Top Banner
WELCOME TO UPPER YAMUNA RIVER BOARD YAMUNA RIVER
34
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: WELCOME TO UPPER YAMUNA RIVER BOARD YAMUNA RIVER.

WELCOME

TO

UPPER YAMUNA RIVER BOARD

YAMUNA RIVER

Page 2: WELCOME TO UPPER YAMUNA RIVER BOARD YAMUNA RIVER.

Upper Yamuna River Board (UYRB)

• It is a sub-ordinate office of MoWR.

•It was Constituted through MoWR Notification dated 11th March, 1995 in pursuance of MoU dated 12th May,

1994.

Page 3: WELCOME TO UPPER YAMUNA RIVER BOARD YAMUNA RIVER.

Upper Yamuna River Board

Constitution

Chairman – Member (WP&P), CWC

Members –

• Chief Engineers from the basin States

• Chief Engineer from Central Electricity Authority

• One Representative each from CGWB and CPCB

Member Secretary - Chief Engineer level officer (on deputation from CWES)

Page 4: WELCOME TO UPPER YAMUNA RIVER BOARD YAMUNA RIVER.

Main Functions of the Board • Regulation and supply of water from all

storages and barrages upto and including Okhla barrage.

• Maintenance of minimum flow in Yamuna from ecological considerations.

• Monitoring return flows from the waters withdrawn :

(i) by Delhi for domestic use. (ii) by the States of Uttar Pradesh and Haryana for the purpose of silt exclusion. (iii) for Khara hydel station.

Page 5: WELCOME TO UPPER YAMUNA RIVER BOARD YAMUNA RIVER.

Main Functions of the Board (contd.)

• Framing of rules and regulations for water accounting.

• Keeping concurrent records of the flows and

withdrawals .

• Ensuring delivery of supplies to all the concerned States in accordance with their entitlements.

• Monitoring and reviewing the progress of all projects.

Page 6: WELCOME TO UPPER YAMUNA RIVER BOARD YAMUNA RIVER.

Vacancy position as on 15.4.2015

Sl.No. Name of Post Sanctioned Filled Vacant

  Group - A      

1 Member Secretary 1 1 Nil

2 Superintending Engineer 2 Nil 2

3 Executive Engineer 3 2 1

4 Specialist (Ground Water) 1 1 Nil

5 Specialist (Environment) 1 Nil 1

6 Asst. Executive Engineer 4 Nil 4

7 Accounts Officer 1 Nil 1

  Group - B      

8 Section Officer 1 Nil 1

9 Private Secretary 1 Nil 1

10 Design Assistant 4 Nil 4

11 P.A. to S.E.s 2 Nil 2

  Group - C      

12 Junior Engineer 4 Nil 4

13 Draftsman 4 Nil 4

14 Stenographer 6 Nil 6

15 Cashier 1 Nil 1

16 U.D.C. 2 Nil 2

17 L.D.C. cum Typist 4 Nil 3

18 Driver 3 Nil 3

  Group - D      

19 Daftary 1 Nil 1

20 Peon 10 Nil 10

21 Chowkidar 2 Nil 2

 Total 58 4 54

Page 7: WELCOME TO UPPER YAMUNA RIVER BOARD YAMUNA RIVER.

Upper Yamuna Review Committee (UYRC)

To supervise working of UYRB and to ensure implementation of MOU dated 12.5.94

Constitution

Chairman - Union Minister / Minister of State for Water Resources

Members - Chief Ministers of basin States Secretary - Chairman, UYRB

•Disagreement, if any, on the decisions of the Board may be referred to the Review Committee by a member of the

Review Committee.

Page 8: WELCOME TO UPPER YAMUNA RIVER BOARD YAMUNA RIVER.

Memorandum of Understanding (MoU)

• An MOU was signed on 12.5.1994 amongst basin States of Himachal Pradesh, Haryana, Uttar Pradesh, Rajasthan and Delhi. Uttrakhand was added in 2001.

