Top Banner
Section 2.04B Publications of decisions Melbourne Airport Reference number Applicant / Company If MEL is the applicant, date application submitted to ABC If MEL is not the applicant date which MEL received the application Description of proposed building activity Location of proposed building activity Status: Consent ( C ) Refusal ( R ) Withdrawn ( W ) Consent Date Issued ABC determination Date / Permit number MEL 13050 APAM 17/04/2013 Consolidation & Decommission of Fire Dampers T2 & T3 Terminals 2 & 3 MELBOURNE AIRPORT VIC 3045 C 8/05/2013 13/05/2013 13/3038 MEL MEL 13051 Beca Consultants Pty Ltd 18/06/2013 Southern apron expansion works to support new pier & new aircraft stands, freight apron & increase GSE capacity & infill of existing grassed islands for new aircraft parking stands Airfield southern apron MELBOURNE AIRPORT VIC 3045 C 20/05/2013 3/07/2013 13/4703 MEL MEL 13107 Sign manager Pty Ltd 6/08/2013 Alterations to Hertz car park area Multi-Level STCP MELBOURNE AIRPORT VIC 3045 C 19/08/2013 30/08/2013 13/6050 MEL MEL 13110 Donald Cant Watts Corke Pty Ltd 6/08/2013 Construction of a new overflow facility for car rental tenants, an extension to the existing Thrifty car rentals site & MLS access ramp Francis Briggs Road MELBOURNE AIRPORT C 27/08/2013 30/09/2013 13/5892 MEL MEL 13126 Gallagher Jeffs Consulting Pty Ltd 21/06/2013 Construction of Tri Generation Facility Bonney Court MELBOURNE AIRPORT VIC 3045 C 8/10/2013 13/02/2014 13/4610-2V MEL MEL 14029 Arup 10/06/2014 Installation of an approximately 200 m² modular building & connection to existing services for the relocation of the Victorian Taxi Directorate 51-53 Francis Briggs Road MELBOURNE AIRPORT VIC 3045 C 13/05/2014 31/10/2014 14/4620 MEL MEL 14031 APAM 18/03/2014 Installation of new signage in the terminal forecourt Terminal forecourt MELBOURNE AIRPORT VIC 3045 C 31/03/2014 13/05/2014 14/2473 MEL MEL 14088 George E Apted & Associates 14/07/2014 Upgrade of the Freight Terminal Building (BLDG 51) electrical switchboard and associated works Building 51 Service Road MELBOURNE AIRPORT VIC 3045 C 28/07/2014 9/04/2015 14/6043 MEL MEL 14102 George E Apted & Associates 21/08/2014 Refaceing of existing signs to Bravo, Charlie,& Echo Fingers, New signs to Bravo Gate 29 and Foxtrot Gates F11, F13-F20 Domestic Terminal MELBOURNE AIRPORT VIC 3045 C 19/08/2014 18/09/2014 14/6557 MEL MEL 14104 MST Building & Maintenance Pty 7/08/2014 Toll DNATA fit out Corporate Area Level 2 - Terminal 2 Terminal 2 MELBOURNE AIRPORT VIC 3045 C 19/08/2014 22/09/2014 14/6171 MEL MEL 14105 Total Trade Property Services Pty Ltd 7/08/2014 Supply and installation of 6x7m cantilevered awning above the existing roller door of the wash bay at Mercedes Benz 21-23 Gowrie Park Drive MELBOURNE AIRPORT VIC 3045 C 20/08/2014 7/10/2014 14/6294 MEL MEL 14110 Aurecon Australasia Pty Ltd 20/08/2014 Antenna upgrades on Terminal building roof near lift motor room 3 associated works for Telstra Terminal Building MELBOURNE AIRPORT VIC 3045 C 1/09/2014 3/09/2014 14/5472 MEL MEL 14112 True Value Solar Pty Ltd 28/09/2014 Installation of Solar Panel on the roof of the Essendon football Club True Value Solar Centre building. 275 Melrose Drive. MELBOURNE AIRPORT VIC 3045 C 19/09/2014 18/02/2015 15/586 MEL MEL 14119-V North Projects Pty Ltd 29/04/2015 Stage 1 - Construct approx. 60m Mace Way Rd extension Stage 2 - Construction of permanent future Mace Way & services Link Road / Airport Drive MELBOURNE AIRPORT VIC 3045 C 11/05/2015 22/05/2015 14/8724-V
47

 · Web viewReplacement of cast iron water mains pipes A6 from Gate 39 along Service Rd to Departures Drv A8 Service Rd. Relocation of Fire Booster from forecourt area into :"At Terminal"

Mar 09, 2020

Download

Documents

dariahiddleston
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1:  · Web viewReplacement of cast iron water mains pipes A6 from Gate 39 along Service Rd to Departures Drv A8 Service Rd. Relocation of Fire Booster from forecourt area into :"At Terminal"

Section 2.04B Publications of decisions

Melbourne AirportReference number

Applicant / Company If MEL is the applicant,date application submitted

to ABC

If MEL is not the applicant

date which MEL received the application

Description of proposed building activity Location of proposed building activity Status:Consent ( C )Refusal ( R )

Withdrawn ( W )

Consent DateIssued

ABC determinationDate / Permit number

MEL 13050 APAM 17/04/2013 Consolidation & Decommission of Fire Dampers T2 & T3

Terminals 2 & 3MELBOURNE AIRPORT VIC 3045

C 8/05/2013 13/05/201313/3038 MEL

MEL 13051 Beca Consultants Pty Ltd 18/06/2013 Southern apron expansion works to support new pier & new aircraft stands, freight apron & increase GSE capacity & infill of existing grassed islands for new aircraft parking stands

Airfield southern apron MELBOURNE AIRPORT VIC 3045

C 20/05/2013 3/07/201313/4703 MEL

MEL 13107 Sign manager Pty Ltd 6/08/2013 Alterations to Hertz car park area Multi-Level STCPMELBOURNE AIRPORT VIC 3045

C 19/08/2013 30/08/201313/6050 MEL

MEL 13110 Donald Cant Watts Corke Pty Ltd 6/08/2013 Construction of a new overflow facility for car rental tenants, an extension to the existing Thrifty car rentals site & MLS access ramp

Francis Briggs Road MELBOURNE AIRPORT C 27/08/2013 30/09/201313/5892 MEL

MEL 13126 Gallagher Jeffs Consulting Pty Ltd 21/06/2013 Construction of Tri Generation Facility Bonney CourtMELBOURNE AIRPORT VIC 3045

C 8/10/2013 13/02/201413/4610-2V MEL

MEL 14029 Arup 10/06/2014 Installation of an approximately 200 m² modular building & connection to existing services for the relocation of the Victorian Taxi Directorate

51-53 Francis Briggs Road MELBOURNE AIRPORT VIC 3045

C 13/05/2014 31/10/201414/4620 MEL

MEL 14031 APAM 18/03/2014 Installation of new signage in the terminal forecourt

Terminal forecourt MELBOURNE AIRPORT VIC 3045

C 31/03/2014 13/05/201414/2473 MEL

MEL 14088 George E Apted & Associates 14/07/2014 Upgrade of the Freight Terminal Building (BLDG 51) electrical switchboard and associated works

Building 51 Service Road MELBOURNE AIRPORT VIC 3045

C 28/07/2014 9/04/201514/6043 MEL

MEL 14102 George E Apted & Associates 21/08/2014 Refaceing of existing signs to Bravo, Charlie,& Echo Fingers, New signs to Bravo Gate 29 and Foxtrot Gates F11, F13-F20

Domestic Terminal MELBOURNE AIRPORT VIC 3045

C 19/08/2014 18/09/201414/6557 MEL

MEL 14104 MST Building & Maintenance Pty 7/08/2014 Toll DNATA fit out Corporate Area Level 2 - Terminal 2

Terminal 2MELBOURNE AIRPORT VIC 3045

C 19/08/2014 22/09/201414/6171 MEL

MEL 14105 Total Trade Property Services Pty Ltd 7/08/2014 Supply and installation of 6x7m cantilevered awning above the existing roller door of the wash bay at Mercedes Benz

21-23 Gowrie Park Drive MELBOURNE AIRPORT VIC 3045

C 20/08/2014 7/10/201414/6294 MEL

MEL 14110 Aurecon Australasia Pty Ltd 20/08/2014 Antenna upgrades on Terminal building roof near lift motor room 3 associated works for Telstra

Terminal BuildingMELBOURNE AIRPORT VIC 3045

C 1/09/2014 3/09/201414/5472 MEL

MEL 14112 True Value Solar Pty Ltd 28/09/2014 Installation of Solar Panel on the roof of the Essendon football Club True Value Solar Centre building.

275 Melrose Drive. MELBOURNE AIRPORT VIC 3045

C 19/09/2014 18/02/201515/586 MEL

MEL 14119-V North Projects Pty Ltd 29/04/2015 Stage 1 - Construct approx. 60m Mace Way Rd extensionStage 2 - Construction of permanent future Mace Way & services

Link Road / Airport Drive MELBOURNE AIRPORT VIC 3045

C 11/05/2015 22/05/201514/8724-V

MEL 14129 APAM 7/11/2014 The supply and installation of new storage facilities in T2 Stairwell 32 andan area outside the terminal adjacent to stairwell 32

Terminal 2MELBOURNE AIRPORT VIC 3045

C 7/11/2014 14/9297 MEL

MEL 14136 Environmental Resources Management P/L

13/11/2014 Removal of 3 decommissioned underground storage tanks and associated infrastructure at JUHI facility Marker Road (petrol, diesel, jet fuel).

Marker RoadMELBOURNE AIRPORT VIC 3045

C 27/11/2014 6/01/201514/9322 MEL

MEL 14138 Donald Cant Watts Corke Pty Ltd 20/11/2014 Construction of a permanent Valet facility including reception, customer waiting area & back of house luggage / services room.

Level 2 Short Term Car Park MELBOURNE AIRPORT VIC 3045

C 5/12/2014 14/8664 MEL

MEL 15008 Melbourne Aviation Precinct Pty Ltd 6/02/2015 Re-alignment of the airside / landside perimeter fencing at Melbourne Aviation Precinct Gate 24.

Melbourne Jet Base MELBOURNE AIRPORT VIC 3045

C 24/02/2015 25/03/201515/1398 MEL

MEL 15009 George E Apted & Associates Pty Ltd 6/02/2015 Interior works to Avionics bldg. 165 and canopies to Oxygen Room bldg. 107 and Hydrostatic Room bldg. 101

Melbourne Jet Base MELBOURNE AIRPORT VIC 3045

C 19/02/2015 14/04/201515/1315 MEL

Page 2:  · Web viewReplacement of cast iron water mains pipes A6 from Gate 39 along Service Rd to Departures Drv A8 Service Rd. Relocation of Fire Booster from forecourt area into :"At Terminal"

Section 2.04B Publications of decisions

Melbourne AirportReference number

Applicant / Company If MEL is the applicant,date application submitted

to ABC

If MEL is not the applicant

date which MEL received the application

Description of proposed building activity Location of proposed building activity Status:Consent ( C )Refusal ( R )

Withdrawn ( W )

Consent DateIssued

ABC determinationDate / Permit number

MEL 15018 George E Apted & Associates Pty Ltd 4/03/2015 Jetstar stores and office relocation project at the Melbourne Jet Base building 101 & 177.

Melbourne Jet Bae MELBOURNE AIRPORT VIC 3045

C 16/03/2015 15/2021 MEL

MEL 15018-V George E Apted & Associates Pty Ltd 13/05/2015 Alterations to second floor on the west end of the Support Building lunch room and kitchen alterations to Central Store racking

Melbourne Jet Base MELBOURNE AIRPORT VIC 3045

C 26/05/2015

MEL 15019 Total Essential Services Group 4/03/2015 Removal of six thermal detectors from under external veranda area at the Melbourne Freight Support Centre (Bldg. 237) for Qantas Airways

Service RoadMELBOURNE AIRPORT VIC 3045

C 16/03/2016 9/04/201514/7107 MEL

MEL 15043 HS Rekaris & Associates Pty Ltd 24/04/2015 Installation of a silo at site near gate 4 off Sunbury Road

Airside adjacent Gate 4 MELBOURNE AIRPORT VIC 3045

C 8/05/2015 29/06/201515/2587 MEL

MEL 15048 Turner & Townsend 14/05/2015 Construction of a third 66/22 kV transformer at MAT, new 66kV control room & 66kV electrical connections.

corner South Centre Road / Link Road MELBOURNE AIRPORT VIC 3045

C 22/05/2015 11/02/201615/3029-1 MEL

MEL 15054 Border Express 5/06/2015 Install 220 kVa standard VPO Border Express-MABP MELBOURNE AIRPORT VIC 3045

C 18/06/2015 30/07/201515/3958 MEL

MEL 15058-V Root Project Australia Pty Ltd 22/06/2015 D4 transformer installation Delta 2 ConcourseMELBOURNE AIRPORT VIC 3045

C 2/07/2015 26/10/201615/4034 MEL

MEL 15059 Signed On 24/06/2015 Installation of wayfinding totem lightboxes (including power) Reid Way

Reid WayMELBOURNE AIRPORT VIC 3045

C 10/08/2015 27/08/201515/4814 MEL

MEL 15069 Donald Cant Watts & Corke Pty Ltd 22/07/2015 Emirates First Class Lounge - floor penetrations for hydraulics, drainage & floor screed

Terminal 2MELBOURNE AIRPORT VIC 3045

C 4/08/2015 31/08/201515/4925-1 MEL

MEL 15074 TNT Australia Pty Ltd 6/08/2015 Supply and install the external signage for the new TNT Super hub

South Centre Road MELBOURNE AIRPORT VIC 3045

C 19/09/2015 29/10/201515/5593 MEL

MEL 15078 Point Project Management 17/08/2015 Installation of new external steps linked from aerobridges at Charlie gates 1,2,4,6,8 & 10 and linking from the terminal Bravo Gates 22 & 24 and associated works (including line markings & smaller structures installation

Terminal 1, Bravo & Charlie Piers MELBOURNE AIRPORT VIC 3045

C 23/09/2015 15/5908 MEL

MEL 15078-V RPS Project Management 19/05/2016 Variation to MEL 15078:Installation of external signage on the recently installed external steps linked from aerobridges at Charlie Gates 1,2,4,6,8 & 11 and Bravo Gates 22 and 24;The installation of internal glass balustrading at Gate 11 and 22; andThe additional atlas barriers to Charlie Gate 1

Terminal 1, Bravo & Charlie Piers MELBOURNE AIRPORT VIC 3045

C 31/05/2016 15/5908V MEL

MEL 15078-V3 RPS Project Management 11/10/2016 Qantas dual boarding project variation 1. Installation of additional jersey barriers and a gate to the base of the newly constructed stairs at Charlie Gate 1 Installation of additional concrete jersey barriers and Atlas barriers at Bravo Gate 24. Installation of internal glass balustrading to Bravo gate B22

Terminal 1, Bravo & Charlie Piers MELBOURNE AIRPORT VIC 3045

C 27/10/2016 15/5908-V2 MEL25/10/2016

MEL 15080 CMW Design & Construct (Vic) Pty Ltd 1/09/2015 Construction of a 23,616m2 warehouse to be split into three or four Separate tenancies

Sky RoadMELBOURNE AIRPORT VIC 3045

C 3/09/2015 15/8654-1 MEL

MEL 15080-V2 CMW Design & Construct (Vic) Pty Ltd 12/09/2016Variation to existing MEL 15080 -Additional Scope of Works being Porsche fit out works in Warehouse C2 including but not limited to dividing wall between Warehouse C1 & C2 , additional loading dock to warehouse C2, Dispatch office, installation of internal partitions to office C2, modifications to the office C2 facade. Location : Sky Road, MABP Structural fit-out works to Warehouse C2

Sky RoadMELBOURNE AIRPORT VIC 3045

15/8654-3V2 MEL17/10/2016

MEL 15086-V TM Commercial 10/09/2015 Variation to fire services design for tenancies STD02(6), 1181 (28), 1110 (40), 1056 (41), 2101 (46) and the demolition of 2 no internal wall

Terminal 2MELBOURNE AIRPORT VIC 3045

C 21/09/2015 18/11/201615/6376-V2

Page 3:  · Web viewReplacement of cast iron water mains pipes A6 from Gate 39 along Service Rd to Departures Drv A8 Service Rd. Relocation of Fire Booster from forecourt area into :"At Terminal"

Section 2.04B Publications of decisions

Melbourne AirportReference number

Applicant / Company If MEL is the applicant,date application submitted

to ABC

If MEL is not the applicant

date which MEL received the application

Description of proposed building activity Location of proposed building activity Status:Consent ( C )Refusal ( R )

Withdrawn ( W )

Consent DateIssued

ABC determinationDate / Permit number

in tenancy 1056(41)

MEL 15087 APAM 11/09/2015 Installation of the new digital advertising signage throughout NT4

Terminal 4MELBOURNE AIRPORT VIC 3045

C 23/09/201515/6377 MEL

MEL 15089 Donald Cant Watts Corke Pty Ltd 16/09/2015 Design, Supply and installation of Melrose Drive LTCP Entry / Exit pylon sign with associated service connections. LTCP

Melrose DriveMELBOURNE AIRPORT VIC 3045

C 24/09/2015 8/12/201515/6549 MEL

2/11/201615/6549-V

MEL 15097 George E Apted & Associates Pty Ltd 1/10/2015 Alterations to upgrade access and utilization of south end Freight Terminal Qantas T1

Terminal 1MELBOURNE AIRPORT VIC 3045

C 14/10/2015 25/02/201615/7385 MEL

MEL 15098 Essendon Football Club 6/10/2015 Installation of automatic sliding gate Melrose DriveMELBOURNE AIRPORT VIC 3045

C 19/10/2015 15/611 MEL

MEL 15099 Star Track C/o Australia Post Corporation

5/10/2015 Installation of a conveyor system within existing warehouse

38 Annandale Road MELBOURNE AIRPORT VIC 3045

C 20/10/2015

MEL 15103 CARA Interior Project Management Pty Ltd

27/10/2015 Fitout of WH Smith Tenancy S20 - Terminal 4 Terminal 4MELBOURNE AIRPORT VIC 3045

C 9/11/2015 15/7274 MEL

MEL 15103-V WH Smith Australia Pty Ltd 11/08/2016 Fit Out of Retail Tenancy S-22 WH Smith Works include installation of high performance vinyl flooring, wiring of all equipment, data points, lighting to display fridges, internally illuminated sign over fridges,X2 LCD screen to column. Joinery works including counter, fridge enclosure, column cladding. X2 self-contained drink fridges & mobile freestanding shutter enclosures.

