-
Webb, Bruce (CWS)
To: Steele, Tania (CWS)Subject: Manitoba Infrastructure and
Transportation - St. Adoiphe Ring Dike Expansion File:
5742.00
The attached information can be placed in the public registries
for the above project:
Additional Information: No additional information was requested
for the project.
Public Comments: (3 pages)James Makiw, November 14, 2014
Technical Advisory Committee Comments: (10 pages)Manitoba
Conservation and Water Stewardship — Environmental Compliance and
Enforcement Branch, December 3,2014Manitoba Conservation and Water
Stewardship — Lands Branch, November 28, 2014Manitoba Conservation
and Water Stewardship — Lands Branch, Land Management and Planning
Section, October 30,2014Manitoba Conservation and Water Stewardship
— Parks and Protected Spaces Branch? November 6,2014Manitoba
Conservation and Water Stewardship — Wildlife Branch, November 12,
2014Manitoba Conservation and Water Stewardship — Water Science and
Management Branch, Water Quality ManagementSection, November 18,
2014Manitoba Conservation and Water Stewardship — Water Science and
Management Branch, Groundwater ManagementSection, November 18,
2014Manitoba Conservation and Water Stewardship — Water Use
Licensing Section, October 30, 2014Manitoba Infrastructure and
Transportation — Highway Planning and Design Branch, Environmental
Services Section,October 31, 2014Manitoba Agriculture, Food and
Rural Development— Crops Branch, December 2,2014
Bruce.
1
-
r.
+1nvyYnD’Wr“‘irif4’rt)?-‘1-(
r-t3rat’fQ
r‘
rv,tothnC’Yrrnr”r-ft -
)4sjy4s-tun8‘rt4t”rPPt’‘-‘rr’rt9cr:iY*‘747’S
fl“-!rY293’r4nnn/irrr”
Ym-°”z_tUZfl1ZtfQfr-v“1’Y
)flifll’1fl 0n-
Jrj5L7vnf t’-Q_rr9Th2
¶flZfl -itntyTh*rE7-’)/fl9C/‘wfl€cA
?2’294
r
r’Yfr-4wyvV-cv fl?7fl47fplL.’rtrn/v
vttc/
fl-flPflf-frpcK4 --vir-‘s”-”°t
“7’“°° rn’2Z°”pzt—“7rYY
9çt4rofl’pjnnfl
3m7nOOl9r‘t9w*-rrf4y
c’-°w,.,Wt
.(‘D”biry7fl-f3r7r
S2hIr”rw4rrr“f-pry”’“3‘‘
_
y-
‘arm/zr?7n72‘°-yz%Z
w-;tr
r4r?r/nc
vtt
rfrVyfl7--
4-,I-9r 4a,
-
-7-
_w+
103‘O”S’
)
7’CCohT“t’‘._n 9/tI-—
fl
Wynfl)
r4’fdrJ°.r’fl-zLic’?9p’w,,nçp-zr-e1:
r”r’r’ -7°rfjçt-r.vJ-r‘-n4r
71tI‘%‘nC-1°t‘?
‘-‘tD4’4rO
nYVaSt-+‘w°’trrr”Y
-t,
wZ -K/
—1n.y4vnp‘.n’aD‘Wt4Cjy7
XrW7 7-”°-rcY-rfl7S’Zr--rn’?rr’77f
“erJurrr
7Th
-
WO3Utqo4iii
-
Webb, Bruce (CWS)
Subject: FW: Reque5t for review/comment - EAP St. Adoiphe dike
File: 574200
From: Fediclç Kim (CWS)Sent: December-03-14 10:51 AMTo: Webb,
Bruce (CWS)Cc Hawryliuk, Yvonne (CWS)Subjecb FW: Request for
review/comment - EAP St. Adoiplie drke File: 5742.00
The Environmental Complance and Enforcement Sran:h of Manitoba
Conservation and Water Stewardship hasreviewed this proposal and
does not have any cOmments.
K. Fedick, 3.A.Scq’Env)Environment OfficerEr.vronmentaI
Compliance and EnforcementManitoba Cons&vaton and Water
Stewardshp123 Main SIWinnipeg MB R3C
A5(204)945-0992(204)948-2338FOR ENMRONMENTAL EMERNCSS CALL
204-9444888
1
-
Webb, Bruce (CWS)
Subject: EW: Request for reviewlcomrnent - EAP Si Adolphe dike
File: 5742.00
From: +WPG1212 - Conservation_Circulars (CWS)Sent:
November-28-14 8:50 AM
,
To: Webb, Bruce (CWS)Subject FW: Request for review/comment -
EAP St. Adolphe dike File: 5742.00
Hi Bruce, -
Good momng.