•It provides for allocation of surface flow of Yamuna to basin States. •It also provides for regulation of allocated waters by Upper Yamuna River Board.

Page 9: WELCOME TO UPPER YAMUNA RIVER BOARD YAMUNA RIVER.

Salient Features of MoU•Mean year availability is assessed 13 BCM out of which 0.68 BCM may not be utilisable due to flood spills.

• Minimum flow upto 10 cumec shall be maintained downstream of Tajewala and Okhla Headwork from ecological considerations.

• Surplus water to be allocated in proportion to each State’s allocation.

• If availability is less, first drinking water allocation of Delhi to be met, balance to be distributed in proportion to state’s allocation.

• Three main storage projects have been identified- Renuka, Kishau and Lakhwar-Vyasi.

Page 10: WELCOME TO UPPER YAMUNA RIVER BOARD YAMUNA RIVER.

Salient Features of MoU (contd.) • Separate agreement to be signed for each

identified storage.

• Annual as well as Interim seasonal water allocations have been made.

• As storages are constructed, allocations shall get progressively modified to the final annual allocations.

• This agreement may be reviewed after the year 2025, if any of the basin States so demand.

• Interim seasonal water allocation is as follows:

Page 11: WELCOME TO UPPER YAMUNA RIVER BOARD YAMUNA RIVER.

ALLOCATION OF YAMUNA WATERS (BCM)

  July - Oct.

Nov. - Feb.

March - June

Annual

Haryana 4.107 0.686 0.937 5.73

Uttar Pradesh & Uttrakhand

3.216 0.343 0.473 4.032

Rajasthan 0.963 0.07 0.086 1.119

Himachal Pradesh

0.19 0.108 0.08 0.378

Delhi 0.58 0.068 0.076 0.724

Total 9.056 1.275 1.652 11.983

STATE

SEASONAL

Page 12: WELCOME TO UPPER YAMUNA RIVER BOARD YAMUNA RIVER.

UPPER YAMUNA

Upper Yamuna refers to the stretch of Yamuna from its origin upto and including the Okhla Barrage at Delhi.

• BASIN STATES:

Himachal Pradesh, Uttrakhand, Uttar Pradesh, Haryana, Rajasthan and Delhi.

• AREA:

42931 Sq.km. (upto Okhla)

Page 13: WELCOME TO UPPER YAMUNA RIVER BOARD YAMUNA RIVER.
Page 14: WELCOME TO UPPER YAMUNA RIVER BOARD YAMUNA RIVER.

BARRAGES:

•Tajewala / Hathnikund•Wazirabad•Okhla

CANAL NETWORKS:

•Western Yamuna Canal•Eastern Yamuna Canal•Agra Canal / Gurgaon canal

Page 15: WELCOME TO UPPER YAMUNA RIVER BOARD YAMUNA RIVER.

Tajewala Barrage (Haryana)

Page 16: WELCOME TO UPPER YAMUNA RIVER BOARD YAMUNA RIVER.

Wazirabad Barrage (Delhi)

Page 17: WELCOME TO UPPER YAMUNA RIVER BOARD YAMUNA RIVER.

Okhla Barrage (Delhi)

Page 18: WELCOME TO UPPER YAMUNA RIVER BOARD YAMUNA RIVER.
Page 19: WELCOME TO UPPER YAMUNA RIVER BOARD YAMUNA RIVER.
Page 20: WELCOME TO UPPER YAMUNA RIVER BOARD YAMUNA RIVER.

Proposed Storage Projects

Project Storage Power

•Renuka 542.5 MCM 40 MW

•Kishau 1275 MCM 600 MW

•Lakhwar 330 MCM 300 MW

•Vyasi HE 3.5 MCM 120 MW

Page 21: WELCOME TO UPPER YAMUNA RIVER BOARD YAMUNA RIVER.

Thank You

Thank You

Page 22: WELCOME TO UPPER YAMUNA RIVER BOARD YAMUNA RIVER.

