Welcome to Shawnee #2 Wastewater Welcome to Shawnee #2 Wastewater Treatment Plant Treatment Plant
Apr 01, 2015
Welcome to Shawnee #2 Wastewater Treatment PlantWelcome to Shawnee #2 Wastewater Treatment Plant
Jeff Mathew, SuperintendentJeff Mathew, Superintendent
Wendell Hurley and Jeff Bassitt, Plant StaffWendell Hurley and Jeff Bassitt, Plant Staff
Wastewater Plant OverviewWastewater Plant Overview
Process OverviewProcess Overview
SBR and Aerobic Digesters.SBR and Aerobic Digesters.
Raw Wastewater InfluentRaw Wastewater Influent
Hydraulic influent sewage grinders.Hydraulic influent sewage grinders.
Sequencing Batch Reactor (SBR) BasinSequencing Batch Reactor (SBR) Basin
Provides mixing and settling for the treatment process.Provides mixing and settling for the treatment process.
Process Control ScreenProcess Control Screen
Computer program providing control strategies Computer program providing control strategies for the treatment process.for the treatment process.
Process Control LabProcess Control Lab
Basic operational tests performed here to analyze Basic operational tests performed here to analyze the treatment plant process.the treatment plant process.
Aerobic DigestersAerobic Digesters
Provides aeration to treat sewage sludge.Provides aeration to treat sewage sludge.
Gravity Thickener BeltGravity Thickener Belt
The Gravity Thickener Belt thickens aerobically The Gravity Thickener Belt thickens aerobically digested sludge from 2% to approximately 6% solids.digested sludge from 2% to approximately 6% solids.
Sludge Processing BuildingSludge Processing Building
Sludge Storage TankSludge Storage Tank
Provides processed sludge storage prior to land application.Provides processed sludge storage prior to land application.
Preparation for Land ApplicationPreparation for Land Application
Sludge is removed from storage and transported Sludge is removed from storage and transported to the field for application.to the field for application.
Land ApplicationLand Application
Sludge is applied to the field for fertilization.Sludge is applied to the field for fertilization.
Generator BuildingGenerator Building
Diesel GeneratorDiesel Generator
The Generator supplies emergency power to The Generator supplies emergency power to maintain treatment.maintain treatment.
Blower RoomBlower Room
De-Chlorination BuildingDe-Chlorination Building
De-ChlorinationDe-Chlorination
Removes chlorine prior to stream discharge.Removes chlorine prior to stream discharge.
Chlorine Contact BasinChlorine Contact Basin
Provides detention time for chlorine to Provides detention time for chlorine to disinfect wastewater effluent.disinfect wastewater effluent.
Final Effluent to Ottawa RiverFinal Effluent to Ottawa River