Lands Branch has no comments on t,e above noted EAP as there are
no Crown aids impacted by the proposaL
Thank you for the cpportunfty to review.
Best regards
!njR flIasCsust Laid Progrwns AdmttsUatorLant Brcrci;‘lwt±a 2r
Wat St€wardthEp2D0 Saulteaux Crerit Box 25Winreg, Manita R3J 3%3
CPAPAPa,e: (204) 945-4524FamIe: (204) 948-2197
1
-
Webb, Bruce (CWS)
Subject: FW: Request for review/comment - EAP St. Adoiphe dike
File: 5742.00
From: Sobkowich, Dale (CWS)Sent: October-30-14 12:21 PMTo: Webb,
Bruce (CWS)Subject: RE: Request for review/comment - LAP St.
Adoiphe dike File: 5742.00
Land Management & Plannhg Sect!on of Lands Branch, Manitoba
ConseraUon has no comment as no Crown lands areimpacted by the
proposal.
Dale SobkowchLands
1
-
.7.-;-
Webb, Bruce (CWS)
Subject: FW: Request for review/comment - EAP St. Adolphe dike
File: 574200
From: Kelly, Jason (CWS)Sent: November-06-14 10:06f’1To: Webb,
Bruce (CWS)Subject: RE: Reque5t for review/comment - EAP St.
Adolphe dike FIle: 574200
Parks and Protected Spaces Branch has reviewed the proposal
submitted pursuant to the Environment Act for EAP St.Adoiphe dike
rUe: 5742.00. The Branch has no comments or concerns to offer as it
does not affect any provincial parks,park reserves, ecologkal
reserves, areas of special interest, or proposed protected
areas.
1
-
Webb, Bruce (CWS)
Subject: FW: Request for review/comment - EAP St. Adolphe dike
File: 574200
From: Kanya, Veronika (CWS)Sent: November-12-14 3:27 PMTo: Webb,
Bruce (CWS)Subject: FW: Request for review/comment - EAP St.
Adolphe dike File: 5742.00
Hi Bruce,
WUdlife has the foflowing comments:
1. Maintain the Option 3 rninmum 01150 m setback from St. Adophe
Coulee as per their Environmental PolicyArea. This will help
maintain the couee as an important wildth’e riparian and movement
corrkior.
2. Construction activities should be undertaken during the
winterto the greatest extent possbe to rnnirnizecor.flict with
migrating/nesting birds, and to minimize impact on riparian
areas.
3. Borrow pits and storm water retenton basins be bioengineered
(i.e. edges re-vegetated to and maintained asnative grasses) so as
to offset any disrupUon or loss of habftat within or near the St.
Adoph coulee.
4. A pre-constructon survey to deternine pre5ence/absence of
endangered species (with apprDpriate mitigation ifpresent) within
the construction footprint shoud be undertaken. This is especiaHy
important f they pursueOption 4 and its immediate proximity to the
St. Adophe Coulee. But defer to Chris on whether this is
needed.
Post-conssuction mor.itorirg for and control of invasive species
(i.e. purple oosestri’e) is required.
Thanks,
Veronika
Veronika Kanya, 8.Sc., C.E.C.Wildlife Branch - Conservation and
Water [email protected]
1
-
Webb, Bruce (CWS)
Subject: FW: Request for review/comment - EAP St. Adolphe dike
File: 5742.00
From: Jacobs, Kevin (CWS)Sent: November-18-14 11:58 AM -‘.To:
Webb, Bruce (CWS)Subject: RE: Request for review/comment - EAP St.
Adolphe dike File: 5742.00
Hello Bruce,
On behalf of the ‘Nater Quaflty Management Section o Manitoba
Conservation and Water Stewardship I reviewed theproposal for the
St. Adolphe dike expansion. Based on review of the proposal do no
have any outstanding concernsthat could not be addressed by license
conditions and the use of best practices.
Of principe concern wouW be possible impacts to the St. Adophe
Cou:ee immediately east of the Project area througherosion and
5ediment transport from the nearby construction area.
