WECC JSIS April 2012
8

WECC JSIS April 2012. System Events 3 March 24, 2012 @ 15:37 – Alberta Separation March 30, 2012 @ 10:20 – 1,600 MW generation loss in WAPA CM, including.

Mar 27, 2015

Download

Documents

Jackson Cooke
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
  • Slide 1

WECC JSIS April 2012 Slide 2 System Events Slide 3 3 March 24, 2012 @ 15:37 Alberta Separation March 30, 2012 @ 10:20 1,600 MW generation loss in WAPA CM, including both Laramie River units March 30, 2012 @ 16:05 952 MW generation loss at Grand Coulee April 6, 2012 @ 9:38 AC RAS event, drop about 1,400 MW of generation April 20, 2012 @ 15:37 AC RAS event, drop 1,643 MW of generation Summary of WECC Events Slide 4 Alberta Separation Slide 5 Slide 6 Slide 7 Slide 8 Frequency Response Summary Dot size is proportional to size of generation drop Blue = nadir, Red = settle