Project Objectives: Continue to establish a comprehensive trail network by connecting Zim Smith trail to NY Route 9 and beyond Utilize existing trail alignments Evaluate potential for pedestrian, bike, and equestrian accommodations Minimize environmental impacts Proposed Zim Smith Connection Trail Project Contact Information Audrey Ball Director of Parks and Recreation Town of Malta One Bayberry Drive Malta, NY 12020 (518) 899‐4411 ext. 303 dirparksrec@malta‐town.org Kevin King Comptroller Town of Malta 2540 Route 9 Malta, NY 12020 (518) 899‐2502 comptroller@malta‐town.org Don Adams Project Manager Creighton Manning Engineering, LLP 17 Computer Drive West Albany, NY 12205 (518) 446‐0396 [email protected] Welcome to the Zim Smith Trail Connection Project Public Informat ion Meet ing October 26, 2010 7:00 PM Locat ion: Town of Malta Recreat ion Center Existing Trolley Trail Project Schedule: Fall/Winter 2010: Preliminary Design Winter/Spring 2011: Final Design Summer 2011: Construction Begins Fall 2011: Construction Completion