WH Smith Tenancy S22 - Terminal 4 MELBOURNE AIRPORT VIC 3045

C 8/09/2016 27/10/201615/7274-V

MEL 15107 AECOM 27/11/2015 Demolition of existing above ground HIALS structure Construction of new pit and conduit system for ALER 2 to the HIALS locations

Runway 16/34 threshold MELBOURNE AIRPORT VIC 3045

C 4/12/2015 8/02/201615/7984 MEL

MEL 15108 George E Apted & Associates Pty Ltd 23/11/2015 Installation of new double doors in existing east wall and modify lock to doorway on west wall in the tool box storage room

Qantas Maintenance Base MELBOURNE AIRPORT VIC 3045

C 4/12/2015 9/03/201615/7834 MEL

MEL 15112 CARA Interior Project Management Pty Ltd

2/12/2015 Retail Fitout for WH Smith store located in MLS

MLSMELBOURNE AIRPORT VIC 3045

C 15/12/2015 19/02/201615/7986 MEL

MEL 15113 PHD Retail P/L 2/12/2015 Retail shop fitout Rolling Luggage Terminal 2 Departures MELBOURNE AIRPORT VIC 3045

C 15/12/2015 15/8075 MEL

MEL 15115 Root Projects Australia 8/12/2015 Construction of a new Customs Control Room

Terminal 2 Level 2MELBOURNE AIRPORT VIC 3045

C 21/12/2015 13/04/201615/8299 MEL

MEL 15116 North Projects Pty Ltd Construction of approximately 800m of recycled water main pipe to connect to existing Francis Briggs Road near Apac Drive and Service Road

Apac DriveMELBOURNE AIRPORT VIC 3045

C 11/01/2016 13/04/201616/359 MEL

MEL 15116-V North Projects Pty Ltd 1/09/2016 Variation Works to MEL 15116Installation of 355 mm dia HDPE portable water main.

Along Francis Briggs Rd from Service Rd to Centre Rd, MELBOURNE AIRPORT VIC 3045

C 2/09/2016 12/10/201616/359-V MEL

MEL 16001 oOh Media Pty Ltd 4/01/2016 Upgrade existing advertising signs to new signs located at various locations within Terminal 2 and Terminal 3.

Terminal 2 & 3MELBOURNE AIRPORT VIC 3045

C 22/01/2016 5/05/201616/284 MEL

MEL16003 CMW Design & Construct (Vic) Pty Ltd 21/12/2016 Construction of a 10,000m2 warehouse to be split in three separate tenancies.

Mace WayMELBOURNE AIRPORT VIC 3045

C 28/01/2016 7/04/201615/8654 MEL

MEL 16004 Icon Co (Vic) Pty Ltd 21/01/2016 Airservices Australia One Sky equipment room

Plant RoadMELBOURNE AIRPORT VIC 3045

C 3/02/2016 31/03/201616/423-1 MEL

MEL 16005 Purple Hills Contracting 27/01/2016 Installation of new and replacement signage for Australia Post-Star Track

Apac DriveMELBOURNE AIRPORT VIC 3045

C 9/02/2016 12/04/201615/8297 MEL

MEL 16006 oOH Media Pty Ltd 1/02/2016 2 new Advertising signs on the MLS Car Park structure

MLSMELBOURNE AIRPORT VIC 3045

C 9/02/2016 13/05/201616/736 MEL

MEL 16012 Case Meallin & Associates 12/02/2016 Expansion of existing departures duty Free store works include demolition of a variety

Terminal 2 Departures MELBOURNE AIRPORT VIC 3045

C 26/02/2016 12/04/201616/1005 MEL

Page 4:  · Web viewReplacement of cast iron water mains pipes A6 from Gate 39 along Service Rd to Departures Drv A8 Service Rd. Relocation of Fire Booster from forecourt area into :"At Terminal"

Section 2.04B Publications of decisions

Melbourne AirportReference number

Applicant / Company If MEL is the applicant,date application submitted

to ABC

If MEL is not the applicant

date which MEL received the application

Description of proposed building activity Location of proposed building activity Status:Consent ( C )Refusal ( R )

Withdrawn ( W )

Consent DateIssued

ABC determinationDate / Permit number

of existing tenanciesMEL 16013 Signed On 8/03/2016 Installation of 2x wayfinding lightboxes to

the front façade of the new T4 TerminalTerminal 4MELBOURNE AIRPORT VIC 3045

C 8/03/2016 20/05/201616/2025 MEL

MEL 16014 George E Apted & Associates Pty Ltd 23/02/2016 New fast lift doors and widening of existing door opening to composite area at Melbourne Base

Qantas Maintenance BaseMELBOURNE AIRPORT VIC 3045

C 7/03/2016 7/06/201616/2030 MEL

MEL 16014 –V1 George E Apted & Associates Pty Ltd 15/9/2017 Variation to MEL16014 for new fast lift doors and widening of existing door opening at composite area at Melbourne Base Qantas

Melbourne Base QantasMELBOURNE AIRPORT VIC 3045

C 2/10/2017

MEL 16016-V Lend Lease Building Contractors Pty Ltd 16/11/2016 Installation of temporary electrical supply for the Air NZ Lounge from Sub 102 to provide required capacity for the Air NZ Lounge until Sub 42 is Upgraded

Terminal 2MELBOURNE AIRPORT VIC 3045 C 28/11/2016

29/11/201616/1576-V2 MEL

MEL 16017 CMW Design & Construct (Vic) Pty Ltd 1/03/2016 Installation of one new Substation and connection to existing Melbourne Airport infrastructure for the MABP project

Steele WayMELBOURNE AIRPORT VIC 3045

C 15/03/2016 14/04/201616/1432 MEL

MEL 16018 CMW Design & Construct (Vic) Pty Ltd 10/03/2016 Installation of a new substation and connection to the existing Airport Infrastructure for the warehouse D/E/F development project

Mace WayMELBOURNE AIRPORT VIC 3045

C 29/03/2016 29/04/201616/1641 MEL

MEL 16019 George E Apted & Associates Pty Ltd 9/03/2016 Replacement of 3 high voltage transformers Qantas Maintenance Base MELBOURNE AIRPORT VIC 3045

C 29/03/2016 24/10/201616/5268 MEL

MEL 16020 Donald Cant Watts Corke Pty Ltd 10/03/2016 Upgrade of the existing Tiger Terminal 4 Façade

Terminal 4MELBOURNE AIRPORT VIC 3045

C 29/03/2016 24/05/201616/1652 MEL

MEL 16021 Spotless Facility Services Pty ltd9/03/2016

Construction of four hour fire rated partition wall in Substations 2 & 3

AirsideMELBOURNE AIRPORT VIC 3045

C 30/03/2016 16/1604 MEL

MEL 16022 George E Apted & Associates Pty Ltd 11/03/2016 Replacement of support steel works to Bay Markers at Charlie Gates

AirsideMELBOURNE AIRPORT VIC 3045

C 30/03/2016 16/1680 MEL

MEL 16023 Melbourne Aviation Precinct Pty Ltd 11/03/2016 Erection of a new sign at the MAP Facility Operations RoadMELBOURNE AIRPORT VIC 3045

C 30/03/2016 4/07/201616/1474 MEL

MEL 16025 Total Construction Pty Ltd 31/03/2016 Fitout an existing warehouse building into a commercial kitchen, food preparation area storage and distribution center Alpha Flight Services

South Centre Road MELBOURNE AIRPORT VIC 3045

C 13/04/2016 16/3521-1 MEL16/3521-2 MEL

MEL 16026 Lend Lease Building Contractors Pty Ltd 8/03/2016 Demolition of existing partition wall between vacant United Airline Lounge tenancy

Terminal 2 Level 2MELBOURNE AIRPORT VIC 3045

C 18/04/2016 16/1576 MEL

MEL 16027 Donald Cant Watts Corke Pty Ltd 2/03/2016 Upgrade Pier F in Terminal 4 which includes partial demolition of existing terminal building to facilitate construction and fitout of terminal space

Terminal 4MELBOURNE AIRPORT VIC 3045

C 14/04/2016 18/05/201616/1384 MEL

MEL 16028 ASA Building Consultants Pty Ltd 5/04/2016 Construction of fit out to the Mezzanine level to comprise of kennels and exercise yards (Hanrob Melbourne Airport)

Melrose DriveMELBOURNE AIRPORT VIC 3045

C 18/04/2016 30/05/201616/2444 MEL

MEL 16031 Builtwise Constructions Pty Ltd 7/04/2016 Relocation of DG cage internal warehouse install 2 No corporate signs

38-52 Sky RoadMELBOURNE AIRPORT VIC 3045

C 20/04/2016 16/3160 MEL

MEL 16032 Australia Post 7/04/2016 Upgrade of Fire Services Apac DriveMELBOURNE AIRPORT VIC 3045

C 20/04/2016 21/06/201616/2806 MEL

MEL 16033 LendLease Engineering Pty Limited 13/04/2016 Widening of the existing Tullamarine Freeway and Sunbury Road including Terminal Drive

Tullamarine Freeway MELBOURNE AIRPORT VIC 3045

C 22/04/2016 16/2959 MEL

MEL 16034 TM Commercial & Leisure 22/04/2016 D18-20 Cabin services T2 Apron fit out of internal space and storage Block 5 T2 Apron Demolition of existing internal walls and services

Terminal 2 ApronMELBOURNE AIRPORT VIC 3045

C 2/05/2016 17/06/201616/2900 MEL

MEL 16035 George E Apted & Associates Pty Ltd 2/05/2016 Construction of new lunchroom on the existing mezzanine at Hangar 141.

Qantas Maintenance Base MELBOURNE AIRPORT VIC 3045

C 11/05/2016 2/09/201616/3629 MEL

MEL 16036 Airside Projects Pty Ltd 5/05/2016 Strip out and demolition of the existing Air New Zealand Lounge returning the space to shell & Core removal of all fixtures

Terminal 2MELBOURNE AIRPORT VIC 3045

C 18/05/2016 16/3161 MEL

Page 5:  · Web viewReplacement of cast iron water mains pipes A6 from Gate 39 along Service Rd to Departures Drv A8 Service Rd. Relocation of Fire Booster from forecourt area into :"At Terminal"

Section 2.04B Publications of decisions

Melbourne AirportReference number

Applicant / Company If MEL is the applicant,date application submitted

to ABC

If MEL is not the applicant

date which MEL received the application

Description of proposed building activity Location of proposed building activity Status:Consent ( C )Refusal ( R )

Withdrawn ( W )

Consent DateIssued

ABC determinationDate / Permit number

MEL 16037 Melbourne Aviation Precinct Pty Ltd 5/05/2016 Construction of driving loop in front of Gate 24C -MAP

Gate 24C -MAPMELBOURNE AIRPORT VIC 3045

C 18/05/2016 7/06/201616/2826 MEL

MEL 16038 Melbourne Aviation Precinct Pty Ltd 13/05/2016 Construction of a bunded area for shell tankers and pits at the end of hangar 145

hangar 145MELBOURNE AIRPORT VIC 3045

C 26/05/2016 16/3169 MEL

MEL 16038-V Melbourne Aviation Precinct Pty Ltd Construction of a bunded area for shell tankers and pits at the end of the hangar 145

North End of Hanger 145, near W2 MELBOURNE AIRPORT VIC 3045

C(Consent granted as

MEL 16051)

9/09/2016 16/3169 MEL

MEL 16039 Root Projects Australia 27/05/2016 Stage 1 works -Demolition of ceiling to existing T2DC and Radio room including hazmat removal Miscellaneous new building and building services

Terminal 2MELBOURNE AIRPORT VIC 3045

C 27/05/2016 16/3586 MEL

MEL 16040 Case Meallin & Associates 22/05/2016 2nd Phase of the T2 Luxury redevelopment works involving demolition of remaining retail stores

Terminal 2MELBOURNE AIRPORT VIC 3045

C 1/06/2016 164465-1V MEL

MEL 16041 George Apted & Associates Pty Ltd 25/05/2016 Installation of a high quality aerospace standard gas fired down draft spray booth

Qantas Maintenance Base MELBOURNE AIRPORT VIC 3045

C 7/06/2016 16/3635 MEL

MEL 16042 TM Commercial & Leisure Demolition of existing internal walls & services and fitout of space to create five new offices and storage areas including amenity areas

Terminal 2 ApronMELBOURNE AIRPORT VIC 3045

C 7/06/2016 16/3588 MEL

MEL 16043 Maz Maintenance 27/05/2016 Renovation of Ramp Leading Hands Room Terminal 3MELBOURNE AIRPORT VIC 3045

C 14/06/2016 16/3051 MEL

MEL 16044 IN2 Space Interior Design 1/06/2016 Installation of 1 x external Sign & 1 x internal sign in the T4 Terminal

Terminal 4MELBOURNE AIRPORT VIC 3045

C 20/06/2016 16/3628 MEL

MEL 16045 AECOM Demolition of existing above ground HIALS structure, new pit and conduit system from ALER 3 to HIALS Runway 09/27

East of Runway 27 Threshold MELBOURNE AIRPORT VIC 3045

C 4/07/2016 16/5119 MEL

MEL 16046 Merit Interiors Pty Ltd 22/06/2016 To undertake light fitout works to existing warm shell of Menzies Cargo Building

1 Apac DriveMELBOURNE AIRPORT VIC 3045

C 4/07/2016 16/4109 MEL

MEL 16047 Case Mealin & Associates Realignment of pedestrian concourse corridor to enlarge Duty Free Space

Terminal 2 Arrivals MELBOURNE AIRPORT VIC 3045

C 5/07/2016 1/09/201616/4106 MEL

MEL 16047-V Case Mealin & Associates Amendment to Qantas Change Room partitioning layout and relocation of Distribution Board.

Terminal 2 Arrivals MELBOURNE AIRPORT VIC 3045

C 5/07/2016 22/11/201616/4106-V MEL

MEL 16048 Builtwise Constructions Pty Ltd 23/06/2016 Alterations and additions to existing racking 1 Mace WayMELBOURNE AIRPORT VIC 3045

C 6/07/2016 11/08/201616/4698 MEL

MEL 16049 Walker Fire Protection Pty Ltd Building 64 Stage 1 Fire Upgrade upgrading the Fire Detection, OWS sprinkler system, relocate hose reel and reprogram the FIP

Service RoadMELBOURNE AIRPORT VIC 3045

C 19/07/2016 16/4514 MEL

MEL 16050 Padraig Sinnott / GHD WoodheadDemolition, extension and refurbishment of existing Duty Free Department Retail Store over a staged development / DUFRY

Terminal 2 DeparturesMELBOURNE AIRPORT VIC 3045

C 14/07/2016 16/4147 MEL16/4147-V

24/10/2017

MEL 16050-V Padraig Sinnott / GHD WoodheadDemolition, extension and refurbishment of existing Duty Free Department Retail Store over a staged development / DUFRY

Terminal 2 DeparturesMELBOURNE AIRPORT VIC 3045

C 8/06/2017 16/4147-V24/10/2017

MEL 16052 Case Meallin & Associates 30/06/2016 APAM Base building work prior to tenant fitout- to be new Café Vue seating area fit out to be by tenant

Terminal 2 Departures MELBOURNE AIRPORT VIC 3045

C 15/07/2016 16/4355 MEL

MEL 16053 Melbourne Aviation Precinct 6/07/2016 Upgrade to MAP Facade and Canopy Front of office near Security Melbourne Aviation Precinct

C 21/09/2016 16/4380 MEL

MEL 16054 ASCO Open Space P/L 20/07/2016 Additional Toilet Block Taxi Holding Area MLS C 15/08/2016 16/4997 MEL

MEL 16055 Beca Consultants 21/07/2016 Construction of a new water hydrant in accordance with AIR-CI-BEC-SK183

Southern Apron Expansion Project East of pier G.

C 12/08/2016 20/10/201616/6042 MEL

MEL 16056 Airside projects 25/07/2016 Interior fit out of newly created Business Class Lounge for Air New Zealand Includes full kitchen, kids play area, staff room, toilet & shower block, and buffet.

T2 Ramp Level Concourse D MELBOURNE AIRPORT VIC 3045

C 15/08/2016 16/4553 MEL

MEL 16057 Desa Australia 27/07/2016 Installation & Relocation of digital way finding signage Bollards installed on L3

MLCP car park on levels 1 to Level 5. L1 and L2 Helix ramp

C 22/08/2016 24/08/201616/4419 MEL

Page 6:  · Web viewReplacement of cast iron water mains pipes A6 from Gate 39 along Service Rd to Departures Drv A8 Service Rd. Relocation of Fire Booster from forecourt area into :"At Terminal"

Section 2.04B Publications of decisions

Melbourne AirportReference number

Applicant / Company If MEL is the applicant,date application submitted

to ABC

If MEL is not the applicant

date which MEL received the application

Description of proposed building activity Location of proposed building activity Status:Consent ( C )Refusal ( R )

Withdrawn ( W )

Consent DateIssued

ABC determinationDate / Permit number

outdoor carpark New Totem SignsMEL 16058 JB Commercial 12/07/2016 Construction and completion of alterations

and additions to existing area for linen store for Qantas Airlines.

Ground floor of Block 4 of International T2 MELBOURNE AIRPORT VIC 3045

C 7/09/2016 13/10/201616/4486 MEL

MEL 16059 The Frame Group Pty Ltd 1/08/2016 Generator Installation outside of MACE CCR on existing slab.In room works include Gas Suppression, lighting, Air Con, CCTV, Data Cabling, UPS Power, and Access Control

MACE CCRMELBOURNE AIRPORT VIC 3045

C 16/08/2016 12/10/201616/5099 MEL

MEL 16060 Airservices 2/08/2016 Civil works to install GBAS equipment, equipment shelter & comms cable approx. 200m south of Main ARFF station

West of Runway 16/34 MELBOURNE AIRPORT VIC 3045

C 16/09/2016 16/7053 MEL

MEL 16061 Australia Pacific Airports (Melbourne) Pty Ltd

4/08/2016 Install permanent 9m x 3.6m billboard sign for commercial advertising Airport drive adjacent MACE Tenant Building 351

Airport Drv, Adjacent to 8 Mace Way MELBOURNE AIRPORT VIC 3045

WRefer MEL 16084

MEL 16062 Eleo Carpus Olive Estate Pty Ltd 10/08/2016 Demolition of Building 151 Melbourne Airport Club

309 Melrose Drive MELBOURNE AIRPORT VIC 3045

C 13/09/2016

MEL 16063 Eleo Carpus Olive Estate Pty Ltd 10/08/2016 Demolition of House 145 Mansfield Road MELBOURNE AIRPORT VIC 3045

C 10/08/2016 16/08/201616/4361 MEL

MEL 16064 James Richardson Pty Ltd 11/08/2016 Shop Floor installation of modular carpet tiles over existing tiles

Shop E23 Terminal 2 MELBOURNE AIRPORT VIC 3045

C 8/09/2016

MEL 16065 Spotless Facility Services Pty Ltd 12/08/2016 Fit Out works for Red Spot Car Rentals at old AFT Tenancy in Short Term Car Park. Removals of existing partitions and facilitate an open plan layout.