Pollution in Yamuna• Industrial Pollution coming from Sonipat/ Panipat

drains, Haryana:

• BOD a non issue.

• Mainly high Ammonia content.

• Damages WTP’s of Delhi.

• Details of proposal for treatment if any not available.

• Municipal pollution coming from Delhi.

• BOD is about 40mg/litre.

• Sewage discharge u/s of Okhla is about 3800 MLD (700 cusec).

Page 23: WELCOME TO UPPER YAMUNA RIVER BOARD YAMUNA RIVER.

Pollution in Yamuna (Contd.)

• DJB’s Interceptor Sewage Project with a cost of about Rs. 1395 crore, financed by JnNRUM, is under implementation.

• Scheduled for completion by December 2015.

• Present overall progress of six packages is about 75%.

• Rehabilitation of old trunk sewers is being done separately.

• Rehabilitation of existing STP’s is also under progress.

Page 24: WELCOME TO UPPER YAMUNA RIVER BOARD YAMUNA RIVER.

Yamuna Water for Rajasthan

•The MoU provides for following interim seasonal allocation pending construction of the storage dams in the upper reaches of the river:

STATES INTERIM SEASONAL ALLOCATION OF YAMUNA WATERS (BCM)

July – Oct Nov - Feb Mar - June Annual

Haryana 4.107 0.686 0.937 5.73

Uttar Pradesh 3.216 0.343 0.473 4.032

Rajasthan 0.963 0.070 0.086 1.119

Himachal Pradesh 0.19 0.108 0.08 0.378

Delhi 0.58 0.068 0.076 0.724

Total 9.056 1.275 1.652 11.983

Page 25: WELCOME TO UPPER YAMUNA RIVER BOARD YAMUNA RIVER.

• The distribution approved by the Upper Yamuna River Board to Rajasthan, in its 22nd meeting held on 21-12-2001 as per above interim seasonal allocation, is as under:

Season Seasonal Allocation as per MoU

Tentative distribution by UYRB

Tajewala Okhla

BCM Cusecs Cusecs Cusecs

July to Oct. 0.963 3198 1917 1281

Nov. to Feb. 0.070 238 0 238

Mar to June 0.086 288 0 288

Total 1.119

Page 26: WELCOME TO UPPER YAMUNA RIVER BOARD YAMUNA RIVER.

• For utilizing its allocated share of Yamuna water, Rajasthan Govt. submitted two schemes, one for district Bharatpur and the other for districts Jhunjhunu & Churu.

1. Ex-Tajewala through Western Yamuna Canal system up-to tail of Loharu feeder (total length of common carrier would be 274.266 Km.) and thereafter through a parallel /new canal up-to Rajasthan border. The total length of canal up-to Rajasthan border is likely to be 320.90 Km. The existing system of WJC/JLN up-to Loharu Feeder will have to remodeled to pass Rajasthan’s share of water.

2. Ex-Okhla through Agra/Gurgaon canal by Modernization of Gurgaon Feeder in Haryana territory.

 

Page 27: WELCOME TO UPPER YAMUNA RIVER BOARD YAMUNA RIVER.

• These schemes were cleared by the Technical Advisory Committee (TAC) of the Ministry of Water Resources in its 80th meeting held on 7.2.2003, subject to certain observations which inter alia included concurrence of Haryana/ Rajasthan Government for taking up the construction in Haryana and Rajasthan simultaneously.

 • Rajasthan submitted a MoU in this regard to Haryana

for: a) Modernization of canal system from Tajewala Head

works lying in Haryana territory upto Loharu sub branch; and

b) Modernization of Gurgaon Feeder in Haryana territory.

Page 28: WELCOME TO UPPER YAMUNA RIVER BOARD YAMUNA RIVER.

• Haryana has not signed the MoU so far. • In the 26th meeting of UYRB held on 6.8.2004, the

member from Haryana insisted that they do not agree to the utilization of water by Rajasthan at Tajewala in the manner proposed by Rajasthan.

