Top Banner
West Brazos Junior High School Brazoria, Texas New Construction Award Type SHW Group 2008 Exhibition of School Planning and Architecture
17

West Brazos Junior High School Brazoria, Texas New Construction Award Type SHW Group 2008 Exhibition of School Planning and Architecture.

Jan 04, 2016

Download

Documents

Beryl King
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: West Brazos Junior High School Brazoria, Texas New Construction Award Type SHW Group 2008 Exhibition of School Planning and Architecture.

West Brazos Junior High School

Brazoria, TexasNew Construction

Award TypeSHW Group

2008 Exhibition of School Planning and Architecture

Page 2: West Brazos Junior High School Brazoria, Texas New Construction Award Type SHW Group 2008 Exhibition of School Planning and Architecture.

West Brazos Junior High School

Main Exterior Image

Page 3: West Brazos Junior High School Brazoria, Texas New Construction Award Type SHW Group 2008 Exhibition of School Planning and Architecture.

Library IMAGECommunity Environment: The school was envisioned as a LEED certified building that would be educating the next generation of sustainability natives. The district is also committed to LEED goals as a way of thinking and has incorporated those guidelines into the design and use of the school. The school maintains several spaces that are open for use by and for the surrounding community. The library and computer lab are open and accessible to the community after school hours for adult/continuing education. The 53 acre site was left mostly undisturbed and is protected natural habitat for local native species. This fit naturally into the districts commitment to sustainability and to the future of their community.

Page 4: West Brazos Junior High School Brazoria, Texas New Construction Award Type SHW Group 2008 Exhibition of School Planning and Architecture.

Computer lab IMAGECommunity Environment: ContinuedThe school is used by three distinct geographic and socio-economic communities, gathering the students together and educating them to lead the way to the future.This building is leading the way for the district and the community, it has started green initiatives at the districts other facilities as well as in the surrounding community.

Page 5: West Brazos Junior High School Brazoria, Texas New Construction Award Type SHW Group 2008 Exhibition of School Planning and Architecture.

Main street IMAGELearning Environment:The main corridor is a central circulation spine that links multiple learning pods within the school. This creates a clear layout that eases way finding and enables ease of supervision. Clerestory lighting along the length of the spine floods the space with natural lighting creating a calmer environment in a space that is historically fast-paced and hectic. It also permits light to penetrate deep into the core areas of the building.Flexibility is a key component to this design. The school is organized into a series of three “academic houses” and one “science house”. The houses can be organized by grade level or by curriculum (departmentalized) and each house has a flex room to accommodate changing needs. The “flex” space in the corridor area connecting the classrooms serve as break-out areas for teaching and collaboration.

Page 6: West Brazos Junior High School Brazoria, Texas New Construction Award Type SHW Group 2008 Exhibition of School Planning and Architecture.

Science lab IMAGELearning Environment: ContinuedThe stage faces the cafetorium and doubles as the black box theater and drama classroom, providing dual use out of an typically underutilized and expensive space.Sustainable design features are intentionally exposed and highlighted within a building designed to teach its’ end users. External shading devices, preserved site features (wetlands, native landscape and trees) and consistent visual connections from inside to outside reinforce the facility’s environmental consciousness. Signage located throughout the building explains the functions of the building and provides a teaching tool to help integrate the sustainable concepts (energy conservation, sunlight control, environmental consciousness of our impact on future generations) into the teaching curriculum.

Page 7: West Brazos Junior High School Brazoria, Texas New Construction Award Type SHW Group 2008 Exhibition of School Planning and Architecture.

Exterior materials IMAGEPhysical Environment Material choices (masonry, metal panels, glass, stucco) are low maintenance and respond to the surrounding environment. Natural beige, brown and rust colors allow the building to blend with the natural beauty of the heavily wooded site. Stucco & metal panels compliment the masonry to provide an economical structure without compromising durability & maintenance. The economical and durable materials reduce long-term costs for the school district.Energy Star roofing & reflective paving reduces heat gain & heat islands. Inexpensive shading devices reduce heat load on the building while enabling natural light in over 90% of inhabited spaces.

Page 8: West Brazos Junior High School Brazoria, Texas New Construction Award Type SHW Group 2008 Exhibition of School Planning and Architecture.