Ground Floor, Short Term Car Park MELBOURNE AIRPORT VIC 3045

C 6/09/2016 16/507 MEL

MEL 16066 Root Projects Australia 15/08/2016 T3 Dry Fire Services Replacement Melbourne Airport

T3 / T4 Terminal Buildings MELBOURNE AIRPORT VIC 3045

C 3/10/2016 16/5049 MEL21/10/201616/5049-V131/10/2017

MEL 16067 Toll Holdings Limited 23/08/2016 Supply and install Diesel & Adblue storage, dispensing and managementFacility, workshop equipment hoist, external signage, pallet racking.

Sky Road Melbourne Airport Business Park MELBOURNE AIRPORT VIC 3045

W - -

MEL 16068 TM Commercial and Leisure 23/08/2016 Refurb of landlord shell Tenancy #19 into an office fit out for Virgin Australia.New partition walls relocated &new services, Comms room, work stations and ICT works

Tenancy 19, T2, Level 2 MELBOURNE AIRPORT VIC 3045

C 14/09/2016 25/10/201616/5200 MEL

MEL 16069 TM Commercial and Leisure 23/08/2016 Refurb of existing legal/payroll/IT areas of Terminal 2 to accommodate additional office workstations and meeting rooms with an additional office area being created within the old drum area of Terminal 2

Terminal 2, Level 2, MELBOURNE AIRPORT VIC 3045

C 7/09/2016 16/5217 MEL

MEL 16070 Qanstruct Pty Ltd 23/08/216 Reprogramming of Fire Indicator Panel Gatehouse 1 - 25 Sky Road MELBOURNE AIRPORT VIC 3045

C 21/10/2016 7/12/201616/5173 MEL

MEL 16072 CMW Design & Construct (Vic) Pty Ltd 25/08/2016 Installation of 7 number totem signs in the road reserve at MABP site

Sky Road and Steele Way MELBOURNE AIRPORT VIC 3045

C 8/09/2016 16/5223 MEL

MEL 16073 Root Projects Australia 25/08/2016 All aspects of the 8th reclaim hall project including site facilities

T2 TerminalMELBOURNE AIRPORT VIC 3045

C 8/09/2016 20/10/2016- 14/2/2017

16/5824 MEL - 16/5824-2 MEL 16/5824A MEL

28/11/2017MEL 16073-V Root Projects Australia 10/11/2016 All aspects of the 8th reclaim hall project

including site facilitiesVariation to Border Force tenancy area. Additional toilets added to serve APAM

T2 TerminalMELBOURNE AIRPORT VIC 3046

C 28/11/2016

MEL 16073-V Root Projects Australia All aspects of the Customer services desk including site facilities @ T2 Terminal

T2 TerminalMELBOURNE AIRPORT VIC 3046

C 07/07/2017 17/1769 MEL

MEL 16074 Turner & Townsend Thinc Pty Ltd 26/08/2016 Replacement of cast iron water mains pipes A6 from Gate 39 along Service Rd to

Centre Rd, Services Rd, Airside RdMELBOURNE AIRPORT VIC 3045

C 4/10/2016 14/11/201616/5254 MEL

Page 7:  · Web viewReplacement of cast iron water mains pipes A6 from Gate 39 along Service Rd to Departures Drv A8 Service Rd. Relocation of Fire Booster from forecourt area into :"At Terminal"

Section 2.04B Publications of decisions

Melbourne AirportReference number

Applicant / Company If MEL is the applicant,date application submitted

to ABC

If MEL is not the applicant

date which MEL received the application

Description of proposed building activity Location of proposed building activity Status:Consent ( C )Refusal ( R )

Withdrawn ( W )

Consent DateIssued

ABC determinationDate / Permit number

Departures Drv A8 Service Rd. Relocation of Fire Booster from forecourt area into :"At Terminal" MLCP.

MEL 16075 The Frame Group Pty Ltd 31/08/2016 ICS outdoor shelter, new DB to existing pillar. Copper cabling, electronic key access, new concrete slab & electrical communications conduits to support new shelter.

Taxi Holding Area , Melrose Drive MELBOURNE AIRPORT VIC 3045

C 13/10/2016 21/11/201616/6605 MEL

MEL 16076 CMW Design & Construct (Vic) Pty Ltd 8/09/2016 Installation of X2 building mounted signs for Bollore on Warehouse A at the MABP

Corner of Sky Road and Steele Way, MELBOURNE AIRPORT VIC 3045

C 5/10/2016 26/10/201616/6295 MEL

MEL 16077 JB Commercial Building Contractors P/L 12/09/2016 Relocation of AKE roller racking to Gate B21 T1 - Gate B21MELBOURNE AIRPORT VIC 3045

C 5/10/2016 27/10/201616/5784 MEL

MEL 16078 APAM 27/09/2016 Installation works required to provide LV power to the existing gantry at Melbourne Drive for the proposed Ooh Medial digital signs project Reference MEL 16010

Melbourne Drive Gantry MELBOURNE AIRPORT VIC 3045

C 24/10/2016 16/6131

MEL 16079 Melbourne Aviation Precinct 29/09/2016 All aspects for the Construction of the New Melbourne Jet Base. Including; 1. Temporary Site Establishment of site offices and worker amenities including all required services;2. Proposed relocation of the exiting underground HV along the Eastern Boundary - works by APAM; 3: Relocation and under grounding of the overhead powerlines along South Centre Rd - works by APAM; 4. Installation and removal of a new temporary security fence to the Northern end of the site during construction; 5. Installation of temporary site fencing and gates along South Centre Rd and Operations Rd.

MAP Gate 24 Operations Rd MELBOURNE AIRPORT VIC 3045

C 10/11/2016 16/5890-1 MEL1/12/2016

16/5890-2 MEL2/2/2017

16/5890-3 MEL26/4/2017

16/5890-4 MEL24/5/2017

16/5890-5 MEL23/6/2017

16/5890-6 MEL10/10/2017

MEL 16080 JLL 5/10/2016 Demolition and Make good of ANZ Tenancy T2 Arrivals Landside

Terminal 2, Arrivals MELBOURNE AIRPORT VIC 3045

C 27/10/2016 16/4995 MEL

MEL 16081 JLL 5/10/2016 Demolition and Make good of ANZ Tenancy T2 Departures ATM'S and office

Terminal 2, Departures MELBOURNE AIRPORT VIC 3045

C 27/10/2016 16/4996 MEL23/11/2016

MEL 16082 Root Projects Australia 19/09/2016 T3 Dry Fire Services Replacement Melbourne Airport - T3 / T4 Terminal Buildings Asbestos Remediation works

Terminal 3MELBOURNE AIRPORT VIC 3045

C 5/10/2016 16/5876 MEL24/10/2016

MEL 16083 Melbourne Aviation Precinct 10/10/2016 Construction of New Airside / Landside Security Fence. This is of a Temporary nature and will be removed once the new Jetbase has been built.

MAP Gate 24 Operations Rd MELBOURNE AIRPORT VIC 3045

C 8/11/2016 16/6235 MEL03/11/2016

MEL 16084 Elaeocarpus 18/10/2016 Advertising sign to be erected and installed .It will be a steel framed billboard 3.6m X 9 m (1.5 m off the ground ) concreted into the ground

11-21 Mace wayMELBOURNE AIRPORT VIC 3045

C 10/11/20106 18/11/201616/0379 MEL

MEL 16085 Builtwise constructions Pty Ltd 18/10/2016 Install or reinstatement of nonstructural partitioning to main office of Agility Logistics

25 Jets CourtMELBOURNE AIRPORT VIC 3045

C 10/11/2016 8/12/201616/6920 MEL

MEL 16086 GHD Woodhead 21/10/2016 T2 -Fitout of existing office tenancy for Dufry offices at Duty Free Arrivals .These works will be carried out by the Shape Group.

Terminal 2, Arrivals MELBOURNE AIRPORT VIC 3045

C 9/11/2016 24/11/201616/6135 MEL

MEL 16087 Success City Pty Ltd T/A 3/11/2016 To install walkway on the roof of the hotel on the airport facing side with maintenance activities.

PARKROYAL Melbourne Airport MELBOURNE AIRPORT VIC 3045

C 17/11/2016 27/02/201716/7008 MEL

MEL 16088 TM Commercial and Leisure 3/11/2016 Minor refurbishment of the level, T2 main corridors and foyer areas. Works include fresh paint to walls, ceilings and doors, new skirting and carpet, lighting review and replacement where required, and new

Terminal 2, Level 2 Melbourne Airport MELBOURNE AIRPORT VIC 3045

W - -

MEL 16089 TM Commercial and Leisure 3/11/2016 Relocation and installation of three existing site sheds and one amenity shed, with Building 59, to be used as temporary office accommodation for the Airfield Ops Team

Building 59MELBOURNE AIRPORT VIC 3045

C 21/11/2016 28/11/201616/6507 MEL03/04/2017

16/6507-V MEL

Page 8:  · Web viewReplacement of cast iron water mains pipes A6 from Gate 39 along Service Rd to Departures Drv A8 Service Rd. Relocation of Fire Booster from forecourt area into :"At Terminal"

Section 2.04B Publications of decisions

Melbourne AirportReference number

Applicant / Company If MEL is the applicant,date application submitted

to ABC

If MEL is not the applicant

date which MEL received the application

Description of proposed building activity Location of proposed building activity Status:Consent ( C )Refusal ( R )

Withdrawn ( W )

Consent DateIssued

ABC determinationDate / Permit number

MEL 16091 WSP Services 23/11/2016 Install concrete footing to fit new 9mt mid sign illuminated. To be replaced next to existing sign

BP Service Centre - Melbourne Drive MELBOURNE AIRPORT VIC 3045

C 6/12/2016 12/12/201616/6938 MEL

MEL 16092 Attorney Generals Department 23/11/2016 Remove plasterboard ceiling. Repair or fill in gaps/penetrations above ceiling. Paint Surfaces above ceiling.Weld wire mesh where applicable. Supply and install key safe. Replace intercom and door alarm. Reinstate ceiling (new plasterboard ceiling)

Site IS L1199 T2

MELBOURNE AIRPORT VIC 3045

C 13/12/2016

MEL 16093 Trio Plumbing (Aust) Pty Ltd 25/11/2016 Installation of (3) 2000 Liter Grease interceptors for Nando, Airbar & Healthy Habits

Nandos, Airbar & Healthy Habits MELBOURNE AIRPORT VIC 3045

C 12/12/2016

MEL 16094 Trio Plumbing (Aust) Pty Ltd 25/11/2016 Installation of (2) 3000 Liter Grease interceptors

McDonalds & P.J O'Brien's MELBOURNE AIRPORT VIC 3045

C 12/12/2016

MEL 16095 Lend Lease Building Contractors Pty Ltd 2/12/2016 Air NZ Lounge base build expansion - Temporary Electrical connection from Sub 102 for the Air NZ Loungeprovide 400A of electrical supply until Sub 42 has been upgraded. Refers to MEL 16016-V2

Air New Zealand Lounge MELBOURNE AIRPORT VIC 3045

MEL 10696 Builtwise constructions Pty Ltd 31/10/2016 Installation/reinstatement of non-structural partitioning to main off @ Agility

25 Jetts CourtMELBOURNE AIRPORT VIC 3045

C 6/12/2016 16/6920 MEL6/06/2016

MEL 16097 Airservices Australia 6/12/2016 Interim Power Supply installation - Airservices Australia ATSC Compound

ATSC CompoundMELBOURNE AIRPORT VIC 3045

C 9/01/2017

MEL 16098 Currie & Brown 9/12/2016 Rex Bussing site at T4 to provide separating wall for the un scanned regional Rex passengers. T4 Rex AirArrivals

T4 Rex Air ArrivalsMELBOURNE AIRPORT VIC 3045

C 9/01/2017 16/7341 MEL04/04/2017

MEL 16099 Root Projects Australia 13/12/2016 Electrical installation works @ New AD4 Kiosk. To connect 2 x 160 Amp GPU's & Amp Pre-conditioned Air unit (PCA) to LV side of Kiosk

Terminal 2 Delta 4MELBOURNE AIRPORT VIC 3045

W

MEL 16100 George E Apted & Assoc P/L 19/12/2016 Construction of 10m x 5m refrigerated cool room with existing Freight Terminal FT1 building - Qantas Airways Ltd

Freight Terminal FT1 building - Qantas Airways Ltd MELBOURNE AIRPORT VIC 3045

C 1/03/2017 17/439 MEL8/03/2017

MEL 16101 Airservices Australia 19/12/2016 Foam Tank & Pump System replacement at the main fire station

Perimeter RdMELBOURNE AIRPORT VIC 3045

C 22/02/2017

MEL 16102 GHD Woodhead 19/12/2016 Construction to two new Duty Free Satellite shops for Dufry

T2 DeparturesMELBOURNE AIRPORT VIC 3045

C 22/02/2017 16/7426 MEL 23/03/2017

MEL 16103 GHD Woodhead 19/12/2016 (A) Conversion old Jemena 66KV control room to amenities and mess room (B) Connection of the newtoilets to APAM sewer system Mat Substation

Cnr South Centre Road & Link Road MELBOURNE AIRPORT VIC 3045

C 9/01/2017 17/287 MEL

MEL 16104 Australia Post 19/12/2016 1) Separating existing hydrant and sprinkler booster systems. 2) Install new hydrant booster connection on Apac Drive.3) Install additional sprinkler booster connection 4) New 150mm domestic water supply tapping5) Increase pipe to infill static water tanks

13/23 Apac DriveMELBOURNE AIRPORT VIC 3045

C 12/01/2017 16/2/06-V MEL

MEL 16105 HS Rekaris & Associates Pty Ltd 20/12/2016 Fit Out works - Hot Kitchen, Cool rooms and ramp

4-12 Reid Way - Gate Gourmet MELBOURNE AIRPORT VIC 3045

C 9/01/2017 16/7474-13/10/2017

MEL 16105 V1 HS Rekaris & Associates Pty Ltd 20/12/2016 Fit Out works - Hot Kitchen, Cool rooms and ramp

4-12 Reid Way - Gate Gourmet MELBOURNE AIRPORT VIC 3045

16/7474-3A13/12/2017

Page 9:  · Web viewReplacement of cast iron water mains pipes A6 from Gate 39 along Service Rd to Departures Drv A8 Service Rd. Relocation of Fire Booster from forecourt area into :"At Terminal"

Section 2.04B Publications of decisions

Melbourne AirportReference number

Applicant / Company If MEL is the applicant,date application submitted

to ABC

If MEL is not the applicant

date which MEL received the application

Description of proposed building activity Location of proposed building activity Status:Consent ( C )Refusal ( R )

Withdrawn ( W )

Consent DateIssued

ABC determinationDate / Permit number

MEL 16106 Mobil Oil Australia Pty Ltd 21/12/2016 MLB JUHI TTUL Upgrade - Bay 1,2,& 3 Works 1) Add structural stiffening columns & beams to 2 existingtruck canopies at Bay 1/2& Bay 3/4 2) Construct new product receipt equipment pad by Bay 3 Receipt c/w concrete spill containment & equipment foundations 3) New Bay 3 Fuel Receipt system c/w 150NB piping, valves, pump, filtrations & meter from Receipt Bay 3 to Receipt Bay 1 4) Modify Receipt piping manifold at Bay 1 & 2 5) Electrics and controls (new and modification) for project works6) Widen existing internal concrete roadways and modify drainage system.

JUHI Aviation Fuel Facility, Marker RoadMELBOURNE AIRPORT VIC 3045

C 9/01/2017 17/318 MEL

MEL 17000 HS Rekaris & Associates Pty Ltd 20/02/2016 Installation of 2 building signs for Porsche on office C2 at the MABP Site

MABP SiteMELBOURNE AIRPORT VIC 3045

C 31/01/2017 17/304 MEL

MEL 17001 Red Rock Airport Services Pty Ltd 20/02/2017 T2 Luxury Project - Fitout of T2-S203 Retail tenancy Gastro Pub. General fitout of food and BeverageTenancy, including services. Departures Level Terminal 2 – Airside Satellite Precinct

Departures Level Terminal 2 – Airside Satellite Precinct MELBOURNE AIRPORT VIC 3045

C 7/03/2017 17/530 MEL25/05/2017

MEL 17002 Brunetti Airports Pty Ltd 20/02/2017 T2 Luxury Project - Fitout of T2-S208 Retail tenancy Cafe. General fitout of food and BeverageTenancy, including services. Departures Level Terminal 2 – Airside Satellite Precinct

Departures Level Terminal 2 – Airside Satellite Precinct MELBOURNE AIRPORT VIC 3045

C 7/03/2017 17/537 MEL 22/05/2017

17/530-V22/09/2017

MEL 17003 Seaway Logistics Pty Ltd 20/02/2017 Four Post Cargo Hoist installation - 11-13 Mace Way

11-13 Mace WayMELBOURNE AIRPORT VIC 3045

C 7/03/2017 17/94-33 MEL17/02/2017

MEL 17004 Airport Retail Enterprises Pty Ltd 21/02/2017 T2 Luxury Project - Fit Out of Food & Beverage Tenancy - Terminal 2 Tenancy W05 Café Vue

Terminal 2 Tenancy W05 Café Vue MELBOURNE AIRPORT VIC 3045

C 9/03/2017 17/618 MEL19/05/2017

MEL 17005 Airport Retail Enterprises Pty Ltd 21/02/2017 T2 Luxury Project - Fit Out of Food & Beverage Tenancy - Terminal 2 Tenancy SO2 Urban Provodore

Terminal 2 Tenancy SO2 Urban Provodore MELBOURNE AIRPORT VIC 3045

C` 8/03/2017 17/525-1 MEL08/05/2017

17/525-2 MEL18/05/2017

MEL 17006 Airport Retail Enterprises Pty Ltd 21/02/2017 T2 Luxury Project - Fit Out of Food & Beverage Tenancy - Tenancy SO7 Bar Pulpo

Tenancy SO7 Bar Pulpo MELBOURNE AIRPORT VIC 3045

C 8/03/2017 17/589 MEL12/05/2017

MEL 17007 AMC Architecture 23/02/2017 Proposed Ceiling Upgrade works at Attorney Generals Department Tenancy T2 Level 2

T2 Level 2MELBOURNE AIRPORT VIC 3045

C 6/04/2017 17/749 MEL

MEL 17008 GHD Pty Ltd - Arnaud Marois 24/02/2017 Jet Base (MAP) HV feeder relocation - South Centre Road & Operations Road

South Centre Road & Operations Road MELBOURNE AIRPORT VIC 3045

C 14/03/2017 17/1286-1 MEL 17/1286-2 MEL

05/10/2017MEL 17009 Signed On (Aust) Pty Ltd - Ben Hurford 27/02/2017 Installation of framework and footings to

create a new retail asset. Location: ATCP 1,2,3 exit lanes

ATCP 1,2,3 exit lanes MELBOURNE AIRPORT VIC 3045

C 15/03/2017 17/695 MEL12/09/2017

MEL 17010 Cara Interior Project Management 28/02/2017 T2 Luxury Project - Fit out of WH Smith Tenancy S10 - T2

Terminal 2MELBOURNE AIRPORT VIC 3045

C 15/03/2017 17/657 MEL26/05/2017

MEL 17011 Harkess Ord Pty Ltd 1/03/2017 Rebrand of existing Mercedes-Benz Melbourne Airport Express dealership Incl installation of 9 exterior signs to reflect corporate branding and repainting of entrance portal and exterior columns. Location: Mercedes- Benz Melbourne Airport Express dealership

Mercedes-Benz Melbourne Airport Express dealershipMELBOURNE AIRPORT VIC 3045

C 17/03/2017 16/7337-A MEL12/04/2017

AMENDED 01/05/2017

Page 10:  · Web viewReplacement of cast iron water mains pipes A6 from Gate 39 along Service Rd to Departures Drv A8 Service Rd. Relocation of Fire Booster from forecourt area into :"At Terminal"

Section 2.04B Publications of decisions

Melbourne AirportReference number

Applicant / Company If MEL is the applicant,date application submitted

to ABC

If MEL is not the applicant

date which MEL received the application

Description of proposed building activity Location of proposed building activity Status:Consent ( C )Refusal ( R )

Withdrawn ( W )

Consent DateIssued

ABC determinationDate / Permit number

MEL 17012 Turner & Townsend Pty Ltd 6/03/2017 The scope of work is to replace the HV and LV equipment of the substation SUB 42. This will see the car parking spaces adjacent the current Sub 42 KV room repurposed to contain the new Sub 42 LV equipment and MSSB's. Upgrade to the existing lighting and services will also be completed as part of this project.

