Page 1: Wellhead Design Slideshow

Wellhead DesignLunch & Learn

06-Feb-0711:30hrs – 13:30hrs

Page 2: Wellhead Design Slideshow

Presented by:

Gerry Bryant, P.Eng.Integrated Services Mgr.Dril-Quip Beijing [email protected]

Page 3: Wellhead Design Slideshow

Agenda• Wellhead Equipment for Exploration and

Development

• Conventional Wellhead Systems, Unitized Wellhead Systems, and Horizontal Wellhead Systems

• Engineering Design Requirements for Surface Wellhead Equipment

• Bohai Phase 2 Development Wellhead Design

• Subsea Wellhead Equipment

Page 4: Wellhead Design Slideshow

Wellhead Design, Lunch & Learn, 06-Feb-07

• Typical Land Based Oilwell

Reprinted from:California Department of Conservation

Page 5: Wellhead Design Slideshow

Wellhead Design, Lunch & Learn, 06-Feb-07

• Typical Land Based Drilling Rig

Reprinted from:California Department of Conservation

Page 6: Wellhead Design Slideshow

Wellhead Design, Lunch & Learn, 06-Feb-07

• Typical Offshore Platform

Reprinted from:California Department of Conservation

Page 7: Wellhead Design Slideshow

Wellhead Design, Lunch & Learn, 06-Feb-07

Page 8: Wellhead Design Slideshow

Wellhead Design, Lunch & Learn, 06-Feb-07

Wellhead Equipment for Exploration and Development

Page 9: Wellhead Design Slideshow

Wellhead Design, Lunch & Learn, 06-Feb-07

• Conventional Wellheads used for Exploration and Development Wells

• Unitized Wellheads used for Development Wells

• Mudline Equipment used for Development Wells, but generally run in Exploration Wells as contingency

• Production Equipment used for Development Wells

Page 10: Wellhead Design Slideshow

Wellhead Design, Lunch & Learn, 06-Feb-07

• Exploration wells use Conventional Wellheads almost exclusively because they can be stacked to accommodate multiple casing strings

• ConocoPhillips used a Cameron conventional wellhead for the exploration well PL25-8-1 in October 2006

• Drilling depth is a major criteria in determining casing program because casing is used to stabilize the up-hole formations, so conventional wellheads can accommodate from one to five casing strings

Page 11: Wellhead Design Slideshow

Wellhead Design, Lunch & Learn, 06-Feb-07

• Conventional Wellheads require nippling-up and nippling-down the BOP stack to install each section, which requires a lot of rig-time; rig-time is very expensive

• Typically low technology design options

• After use, Convention –al Wellhead spools can be easily separated, repaired, inspected, and re-used

Page 12: Wellhead Design Slideshow

Wellhead Design, Lunch & Learn, 06-Feb-07

• Development wells can be completed with the conventional wellhead system discussed earlier or using the Unitized Wellhead System shown here

• Designed in the 1950’s, the major benefit of the Unitized Wellhead System is reduced rig-time removing the BOP stack after running each casing string, then having to re-install it.

• This is accomplished as the Unitized Wellhead System suspends multiple strings of casing within the one wellhead housing

Page 13: Wellhead Design Slideshow

Unitized Wellhead Systems

Page 14: Wellhead Design Slideshow

Wellhead Design, Lunch & Learn, 06-Feb-07

• CoPC Bohai Phase 2 Unitized Wellhead will receive the 9-5/8”casing hanger and the 4-1/2” tubing hanger

Page 15: Wellhead Design Slideshow

Wellhead Design, Lunch & Learn, 06-Feb-07

• Mudline Systems are used in both exploration and development wells and are designed for temporary abandonment and reconnect at a later time

• Used if exploration campaigns are expected to yield good shows of oil or if development of the oilfield may take several more months or years

• With the improved design of today’s Mudline Systems, they are almost universally used during exploratory drilling

Page 16: Wellhead Design Slideshow

Wellhead Design, Lunch & Learn, 06-Feb-07

• Mudline Hangers are designed to nest one inside the other

• Each Hanger except the last includes internal profile to suspend the casing hanger for the next casing string

Page 17: Wellhead Design Slideshow

Wellhead Design, Lunch & Learn, 06-Feb-07

• Temporary Abandonment (TA) Caps are installed after drilling to isolate the annuli and hole bore for months or years until the platform is installed above

• The upper-most TA Cap is spaced out during drilling to be a couple metres above the mudline

• Tie-back hangers have seals to re-establish integrity with each casing string back to the platform

Page 18: Wellhead Design Slideshow

Wellhead Design, Lunch & Learn, 06-Feb-07

see Mudline Equipment and Template Slideshow

Page 19: Wellhead Design Slideshow

Wellhead Design, Lunch & Learn, 06-Feb-07

• Once the drilling has reached its total depth and production casing is in place, the operations that prepare the well for production is referred to as Completion.

• Completion includes displacement of drilling mud with completion fluid, perforating the casing, and installation of the production tubing.

• Finally, the Surface Production Equipment is installed which will control the flow of oil from the well during production.

• This flow control equipment is an assembly of valves known as the christmas tree.

Page 20: Wellhead Design Slideshow

Wellhead Design, Lunch & Learn, 06-Feb-07

• The christmas tree can include actuated valves (air or hydraulic), manual valves, and production chokes in order to the control flow of oil.

Pneumatic Actuated Master Valve

Manual Master Valve

Production Choke

CoPC Bohai Wellhead and Tree Assembly

Page 21: Wellhead Design Slideshow

Wellhead Design, Lunch & Learn, 06-Feb-07

There are numerous designs and arrangements for the production equipment.

