Top Banner
West African Gas pipeline West African Gas pipeline Project Project (WAGP) _________________ (WAGP) _________________ 11th Africa Oil and gas trade and finance conference 23-25 May, Nairobi, Kenya Developing transborder infrastructures : West African Gas Pipeline Project: A case Study Débo-K’mba A. BARANDAO West African Gas Pipeline Authority Coordinator NOT AN OFFICIAL UNCTAD RECORD
27

West African Gas pipeline Project (WAGP) _________________ 11th Africa Oil and gas trade and finance conference 23-25 May, Nairobi, Kenya Developing transborder.

Mar 31, 2015

Download

Documents

Alec Lassiter
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: West African Gas pipeline Project (WAGP) _________________ 11th Africa Oil and gas trade and finance conference 23-25 May, Nairobi, Kenya Developing transborder.

West African Gas pipeline ProjectWest African Gas pipeline Project (WAGP) _________________ (WAGP) _________________

11th Africa Oil and gas trade and finance conference

23-25 May, Nairobi, Kenya

Developing transborder infrastructures :

West African Gas Pipeline Project: A case Study

Débo-K’mba A. BARANDAO

West African Gas Pipeline Authority Coordinator

NOT AN OFFICIAL UNCTAD RECORD

Page 2: West African Gas pipeline Project (WAGP) _________________ 11th Africa Oil and gas trade and finance conference 23-25 May, Nairobi, Kenya Developing transborder.

West African Gas pipeline ProjectWest African Gas pipeline Project (WAGP) _________________ (WAGP) _________________

I. Overview

Page 3: West African Gas pipeline Project (WAGP) _________________ 11th Africa Oil and gas trade and finance conference 23-25 May, Nairobi, Kenya Developing transborder.

West African Gas pipeline ProjectWest African Gas pipeline Project (WAGP) _________________ (WAGP) _________________

• The WAGP

New high pressure natural gas pipeline to transport Nigerian produced natural gas to commercially viable markets in Benin, Ghana and Togo

Page 4: West African Gas pipeline Project (WAGP) _________________ 11th Africa Oil and gas trade and finance conference 23-25 May, Nairobi, Kenya Developing transborder.

• The WAGPTakoradi

Tema

Escravos

Cotonou

GHANA

TOGO

NIGERIA

Lomé

Lagos

Niger

Burkina Faso

Mali

BENIN

West African Gas pipeline ProjectWest African Gas pipeline Project (WAGP) _________________ (WAGP) _________________

Page 5: West African Gas pipeline Project (WAGP) _________________ 11th Africa Oil and gas trade and finance conference 23-25 May, Nairobi, Kenya Developing transborder.

West African Gas pipeline ProjectWest African Gas pipeline Project (WAGP) _________________ (WAGP) _________________

• Pipeline System

680 km of mainly 20” pipeline from Nigeria to Ghana; delivery points in Benin, Togo and Ghana (8”, 10” & 18” lateral lines); extension to Cote d’Ivoire possible

Compressor Station on Lagos Beach: 2 x 12,500 HP (one stand-by) in initial phase

Page 6: West African Gas pipeline Project (WAGP) _________________ 11th Africa Oil and gas trade and finance conference 23-25 May, Nairobi, Kenya Developing transborder.

West African Gas pipeline ProjectWest African Gas pipeline Project (WAGP) _________________ (WAGP) _________________

• Pipeline System (Cont’d)

Expansion Stages: Initial Capacity 160 MMBtu / day; Final Capacity of 474 MMBtu/day, i.e. potential for 2,500-3000 MW on combined cycle power plants); expansion by increasing compression capacity

Initially, 85% of gas to power plants; 15% to heat-using industries

Page 7: West African Gas pipeline Project (WAGP) _________________ 11th Africa Oil and gas trade and finance conference 23-25 May, Nairobi, Kenya Developing transborder.

West African Gas pipeline ProjectWest African Gas pipeline Project (WAGP) _________________ (WAGP) _________________

• Project Objectives► New markets for Nigerian gas (Reduce gas

flaring)

Access to cleaner & cheaper fuel and greater energy security for Benin, Togo and Ghana

Regional economic integration (ECOWAS)

Page 8: West African Gas pipeline Project (WAGP) _________________ 11th Africa Oil and gas trade and finance conference 23-25 May, Nairobi, Kenya Developing transborder.

West African Gas pipeline ProjectWest African Gas pipeline Project (WAGP) _________________ (WAGP) _________________

• Developed by the West African gas pipeline Company (WAPCo):

Chevron (36.7%) Managing PartnerNigerian National Petroleum Corp. (NNPC, 25%)Shell (18%)The Volta River Authority of Ghana (VRA, 16.3%)BenGaz SA (2%)Société Togolaise de Gaz SA (2%)

Page 9: West African Gas pipeline Project (WAGP) _________________ 11th Africa Oil and gas trade and finance conference 23-25 May, Nairobi, Kenya Developing transborder.

