FINAL ENVIRONMENTAL IMPACT STATEMENT/RECORD OF DECISION AND
SECTION 4(F) EVALUATION
WEST LAKE CORRIDOR PROJECT
MARCH 2018Federal Transit Administration and Northern Indiana
Commuter Transportation District
In cooperation with the U.S. Army Corps of Engineers
-
West Lake Corridor Final Environmental Impact Statement/ Record
of Decision and Section 4(t) Evaluation
WEST LAKE CORRIDOR PROJECT
Final Environmental Impact Statement/Record of Decision and
Section 4(f) Evaluation
Volume 1: Main Text
March 2018
Prepared by
United States Department of Transportation,
Federal Transit Administration
and
Northern Indiana Commuter Transportation District
In Cooperation with
United States Army Corps of Engineers
Pursuant to
National Environmental Policy Act of 1969 (42 USC § 4332);
Efficient Environmental Reviews for Project Decision making (23 USC
§ 139); Council on Environmental Quality Regulations for
Implementing the Procedures of the National Environmental Policy
Act (40 CFR Parts 1500-1508); FHWA/FTA Environmental Impact and
Related Procedures (23 CFR Part 771 ); Section 4(f) requirements
(49 USC § 303 and 23 USC § 138) and regulations (23 CFR Part 774);
and Clean Water Act (33 USC§ 1251 et seq.).
Marisol R. Simon, Regional Administrator
U.S. Department of Transportation
Federal Transit Administration
Michael Noland, General Manager
Northern Indiana Commuter Transportation District
March 2018
Date of Approval
Date of Approval
3/1/2018
-
West Lake Corridor Final Environmental Impact Statement/ Record
of Decision and Section 4(f) Evaluation
March 2018
This page is intentionally left blank.
-
West Lake Corridor Final Environmental Impact Statement/ Record
of Decision and Section 4(f) Evaluation
March 2018
WEST LAKE CORRIDOR PROJECT FINAL ENVIRONMENTAL IMPACT
STATEMENT
Responsible Agencies Federal Lead Agency: United States
Department of Transportation; Federal Transit Administration
(FTA)
Local Project Sponsor: Northern Indiana Commuter Transportation
District (NICTD) Cooperating Agency: United States Army Corps of
Engineers (USACE) Title: West Lake Corridor Project Location: Lake
County, Indiana and Cook County, Illinois
Abstract FTA and NICTD, in cooperation with USACE, have prepared
this Final Environmental Impact Statement (FEIS) for the West Lake
Corridor Project (Project) in Lake County, Indiana, and Cook
County, Illinois. The Project is an approximately 9-mile proposed
southern branch extension of NICTD’s existing South Shore Line
(SSL) commuter rail service between the town of Dyer and the city
of Hammond, Indiana. Traveling north from the southern terminus
near Main Street at the Munster/Dyer municipal boundary, the
Project would include new track operating at grade on a separate
right-of-way (ROW) to be acquired adjacent to the CSX
Transportation (CSX) Monon Subdivision railroad in Dyer and
Munster. The Project alignment would be elevated from 45th Street
to the Canadian National Railway (CN) Elsdon Subdivision railroad
at the Maynard Junction in Munster. North of the CN railroad, the
Project alignment would return to grade and join with the publicly
owned former Monon Railroad corridor in Munster and Hammond,
Indiana, and continue north. The Project would relocate the
existing Monon Trail pedestrian bridge crossing over the Little
Calumet River and build a new rail bridge at the location of the
former Monon Railroad Bridge. The Project alignment would cross
under Interstate 80 and Interstate 94 and continue north on the
former Monon Railroad corridor to Sibley Street. From Douglas
Street north, the Project would be elevated over all streets and
rail lines using a combination of retaining walls, elevated
structures, and bridges. The Project would terminate just east of
the Indiana Harbor Belt railroad at the Illinois/Indiana state
line, where it would connect with the SSL. Project trains would
operate on the existing Metra Electric District (MED) line for the
final 14 miles, terminating at Millennium Station in downtown
Chicago.
Discussions of the proposed alignment, stations, maintenance and
storage facility, traction power substations, guideway, vehicles,
and operating frequencies are included in this FEIS. This FEIS
includes the Project’s Purpose and Need Statement and a description
of the alternatives currently and previously considered including a
No Build Alternative and three build alternatives with design
options – Commuter Rail, Indiana Harbor Belt, and Hammond
Alternatives.
The Draft Environmental Impact Statement (DEIS) for the Project
was made available to the public and agencies for review and
comment on December 16, 2016 in accordance with the National
Environmental Policy Act. The comment period closed on February 3,
2017. During that time three public hearings were held in the
Project Area to facilitate public input. A summary of the comments
received during the review period is presented in Chapter 9 of this
FEIS.
-
West Lake Corridor Final Environmental Impact Statement/ Record
of Decision and Section 4(f) Evaluation
March 2018
Appendix H contains all comments received on the West Lake
Corridor Project DEIS and corresponding responses.
After the close of the comment period on the DEIS, NICTD
selected the Hammond Alternative Option 2 as the Locally Preferred
Alternative on May 12, 2017. This FEIS evaluates the environmental,
transportation, social, and economic impacts associated with the
Project including methods and regulations, agency coordination
(where applicable), anticipated direct long‐term (operating) and
short‐term (construction) impacts. This FEIS also addresses the
following: environmental justice compliance; Section 4(f)
compliance; Section 106 compliance; finance; evaluation of
alternatives; and public involvement and agency coordination.
This FEIS is a combined document consisting of the FEIS and the
Record of Decision (ROD) for the Project, pursuant to 23 United
States Code § 139(n).
More information can be found on the Project website at
http://www.nictdwestlake.com.
The following persons may be contacted for additional
information concerning this document:
Mark Assam, AICP Nicole Barker
Environmental Protection Specialist Director of Capital
Investment and Implementation
Federal Transit Administration Northern Indiana Commuter
Transportation District
200 W. Adams Street, Suite 320 33 E. US Highway 12
Chicago, IL 60606 Chesterton, IN 46304
Telephone: (206) 220-4465 Telephone: (219) 926-5744 ext. 313
http://www.nictdwestlake.com/