Terminal 2, Apron adjacent Delta 4MELBOURNE AIRPORT VIC 3045

C 25/07/2017 17/1642 MEL

MEL 17013 CMW Design & Construct (Vic) Pty Ltd 7/03/2017 Construct a new tear drop traffic island at the end of Steele Way court bowl and modify adjacent existing line making and street signs on Steele Way.

Steele WayMELBOURNE AIRPORT VIC 3045

C 22/03/2017 17/1029 MEL

MEL 17014 CMW Design & Construct (Vic) Pty Ltd 9/03/2017 Supply and installation of in ground scales at Qantas Freight

Landside RoadMELBOURNE AIRPORT VIC 3045

C 27/03/2017 17/849 MEL21/04/2017

MEL 17015 George E Apted & Associates Pty Ltd 9/03/2017 Installation of new pallet racking. Apac Drive C 6/04/2017 17/848 MEL05/05/2017

MEL 17016 CMW Design & Construct (Vic) Pty Ltd 10/03/2017 Construction of Horse Transfer area within existing warehouse including associated trade waste and services. Construction of Cat & Dog enclosure. Construction of stable wash area. Office refurbishment andmake good works. New concrete ramp, fencing and landscaping.

5 Apac DriveMELBOURNE AIRPORT VIC 3045

C 04/04/2017 17/929 MEL09/05/2017

MEL 17017 Sensor Dynamics Pty Ltd 10/03/2017 Installation and commissioning of an integrated Taxi Management System for Melbourne Airports Primary Taxi Holding Area (PHA), Secondary Holding Area (SHA), feeding exits to Terminal 1, Terminal 2 & Terminal 3 and Exit to Terminal 4 (MLS)

Terminal 1,2,3,4MELBOURNE AIRPORT VIC 3045

C 29/03/2017 17/1128 MEL

MEL 17018 Care Interior Project Management 15/03/2017 Fit out of WH Smith Tenancy I13B T2 ArrivalsMELBOURNE AIRPORT VIC 3045

C 30/03/2017 17/825 MEL

MEL 17019 George E Apted & Associates Pty Ltd 17/03/2017 Supply & installation of 4 new freight screening machines including wall penetrations, new airside screen wall and removal of existing fence and airside boundary relocated at Qantas Freight Terminal Building

Qantas Freight Terminal Building MELBOURNE AIRPORT VIC 3045

C 31/03/2017 17/1193 MEL18/05/2017

MEL 17020 George E Apted & Associates Pty Ltd 24/03/2017 Installation of new AKE roller bed racking and transfer roller matt together with associated demolition and building works -

ULD workshop - Qantas Maintenance BaseMELBOURNE AIRPORT VIC 3045

C 10/04/2017 17/1193 MEL

MEL 17021 George E Apted & Associates Pty Ltd 24/03/2017 Removal of existing storage mezzanine and shelving together with redundant electrical and fire sprinkler services

Qantas Maintenance BaseMELBOURNE AIRPORT VIC 3045

C 10/04/2017

MEL 17022 Skybus 27/03/2017 Construction of an operations control room and office, including hallway built over existing deck.

Skybus Depot - Francis Briggs RoadMELBOURNE AIRPORT VIC 3045

C 11/04/2017

MEL 17023 Builtwise Constructions Pty Ltd 31/03/2017 Removal of storage racking from existing facility allowing space for the installation of new secured storage unit. Installation of new storage racking and service alterations to suit.

18 Reid WayMELBOURNE AIRPORT VIC 3045

C 18/04/2017 17/1284 MEL

MEL 17024 OLPS Pty Ltd (Trading as Sidegreaves & Co

31/03/2017 T2 Luxury Project: Retail interior Fit out for Hugo Boss Menswear New Shopfront, new internal works to walls, floors and ceiling including Fire & Mechanical Services and new Joinery.

Shop T2-L05 Airside International TerminalMELBOURNE AIRPORT VIC 3045

C 18/04/2017 17/1284 MEL31/05/2017

MEL 17025 Hotchin Design 3/4/2017 Retail Fit out - World of Chocolate. Shop T2-L05 Airside International TerminalMELBOURNE AIRPORT VIC 3045

C 18/04/2017 17/893 MEL18/05/2017

MEL 17026 CMW Design & Construct (Vic) Pty 3/4/2017 Construction of temporary airside fence - Location 5 Apac Drive

5 Apac DriveMELBOURNE AIRPORT VIC 3045

C 16/08/2017

Page 11:  · Web viewReplacement of cast iron water mains pipes A6 from Gate 39 along Service Rd to Departures Drv A8 Service Rd. Relocation of Fire Booster from forecourt area into :"At Terminal"

Section 2.04B Publications of decisions

Melbourne AirportReference number

Applicant / Company If MEL is the applicant,date application submitted

to ABC

If MEL is not the applicant

date which MEL received the application

Description of proposed building activity Location of proposed building activity Status:Consent ( C )Refusal ( R )

Withdrawn ( W )

Consent DateIssued

ABC determinationDate / Permit number

MEL 17026-V1 CMW Design & Construct (Vic) Pty 2/04/2017 Construction of temporary airside fence - 5 Apac Drive

5 Apac DriveMELBOURNE AIRPORT VIC 3045

C 18/04/2017 17/929-V MEL

MEL 17027 Newslink Pty Ltd 7/04/2017 T2 Luxury Project: Tenancy Fit out for Out of Australia

Tenancy S01MELBOURNE AIRPORT VIC 3045

C 18/04/2017 17/893 MEL

MEL 17028 Newslink Pty Ltd 7/04/2017 T2 Luxury Project: Tenancy Fit Out of Tech2go

Tenancy S06MELBOURNE AIRPORT VIC 3045

27/04/2017 17/1034 MEL

MEL 17029 Giorgio Armani Australia Pty Ltd 10/04/2017 T2 Luxury Project: Fit out of Tenancy T2-L04 Tenancy T2-L04MELBOURNE AIRPORT VIC 3045

C 28/04/2017 17/1031 MEL

Mel 17029-V1 Giorgio Armani Australia Pty Ltd 10/04/2017 T2 Luxury Project: Fit out of Tenancy T2-L04. Variation 1 Structural works of interior retail store

Tenancy T2-L04MELBOURNE AIRPORT VIC 3045

C 16/8/2017 17/1031 MEL23/06/2017

MEL 17030 Case Meallin & Associates 10/04/2017 Demolition of the existing TRS counter in T2 Departures. A new TRS zone will be constructed consisting of the reconfiguration of the vacant Dufry landside site. The new TRS zone will take all passengers queuing away from Durfy Lobby.

Departure Level - Terminal 2MELBOURNE AIRPORT VIC 3045

C 28/04/2017 17/1031-V123/06/2017

MEL 17031 Donald Cant Watts Corke 11/04/2017 Improving/upgrading of Virgin and Melair Valet offices on

Level 2 Carpark @ Terminal 1,2,3MELBOURNE AIRPORT VIC 3045

C 1/05/2017 17/1300 MEL5/7/2017

17/1300-V MEL9/10/2017

MEL 17032 Airside Projects Pty Ltd 19/04/2017 Strip out and demolition of the existing Air New Zealand Lounge. Returning the space to shell & Core. Removal of all fixtures, fittings and furniture, equipment and capping of all services at lease boundary in readiness for new fit out.

T2 Ramp Level Concourse DMELBOURNE AIRPORT VIC 3045

C 8/05/2017 17/1088 MEL

MEL 17033 Department of Immigration and Border Protection

27/04/2017 Installation of 3 SmartGates passengers processing units and relocation of 1 SmartGate kiosks. Details are provided in the scope of works document -

T2 arrivals Immigration Hall, Melbourne International Airport

W - -

MEL 17034 Ramvek Pty Ltd 1/05/2017 T2 Luxury Project: Fit out of Tenancy T2-L02 - including modifications to base buildings services to suit new design.

Tenancy T2-L02MELBOURNE AIRPORT VIC 3045

C 15/05/2017 17/1127 MEL14/6/2017

MEL 17035 GHD Woodhead 1/05/2017 T2 Luxury Project: Fit out of Salvatore Ferragmoa Brand Store.

Tenancy T2-L03MELBOURNE AIRPORT VIC 3045

C 17/05/2017 17/1033 MEL

MEL 17036 Construction Specialists Pty Ltd 2/05/2017 Installation of new racking Warehouse C2 - 2 Steele WayMELBOURNE AIRPORT VIC 3045

C 17/05/207 17/1304 MEL

MEL 17037 GHD Woodhead 2/05/2017 T2 Luxury Project: Demolition, extension and refurbishment of existing Duty Free Department Retail store. T2 Departures

T2 DeparturesMELBOURNE AIRPORT VIC 3045

W - -

MEL 17038 GHD Woodhead 3/05/2017 T2 Luxury Project: Construction of two new Duty Free Satellite shops for Dufry at Arrivals.

Terminal 2, Arrivals (International)MELBOURNE AIRPORT VIC 3045

MEL 17039 Gordon McKay Pty Ltd 5/5/2017 Existing DJR safety camera site upgrade inc. the following: Relocation & replace camera & flash poles, new footings, pits & underground conduits to be installed. Replace 1 & install 1 new electrical control cabinet. Replace existing electrical cabling on site.

Cnr Terminal Drive & Centre RoadMELBOURNE AIRPORT VIC 3045

17/1380 MEL22/5/2017

MEL 17040 Spotless Facilities Services Pty Ltd 10/05/2017 APAM Lift 5 & 6 Digital Operation & Display Upgrade & APAM Lift 1, 2, 4, 5, 6 & 30 Wittur Door Operation Upgrade

APAM T2 & T3 - Lift 1, 2, 4, 5, 6 & 30MELBOURNE AIRPORT VIC 3045

C 1/06/2017 17/1149 MEL

MEL 17041 Root Projects Australia 10/05/2017 Gate 22 Electrical and Comms back bone upgrade between Sub Station 99 MAT to

Operations Road, South Centre Road, Link Road in proximity to MAT

C 29/05/2017 17/1222 MEL

Page 12:  · Web viewReplacement of cast iron water mains pipes A6 from Gate 39 along Service Rd to Departures Drv A8 Service Rd. Relocation of Fire Booster from forecourt area into :"At Terminal"

Section 2.04B Publications of decisions

Melbourne AirportReference number

Applicant / Company If MEL is the applicant,date application submitted

to ABC

If MEL is not the applicant

date which MEL received the application

Description of proposed building activity Location of proposed building activity Status:Consent ( C )Refusal ( R )

Withdrawn ( W )

Consent DateIssued

ABC determinationDate / Permit number

Gate 22 MELBOURNE AIRPORT VIC 3045

MEL 17042 APAM 12/05/2017 Supply, install and commissioning of 8 x Thermal CCTV Cameras. The installation of stairs and a platform at Terminal 2 D20, to allow the installation and easy access of the new thermal camera. The supply and installation of a new camera pole at D20 Rooftop for the new camera to be mounted to. Installation of new CAT6 cabling using existing conduit.

Terminal 2 Level 2 Management Office.MELBOURNE AIRPORT VIC 3045

W - -

MEL 17043 Airside Projects P/L 22/05/2017 The old Emirates lounge is to undergo a minor face lift. All existing building works will with no demolition works other than cosmetic. Scope of works is essentially carpets, wallpaper, painting, new furniture TV & FID's, minor buffet works, no work to kitchen other than painting and silicone Works, minor electrical and plumbing works, some mechanical works and rebranding. Lounge will be converted to SRA by hoarding at front entry access proposed via stair 49

T2 Level 3 Concourse DMELBOURNE AIRPORT VIC 3045

C 29/5/2017 17/1088 MEL5/7/2017

MEL 17045 Airservices Australia 23/05/2017 Installation of a new optical fiber ring around the Airservices campus. Works to incorporate some trenching, installation of new pits and replacement of existing pits. Are impacted by trenching is the grass area located to the East of the new

OneSky Equipment Room (Bld 401)MELBOURNE AIRPORT VIC 3045

C 7/06/2017

MEL 17044 Airservices Australia n 26/05/2017 Installation of DE Antenna with Pole Mast and associated trenching.

Rwy 27 ILS Glide PathMELBOURNE AIRPORT VIC 3045

14/06/2017 17/128131/10/2017

MEL 17047 Root Projects 26/05/2017

Gas Suppression & VESDA installation in

MLS A & B Comms ROOMMELBOURNE AIRPORT VIC 3045

C 14/06/2017 17/1332 MEL20/09/2017

MEL 17048 Root Projects Australia 26/05/2017 Gas Suppression & VESDA (Interface) installation for Pier F 11 Comms/UPS Room

Melb Airport Pier FMELBOURNE AIRPORT VIC 3045

C 14/06/2017 17/1331 MEL

MEL 17049 Higgovale Pty Ltd Max Mara 26/05/2017 T2 Luxury Project - Fit out - Max Mara T2-L10MELBOURNE AIRPORT VIC 3045

C 14/06/2017 17/1328 MEL

MEL 17050 Case Meallin & Associates 29/05/2017 The works consist of the reconfiguration of the existing loading dock, bin room and security screening area. Existing bin area will be demolished to increase the size of the area. The security screening will be increased and realigned to allow a body scanner to be installed. New ramp and extension to loading dock @

Satellite Loading Dock Apron Level, Terminal 2MELBOURNE AIRPORT VIC 3045

C 14/06/2017 17/1349 MEL20/09/2017

MEL 17051 Australia Post /SMEC 31/05/2017 Buildings and works for an extension to existing awning at the Melbourne Gateway Facility

Gateway FacilityMELBOURNE AIRPORT VIC 3045

C 15/06/2017 17/1233 MEL30/06/2017

Mel 17051-V1 Case Meallin & Associate 29/05/2017 The works consist of the reconfiguration of the existing loading dock, bin room and security screening area. Existing bin area will be demolished to increase the size of the area. The security screening will be increased and realigned to allow a body

Satellite Loading Dock Apron Level, Terminal 2.MELBOURNE AIRPORT VIC 3045

C 21/09/2017 17/1349 MEL

Page 13:  · Web viewReplacement of cast iron water mains pipes A6 from Gate 39 along Service Rd to Departures Drv A8 Service Rd. Relocation of Fire Booster from forecourt area into :"At Terminal"

Section 2.04B Publications of decisions

Melbourne AirportReference number

Applicant / Company If MEL is the applicant,date application submitted

to ABC

If MEL is not the applicant

date which MEL received the application

Description of proposed building activity Location of proposed building activity Status:Consent ( C )Refusal ( R )

Withdrawn ( W )

Consent DateIssued

ABC determinationDate / Permit number

scanner to be installed. New ramp and extension to loading dock @ Satellite Loading Dock Apron Level, Terminal 2. Variation to MEL 17050 to exclude the following works. Deletion of works from the submitted RFT include the following: Concrete New Ramp / Infills / Bulk Fill/ Formwork. Existing Ramp Concrete Infill/Formwork/ Steel Edging. Apron Paving/ Edged Beams/ Bollards. New Formed Stairs and Bulk Concrete Fill. New Handrails, Brickwork Infill to Plant Room, New Access Door to Plan Room, Labour/Materials. Reinforcing, Concrete Pump.

MEL 17052 McCredie Group Pty Ltd 31/05/2017 T2 Luxury Project – Fit out of Retail eyewear Store @

Terminal 2 - W09MELBOURNE AIRPORT VIC 3045

C 19/06/2017 17/1359 MEL3/7/20174

MEL 17053 PTID 01/06/2017 T2 Luxury Project - Retail fit out for jew2ellery store - Tiffany & Co. New partition walls, flooring finishes, ceiling, services, millwork and shop front.

Tenancy T2-L01 - Tiffany & CoMELBOURNE AIRPORT VIC 3045

C 19/06/2017 17/1360 MEL20/07/2017

MEL 17054 Hutchinson Builders - MAP - 6/6/2017 All aspects for the construction to complete the Link Rd entry connection to Essendon Football Club. Including 1. Temporary Site Establishment. 2. Proposed relocation of the exiting and installation of new underground services as noted on the preliminary Aurecon drawings attached. 3. Demolition of existing civil areas to extend Link Rd including all hard and soft landscaping. 5. Installation of temporary site fencing and gates within the carpark area to protect the works during construction.

