows
Hyd. No. 9 -- 5 Year
Hyd No. 9 Hyd No. 7 Total storage used = 27,531 cuft
Page 27
Hydrograph Report
Hydraflow Hydrographs Extension for Autodesk® Civil 3D® 2019 by Autodesk, Inc. v2020 Monday, 09 / 16 / 2019
Hyd. No. 1
Pre-Developed
Hydrograph type = SBUH Runoff Peak discharge = 1.192 cfsStorm frequency = 10 yrs Time to peak = 486 minTime interval = 2 min Hyd. volume = 29,438 cuftDrainage area = 5.310 ac Curve number = 79Basin Slope = 0.0 % Hydraulic length = 0 ftTc method = TR55 Time of conc. (Tc) = 30.80 minTotal precip. = 3.45 in Distribution = Type IAStorm duration = 24 hrs Shape factor = n/a
18
0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560
Q (cfs)
0.00 0.00
1.00 1.00
2.00 2.00
Q (cfs)
Time (min)
Pre-Developed
Hyd. No. 1 -- 10 Year
Hyd No. 1
Page 28
Hydrograph Report
Hydraflow Hydrographs Extension for Autodesk® Civil 3D® 2019 by Autodesk, Inc. v2020 Monday, 09 / 16 / 2019
Hyd. No. 3
Turf
Hydrograph type = SBUH Runoff Peak discharge = 3.325 cfsStorm frequency = 10 yrs Time to peak = 474 minTime interval = 2 min Hyd. volume = 48,107 cuftDrainage area = 4.120 ac Curve number = 98Basin Slope = 0.0 % Hydraulic length = 0 ftTc method = User Time of conc. (Tc) = 5.00 minTotal precip. = 3.45 in Distribution = Type IAStorm duration = 24 hrs Shape factor = n/a
19
0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560
Q (cfs)
0.00 0.00
1.00 1.00
2.00 2.00
3.00 3.00
4.00 4.00
Q (cfs)
Time (min)
Turf
Hyd. No. 3 -- 10 Year
Hyd No. 3
Page 29
Hydrograph Report
Hydraflow Hydrographs Extension for Autodesk® Civil 3D® 2019 by Autodesk, Inc. v2020 Monday, 09 / 16 / 2019
Hyd. No. 4
Natural Grass
Hydrograph type = SBUH Runoff Peak discharge = 0.080 cfsStorm frequency = 10 yrs Time to peak = 476 minTime interval = 2 min Hyd. volume = 1,133 cuftDrainage area = 0.130 ac Curve number = 90Basin Slope = 0.0 % Hydraulic length = 0 ftTc method = User Time of conc. (Tc) = 5.00 minTotal precip. = 3.45 in Distribution = Type IAStorm duration = 24 hrs Shape factor = n/a
20
0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560
Q (cfs)
0.00 0.00
0.01 0.01
0.02 0.02
0.03 0.03
0.04 0.04
0.05 0.05
0.06 0.06
0.07 0.07
0.08 0.08
0.09 0.09
0.10 0.10
Q (cfs)
Time (min)
Natural Grass
Hyd. No. 4 -- 10 Year
Hyd No. 4
Page 30
Hydrograph Report
Hydraflow Hydrographs Extension for Autodesk® Civil 3D® 2019 by Autodesk, Inc. v2020 Monday, 09 / 16 / 2019
Hyd. No. 5
Impervious
Hydrograph type = SBUH Runoff Peak discharge = 0.428 cfsStorm frequency = 10 yrs Time to peak = 474 minTime interval = 2 min Hyd. volume = 6,188 cuftDrainage area = 0.530 ac Curve number = 98Basin Slope = 0.0 % Hydraulic length = 0 ftTc method = User Time of conc. (Tc) = 5.00 minTotal precip. = 3.45 in Distribution = Type IAStorm duration = 24 hrs Shape factor = n/a
21
0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560
Q (cfs)
0.00 0.00
0.05 0.05
0.10 0.10
0.15 0.15
0.20 0.20
0.25 0.25
0.30 0.30
0.35 0.35
0.40 0.40
0.45 0.45
0.50 0.50
Q (cfs)
Time (min)
Impervious
Hyd. No. 5 -- 10 Year
Hyd No. 5
Page 31
Hydrograph Report
Hydraflow Hydrographs Extension for Autodesk® Civil 3D® 2019 by Autodesk, Inc. v2020 Monday, 09 / 16 / 2019
Hyd. No. 6
Gravel
Hydrograph type = SBUH Runoff Peak discharge = 0.333 cfsStorm frequency = 10 yrs Time to peak = 476 minTime interval = 2 min Hyd. volume = 4,707 cuftDrainage area = 0.520 ac Curve number = 91Basin Slope = 0.0 % Hydraulic length = 0 ftTc method = User Time of conc. (Tc) = 5.00 minTotal precip. = 3.45 in Distribution = Type IAStorm duration = 24 hrs Shape factor = n/a
22
0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560
Q (cfs)
0.00 0.00
0.05 0.05
0.10 0.10
0.15 0.15
0.20 0.20
0.25 0.25
0.30 0.30
0.35 0.35
0.40 0.40
0.45 0.45
0.50 0.50
Q (cfs)
Time (min)
Gravel
Hyd. No. 6 -- 10 Year
Hyd No. 6
Page 32
Hydrograph Report
Hydraflow Hydrographs Extension for Autodesk® Civil 3D® 2019 by Autodesk, Inc. v2020 Monday, 09 / 16 / 2019
Hyd. No. 7
Developed
Hydrograph type = Combine Peak discharge = 4.166 cfsStorm frequency = 10 yrs Time to peak = 474 minTime interval = 2 min Hyd. volume = 60,136 cuftInflow hyds. = 3, 4, 5, 6 Contrib. drain. area = 5.300 ac
23
0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560
Q (cfs)
0.00 0.00
1.00 1.00
2.00 2.00
3.00 3.00
4.00 4.00
5.00 5.00
Q (cfs)
Time (min)
Developed
Hyd. No. 7 -- 10 Year
Hyd No. 7 Hyd No. 3 Hyd No. 4 Hyd No. 5
Hyd No. 6
Page 33
Hydrograph Report
Hydraflow Hydrographs Extension for Autodesk® Civil 3D® 2019 by Autodesk, Inc. v2020 Monday, 09 / 16 / 2019
Hyd. No. 9
Detained Flows
Hydrograph type = Reservoir Peak discharge = 0.848 cfsStorm frequency = 10 yrs Time to peak = 642 minTime interval = 2 min Hyd. volume = 59,591 cuftInflow hyd. No. = 7 - Developed Max. Elevation = 103.00 ftReservoir name = Underground Detention Max. Storage = 27,846 cuft
Storage Indication method used.
24
0 480 960 1440 1920 2400 2880 3360 3840 4320 4800 5280
Q (cfs)
0.00 0.00
1.00 1.00
2.00 2.00
3.00 3.00
4.00 4.00
5.00 5.00
Q (cfs)
Time (min)
Detained Flows
Hyd. No. 9 -- 10 Year
Hyd No. 9 Hyd No. 7 Total storage used = 27,846 cuft