• Haryana was opposed to UYRB’s decision allocating Rajasthan’s shares at Tajewala and Okhla on the ground that UYRB did not follow set procedures of protecting the existing uses of the States at Tajewala and Okhla while taking the decision.

• Accordingly, Haryana referred the matter to UYRC.

Page 29: WELCOME TO UPPER YAMUNA RIVER BOARD YAMUNA RIVER.

• Further, Haryana has suggested that water to Rajasthan could be carried through a 300 km long canal parallel to Western Yamuna Canal (WYC) from a new barrage proposed at Mawi near Panipat on river Yamuna.

• Rajasthan is not enthusiastic about this proposal and has been stressing to get its share of water from Tajewala/ Hathnikund barrage through WYC instead of the new barrage and canal system being proposed by Haryana.

Page 30: WELCOME TO UPPER YAMUNA RIVER BOARD YAMUNA RIVER.

From Tajewala •The mode of conveyance of Rajasthan’s share upto border of Rajasthan and Haryana was discussed in the 4th UYRC meeting held on 19.07.2011. •It was decided that that both the States may discuss and settle the issue bilaterally, at the earliest and if needed, help of CWC may be taken to find out most appropriate option for the conveyance of Rajasthan’s share upto Rajasthan border. •Both the States agreed to the suggestion. •However the bilateral meeting was not held.

Page 31: WELCOME TO UPPER YAMUNA RIVER BOARD YAMUNA RIVER.

• The issue was again discussed in the 5th UYRC meeting held on 28.05.2013.

• Chairman felt that one more chance may be given to both the States to settle the issue bilaterally.

• However bilateral meeting has not been held so far to settle the issue.

• The issue was again discussed in the 6th UYRC meeting held on 20.03.2015.

• Chairperson felt that one more chance may be given to both the States to settle the issue bilaterally.

Page 32: WELCOME TO UPPER YAMUNA RIVER BOARD YAMUNA RIVER.

From Okhla

•The Agra Canal takes off from the Okhla barrage. After a short while, AgraCanal enters Haryana territory. After flowing for some distance, it enters into UP. •While the Agra Canal flows in Haryana territory, it carries waters for Haryana as well as for Rajasthan. •The Gurgaon Canal takes off from Agra Canal while the latter is in Haryana territory. The Gurgaon canal flows in Haryana territory for some distance after which it enters Rajasthan. Therefore it carries water for the requirements of both Haryana en route, and Rajasthan. •A part of Rajasthan’s share is delivered through Agra Canal / Aring Distributary / Bharatpur Feeder.

Page 33: WELCOME TO UPPER YAMUNA RIVER BOARD YAMUNA RIVER.

• Agra Canal enters UP after it has flowed for some distance in Haryana.

• It is in Haryana territory that the alleged unauthorized lifting of water by Haryana farmers and the need for restoration of carrying capacity has been reported.

• In order to check unauthorized lifting of water by Haryana farmers Upper Yamuna River Board has constituted a committee of Superintending Engineers from Rajasthan, Haryana and Uttar Pradesh to jointly observe the water releases in Hindon Cut Canal, Agra Canal and Gurgaon Canal, periodically.

• Three Joint observations have been made by the Committee so far.

Page 34: WELCOME TO UPPER YAMUNA RIVER BOARD YAMUNA RIVER.

• Agra Canal enters UP after it has flowed for some distance in Haryana.

• It is in Haryana territory that the alleged unauthorized lifting of water by Haryana farmers and the need for restoration of carrying capacity has been reported.

• In order to check unauthorized lifting of water by Haryana farmers Upper Yamuna River Board has constituted a committee of Superintending Engineers from Rajasthan, Haryana and Uttar Pradesh to jointly observe the water releases in Hindon Cut Canal, Agra Canal and Gurgaon Canal, periodically.

• Three Joint observations have been made by the Committee so far.