Page 22: Wellhead Design Slideshow

Wellhead Design, Lunch & Learn, 06-Feb-07

Engineering Design Requirements for Surface Wellhead

Equipment

Page 23: Wellhead Design Slideshow

Wellhead Design, Lunch & Learn, 06-Feb-07

American Petroleum Institute (API)

• established in 1919 when American oil companies worked together to standardize oil field equipment in order to provide more reliable supply to the country

• maintain more than 500 standards and recommended practices covering all segments of the oil and gas industry to promote use of interchangeable equipment and sound engineering practices

• license facilities that produce products that meet API standards, to monogram those products with the API logo

• API Specification 6A covers the standardization of valves and wellhead equipment and first appeared in 1961. The Nineteenth Edition is the current reference for manufacture and use of surface wellhead equipment.

• Scope of API 6A includes criteria for performance, design, material selection, testing, inspection, welding, marking, handling, storage, shipping, and documentation of the wellhead equipment.

Page 24: Wellhead Design Slideshow

Wellhead Design, Lunch & Learn, 06-Feb-07

Page 25: Wellhead Design Slideshow

Wellhead Design, Lunch & Learn, 06-Feb-07

API Design.

Design Methodology for pressure containing equipment is as described in ASME, Section VIII, Division 2, Appendix 4. Design allowable stresses are limited by the following criteria:

St = 0.83 * Sy and Sm = 2/3 * Sy

where,Sm = design stress intensity at W.P.St = maximum allowable general primary

membrane stress intensity at T.P.Sy = the mat’l specified min. yield strength

The theory of constant energy of distortion can also be used for design calculations for pressure containing equipment. Discontinuities and stress concentrations must be considered where applicable.

Page 26: Wellhead Design Slideshow

Wellhead Design, Lunch & Learn, 06-Feb-07

Equipment Specifications are detailed in the title block.

Page 27: Wellhead Design Slideshow

Wellhead Design, Lunch & Learn, 06-Feb-07

Equipment Specifications are detailed in the title block.

Page 28: Wellhead Design Slideshow

Wellhead Design, Lunch & Learn, 06-Feb-07

Temperature Ratings – equipment must be designed to operate in one or more of the specified temperature ratings per API 6A. The design must consider the effects of differential thermal expansion from temperature gradients which the equipment experiences in service.

Page 29: Wellhead Design Slideshow

Wellhead Design, Lunch & Learn, 06-Feb-07

Material Requirements – are determined by considering factors such as H2S concentration, CO2 partial pressure, erosion effects, etc. The numerical value refers to maximum allowable partial pressure of H2S, in this case 1.5%.

Page 30: Wellhead Design Slideshow

Wellhead Design, Lunch & Learn, 06-Feb-07

Page 31: Wellhead Design Slideshow

Wellhead Design, Lunch & Learn, 06-Feb-07

Product Specification Level (PSL) – defines five different levels of technical quality requirements. PSL1, PSL2, PSL3, PSL3G, PSL4.

The selection of PSL should be based on a quantitative risk analysis of potential hazardous events if the equipment fails. H2S concentration, radius of exposure to the public, corrosivity of retained fluid are important factors to consider.

In general, the higher the Product Specification Level the more inspection and testing will be required for the equipment.

Page 32: Wellhead Design Slideshow

Wellhead Design, Lunch & Learn, 06-Feb-07

Page 33: Wellhead Design Slideshow

Wellhead Design, Lunch & Learn, 06-Feb-07

Performance Requirement (PR) – is specific and unique to the product in the as-shipped condition. Two PR levels exist, PR1 and PR2.

These performance requirements must be verified by a testing procedure performed on a prototype of a specific design, or by a means which verifies the test requirements defined in API 6A, Section 10.

Page 34: Wellhead Design Slideshow

Wellhead Design, Lunch & Learn, 06-Feb-07

Bohai Phase 2 Development

Wellhead Equipment

Page 35: Wellhead Design Slideshow

Wellhead Design, Lunch & Learn, 06-Feb-07

Design Objectives:

‘ Standardize the wellhead and tree components to the greatest extent practical considering the following factors:

a. interchangeability of components,b. minimizing spare part inventory,c. maintenance, andd. cost effectiveness.

• Minimize the aerial envelope of the wellhead and tree assembly in order to maximize the working clearance between wellheads and to ensure safe ingress/egress of the wellhead area.

(see 3D image of Wellhead decks)

• Use a basic design philosophy in order to choose reliable and well-proven equipment to reduce maintenance and workover costs.

• Wellheads must be Unitized type.

Page 36: Wellhead Design Slideshow

Wellhead Design, Lunch & Learn, 06-Feb-07

Production Well Water Injection Well Cuttings ReInjection Well

Page 37: Wellhead Design Slideshow

Wellhead Design, Lunch & Learn, 06-Feb-07

• The CoPC Bohai Wellhead System was designed with a unique horizontal production tree.

• A horizontal production tree allows complete access to the well bore without removing the tree. The well is produced from the side of the tubing hanger and flows horizontally through the master valve.

• Horizontal production trees are ideal on wells where frequent workovers are anticipated, such as Electric Submersible Pump (ESP) applications.

Page 38: Wellhead Design Slideshow

Wellhead Design, Lunch & Learn, 06-Feb-07

Conventional Wellhead and Tree

Assembly

Horizontal Wellhead and Tree Assembly