West African Gas pipeline ProjectWest African Gas pipeline Project (WAGP) _________________ (WAGP) _________________

• Project Milestones►Pre-Feasibility Study 1993 States Agreement 1995 MOU States-Developer 1999 Intergovernmental Agreement (IGA) Feb 2000 Shareholders Agreement (May 2003) Treaty Jan 2003; IPA May 2003 Enabling Legislation 2004 Final Investment Decision Dec 2004 Construction March 2005 – Q2 2008 First Gas Jan 2008 (Free Flow)

Page 10: West African Gas pipeline Project (WAGP) _________________ 11th Africa Oil and gas trade and finance conference 23-25 May, Nairobi, Kenya Developing transborder.

West African Gas pipeline ProjectWest African Gas pipeline Project (WAGP) _________________ (WAGP) _________________

• Pipeline Financing

Estimated (and fixed) Initial Cost: $614 million

Financed by equity contributions from Company Shareholders

CAPEX amount in Escrow Account at FID

Longer term Guarantees from the Governments backed up by World Bank Group (MIGA, OPIC)

Page 11: West African Gas pipeline Project (WAGP) _________________ 11th Africa Oil and gas trade and finance conference 23-25 May, Nairobi, Kenya Developing transborder.

West African Gas pipeline ProjectWest African Gas pipeline Project (WAGP) _________________ (WAGP) _________________

• Participating Countries

English speaking• Common Law

GhanaNigeria

TogoBenin

French speaking• Civil law

Two French speakingTwo English speakingDifferent legal systemsThree of four countries without pipeline experience

Page 12: West African Gas pipeline Project (WAGP) _________________ 11th Africa Oil and gas trade and finance conference 23-25 May, Nairobi, Kenya Developing transborder.

West African Gas pipeline ProjectWest African Gas pipeline Project (WAGP) _________________ (WAGP) _________________

II. Enabling Environment

Page 13: West African Gas pipeline Project (WAGP) _________________ 11th Africa Oil and gas trade and finance conference 23-25 May, Nairobi, Kenya Developing transborder.

West African Gas pipeline ProjectWest African Gas pipeline Project (WAGP) _________________ (WAGP) _________________

· Harmonized fiscal, regulatory, legal and investment regime

3 mechanisms to achieve regime standardization– WAGP Treaty – International Project Agreement – Enabling Legislations passed in all countries

Regulatory Documents– Access Code – WAGP Technical Regulations – Pipeline Licenses – Pipeline Development Plan – Environmental Impact Assessment & Management

Plan

Page 14: West African Gas pipeline Project (WAGP) _________________ 11th Africa Oil and gas trade and finance conference 23-25 May, Nairobi, Kenya Developing transborder.

West African Gas pipeline ProjectWest African Gas pipeline Project (WAGP) _________________ (WAGP) _________________

• WAGP Treaty

Establishes WAGPA as the Regulatory Authority Establishes Bodies for Legal & Fiscal appeals Joint Commitment to implement the IPA Agreement for sharing of fiscal

commitments/revenues among countries No Transit Royalties:

a)Unnecessary cost additions and administrative process: countries get fiscal income from taxes on Revenue

b)ECOWAS Treaty stipulates free transit of goods

Page 15: West African Gas pipeline Project (WAGP) _________________ 11th Africa Oil and gas trade and finance conference 23-25 May, Nairobi, Kenya Developing transborder.

West African Gas pipeline ProjectWest African Gas pipeline Project (WAGP) _________________ (WAGP) _________________

• International Project Agreement (IPA)

Establishes the Commercial and Regulatory terms of the WAGP Business

Comprehensive and harmonized investment Regime to enable WAPCo to operate as a single business entity across the four countries

WAPCo to Build, Own, Operate & Maintain Pipeline System

Page 16: West African Gas pipeline Project (WAGP) _________________ 11th Africa Oil and gas trade and finance conference 23-25 May, Nairobi, Kenya Developing transborder.

West African Gas pipeline ProjectWest African Gas pipeline Project (WAGP) _________________ (WAGP) _________________

· IPA (Cont’d)

Tariff Methodology principles

Pipeline Development Plan outline

Pipeline Access Code principles

Environmental Impact Assessment & Management Plan

Page 17: West African Gas pipeline Project (WAGP) _________________ 11th Africa Oil and gas trade and finance conference 23-25 May, Nairobi, Kenya Developing transborder.

West African Gas pipeline ProjectWest African Gas pipeline Project (WAGP) _________________ (WAGP) _________________

• WAGP Authority – WAGPA

Established as an international institution by the WAGP Treaty. WAGPA’s powers and functions are:

a) Representing the States;

b) Facilitation between Project Stakeholders; and

c) Regulatory (enforces Regulations,

Access Code)

Page 18: West African Gas pipeline Project (WAGP) _________________ 11th Africa Oil and gas trade and finance conference 23-25 May, Nairobi, Kenya Developing transborder.