• The proponents advised to implement effective sediment and
erosion control practices• Minimize the amount of vegetated area
adjacent to the Coulee that’s ceared• Stabilize and re-vegetate
exposed areas• Avoid working in sensitive areas with heavy
equipment during wet condtions.
• The proponent should also ensure that all equipments kept free
of leaks of fuel and other petroleum products,and m&ntain a
supply of absorbent materials on site at all times.
Kevin Jacobs, M.Sc,Senior Water Protection OfficerWater Science
and Management BranchManitoba Conservation and Water Ste
wardshipSuite 160- 123 Main Street (Box 20)Winnioeg, ManitobaR3C
lASPhone:204 9454304Fax: 204 948 2357
1
-
Webb, Bruce (CWS)
Subject: FW: Request for review/comment - EAP St. Adoiphe dike
File: 5742.00
From: Frost, Laurie (CWS)Sent: November-18-14 2:50 PM ITo: Webb,
Bruce (CWS) L4JCc: Phipps, Graham (CWS)Subject: RE: Request for
review/comment - EAP St. Adoiphe dike rile: 5742.00
In response to your request for comments on the EA Proposal -
St. Ado]phe Ring Dike Expan&on, the GroLndwaterManagement
Section is pleased to provide the coiIowng:
If the expanded ring dikes to be ocated on deveoped property,
the property should be inventoried for water wells.Any wells ocated
within the footprint of the dIke or in areas of future
dev&opment to be serviced by municipal watershould be properly
sealed to prevent potential contamination of the local aquifer.
Regards,
Laurie Frost, M.Sc., PEng.HydrogeologistGroundwater Management
SectionBox 18, 200 Sauiteaux Creso.Winnpeg, Manitoba R3J 3W3P(204)
945-3737 F(204) 945-7419e-ma[I LaurioFrostqov,rnb.ca
Manllobat1Conséryatiopi and Water £tewardshp
-
Webb, Bruce (CWS)
Subject: FW: Request for review/comment - EAP St. Adalphe dike
File: 5742.00
From: Matthews, Rob (CWS)Senh October-30-14 11:16 AMTo: Webb,
Bruce (CWS)Subject: RE: Request for review/thmment - EAP St.
Adolphe dike RIe: 5742.00
No concerns.
W U L5
1
-
October31, 2014
Tracey Braun, M. Sc.Director, En*onmental Approvals
BrandiManftoba Conservation and Water Stewardship123 Main St.,
Suite 160WInnipeg, MB R30 1A5
RE: MIT - St. Adoiphe Ring Dike ExpansionClient File No
5142,00
Dear Ms. Braurt
S
MIT has rr4end the proposal under the Environment Act noted
above arid we do riot have anyconcern.
Thank you very mudi for pro%ldlng us the opportunity to rniew
the proposal.
SInowely
Ryan Coufter, M. Sc., P. Eng.Manager & ErMronmentaI
Services
Monilo
a-.
Manilobabifratnidur. and flti.port.tionHØiwiy Pbmfl .nd
O.&gn WIdii&d
— Qwy a, upnI RSO fl700416W4U9 FfZ4)948050Z
—
-
Webb, Bruce (CWS)
Subject: FW: Request for review/comment - EAP St. Adolphe dike
File: 5742.00
From: Wilson, Brian (MAFRD)Sent: December-02-14 11:22 AMTo:
Webb, Bruce (CWS)Subject: RE: Request for review/comment - EAP St.
Adoiphe dike File: 5742.00
The spread of pathogens is becoming an increasing concern to the
farming community and to MAFRO. Biosecuritymeasures should be
included in the construction plan to prevent the spread of
sail-borne pests (disease, weeds,nematodes) in agricultural soils
by minimizing soil movement between fields and across Right of Ways
(ROW).Implementation strategies during construction should include
cleaning/washing equipment before coming on site andbetween land
owner fields and avoiding activities that would transfer soil to
different fields (I.e. reducing trafficbetween separate fields in
wet weather).
Brian WUsonBrian .Wilsornãov. m b. CaSoils Suitability
SpecaistCrops BranchManitoba Agricufture, Food and Rural
DeveropmentBox 1149 #65-3rd Avenue NECarman, Manitoba RUG OJO(204)
750-31 SDFAX (204) 745-5690
1