© 2015 iZenBridge | Public Webinar on Perform Integrated Change Control
31
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: Webinar on Perform Integrated Change Control - PMP

© 2015 iZenBridge | Public

Webinar on

Perform Integrated

Change Control

Page 2: Webinar on Perform Integrated Change Control - PMP

© 2015 iZenBridge | Public

Agenda

Page 3: Webinar on Perform Integrated Change Control - PMP

© 2015 iZenBridge | Public

What is Change?

Page 4: Webinar on Perform Integrated Change Control - PMP

© 2015 iZenBridge | Public

Modification needed in any document, deliverable, or baseline.

What is change

Page 5: Webinar on Perform Integrated Change Control - PMP

© 2015 iZenBridge | Public

Why Change?

Page 6: Webinar on Perform Integrated Change Control - PMP

© 2015 iZenBridge | Public

No plan survives contact with the enemy

Project Team Keep Learning

Environment Keeps Changing

Projects works in uncertain domain

Why Change

Page 7: Webinar on Perform Integrated Change Control - PMP

© 2015 iZenBridge | Public

Change Triggers

• Value added

• External events

• Errors or omissions

• Risk response

Page 8: Webinar on Perform Integrated Change Control - PMP

© 2015 iZenBridge | Public

Who can ask for change?

Page 9: Webinar on Perform Integrated Change Control - PMP

© 2015 iZenBridge | Public

Various Sources of Change Requests

Change Change Defect RepairDefect Repair

StakeholdersStakeholders

CustomerCustomer

Corrective Actions

Corrective Actions

Preventive Actions

Preventive Actions

Project Team

Project Team

Page 10: Webinar on Perform Integrated Change Control - PMP

© 2015 iZenBridge | Public

How to manage change?

Page 11: Webinar on Perform Integrated Change Control - PMP

© 2015 iZenBridge | Public

Formal Process starts with Change Request

Change Request.

A formal proposal to modify any document, deliverable, or baseline.

Page 12: Webinar on Perform Integrated Change Control - PMP

© 2015 iZenBridge | Public

Poll

Do we need a Change request for modifying project documents ?

Page 13: Webinar on Perform Integrated Change Control - PMP

© 2015 iZenBridge | Public

Change Request

Please raise the Change Request

I want to change the scope to get better product

Page 14: Webinar on Perform Integrated Change Control - PMP

© 2015 iZenBridge | Public

Change Request

Sure, you need to own it when I take it for analysis

and approval

Can you raise change request for me?

Page 15: Webinar on Perform Integrated Change Control - PMP

© 2015 iZenBridge | Public

Change Request

Raising a change request does not mean we will work

on it, we are following change control process

I have raised the change request when can I see the

changes

Page 16: Webinar on Perform Integrated Change Control - PMP

© 2015 iZenBridge | Public

Change Request

It has set of procedures that describes how modifications are managed and controlled.

What is change control process ?

Page 17: Webinar on Perform Integrated Change Control - PMP

© 2015 iZenBridge | Public

Poll

Do we need to raise change request for all changes asked by stakeholders?

Page 18: Webinar on Perform Integrated Change Control - PMP

© 2015 iZenBridge | Public

Questions

Page 19: Webinar on Perform Integrated Change Control - PMP

© 2015 iZenBridge | Public

Project Time

Cost

Predictive Life Cycle

Adaptive Life Cycle

Impact of change on cost

Page 20: Webinar on Perform Integrated Change Control - PMP

© 2015 iZenBridge | Public

Change Costs

• As a project manager focus on preventing unnecessary changes

Page 21: Webinar on Perform Integrated Change Control - PMP

© 2015 iZenBridge | Public

Integrated Change Control

Change Scope

Change Scope

Resource Movement Resource

Movement

Weather impacting schedule

Weather impacting schedule

Sponsor want early release

Sponsor want early release

Perform Integrated Change Control

Perform Integrated Change Control

The process of reviewing all change requests; approving changes and managing changes to deliverables, organizational process assets, project documents, and the project management plan; and communicating their disposition.

Page 22: Webinar on Perform Integrated Change Control - PMP

© 2015 iZenBridge | Public

Change Control Board (CCB)

• Group having expertise• Decide based on Change Management

Plan• Can be formed at multiple level• Can Approve, Reject or Postpone

Change • Usually have

• Sponsor• Customer Representative• Project Manager• Technical Experts• Subject Matter Experts

Page 23: Webinar on Perform Integrated Change Control - PMP

© 2015 iZenBridge | Public

Change Request Flow

Change Log the Change : Create Change

Request

Perform Impact Analysis : Update Change Request

Page 24: Webinar on Perform Integrated Change Control - PMP

© 2015 iZenBridge | Public

Change Request Flow

Submit Change

Request to Change

Control Board

Evaluate changes , cost and benefits

Approve, Reject or Postpone Change

Page 25: Webinar on Perform Integrated Change Control - PMP

© 2015 iZenBridge | Public

Change Request Flow

Update Change Log

Communicate decisions to

Stakeholders

Update Project Baselines for

Approved Changes

Project Baseline

Page 26: Webinar on Perform Integrated Change Control - PMP

© 2015 iZenBridge | Public

When can change occur?

Page 27: Webinar on Perform Integrated Change Control - PMP

© 2015 iZenBridge | Public

Poll

Change Request can be raised at any stage of the project?

Page 28: Webinar on Perform Integrated Change Control - PMP

© 2015 iZenBridge | Public

Early Stage

Change

Early Stage

Change

Later Stage

Change

Later Stage

Change

Does the change management process changes?

Change management at different stages

Page 29: Webinar on Perform Integrated Change Control - PMP

© 2015 iZenBridge | Public

Summarize

• Change is need to modify document, deliverable, or baseline.

• Change is required due to change in technology or team learning's or change in environment

• Change can be requested by any stakeholder including project manager

• Change can be managed by following a formal process.

• Change Request is a formal proposal for change

• Flow: Log change-> Perform impact analysis-> Submit to (CCB)-> Update change log -> Update project baselines.

Page 30: Webinar on Perform Integrated Change Control - PMP

© 2015 iZenBridge | Public

Questions

Page 31: Webinar on Perform Integrated Change Control - PMP

© 2015 iZenBridge | Public

Stay Connected

YouTube Channel

www.youtube.com/izenbridge

YouTube Channel

www.youtube.com/izenbridge

PMP® / PMI-ACP® Discussion Forum

forum.izenbridge.com

PMP® / PMI-ACP® Discussion Forum

forum.izenbridge.com

www.iZenBridge.com

www.iZenBridge.com