Essendon Football Club Training Facility - End of Link RoadMELBOURNE AIRPORT VIC 3045

C 23/06/2017

MEL 17055 Transform Retail Project 6/6/2017 T2 Luxury Project – Fit out of new Travelex Currency Exchange store

T2 W10 LanewayMELBOURNE AIRPORT VIC 3045

C 21/06/2017 17/1382 MEL12/7/2017

MEL 17056 Australian Produce Store 9/06/2017 T2 Luxury Project - Fitout of new Australian Produce Store T2 W03

95-99 South Centre RoadMELBOURNE AIRPORT VIC 3045

C 27/06/2017 17/1408 MEL29/06/2017

MEL 17057 A1 Office 9/06/2017 Refurbishment of internal fitout - 95-99 South Centre Road

T2 North Bag Room/Spotless OfficeMELBOURNE AIRPORT VIC 3045

C 27/06/2017 17/1664 MEL26/09/2017

MEL 17058 Donald Cant Watts Corke (Management) P/L

13/06/2017 MU-1: Demolition of existing spotless offices; services and other building works associated with fit out of the new open space; expansion of existing MU-1 carousel. North Bag Room (MU-14); Services and other building works associated with fit out of the existing vacant space in the North Bag Room; Installation of new MU-14 carousel. T2 North Bag Room/Spotless Office

T2 North Bag Room/Spotless OfficeMELBOURNE AIRPORT VIC 3045

C 28/06/2017 17/1499 MEL8/8/2017

MEL 17059 Donald Cant Watts Corke (Management) P/L

14/06/2017 Parking and Forecourt Optimistation. Forecourt - Alterations to lanes 2, 3, & 4 to create better flow. Relocate pedestrian crossing. MLCP Ground Floor - installation of 8 boom gates and 8 vehicle inspection systems for rentals. Install new entrance off Centre Rd. New fencing internally and on Centre Road. Asphalting and line marking.

Sky Road Melbourne Airport Business ParkMELBOURNE AIRPORT VIC 3045

W - -

MEL 17060 Toll Holdings Limited 14/06/2017 Demolish internal partitions and install workstations to the main office @Sky Road Melbourne Airport Business Park

107-113 Link Road (West)MELBOURNE AIRPORT VIC 3045

C 29/06/2017

Page 14:  · Web viewReplacement of cast iron water mains pipes A6 from Gate 39 along Service Rd to Departures Drv A8 Service Rd. Relocation of Fire Booster from forecourt area into :"At Terminal"

Section 2.04B Publications of decisions

Melbourne AirportReference number

Applicant / Company If MEL is the applicant,date application submitted

to ABC

If MEL is not the applicant

date which MEL received the application

Description of proposed building activity Location of proposed building activity Status:Consent ( C )Refusal ( R )

Withdrawn ( W )

Consent DateIssued

ABC determinationDate / Permit number

MEL 17061 CMW Design & Construct (Vic) Pty Ltd 15/06/2017 Construction of a new 14,000m2 Warehouse with a 1,000m2 single story office, associated car parking, hardstand and amenities. Connection to existing infrastructure services including extension of the high voltage network and installation of a new substation

107-113 Link Road (West)MELBOURNE AIRPORT VIC 3045

C 15/06/2017 17/1736-1 MEL4/10/2017

17/1736-V MEL8/03/2018

17/2459 MEL23/01/2018

MEL 17062 Walker Fire Protection Pty Ltd 15/06/2017 Installation of Fire Detection and Gas Suppression System for Parkroyal Hotel

ParkroyalMELBOURNE AIRPORT VIC 3045

C 30/6/2017 17/922 MEL12/7/2017

MEL 17063 Spotless 19/06/2017 Construct a steel framed shelter to join existing building. The purpose of the shelter is to provide protection over the enquiries window and pedestrian walkway

Gate 27 MelbourneMELBOURNE AIRPORT VIC 3045

C 5/07/2017

MEL 17064 Morphos 21/06/2017 Office Fit Out Works for Japan Airlines - Tenancy 4 Level 2 Japan AirlinesMELBOURNE AIRPORT VIC 3045

C 5/7/2017 17/12836/07/2017

MEL 17065 Cushman & Wakefield (on behalf of Growthpoint Properties)

21/06/2017 Refresh & make good works including: Demolition of office partition and floor finishes, installation of workstations to office space, replacement of ceiling tiles, reconfiguration of warehouse racking, painting of external building, it is proposed that the services design remains the same -

120 Link RoadMELBOURNE AIRPORT VIC 3045

C 5/07/2017

MEL 17066 Samsonite C/O PHD Retail 22/06/2017 T2 Luxury Project - Retail interior fit out - Rolling Luggage

Tenancy T2 - W02MELBOURNE AIRPORT VIC 3045

C 7/07/2017 17/1566 MEL31/7/2017

MEL 17067 GSM Operational Pty Ltd 22/06/2017 T2 Luxury Project - Fit out of retail - Billabong

Tenancy W08, T2MELBOURNE AIRPORT VIC 3045

C 7/07/2017 17/1567 MEL12/07/2017

MEL 17068 George E Apted & Associates Pty Ltd 23/06/2017 Removal of the existing mezzanine and associated services and tail dock equipment from Bay 1 and to relocate the existing tail docking equipment from Bay 2 to Bay 1 - No cutting and removal of concrete or excavation required for these works. - Qantas Maintenance Base C

Tenancy L07, T2MELBOURNE AIRPORT VIC 3045

C 10/07/2017 17/1595 MEL10/08/2017

MEL 17069 Tu Projects Pty Ltd 23/06/2017T2 Luxury Project - Fit out of retail - Furla

Tenancy L07, T2MELBOURNE AIRPORT VIC 3045

C 10/07/2017 17/1565 MEL19/7/2017

MEL 17070 Cara Interior Project Management 26/06/2017 T2 Luxury Project - Fit out of WH Smith Tenancy

Tenancy T2 - W07MELBOURNE AIRPORT VIC 3045

C 12/07/2017 17/1583 MEL31/7/2017

MEL 17071 GHD Woodhead 27/06/2017 T2 Luxury Project - Fit out of Bally Store Tenancy T2 - L08MELBOURNE AIRPORT VIC 3045

C 12/07/2017 17/1592 MEL15/8/2017

MEL 17072 Root Projects Australia 27/06/2017

Trolley lift Project - Site facilities and Baggage Line relocation - Terminal 2 Reclaim Hall

Terminal 2 Reclaim HallMELBOURNE AIRPORT VIC 3045

C 12/07/201731/01/2018

17/1935-1 MEL 31/01/2018

17/1935-2 MEL13/03/2018

17/1935-V MEL 14/06/2018

MEL 17073 Root Partnerships Australia 29/06/2017 Demolition of the existing check-in counters in Zone N & M . The base building works include new hard flooring, new wall and column cladding, new way finding signage and display screens, clean and paint existing ceiling. Service desks, exception desks, weigh scales and specialist joinery in Zones N, M & O.

Terminal 2 Level 1MELBOURNE AIRPORT VIC 3045

C 17/07/2017 17/1701 MEL7/8/2017

17/17701-V2 MEL29/01/2018

MEL 17074 Case Meallin & Associates 29/06/2017 Construction of a key room for the New T2 Departures Level Two Johns Tenancy. Key room has a 20m2 area including fridge panels, compressor unit and allocated power board

T2 Store Room ArrivalsMELBOURNE AIRPORT VIC 3045

C 17/04/2017 17/530 MEL25/05/2017

17/530-V MEL 22/09/2017

MEL 17075 Mecca Brands Pty Ltd 4/07/2017 Installation of Pallet Racking and long span shelving

Unit C1 - 7-11 Sky RoadMELBOURNE AIRPORT VIC 3045

C 19/07/2017 17/1695 MEL 23/08/2017

Page 15:  · Web viewReplacement of cast iron water mains pipes A6 from Gate 39 along Service Rd to Departures Drv A8 Service Rd. Relocation of Fire Booster from forecourt area into :"At Terminal"

Section 2.04B Publications of decisions

Melbourne AirportReference number

Applicant / Company If MEL is the applicant,date application submitted

to ABC

If MEL is not the applicant

date which MEL received the application

Description of proposed building activity Location of proposed building activity Status:Consent ( C )Refusal ( R )

Withdrawn ( W )

Consent DateIssued

ABC determinationDate / Permit number

17/1695-A MEL12/9/2017

MEL 17076 Luxtralia Pty Ltd 5/07/2017 T2 Luxury Project: Fit out of Michael Kors Shop

Tenancy T2 L11MELBOURNE AIRPORT VIC 3045

17/1638 MEL 23/08/2017

MEL 17077 Airside Projects Pty Ltd 5/07/2017 The old united airlines / air New Zealand lounges have been demolished in readiness for two new lounges. The AMEX lounge will have its entrance next to the existing Singapore lounge and the Plaza Premium lounge will have its entrance next to the Malaysian lounge. Both AMEX & Plaza are operated by the plaza group. The lounges will be separate but will share a common kitchen and toilet facilities. The approx. area is 700m2 which is located on lower departures abutting the arrivals corridors

T2 Ramp Level Concourse DMELBOURNE AIRPORT VIC 3045

C 11/08/2017 17/1639 MEL1/9/2017

MEL 17078 Beca Consultants Pty Ltd - Melanie Orr 7/07/2017 As part of Taxiway Victor project Building 70 was demolished and the Negri site compound was utilised as temporary staff accommodation for building 70 staff until a permanent arrangement was made. The site compound fence was amended to allow for airside access from the site compound. This BAC is to reinstate the fence to it's original arrangement. NOTE: Installation of 2 x double gates (6m wide) to be reinstalled on eastern side of the compound) Gate 22 access road side). No new fence posts required as the fence posts are still there from before

Gate 22 Operations Road.MELBOURNE AIRPORT VIC 3045

C 24/07/2014 17/1669 MEL28/7/2017

MEL 17079 Donald Cant Watts Corke (Management) P/L

7/07/2017 Replacement of 3 static sign gantries with 3 dynamic sign gantries including all associates services and infrastructure. Replacement of static signs on two existing gantries with new static signs. Note the geotech and Enviro (PFAS) testing will be undertaken separately under a Misc Percow. Terminal Drive.

Terminal Drive.MELBOURNE AIRPORT VIC 3045

C 21/08/2017

MEL 17080 Donald Cant Watts Corke (Management) P/L

17/07/2017 Construction of a new ICT Store Room in the Multi Story Carpark Level 3, which includes stud walling, shelving, floor screed, power, lighting, fire protection, CCTV, IT Services and Hydraulics. The store will be used for storing ICT equipment relocated from the current ICT Store in T2 Apron Level @

Level 3 Short Term CarparkMELBOURNE AIRPORT VIC 3045

C 24/07/2017 17/1643 MEL21/7/2017

MEL 17081 TVD 17/07/2017 T2 Luxury Project: Retail fit out of new tenancy for Watches of Switzerland MELBOURNE AIRPORT VIC 3045

C 1/08/2017 17/1713 MEL15/8/2017

MEL 17082 George E Apted & Associates Pty Ltd 17/07/2017 Construction of new office partition and door and associated electrical works and room air conditioners. - Qantas Freight Terminal

Qantas Freight TerminalMELBOURNE AIRPORT VIC 3045

W - -

MEL 17083 The Blueprint Pty Ltd 18/07/2017 Removal and replacement of the Qantas Branded external signage on T1 domestic terminal - External Façade of Qantas T1 domestic

T1 domestic terminal - External Façade of Qantas T1 domesticMELBOURNE AIRPORT VIC 3045

C 22/11/2017 17/1715 MEL 28/11/2017

MEL 17084 Donald Cant Watts Corke (Management) Pty Ltd

18/07/2017 Installation of illuminated Terminal Identification Signage on the landside structure of Terminals 1 to 4 at Melbourne Airport

Terminals 1 to 4MELBOURNE AIRPORT VIC 3045

C 2/08/2017

MEL 17085 Root Partnerships 31/07/2017 Remove and depose of the existing aerobridges D5, D6, D7, D10 in Terminal 2

T2 & T2 @ Gates D5, D6, D7, D10,E4, E7, F12 & F13

C 15/08/2017 17/1817 MEL5/09/2017

Page 16:  · Web viewReplacement of cast iron water mains pipes A6 from Gate 39 along Service Rd to Departures Drv A8 Service Rd. Relocation of Fire Booster from forecourt area into :"At Terminal"

Section 2.04B Publications of decisions

Melbourne AirportReference number

Applicant / Company If MEL is the applicant,date application submitted

to ABC

If MEL is not the applicant

date which MEL received the application

Description of proposed building activity Location of proposed building activity Status:Consent ( C )Refusal ( R )

Withdrawn ( W )

Consent DateIssued

ABC determinationDate / Permit number

and bays E4, E7, F12, F13 in T3. Functional items such as the control system and hydraulic system will be recovered and kept for utilisation as spare parts on other aerobridges at Melbourne Airport

MELBOURNE AIRPORT VIC 3045 17/1817-V MEL9/03/2017

MEL 17086 Root Partnership 1/08/2017 Minor external works in the Tri-Generation building area such as: Soft Landscaping, Boom Gate relocation, minor asphalt works and kerb realignment works, new chain mesh gate installation, stockpile removal and other tidy up works.

Terminal 2 Level 1MELBOURNE AIRPORT VIC 3045

C 16/08/2017 17/1980 MEL20/10/2017

MEL 17087 Turner & Townsend Pty Ltd 1/08/2017 Fit out of existing area (previously Landside duty Free) to be used as new Staff and Goods Corridor with all new screening equipment. Installation of new light and power and cable reticulation. Installation of new fan coil units and modification to duct works. Installation of new access security control and CCTV. All new finishes, tiles and structural floor to the existing structure, reated at 5.0kPA - T2 Departures.

T2 Departures.MELBOURNE AIRPORT VIC 3045

C 13/09/2017 17/914 MEL12/09/2017

MEL 17088 Australia Postal Corporation 2/08/2017 Development of land for a warehouse extension to the existing Australia Post Facility, approx.. 5000sqm in size, and including any associated external and building services works. This is to accommodate new sortation equipment and will be constructed in keeping with the existing building. Including air conditioning, new roller shutter/ rapid lift openings and all associated building services requirements. 13-25 Apac Drive

13-25 Apac DriveMELBOURNE AIRPORT VIC 3045

C 17/08/2017 17/1827-1 MEL17/10/2017

17/1827-2 MEL 17/11/2017

17/1827-3 MEL26/02/2018

17/1827-V MEL 2/05/2018

MEL 17089 The Blueprint Pty Ltd 3/08/2017 Removal & Replacement of internal illuminated wall mounted letters. Removal and & refurbishment of existing under awning boxes. Removes & replacement of Qantas window decals -

T1 QantasMELBOURNE AIRPORT VIC 3045

C 31/10/2017 17/1714 MEL 16/11/2017

MEL 17090 Rodine Australia 7/08/2017 Enclose existing comms room 9 , Install fire rated doors, A/C Unit, Access control and modify fire services.

T2 North Baggage RoomMELBOURNE AIRPORT VIC 3045

C 7/9/2017 17/1879 MEL12/09/2017

MEL 17091 TM Commercial & Leisure 7/08/2017 Building 64 refurbishment works and office including external make good works and improvement works to Building 59 carpark

Building 64 Melbourne AirportMELBOURNE AIRPORT VIC 3045

C 22/08/2017 17/1852-116/10/2017

MEL 17091 Stage 1 TM Commercial & Leisure 7/08/2017 Stage 1: Building 64 refurbishment works and office including external make good works and improvement works to Building 59 carpark

Building 64 Melbourne AirportMELBOURNE AIRPORT VIC 3045

C 26/09/2017 17/1852-1 MEL16/10/2017

MEL 17091 Stage 1- V1

TM Commercial & Leisure 16/11/2017 Stage 1 Variation: Building 64 refurbishment works and office including external make good works and improvement works to Building 59 carpark Variation to Stage 1 - converting the space into a single occupied tenancy

Building 64 Melbourne AirportMELBOURNE AIRPORT VIC 3045

17/1852-1V5/12/2017

MEL 17091 Stage 2 TM Commercial & Leisure 16/11/2017 Stage 2: Building 64 refurbishment works and office including external make good works to Level 1 - Building 64 Melbourne Airport

Building 64 Melbourne AirportMELBOURNE AIRPORT VIC 3045

C 16/11/2017 16/3586-V MEL 18/12/2017

MEL 17092 TM Commercial & Leisure 15/08/2017 Demolition works of numerous buildings and footings to ground level, fencing, asphalt and hardstand areas, tree removals, disconnection/capping of services and

10 Marker RoadMELBOURNE AIRPORT VIC 3045

C 29/08/2017 17/1924 MEL 23/10/2017

Page 17:  · Web viewReplacement of cast iron water mains pipes A6 from Gate 39 along Service Rd to Departures Drv A8 Service Rd. Relocation of Fire Booster from forecourt area into :"At Terminal"

Section 2.04B Publications of decisions

Melbourne AirportReference number

Applicant / Company If MEL is the applicant,date application submitted

to ABC

If MEL is not the applicant

date which MEL received the application

Description of proposed building activity Location of proposed building activity Status:Consent ( C )Refusal ( R )

Withdrawn ( W )

Consent DateIssued

ABC determinationDate / Permit number

relocation of demountable buildingMEL 17093 Red Rock Airport Services Pty Ltd 21/08/2017 T2 Luxury Project - Fit out of T2-S09 Retail

tenancy Asian Restaurant. General fit out of food & beverage tenancy, including services @ Departures level Terminal 2 - Airside Satellite Precinct

Tenancy T2 S09MELBOURNE AIRPORT VIC 3045

C 5/9/2017 17/1949 MEL11/09/2017

17/1949-1A MEL19/9/2017

17/4949-2 MEL6/10/2017

MEL 17094 Newslink Pty Ltd 21/08/2017

T2 Luxury Project – Fit out of new retail tenancy - The Melbourne Store @

Tenancy T2- W01MELBOURNE AIRPORT VIC 3045

C 5/9/2017 17/1962 MEL 06/10/201717/1962-A

31/10/2017

MEL 17095 Newslink Pty Ltd 21/08/2017 T2 Luxury Project - Fit out of new retail tenancy - Purely Merino

Tenancy T2-W06MELBOURNE AIRPORT VIC 3045

C 5/9/2017 17/1963 MEL9/10/2017

MEL 17096 RPSPM 28/08/2017 Melbourne Domestic Club Business Lounge Refurbishment

Qantas Domestic Lounge, Melb Domestic Terminal (T1)MELBOURNE AIRPORT VIC 3045

C 21/12/2017 17/1989 MEL 21/12/2017

MEL17097 AECOM 28/08/2017 Construction of new access road from Sunbury Road / Oakland Drive to Taxiway Quebec/Romeo. Construction of new section of Perimeter Road from Building 52 to the existing northern perimeter fence. Construction of new Gate House Building including screening rooms and covered canopy, amenities and car park. Construction of controlled entry gate. Construction of storm water drainage to suit the road alignment and new paved areas. Upgrade of Substation 32 from 200kVA to 1000kVA. Provision of utilities - Water supply, Sewerage, HV electrical, LV electrical, ICT infrastructure, Street Lighting.