West African Gas pipeline ProjectWest African Gas pipeline Project (WAGP) _________________ (WAGP) _________________

• WAGPA (Cont’d)

This includes Approving conceptual design package & FEED Agreeing upon & Enforcing Terms of Pipeline

Development Plan Reviewing EIA & EMP Coordinating and facilitating all necessary

approvals Conflict Resolution

Page 19: West African Gas pipeline Project (WAGP) _________________ 11th Africa Oil and gas trade and finance conference 23-25 May, Nairobi, Kenya Developing transborder.

West African Gas pipeline ProjectWest African Gas pipeline Project (WAGP) _________________ (WAGP) _________________

• Enabling Legislation Single law adopted by the four countries, validates

the Regime established for the Project in the IPA (including Fiscal & Regulatory Regime)

Authorizes Company to own & carry out Project Establishes Licensing procedures & introduces

Pipeline Regulations

Validate Guarantees by Governments Confirms Tax Sharing by Countries

Page 20: West African Gas pipeline Project (WAGP) _________________ 11th Africa Oil and gas trade and finance conference 23-25 May, Nairobi, Kenya Developing transborder.

West African Gas pipeline ProjectWest African Gas pipeline Project (WAGP) _________________ (WAGP) _________________

• Fiscal Regime

Single Fiscal Regime across the entire region (only applicable to WAGP Activity)– 35% income tax rate – 25% reducing balance method of depreciation – 5 year tax holiday – No import / customs duties or VAT on import of capital

goods – No Transit Royalties – Single tax filing & country assessment process – Minor taxes aggregated & capped – Exchange control rules harmonized

Page 21: West African Gas pipeline Project (WAGP) _________________ 11th Africa Oil and gas trade and finance conference 23-25 May, Nairobi, Kenya Developing transborder.

West African Gas pipeline ProjectWest African Gas pipeline Project (WAGP) _________________ (WAGP) _________________

• Tax Sharing Between Countries International Practice: Income Tax shared in proportion to

Distance or Investment amount in Countries – Some States required Sales volume & Country Development

Costs to be considered –

A combined formula is applied for WAGP:

APs (%) = 45 x (( LS ÷ LT ) + ( RCS ÷ RCT )) + 2.5 APs: Apportionment Percentage for a State LS: Length in State RCS: Reserved Capacity by State LT: Total length of Pipeline RCT: Total Reserved Capacity

Formula also valid for sharing of Project costs incurred collectively by the States

Page 22: West African Gas pipeline Project (WAGP) _________________ 11th Africa Oil and gas trade and finance conference 23-25 May, Nairobi, Kenya Developing transborder.

West African Gas pipeline ProjectWest African Gas pipeline Project (WAGP) _________________ (WAGP) _________________

III. Commercial Environment

Page 23: West African Gas pipeline Project (WAGP) _________________ 11th Africa Oil and gas trade and finance conference 23-25 May, Nairobi, Kenya Developing transborder.

West African Gas pipeline ProjectWest African Gas pipeline Project (WAGP) _________________ (WAGP) _________________

• Tariff Methodology Tariff Model Discounted Cash Flow at FID date 12% Rate of Return (ROR) on Foundation Market (20

years) 15% ROR on Overall Market after 20 years ROR is real, after Tax (to attract Investors) 3 Tariff Classes: Foundation, Standard & Industrial

Development 10c/MMBtu premium for Foundation Customers Based on Reserved Capacity – Ship or Pay (not on

volume transported)

Page 24: West African Gas pipeline Project (WAGP) _________________ 11th Africa Oil and gas trade and finance conference 23-25 May, Nairobi, Kenya Developing transborder.

West African Gas pipeline ProjectWest African Gas pipeline Project (WAGP) _________________ (WAGP) _________________

• Delivered Gas Price: Sum of

1. Gas Commodity 2. ELPS Transportation 3. Shipper delivery fee 4. Compression Fuel Gas 5. Take or Pay Commodity / Ship or Pay ELPS 6. WAGP Reservation Charges 7. WAGP Authority Charge 8. Credit Security Charge

Page 25: West African Gas pipeline Project (WAGP) _________________ 11th Africa Oil and gas trade and finance conference 23-25 May, Nairobi, Kenya Developing transborder.

West African Gas pipeline ProjectWest African Gas pipeline Project (WAGP) _________________ (WAGP) _________________

IV. Project Benefits

Page 26: West African Gas pipeline Project (WAGP) _________________ 11th Africa Oil and gas trade and finance conference 23-25 May, Nairobi, Kenya Developing transborder.

West African Gas pipeline ProjectWest African Gas pipeline Project (WAGP) _________________ (WAGP) _________________

Savings against Oil: $700 M – $2,500 M, range over 20 years

Fiscal revenues: $650-$700 M, shared between four countries

Access to sustainable energy for Benin, Togo & Ghana Promote economic development Create gas industry in Benin, Togo & Ghana

Reduce GHG emissions by 52% IRR between 25% - 58%, depending on specific

country

Page 27: West African Gas pipeline Project (WAGP) _________________ 11th Africa Oil and gas trade and finance conference 23-25 May, Nairobi, Kenya Developing transborder.