Interior materials IMAGEPhysical Environment – ContinuedEnergy waste is minimized in the mechanical, electrical and plumbing design. The mechanical systems are zoned and digitally controlled to only use energy as required by the operational needs of the facility instead of consuming energy. The electrical systems have automatic shut-off on the light fixtures that minimize waste of electricity and the lighting system is designed to eliminate light pollution to the neighboring sites and night skies. The plumbing systems minimize waste through the use of automatic flush valves, metered faucets and low flow fixtures.All of these features helped to make this the first LEED certified public Junior High School in the state of Texas.

Page 9: West Brazos Junior High School Brazoria, Texas New Construction Award Type SHW Group 2008 Exhibition of School Planning and Architecture.

Commons IMAGEPlanning Process:The process began by evaluating the district’s existing facilities, demographics, and growth to define the need and the optimal solution. The Architects led the district’s bond planning efforts to ensure the districts’ vision of future projects remained intact. Multiple sites were evaluated and an interactive 5-day design process with administration, staff, and students was conducted in the district prior to the school bond election. During the project, the architect facilitated multiple meetings with administration, staff and the community to develop and confirm the design. The architect returned to the user groups at multiple stages during the process to review and review and review. The architect designed with the philosophy that “instruction drives construction” enabling the curriculum goals to derive the physical response.

Page 10: West Brazos Junior High School Brazoria, Texas New Construction Award Type SHW Group 2008 Exhibition of School Planning and Architecture.

The reason why IMAGEPlanning Process: ContinuedThe staff and administration were active partners in the design process keeping the architect on track and considering flexibility and adaptability for the future.

Page 11: West Brazos Junior High School Brazoria, Texas New Construction Award Type SHW Group 2008 Exhibition of School Planning and Architecture.

Exhibition of School Planning and Architecture 2008 Project Data

Submitting Firm : SHW GroupProject Role Bond Planning, Programming, Architectural, Structural

Engineering, Interior DesignProject Contact Jennifer Henrikson, AIA, LEED APTitle Principal in ChargeAddress 20 East Greenway Plaza, Suite 200City, State or Province, Country Houston, Texas 77046Phone 713.548.5700Joint Partner Firm: N/AProject RoleProject ContactTitleAddressCity, State or Province, CountryPhone

Other Firm:Project RoleProject ContactTitleAddressCity, State or Province, CountryPhone

Construction Firm: Tellepsen Builders, LPProject Role General ContractorProject Contact Tad LewisTitle Project SuperintendentAddress 777 Benmar, Suite 400City, State or Province, Country Houston, Texas 77060Phone 281.447.8100

Page 12: West Brazos Junior High School Brazoria, Texas New Construction Award Type SHW Group 2008 Exhibition of School Planning and Architecture.

Exhibition of School Planning and Architecture 2008 Project Details

Project Name  West Brazos Junior High School

City  Brazoria

State  Texas

District Name  Columbia-Brazoria Independent School District

Supt/President  Carol Bertholf – Superintendent

Occupancy Date  5/1/06

Grades Housed  7-8

 

Capacity(Students)  600

Site Size (acres)  53

Gross Area (sq. ft.)  91,500

Per Occupant(pupil)  152.5

gross/net please indicate  1.18 gross to net SF

 

Design and Build?  No

If yes, Total Cost:  

Includes:  

 

If no,  

Site Development:  $2,750,000

Building Construction:  $9,181,000

Fixed Equipment:  Furnishings - $289,621 Technology - $246,829

Other:  $1,087,587

 

Total:  $13,555,037

Page 13: West Brazos Junior High School Brazoria, Texas New Construction Award Type SHW Group 2008 Exhibition of School Planning and Architecture.

library

Page 14: West Brazos Junior High School Brazoria, Texas New Construction Award Type SHW Group 2008 Exhibition of School Planning and Architecture.

gym

Page 15: West Brazos Junior High School Brazoria, Texas New Construction Award Type SHW Group 2008 Exhibition of School Planning and Architecture.

cafetorium

Page 16: West Brazos Junior High School Brazoria, Texas New Construction Award Type SHW Group 2008 Exhibition of School Planning and Architecture.

library

Page 17: West Brazos Junior High School Brazoria, Texas New Construction Award Type SHW Group 2008 Exhibition of School Planning and Architecture.

exterior