North Eastern Airfield areaMELBOURNE AIRPORT VIC 3045

MEL17098 Luxtralia Pty Ltd 1/09/2017 T2 Luxury Project: Retail interior fit out for TUMI shop . New shop front, new internal works to walls, floors and ceiling including Fire & Mechanical Services and new joinery. - Shop T2-L06

Shop T2-L06MELBOURNE AIRPORT VIC 3045

C 15/09/2017 17/2038 MEL22/09/2017

MEL17099 Newslink Pty Ltd 5/09/2017 Fit out of new retail tenancy @ T4 MAC T4 MACMELBOURNE AIRPORT VIC 3045

C 20/09/2017 17/2039 MEL 20/10/2017

MEL17100 Turner & Townsend Pty Ltd 7/09/2017 The scope of works is define as the reconfiguration, upgrade and fit-out of the existing T2 Security Hall Farewell Wall and Security Hall Entry. New ceiling to the entrance and queuing rea and upgrade to existing fins. Modifications and upgrades to existing building services systems due to increase in demand loads; including electrical, comms, fire, access security control and CTV, mechanical and hydraulics with replacement light and power cable reticulation required. All new finishes, tiles and structural floor to the existing structure, rated at 5.0kPA @ Terminal 2 Departures

Terminal 2 DeparturesMELBOURNE AIRPORT VIC 3045

C 25/09/2017 17/2072 MEL 21/12/2017

MEL 17101 Builtwise Construction Pty Ltd 11/9/2017 Installation of new storage racking. Additional of extra hose reel and emergency exit signs to suit proposed racking installation

Agility Logistics Sky Road EastMELBOURNE AIRPORT VIC 3045

C 26/9/2017 17/1642 MEL5/10/2017

MEL 17102 CBRE (GCS) P/L - Thomas Alsop 15/09/2017 Removal of manual entry gates to be replaced with automated entry gates as well as reconfiguration of ground floor amenities

45-55 South Centre RoadMELBOURNE AIRPORT VIC 3045

C 2/10/2017 17/2122 MEL15/11/2017

Page 18:  · Web viewReplacement of cast iron water mains pipes A6 from Gate 39 along Service Rd to Departures Drv A8 Service Rd. Relocation of Fire Booster from forecourt area into :"At Terminal"

Section 2.04B Publications of decisions

Melbourne AirportReference number

Applicant / Company If MEL is the applicant,date application submitted

to ABC

If MEL is not the applicant

date which MEL received the application

Description of proposed building activity Location of proposed building activity Status:Consent ( C )Refusal ( R )

Withdrawn ( W )

Consent DateIssued

ABC determinationDate / Permit number

MEL 17103 Sencillo Design Pty Ltd - 15/09/2017 Fitout of new existing tenancy within the international luggage check in area

T2 Pressed Juices - Site I.D. 1L8MELBOURNE AIRPORT VIC 3045

C 2/10/2017 17/2116 MEL25/10/2017

MEL 17104 Cara Interior Project Management 20/09/2017 Fitout of WH Smith T2 K05MELBOURNE AIRPORT VIC 3045

C 5/10/2017 17/2129 MEL 22/02/2018

MEL 17105 Donald Cant Watts Corke (Mang) Pty Ltd

25/09/2017 Demolition of existing concrete pathways, installation of concrete islands and ramp, installation of boom gate assembly and associated services, installation of line marking and bollards (summary of scape provided in cover letter)

Level 2, TerminalMELBOURNE AIRPORT VIC 3045

C 11/10/2017 17/2162 MEL20/10/2017

MEL 17106 Apam - Colin Fowler 26/9/2017 Taxiway Zulu Program - CP 14038 Airfield Northern PrecinctMELBOURNE AIRPORT VIC 3045

C 11/10/2017

MEL 17107 Signed On (Aust) Pty Ltd Installation of steel gantry with lightbox over carpark exit lane @ Business Parking - Centre Road - Stage 3

Business Parking - Centre Road - Stage 3MELBOURNE AIRPORT VIC 3045

C 17/10/2017 172182 MEL25/01/2018

MEL 17108 Air Menzies International (AMI) Pty Ltd 9/10/2017 Office and Warehouse fit out to new premises. Light works only required. Office: Gyrock walls & partitioning, electrical and data work, furniture, IT room, staff lunch room, access control and CCTV, signage. Warehouse: Racking, access control, CCTV, Hoist installation (for handling airline ULD equipment), cabinet x-ray machine installation, warehouse office (demountable), inspection areas, electrical and data signage @ Unit 1F, 19-21 Mace Way, Melbourne Airport

Unit 1F, 19-21 Mace Way, Melbourne AirportMELBOURNE AIRPORT VIC 3045

C 26/10/2017 17/2301-1 MEL13/12/2017

MEL 17109 Turner & Townsend Pty Ltd - Marc Whiffin

13/10/2017 To demolish the existing Healthy Habbits tenancy back to base build in preparation for the new Noodles tenancy. The fit out of Noodles is not part of this application. Works will include demolition of the existing tenancy bake to existing slab floor, removal of existing fittings, fixtures and services. Replacement of existing DB with new to meet with current Australia Standards -

Terminal 2 Departures.MELBOURNE AIRPORT VIC 3045

C 31/10/2017 17/2228 MEL 13/11/2017

MEL 17110 TM Commercial & Leisure 1/10/2017 Building 59 permanent office refurbishment to accommodate Airside Operations to ground level with upgrade to existing services to meet compliance to level 1. Removal and relocation of temporary Airside offices and facilities currently installed in

Bld 59 - Bld 59 Service RoadMELBOURNE AIRPORT VIC 3045

C 30/10/2017 17/2229 MEL19/01/2018

17/2229-V MEL 08/06/2018

MEL 17111 Entire Building Services Pty Ltd 19/10/2017 Build two separate offices inside an existing warehouse (Timber Frame Plaster) Build 5 offices inside an existing open plan office (Metal stud, plaster, glass)

45-55 South Centre RoadMELBOURNE AIRPORT VIC 3045

W - -

MEL 17112 Advisian Pty Ltd 20/10/2017 JUHI Tanks - Underground Services Investigation -

Marker RoadMELBOURNE AIRPORT VIC 3045

W - -

MEL 17113 Direct Couriers (Melb) Pty Ltd 24/10/2017 Relocation and installation of pallet racking - 45-55 South Centre RoadMELBOURNE AIRPORT VIC 3045

W - -

MEL 17114 Menzies Aviation (Cargo) 27/10/2017 Remove existing signage board from building. Replace with new lightbox with new MA Logo and lettering affixed to it's own backboard panel.

1 APAC Drive - Menzies Cargo Facility.MELBOURNE AIRPORT VIC 3045

W - -

MEL 17115 Donald Cant Watts Corke (Management) P/L

1/11/2017 Construction relation to payments, drainage, hydraulics, communications, electrical and ICT Systems. Additionally, it involves an element of co-ordination and interface with JUHI for works running parallel to the construction for the installation of new fuel line and associated infrastructure. These

End of current existing Pier F, Foxtrot infill area and around- about area to the north of the Foxtrot infill.MELBOURNE AIRPORT VIC 3045

C 17/11/2017 17/2262 MEL 21/12/2017

Page 19:  · Web viewReplacement of cast iron water mains pipes A6 from Gate 39 along Service Rd to Departures Drv A8 Service Rd. Relocation of Fire Booster from forecourt area into :"At Terminal"

Section 2.04B Publications of decisions

Melbourne AirportReference number

Applicant / Company If MEL is the applicant,date application submitted

to ABC

If MEL is not the applicant

date which MEL received the application

Description of proposed building activity Location of proposed building activity Status:Consent ( C )Refusal ( R )

Withdrawn ( W )

Consent DateIssued

ABC determinationDate / Permit number

works are to cater for APAM's need for additional and domestic stand-off aircraft stands for bussing operations. The Foxtrot Apron works project therefore seeks to construct and activate the aircraft stands F21 to F25, inclusive, and associated apron works to the meet this requirement.

MEL 17116 Turner & Townsend Pty Ltd 3/11/2017 Refurbishment of 5 Offices & storage tenancies in T2 & T3. Sita Office Site ID STD42, Red Rock Site ID 11128, Thai Airways Office and Kitchenette Site ID 11096, Gate Gourmet Office Site ID STA30, Menzies Engineering Office Site ID 11170 -

Terminal 2 & 3 Landside & Airside MELBOURNE AIRPORT VIC 3045

C 20/11/2017 17/2357 MEL 29/11/2018

MEL 17117 Root Partnerships 8/11/2017New Departures Drive Ramp Lighting project to replace existing lighting and switchboards

T2 Terminal Departures Drive.MELBOURNE AIRPORT VIC 3045

C 27/11/2017 18/7001-1 MEL 06/04/2018

18/1071-2 MEL 19/06/2018

MEL 17118 HS Rekaris 17/11/2017 Proposed warehouse racking and associated works -

4-12 Reid WayMELBOURNE AIRPORT VIC 3045

C 5/12/2017 16/7474-3A & 3B MEL5/12/2017 & 13/12/2017

MEL 17119 Donald Cant Watts Corke (Management) P/L

21/11/2017 Construction of infrastructure relating to the separation of new spaces, new entry and exit points, new line marking arrangements, new ICT systems and a new modular toilet facility to service the Uber holding area.

Existing Value Long Stay carparkMELBOURNE AIRPORT VIC 3045

C 7/12/2017 17/2351 MEL 19/01/2018

17/2351-V MEL 22/03/2018

MEL 17120 Vic-Roads 29/11/2017 Installation of Safety Barrier, widening works, drainage works, and other associated civil works.

Sunbury Road, Melbourne Airport Between Tullamarine Freeway and Oaklands RoadMELBOURNE AIRPORT VIC 3045

C 14/12/2017 17/2529 MEL 14/02/2018

MEL 17121 APAM 6/12/2017 - Building works for the Business Park Service Station, works to include: The Service Station Control Building and retail areas, Petrol Station canopy, signs, fuel bowsers, fuel tank farm and all associated works. Carpark, hardstands and landscaping. Builders temporary site sheds, fencing and all temporary services, inclusive of all contractors, all services required for the works, LV, Gas, Power, Lighting, Water, Drainage, Grease Traps, etc. Line marking signage, landscaping.

Corner of Link Road , Airport Drive and Watson Drive - Business ParkMELBOURNE AIRPORT VIC 3045

C 3/01/2018

MEL 17122 APAM 6/12/2017 - Civil and infrastructure works required for the Business Park Service Station, the works to include: Road, Footpaths, kerb and channels, Drainage, Water, High Voltage substation and cable reticulation, Low Voltage services, ICT etc. Street Lighting, Line marking, signage, landscaping.

Corner of Link Road, Airport Drive and Watson Drive - Business ParkMELBOURNE AIRPORT VIC 3045

MEL 17123 Essendon Football Club 13/12/2017 4 light Towers to be installed on our Etihad size ground

Melrose Drive TullamarineMELBOURNE AIRPORT VIC 3045

C 10/01/2018 17/2146 MEL 29/03/2018

MEL 17124 Construction Specialists Pty Ltd 19/12/2017 Relocation and installation of pallet racking - 101-111 South Centre Road

101-111 South Centre RoadMELBOURNE AIRPORT VIC 3045

C 11/01/2018 17/2264 MEL 15/01/2017

MEL 17125 Wood Group PSN Australia Pty Ltd 19/12/2017 JUHI PROJECT: Installation of 2 x additional 10ML Jet A1 tanks and associated infrastructure- 10-22 Marker Road

10-22 Marker RoadMELBOURNE AIRPORT VIC 3045

C 11/01/2018 17/2562 MEL 19/01/2018

MEL 17125 Mobil Oil Australia Pty Ltd - Garth Norman

23/01/2018 JUHI PROJECT: Phase 2 - Jet Fuel Tanks and Foundations (Installation of two additional Jet Fuel Tanks and associated infrastructure.

10-22 Marker RoadMELBOURNE AIRPORT VIC 3045

C 08/02/2018 18/194 MEL 28/02/2018

MEL 17125 Mobil Oil Australia Pty Ltd - Garth Norman

19/03/2018 JUHI PROJECT: Phase 3 - Jet Fuel Tanks and Foundations (Installation of two additional Jet Fuel Tanks and associated infrastructure. Final works and supporting infrastructure.

10-22 Marker RoadMELBOURNE AIRPORT VIC 3045

C 03/04/2018 18/626 MEL 18/04/2018

Page 20:  · Web viewReplacement of cast iron water mains pipes A6 from Gate 39 along Service Rd to Departures Drv A8 Service Rd. Relocation of Fire Booster from forecourt area into :"At Terminal"

Section 2.04B Publications of decisions

Melbourne AirportReference number

Applicant / Company If MEL is the applicant,date application submitted

to ABC

If MEL is not the applicant

date which MEL received the application

Description of proposed building activity Location of proposed building activity Status:Consent ( C )Refusal ( R )

Withdrawn ( W )

Consent DateIssued

ABC determinationDate / Permit number

MEL 18001 Ontoit Global Pty Ltd 3/01/2018 "The project involves upgrades to SkyBus's leased areas including:- Reconfiguration of corralling and ticketing areas (T1, T3 & T4)- Installation of 3 new ticket booths on these sites- Installation of 4 e-kiosk stands in each external area T1, T3 & T4- Installation of 5 e-kiosks across two locations in T4 internal area- Civil works to T4 forecourt .The works are planned in two stages: 1. T4 internal works, 2. T1, T3 and T4 external works(Note, the T2 works shown on the attached drawings are currently on hold, pending the proposed T2 redevelopment)."

T4 Forecourt,- T4 Internal,- T3 Forecourt,- T1 ForecourtMELBOURNE AIRPORT VIC 3045

C 22/01/2018 18/182-1 MEL 13/04/2018 1

MEL 18001 Stage 2 Ontoit Global Pty Ltd / Ash Ellawala Stage 2: The project involves upgrades to SkyBus's T2, T3 and T4 external Leased areas including: T1 & T3 T4 - ALL REMAINING WORKS

T1, T2 & T4 forecourt - SkyBus Facilities UpgradeMELBOURNE AIRPORT VIC 3045

C 19/06/2018 8/182-2 MEL 25/05/2018

MEL 18002 Donald Cant Watts Corke 10/01/2018 Balustrade Repair Project: This project involves the repairs to 327 STCP Parapets / Concrete Balustrade Panels highlighted as loose in Multi-Level Car Park Expansion Stage 2. This includes installing steel brackets to each identified balustrade panel as per design drawings provided by AECOM which are to withstand impact loads of 30kN and 240kN dependent on the area in the carpark.

All levels Short Term Carpark,MELBOURNE AIRPORT VIC 3045

C 01/02/2018 18/51 MEL02/03/2018

MEL 18003 CMW Design & Construct ( Vic) Pty Ltd 15/01/2018 Installation of Pallet Racking, Long Span Shelving and Picking Bins. Installation of Zone Routing Conveyor System

107-113 Link RoadMELBOURNE AIRPORT VIC 3045

C 31/01/2018 18/407 MEL13/04/2018

MEL 18004 Root Partnerships Australia Pty Ltd 15/01/2018 T2 Replacement of Aerobridge Elevating Links (Like for like) @ Delta Concourse: Replace Aerobridges Elevating Links at D4, D5, D6 & D7. These works will be carried out concurrently with Aerobridge replacement works (Ref MEL 17085).

Terminal 2 @ Gates: D4, D5, D6 & D7MELBOURNE AIRPORT VIC 3045

C 31/01/2018 18/54 MEL20/02/2018

MEL 18005 Blue Fire Systems – Brett Sheppard 22/01/2018 Supply and installation of a Novec 1230 Fire Suppression System. Associated installation works are as follows: - Installation of VESDA conduit and head unit - Minor modification of the existing fire detection system - Installation of a Novec 1230 gas bottle - Installation of gas pipe and nozzles

Building 277 (ALER 1) Met RoadMELBOURNE AIRPORT VIC 3045

C 07/02/2018

MEL 18006 CMW Design & Construct 22/01/2018 Construction of a new 7,000m2 warehouse with a 1,000m2 single storey office, associated car parking, hardstand and amenities. Connection to existing infrastructure services.

48-54 Operations RoadMELBOURNE AIRPORT VIC 3045

C 9/02/2018 18/431-1 MEL 19/03/2018

18/431-2 MEL 31/05/2018

MEL 18007 Donald Cant Watts Corke 23/01/2018 Fit out of food a beverage tenancy Terminal 2 Landside Noodles C 08/02/2018 18/190 MEL

Page 21:  · Web viewReplacement of cast iron water mains pipes A6 from Gate 39 along Service Rd to Departures Drv A8 Service Rd. Relocation of Fire Booster from forecourt area into :"At Terminal"

Section 2.04B Publications of decisions

Melbourne AirportReference number

Applicant / Company If MEL is the applicant,date application submitted

to ABC

If MEL is not the applicant

date which MEL received the application

Description of proposed building activity Location of proposed building activity Status:Consent ( C )Refusal ( R )

Withdrawn ( W )

Consent DateIssued

ABC determinationDate / Permit number

MELBOURNE AIRPORT VIC 3045 02/03/2018

MEL 18008 Trio Plumbing 24/01/2018 Rectification and replacement of 75 apron slabs installed as part of the Southern Apron Expansion Project to correct levels and grading for compliance. Stage 1: will be undertaken first, rectifying 46 slabs with the temp closure of stand Hotel 2. Stage

Airfield, aircraft stand Hotel 2 and Hotel 3MELBOURNE AIRPORT VIC 3045

C 30/01/2018 18/69 MEL 31/01/2018

MEL 18009 CMW Design & Construct 25/01/2018 Extension of the 225mm water main Cargo Road to the existing 300mm water main airside

Cargo Road, Melbourne AirportMELBOURNE AIRPORT VIC 3045

C 12/02/2018 18/506 MEL 18/05/2018

MEL 18010 The Just Group 5/02/2018 Fitout of new Peter Alexander tenancy within T4

T4 DeparturesMELBOURNE AIRPORT VIC 3045

C 20/02/2018 18/221 MEL06/03/2018

MEL 18011 Airport Retail Enterprises 8/02/2018 Install a cool/freezer room within a store room partitioned by wire mesh

T2 Apron LevelMELBOURNE AIRPORT VIC 3045

C 28/02/2018 18/284 MEL13/04/2018

MEL 18012 Entire Building Services Pty Ltd 14/02/2018 Build two separate offices inside an existing warehouse (Timber Frame Plaster) & Build 5 offices inside an existing open plan office. (Metal stud, plaster glass)

101-111 South Centre RoadMELBOURNE AIRPORT VIC 3045

C 1/03/2018 17/2242 MEL 26/6/2018

MEL 18013 Umbarra Services Group P/L 15/02/2018 Remove and replace (foam) fire suppression system in commercial kitchens x 3.

Qantas catering facility Tullamarine Airport East StMELBOURNE AIRPORT VIC 3045

C 18/04/2018 18/443 MEL 1/05/2018

MEL 18014 Country Road Group 20/02/2018 Demolition of fit out in Tenancy S5 - Trenery T4 DeparturesMELBOURNE AIRPORT VIC 3045

C 7/03/2018 18/474 MEL13/03/2018

MEL 18015 DNATA Airport Services P/L - JH Choi 23/03/2018 Install 14 sets of new ULD build up & breakdown workstations with caster decks to minimize forklifts movement in the warehouse. Install 2 set of Universal decks including weighing scales for ULD turning to align ULD to the dolly under airside canopy area. Install caster deck platform with powered lead-on roller or ULD's transfer from/to dolly under air-side canopy area.

DNATA 27-35 APAC DriveMELBOURNE AIRPORT VIC 3045

C 10/04/2018 18/577 MEL 16/05/2018

MEL 18016 Airside Projects P/L - Nikki Zhang 17/04/2018 The Plaza Premium & American Express Lounges consist of a shared amenity zone where the PWD toilet requires constructing additional shower facility. The proposed works in the PWD toilet include plumbing services for shower and to make existing walls and floors to comply with water resistant requirements.

T2 Lower Departures Concourse DMELBOURNE AIRPORT VIC 3045

C 03/05/2018 18/798 MEL 11/05/2018

MEL 18017 Turner Townsend Thinc P/L - Daniel Scriva

17/04/2018 Wave Park - Works Package 1: Earthworks and includes clearing and grubbing, bulk excavation and stockpiling of fill, screening and sorting of unsuitable material (e.g. basalt floaters) and construction of storm water drainage.

6 Watson DriveMELBOURNE AIRPORT VIC 3045

C 05/05/2018 17/711-1 MEL 11/05/2018

MEL 18018 Mobile Oil Australia P/L - Dick Stephens 17/04/2018 Install Jet Fuel Hydrant piping to support refueling operations for the expansion of Foxtrot Apron.

Foxtrot PierMELBOURNE AIRPORT VIC 3045

C 7/05/2018 18/824 MEL 8/6/2018

MEL 18019 George E Apted & Associates P/L - George Apted

30/04/2018 Proposed new steel framed awning to south end of Qantas freight terminal

Qantas Freight TerminalMELBOURNE AIRPORT VIC 3045

C 30/05/2018

MEL 18020 MST Building & Main - Michael Taylor 25/05/2018 Minor office alterations to main office building - Level 1 - Toll IPEC

11 Steel WayMELBOURNE AIRPORT VIC 3045

C 14/06/2018 18/1058 MEL 29/06/2018

MEL 18021 CMW Design & Construct (Vic) P/L - Tom Carlisle

8/06/2018 Installation of office partitions and workstations ( no electrics involved in these works)

Porsche Cars Bls C2 8-10 Steele WayMELBOURNE AIRPORT VIC 3045

C 25/06/2018 BAN-18-MEL-0048 02/08/2018

Page 22:  · Web viewReplacement of cast iron water mains pipes A6 from Gate 39 along Service Rd to Departures Drv A8 Service Rd. Relocation of Fire Booster from forecourt area into :"At Terminal"

Section 2.04B Publications of decisions

Melbourne AirportReference number

Applicant / Company If MEL is the applicant,date application submitted

to ABC

If MEL is not the applicant

date which MEL received the application

Description of proposed building activity Location of proposed building activity Status:Consent ( C )Refusal ( R )

Withdrawn ( W )

Consent DateIssued

ABC determinationDate / Permit number

MEL 18022 GHD Woodhead - Padraig Sinnott 5/07/2018 Refit and Expansion of Arrivals Duty Free Store for Dufry

Terminal 2 Arrivals (International) C 23/07/2018 BAN-18-MEL-0057 23/07/2018

3 Turner & Townsend Pty Ltd 15/02/2018 Installation of one additional UPS unit, which will provide Distributed UPS power to the Check-In West Comms Room and 4 additional banks of Check-In counters. Existing IDF frame containing the UPS units and communications equipment is at capacity and will be expanded. Room entry reconfiguration to wider kit-kat door style opening. The existing CRAC units are prone to failure and have been deemed unfit for purpose and are therefore also to be replaced.

T2 CIC Communications Room West (T2 Departures Hall)MELBOURNE AIRPORT VIC 3045

C 20/02/2018 18/439 MEL21/03/2018

10 Australia Pacific Airports Corporation Limited

23/02/2018 Install two FID screens and one advertising screen including frame and required electrical/data in T4 food court

Terminals : T4MELBOURNE AIRPORT VIC 3045

C 09/03/2018 18/484 MEL 31/05/2018

11 Root Partnerships 26/02/2018 Replacement of traditional CIC to ABD units and site facilities

Landside : T2 Departures hall Terminals : T2MELBOURNE AIRPORT VIC 3045

C 14/03/2018 BAN-18-MEL-0037 24/06/2018

15 Airside Projects P/L 07/05/2018 The works is for the raising of the external pavement outside of the building to enable level access to the loading dolly and rollers. This will involve laying a new section of concrete over the existing pavement. The size will be approx 44 metres x 4 metres and less than 200mm in depth.

DNATAMELBOURNE AIRPORT VIC 3045

C 24/05/2018 18/148-70 MEL16/05/2018

21 Donald Cant Watts Corke (Management) Pty Ltd

05/03/2018 In summary, the scope of works includes:• Construction of an extension to the fixed link at D10 including new bussing platform at Apron Level to facilitate bussing arrivals and departures• Installation of additional glass partitions and reconfiguration of existing services at D15 to enable both bussing departures & arrivals.• Reconfiguration of the existing terminal building at D20 including new bussing platform at Apron Level to facilitate bussing arrivals and departures

T2 Bussing Enhancement Project located airside at gates D10, D15 & D20.MELBOURNE AIRPORT VIC 3045

C 30/04/2018 BAN-18-MEL-007009 Jul 2018

26 Airport Data & Electrical 08/03/2018 The North and South Data Centre’s do not have sufficient redundant cooling capacity to support failover in the event of the failure of the Kyoto Wheel. The scope of this project is to procure and commission additional Air Conditioning units in the North and South Data Centre to build redundant cooling capacity.

Landside : Data Centre North (DCN) and Data Centre South (DCS)MELBOURNE AIRPORT VIC 3045

R - -

32 Turner & Townsend Pty Ltd 15/03/2018 Vacuum hazardous material containing dust from lift shaft and removal of hazardous materials components within lift 5 & 6.

Terminals : T2MELBOURNE AIRPORT VIC 3045

C 3/04/2018 18/771 MEL 30/04/2018

35 Trio Plumbing Australia Pty Ltd 13/03/2018 T2 RE-ROOF & T2 PARAPET CAPPING & MAINTENANCE WORKS

Landside : Departure DriveTerminals : T2MELBOURNE AIRPORT VIC 3045

C 09/04/2018 18/798 MEL 1/06/2018

36 Australia Pacific Airports Corporation Limited

13/03/2018 Smoke zone adjustments required to enable the WH Smith kiosk to be installed, MEL 17104, down in Pier D (DG 12-20).Works include adjusting the smoke baffles (re-use existing if possible and match existing), re-programming smokes to the

Terminals : T2MELBOURNE AIRPORT VIC 3045

C 29/03/2018 18/588 MEL 23/04/2018

Page 23:  · Web viewReplacement of cast iron water mains pipes A6 from Gate 39 along Service Rd to Departures Drv A8 Service Rd. Relocation of Fire Booster from forecourt area into :"At Terminal"

Section 2.04B Publications of decisions

Melbourne AirportReference number

Applicant / Company If MEL is the applicant,date application submitted

to ABC

If MEL is not the applicant

date which MEL received the application

Description of proposed building activity Location of proposed building activity Status:Consent ( C )Refusal ( R )

Withdrawn ( W )

Consent DateIssued

ABC determinationDate / Permit number

adjusted zone and install a smoke damped within an existing AHU.

39 TM Commercial Pty Ltd 15/03/2018 Stage 1 – New Male Amenities to T4 Level 1 as enabling works for Stage 2, including partitions, buildingservices and fit outStage 2 – Demo of existing Male amenities, new access to Level 2, and fit out of services and finishesto Level 2 tenancy for office accommodation, including roof penetrations for skylights.Stage 2 consent to be issued separately.

Terminals : T4MELBOURNE AIRPORT VIC 3045

C 09/04/2018 19/07/2018BAN-18-MEL-0099

40 AECOM Australia Pty Ltd 15/03/2018 Construction of protection barriers along Sunbury Road to protect HIALS 27 structure.

Landside : Sunbury Road near HIALS 27 StructureMELBOURNE AIRPORT VIC 3045

C 28/03/2018

43 Root Partnerships 20/03/2018 Installation of lifting equipment to move bags of outbound carousel to trolleys in the T4 bag room as part of works to have Work safe PIN removed

Airside : T4MELBOURNE AIRPORT VIC 3045

C 29/03/2018 18/148-88 Mel31105/2018

47 UBERCON PTY LIMITED 22/03/2018 NT Safe Access Walkway 1. Supply & install new walkway on top of the existing bulkhead for access to clean the existing windows2. Modify the existing handrail on the stairs, supply & install new door for access to new walkway3. Make good existing bulkhead4. Paint to match existing

Landside : T4 & Terminals : T4MELBOURNE AIRPORT VIC 3045

C 05/04/2018 18/702 MEL 18/05/2018

49 Root Partnerships 26/03/2018 Works involve the installation of new facilities for new sprinkler Pumps and Tanks in key locations, These installation shall provide reliable and independent water supply to the fire Sprinkler systems protecting the terminal. An existing contractor who is on site will be engaged and the current site facilities used.

Airside : T2 Gates, T3 F concourse and T1 Landside : TSBMELBOURNE AIRPORT VIC 3045

C 06/04/2018 18/1019 MEL 25/06/2018

50 SPOTLESS FACILITY SERVICES PTY LTD 26/03/2018 Comprehensive Removal of and Replacement of Concrete Slabs to Loaders Yard and Driveway

Landside : Menzies Cargo Terminal Apac DriveMELBOURNE AIRPORT VIC 3045

R - -

51 SPOTLESS FACILITY SERVICES PTY LTD 26/03/2018 INSTALLATION OF WASTE WATER REMOVAL SYSTEM TO ALL LEVELS OF T 4 CAR PARK

Car Parks : @T4Landside : T4 CAR PARKMELBOURNE AIRPORT VIC 3045

C 10/04/2018 18/567 MEL 24/04/2018

52 AECOM Australia Pty Ltd 28/03/2018 Non Destructive Investigations for Northern Access Route project to determine location of services

Airside : Northern Access Route areaMELBOURNE AIRPORT VIC 3045

R - -

57 Beca Consultants Pty Ltd 06/04/2018 1 - Rigid Pavement Replacement. Replacement of rigid pavement on Taxiway Bravo.2 - Shoulder PavementReplacement of shoulder (asphalt) pavement and installation of blast pavement.3 - Subsoil DrainageSubsoil drainage to be installed on the

Airside : Taxiway Bravo & Taxiway CharlieMELBOURNE AIRPORT VIC 3045

C 23/04/2018 18/810 MEL 13/06/2018

Page 24:  · Web viewReplacement of cast iron water mains pipes A6 from Gate 39 along Service Rd to Departures Drv A8 Service Rd. Relocation of Fire Booster from forecourt area into :"At Terminal"

Section 2.04B Publications of decisions

Melbourne AirportReference number

Applicant / Company If MEL is the applicant,date application submitted

to ABC

If MEL is not the applicant

date which MEL received the application

Description of proposed building activity Location of proposed building activity Status:Consent ( C )Refusal ( R )

Withdrawn ( W )

Consent DateIssued

ABC determinationDate / Permit number

southern side of Taxiway Bravo.4 - Airfield Ground Lighting (AGL)Removal and replacement of AGL cans, secondary cables and SITs affected by the works, including; upgrade of Taxiway Charlie to enable use during runway visual range (RVR) conditions <350m.

58 Root Partnerships 09/04/2018 The Project involves the supply, installation and commissioning of a new Sewer Monitoring Station system connected to the existing main sewer outfall pipe adjacent to Annandale Road.

Landside: Located just inside the Melbourne Airport southern boundary adjacent to Annandale Road Tullamarine.MELBOURNE AIRPORT VIC 3045

C 27/04/2018

70 CMW Design & Construct (Vic) Pty Ltd 18/05/2018 Construction of a 1500 diameter storm water drain linking the Geodis site to the Link Road storm water system.

Business Park TenancyMELBOURNE AIRPORT VIC 3045

C 30/05/2018 18/1071 MEL 21/06/2018

79 Donald Cant Watts Corke (Management) Pty Ltd

31/05/2018 These works are to be completed as part of the broader CP17028 Foxtrot Apron Works Project. To facilitate the construction of the overall project, the current parking positions of REX's aircrafts, at the western end of Pier F, need to be relocated. A suitable space has been determined for REX's aircrafts on the Sierra Infill apron and these works are required to modify this space to make it REX compliant.

Airside : Sierra Infill Apron - West of Pier G MELBOURNE AIRPORT VIC 3045

R - -

80 A.G COOMBS PTY LTD 01/06/2018 Installation of 12-off additional surface mounted thermal energy meters to the chilled water system. All thermal energy meters to be connected to BMS system.

Airside : Service TunnelsLandside : Service TunnelsMELBOURNE AIRPORT VIC 3045

C 15/06/2018 18/148-117 MEL 27/06/2018

86 Trio Plumbing Australia Pty Ltd 07/06/2018 Replace T2 roof & canopy on Departure Drive

Landside : Departure DriveTerminals : T2MELBOURNE AIRPORT VIC 3045

R - -

87 Rodine Australia Pty Ltd 16/06/2018 Building 59 - Permanent Staff Accommodation Fit Out Works. Works required are demolition of existing conditions, new layout and refurbishment works. A small extension involved to the Kitchen/lunch room area. This extension is built using an Engineered Structural System by Hopley's

Airside : Building 59, Service Road, Melbourne AirportLandside : Building 59, Service Road, Melbourne AirportMELBOURNE AIRPORT VIC 3045

R - -

90 TM Commercial Pty Ltd 12/06/2018 T4 Mezzanine fit out works to accommodate approximately 190 workstations, including meeting rooms, EOT facilities, break out spaces and Executive areas. The works will take place on T4 Mezzanine (Level 2)

Terminals : T4MELBOURNE AIRPORT VIC 3045

C 16/07/2018 25/07/2018BAN-18-MEL-0099

91 Donald Cant Watts Corke (Management) Pty Ltd

14/06/2018 The works comprise the provision of 2 new substations and a recycled water connection in the Business Park to service the Wave Park site which is bounded by Airport Drive, Melrose Drive and Watson Drive.SUBSTATION 124 - 1No. 1MVA substation will be located off Melrose Drive. SUBSTATION 125 - 1 No. 2.5MVA Substation will be located off Airport Drive at the South West Boundary of the Wave Park site.RECYCLED WATER CONNECTION will be located on Watson Drive to the hSe corner of the site.

Business Park Tenancy: The works are located along Melrose Drive, Watson Drive and Airport Drive.MELBOURNE AIRPORT VIC 3045

C 25/06/2018 12/07/2018BAN-18-MEL-0053

92 Turner & Townsend Pty Ltd 15/06/2018 • install 32 new self-service kiosks and 8 Terminals : T3 C 10/07/2018 31/07/2018

Page 25:  · Web viewReplacement of cast iron water mains pipes A6 from Gate 39 along Service Rd to Departures Drv A8 Service Rd. Relocation of Fire Booster from forecourt area into :"At Terminal"

Section 2.04B Publications of decisions

Melbourne AirportReference number

Applicant / Company If MEL is the applicant,date application submitted

to ABC

If MEL is not the applicant

date which MEL received the application

Description of proposed building activity Location of proposed building activity Status:Consent ( C )Refusal ( R )

Withdrawn ( W )

Consent DateIssued

ABC determinationDate / Permit number

exceptions to replace the existing kiosks;• install 18 new automated bag drop units to replace traditional check-in counters; • realignment and reconfiguration of the take away belt; and• installation of new conveyor low height security screen

MELBOURNE AIRPORT VIC 3045 BAN-18-MEL-0061

94 Civilex Victoria Pty Ltd 16/06/2018 Dynamic Lane Allocation Early works package. Scope includes construction of guardrails along terminal drive and relocation of 1 Light-pole at G2 location. Construction of guardrails will involves excavation, removal of PFAS, concreting works, minor traffic management and installation works.

Landside : Terminal Drive, Various locationsMELBOURNE AIRPORT VIC 3045

C 03/07/2018 25/07/2018BAN-18-MEL-0073

95 Root Partnerships 18/06/2018 Monitoring station for sewer discharge. Works are going to go out to tender on a D&C contract.

Landside : Annandale RdMELBOURNE AIRPORT VIC 3045

C 26/06/2018

98 Root Partnerships 21/06/2018 Installation of stainless steel water main under T2 satellite to allow abandonment of old in ground pipework. ( Please note works require no digging, all works above ground )

Airside : T2 SatelliteMELBOURNE AIRPORT VIC 3045

C 05/07/2018 05/09/2018 BAN-18-MEL-0054

100 Rodine Australia Pty Ltd 25/06/2018 Construct new bussing platforms at D10 and D20. Segregate D15 A&B at Departures level

Airside: D10 &amp; D20 Apron level. D15 departures levelMELBOURNE AIRPORT VIC 3045

R - -

101 John Holland Group Pty Ltd 26/06/2018 Design and Construct for the provision of ceiling mounted air conditioning units and air curtains to the T4 Staff and Goods Screening area and installation of new or modification of existing automated doors to enclose the new air-conditioned space created.

Terminals : T4MELBOURNE AIRPORT VIC 3045

R - -

102 Root Partnerships 28/06/2018 T3 Entry Alterations and T1 Taxi Lane Extension

Landside : T3 Entry and T1 Taxi LaneTerminals : T1,T3MELBOURNE AIRPORT VIC 3045

C 17/07/2018 16/10/2018BAN-18-MEL-0194

103 John Holland Group Pty Ltd 28/06/2018 Design and Construct Contract for the provision of ceiling mounted air conditioning units and air curtains to the T4 Staff and Goods screening area and installation of new, or modification of existing automated doors to enclose the new air-conditioned space created.

Terminals : T4MELBOURNE AIRPORT VIC 3045

C 18/07/2018 24/09/2018BAN-18-MEL-0051

105 Civilex Victoria Pty Ltd 04/07/2018 Bored pile foundation works, construction of pile caps and plinths, fabrication and install of new overhead VMS gantries including columns along Terminal Drive. Removal of existing gantries G2 & G3 once new structures are commissioned.

Landside: Centre Rd &amp; Terminal Drive Intersection.MELBOURNE AIRPORT VIC 3045

C 17/07/2018 15/08/2018BAN-18-MEL-0076

109 Donald Cant Watts Corke (Management) Pty Ltd

04/07/2018 Carrying out of structural rectification works to the Terminal T123 Car Park at Melbourne Airport across all levels. The works involve the following:- Concrete repair of spalled and delaminated concrete including areas of exposed reinforcement with low concrete cover- Sealing of cracks on the wearing surface and soffit of concrete decks. - Replacement of defective sealant joints and expansion joint covers- Re-fixing of sagging permanent formwork

Car Parks : @T1,@T2,@T3MELBOURNE AIRPORT VIC 3045

C 18/07/2018 16/07/2018BAN-18-MEL-0071

Page 26:  · Web viewReplacement of cast iron water mains pipes A6 from Gate 39 along Service Rd to Departures Drv A8 Service Rd. Relocation of Fire Booster from forecourt area into :"At Terminal"

Section 2.04B Publications of decisions

Melbourne AirportReference number

Applicant / Company If MEL is the applicant,date application submitted

to ABC

If MEL is not the applicant

date which MEL received the application

Description of proposed building activity Location of proposed building activity Status:Consent ( C )Refusal ( R )

Withdrawn ( W )

Consent DateIssued

ABC determinationDate / Permit number

- Miscellaneous repairs110 TM Commercial Pty Ltd 04/07/2018 Prototype Rooms for the Square Hotel.

These are a temporary installation to verify finishes and brand standards, expected to be in place for approximately 12 -18 months. They will be unoccupied other than occasional inspections by contractors & stakeholders.

Landside : Within Building 64 (north)MELBOURNE AIRPORT VIC 3045

R - -

112 Civilex Victoria Pty Ltd 06/07/2018 Civil works to complete trenching, footing excavation and conduit installation along Terminal Drive to support new gantry structures.

Landside : Terminal Drive, Gantry 2 &amp; 3MELBOURNE AIRPORT VIC 3045

C 17/07/2018 08/08/2018BAN-18-MEL-0084

114 Turner & Townsend Pty Ltd 10/07/2018 With expected passenger growth, and current ageing infrastructure and mechanical equipment, 2 of. Lifts (part of the Lift Upgrade Project) in Terminal 2 are being upgraded to minimise disruption to passenger and staff movements. Lift 14, 15 works include upgrading door system, upgrading Hydraulic ram, and modernizing the interiors.

Terminals : T2MELBOURNE AIRPORT VIC 3045

C 26/07/2018 30/07/2018BAN-18-MEL-0103

115 CMW Design & Construct (Vic) Pty Ltd 11/07/2018 Geodis Fit Out Works Business Park Tenancy : 48-54 Operations RoadMELBOURNE AIRPORT VIC 3045

C 06/08/2018 11/10/2018BAN-18-MEL-1095

117 Turner & Townsend Pty Ltd 12/07/2018 Refurbishment of car park lift no's 22, 23, 24, 25, 26 and 27 Including installing 3D door protection units and upgrading/replacing door system, hoisting machines, landing fixtures, car operating panels and modernizing the interiors.Two lifts (1 on each side) will be taken out for installing/ upgrading at a time. Lift doors will be hoarded at the landings top and ground floor landings.

Car Parks : @T1,@T2,@T3MELBOURNE AIRPORT VIC 3045

C 25/07/2018 24/08/2018 BAN-18-MEL-0110

121 Civilex Victoria Pty Ltd 17/07/2018 Package includes all electrical and ICT works necessary to provide electrical and data services to overhead gantries and supplementary control equipment. Specifically running cables through conduit, installation of cable trays, installation of all electrical/ICT equipment, fit off and termination of equipment, isolation and switchboard works.

Landside : Terminal Drive,MELBOURNE AIRPORT VIC 3045

C 27/07/2018 03/08/2018BAN-18-MEL-0130

125 Root Partnerships

20/07/2018

Replacement of existing Air Handling Unit within Plant room 3, T2. The AHU services T2 Arrivals Duty Free.

Airside : Plantroom 3, T2 Terminals : T2MELBOURNE AIRPORT VIC 3045

C 31/07/2018 19/09/2018BAN-18-MEL-0194

126 Turner & Townsend Pty Ltd

06/08/2018Lift 30 works include upgrading door system and replacing landing/ lift car door panels

Terminals : T2MELBOURNE AIRPORT VIC 3045

C 01/08/2018 06/08/2018BAN-18-MEL-0151

132 A.G COOMBS PTY LTD 31/07/2018 Lift 30 works include upgrading door system and replacing landing/ lift car door panels

Terminals : T2MELBOURNE AIRPORT VIC 3045

C 20/08/2018 03/09/2018 BAN-18-MEL-0154

133 Turner & Townsend Pty Ltd 01/08/2018 Installation of 250mm diameter (flow and return) chilled water pipe to connect to Concourse C to TSB2 in order to increase the cooling capacity in this area. All works are located in the service tunnel area as shown on design report and shop drawings.The existing connection points are located at

Airside : In between T1 Concourse C and T1 Concourse B - Service TunnelLandside : In between T1 Concourse C and T1 Concourse B - Service TunnelMELBOURNE AIRPORT VIC 3045

C 27/08/2018 20/09/2018BAN-18-MEL-0169

Page 27:  · Web viewReplacement of cast iron water mains pipes A6 from Gate 39 along Service Rd to Departures Drv A8 Service Rd. Relocation of Fire Booster from forecourt area into :"At Terminal"

Section 2.04B Publications of decisions

Melbourne AirportReference number

Applicant / Company If MEL is the applicant,date application submitted

to ABC

If MEL is not the applicant

date which MEL received the application

Description of proposed building activity Location of proposed building activity Status:Consent ( C )Refusal ( R )

Withdrawn ( W )

Consent DateIssued

ABC determinationDate / Permit number

Concourse C and TSB2 respectively and currently have blanked valves for connecting to.

134 Turner & Townsend Pty Ltd 01/08/2018 Installation and commissioning of two (2No.) new LED technology based advertising super screens (24 meter wide x 13.2 meter high) on the eastern façade (car ramp structures) of the Terminal 4 (T4) Multi Level Structure (MLS) car park. Scope of works includes structural steel works and electrical power / data works. New super screen structures will use the existing advertising banner steel frames but these will be modified / strengthened to support the new LED screens.

Car Parks : @T4MELBOURNE AIRPORT VIC 3045

C 15/08/2018

135 Australia Pacific Airports Corporation Limited

02/08/2018 VIP Lane UpgradeCeiling Upgrade to remove the old fin type structure. All associated Lighting and power to accommodate.The perforated ceiling panels span across two different ceiling heights across the security hall.New Fire Protection and Detection and Mechanical upgrades to suit.An increased Tile scope including Hearing Loops between ABF and Dufry.

Terminals : T2MELBOURNE AIRPORT VIC 3045

C 21/08/2018 07/09/2018BAN-18-MEL-0178

144 Programmed Maintenance Services Limited

15/08/2018 Install Programmed signage (predominately sticker signage) to Building 64 and T2 Block 5 office.

Airside : T2 Block 5 Access Doors to workshop/officeLandside : Building 64MELBOURNE AIRPORT VIC 3045

C 29/08/2018

146 Turner & Townsend Pty Ltd 13/08/2018 To create a new dedicated communication room with in the T2 Inbound bag room, located under the stairwell.The room to be sealed and incorporated all, mechanical, electrical, data, hydraulics and fire protection and fire detection services.

Airside : Terminal 2 Arrivals, Inbound Bag Room adjacent Delta 2MELBOURNE AIRPORT VIC 3045

C 30/08/2018 02/10/2018 BAN-18-MEL-0095

147 Turner & Townsend Pty Ltd 13/08/2018 The project involves the reconfiguration of the existing T2 Joint APAM / BHS Comms Room (located near LoadingDock 2 Security Point), with the primary intention of separating the existing space into separate APAM and BHSComms Rooms.

Airside : T2 Terminal 2, ApronMELBOURNE AIRPORT VIC 3045

R - -

149 Turner & Townsend Pty Ltd 15/08/2018 The project involves the reconfiguration of the existing T2 Joint APAM / BHS Comms Room (located near Loading Dock 2 Security Point), with the primary intention of separating the existing space into separate APAM and BHS Comms Rooms.

Airside : T2 Loading Dock 1MELBOURNE AIRPORT VIC 3045

C 30/08/2018 05/09/2018BAN-18-MEL-0077

150 Turner & Townsend Pty Ltd 15/08/2018 Refurbishment of Terminal lift no's 1, 2, 10, 21, 31, 35 and 38Including upgrading/replacing door system, machines, controllers, modernizing the interiors, Hazard and risk assessments to meet current code requirements

Terminals : T2,T3MELBOURNE AIRPORT VIC 3045

C 30/08/2018 01/10/2018BAN-18-MEL-0200

151 Programmed Maintenance Services Limited

15/08/2018 Fenced area to be installed in the T2 Penthouse, for United Lift Service to utilize as a material storage area and tool storage.

Landside : T2 Penthouse Plant RoomMELBOURNE AIRPORT VIC 3045

C 30/08/2018

166 Signed On (Aust) Pty Ltd 09/08/2018 LIGHTBOX INSTALLATION TO ATCP123 ENTRANCE CANOPY ON LEVEL 3.

Car Parks : @T3MELBOURNE AIRPORT VIC 3045 C 10/09/2018

11/09/2018 BAN-18-MEL-0192

167 Signed On (Aust) Pty Ltd 28/08/2018 INSTALLATION OF 1 NO. FLEXFACE Car Parks : @T4

Page 28:  · Web viewReplacement of cast iron water mains pipes A6 from Gate 39 along Service Rd to Departures Drv A8 Service Rd. Relocation of Fire Booster from forecourt area into :"At Terminal"

Section 2.04B Publications of decisions

Melbourne AirportReference number

Applicant / Company If MEL is the applicant,date application submitted

to ABC

If MEL is not the applicant

date which MEL received the application

Description of proposed building activity Location of proposed building activity Status:Consent ( C )Refusal ( R )

Withdrawn ( W )

Consent DateIssued

ABC determinationDate / Permit number

LIGHTBOX SIGN TO AT4 CARPARK - LEVEL 6 EXTERIOR.

MELBOURNE AIRPORT VIC 3045

168 Retail PMS (Vic) Pty Ltd 03/09/2018 Retail fit out of Kathmandu store located within the T2 International terminal at Melbourne Airport Departures, works to include:- Construct walls- timber ceiling feature- LED lighting throughout- vinyl floor files- proprietary wall post system, counter & credenza and misc. loose joinery- 2 stacking door closures- louvered BOH door to maintain the airflow- Kathmandu signage and light box to shopfront

Airside : Tenancy W13 T2 International terminalTerminals : T2MELBOURNE AIRPORT VIC 3045

C 24/09/2018 27/09/2018 BAN-18-MEL-0207

172 PROMPCORP PTY LTD 03/09/2018 Reinforce wall and install TV screen to Melbourne Meeting Room, Level 2, Terminal 2 and associated works.

Terminals : T2MELBOURNE AIRPORT VIC 3045

C 21/09/2018 02/10/2018BAN-18-MEL-0174

173 TM Commercial Pty Ltd 06/09/2018 Stage 3 T4 Mezzanine fit out works to accommodate approximately 190 workstations, including meeting rooms, EOT facilities, break out spaces and Executive areas.The works will take place on T4 Mezzanine (Level 2)

*Note these works have already received consent under Approval Number 90. A PERCOW was already raised (Stage 2 works) under this application and a separate PERCOW was not able to be raised. Can you please issue approval for lodgment of PERCOW. Thanks

Terminals : T4MELBOURNE AIRPORT VIC 3045

C 13/09/2018 05/09/2018BAN-18-MEL-0099

174 Root Partnerships 07/09/2018 Satellite Water Ring Main installation. Airside : perimeter of Delta concourse "satellite"MELBOURNE AIRPORT VIC 3045

W - -

178 Programmed Maintenance Services Limited

10/09/2018 Install additional bollards at the top and bottom of the escalators at the T4 Carpark on Ground Level & Level 2.

Car Parks : @T4MELBOURNE AIRPORT VIC 3045

C 25/09/2018

180 Donald Cant Watts Corke (Management) Pty Ltd

11/09/2018 Installation of a Royal Wolf Container that has been re-purposed for general site office use by Rex. LV power to be provided to the container office.

Airside : Adjacent to Taxiway Sierra InfillMELBOURNE AIRPORT VIC 3045

C 14/10/2018

184 FITTED FRIDAY PTY LTD 13/09/2018 Stage and truss designs which will be all be supplied engineer certificate and added in the portal. VALUED LONG STAY CAR PARK.

Airside : Adjacent to Taxiway Sierra InfillMELBOURNE AIRPORT VIC 3045

185 ISG MANAGEMENT PTY LTD 13/09/2018 Install 1 x new 6 pit outside 37 South Centre Road (located on Operations Road) Bore approx. 35m to install P100 (road crossing) conduit from new pit to existing manhole opposite new pit Trench approx. 2m to install P100 lead-in conduit from new pit to property boundary point Haul new 10pr cable through new and existing conduit as per plan Reinstate area and joint all cabling as required

Car Parks : Long TermLandside : VALUED LONG STAY CAR PARKMELBOURNE AIRPORT VIC 3045

C 01/10/2018 01/10/2018BAN-00-MEL-0185

Page 29:  · Web viewReplacement of cast iron water mains pipes A6 from Gate 39 along Service Rd to Departures Drv A8 Service Rd. Relocation of Fire Booster from forecourt area into :"At Terminal"

Section 2.04B Publications of decisions

Melbourne AirportReference number

Applicant / Company If MEL is the applicant,date application submitted

to ABC

If MEL is not the applicant

date which MEL received the application

Description of proposed building activity Location of proposed building activity Status:Consent ( C )Refusal ( R )

Withdrawn ( W )

Consent DateIssued

ABC determinationDate / Permit number

198 AirServices Australia 24/09/2018 The Melbourne Fire Station Workshop has an outdoor canopy and carport which faces East and is open to the North, East and South. it is proposed to install a metal clad wall on the North side of the large canopy between the high canopy section and the carport to provide protection from the elements to ARFFS new Internal Access Vehicle (IAV). It is also proposed to install a small wall on the North end of the small carport to provide protection from the elements for the mechanical staff vehicles.

Landside : South Centre roadMELBOURNE AIRPORT VIC 3045

C 08/10/2018

205 AUSTRALIA PACIFIC AIRPORTS (MELBOURNE) PTY LIMITED

25/09/2018 These works are associated with the installation of digital signs within the Multi Level Car Park (MLCP).To allow better messaging to customers, new digital signage is to be installed at 3 main locations within the MLCP. This signage will be for car park specific marketing, branding and wayfinding. Each sign is to be supported by comms and power cabling from local Distribution Boards and racks.

Airside : Building 379 - Emergency Vehicle Technician WorkshopMELBOURNE AIRPORT VIC 3045

208 AUSTRALIA PACIFIC AIRPORTS (MELBOURNE) PTY LIMITED

26/09/2018 The works include the design, testing, supply and installation of a taxi alert system at Melbourne Airports T123 TMS. Currently taxis are bypassing the TMS system by following buses into T123. The proposed solution involves using two Lidar Sensors to detect and ignore buses whilst capturing all taxis using a dual channel LPR Camera. These reads will be then sent as alerts to the Head Of Rank.

Car Parks : @T1,@T2MELBOURNE AIRPORT VIC 3045

C 09/10/2018 19/10/2018 BAN-18-MEL-0227

214 Turner & Townsend Pty Ltd 02/10/2018 Item 1. Installation of a new alternative / egress gate to the existing black steel mesh landscape fence protecting the @T4 MLS Car Park Northern Services Yard.Item 2. Installation of a new galvanized and cantilevered steel awning structure above the @T4 MLS Car Park Southern Services Yard exit / egress door to Room IT-UPS room B.

Item 1. And Item 2. Are required in response ABCO bld permit approval to ensure protected egress is provided to all areas / rooms below the new T4 MLS super screens.

Car Parks : @T4Landside : @T4 Northern and Southern Service AreasMELBOURNE AIRPORT VIC 3045

C 19/10/2018

215 Australia Pacific Airports Corporation Limited

03/10/2018 Alterations to the 'Concierge Area' within T2 Luxury to install a large LED screen.

Airside : Departures - Luxury PrecinctTerminals : T2MELBOURNE AIRPORT VIC 3045

C 22/10/2018

227 THINXTRA LTD 12/10/2018 Conducting a walk around to test reception signals so once Telematic devices are all installed on the GSE Equipment we don't lose signals for the GPS around the Airport.The site survey is the first stage to determine if the reception signals are good and the second stage will be to install antennas to fix the problems in the low coverage areas if required.

Airside : Ramp and Bag roomTerminals : T1,T2,T3,T4MELBOURNE AIRPORT VIC 3045

Page 30:  · Web viewReplacement of cast iron water mains pipes A6 from Gate 39 along Service Rd to Departures Drv A8 Service Rd. Relocation of Fire Booster from forecourt area into :"At Terminal"

Section 2.04B Publications of decisions

Melbourne AirportReference number

Applicant / Company If MEL is the applicant,date application submitted

to ABC

If MEL is not the applicant

date which MEL received the application

Description of proposed building activity Location of proposed building activity Status:Consent ( C )Refusal ( R )

Withdrawn ( W )

Consent DateIssued

ABC determinationDate / Permit number

234 Root Partnerships 16/10/2018 Construction of Zone X CIC counters and associated equipment , existing site sheds to remain from Zone L

Airside : T2 bag room Terminals : T2MELBOURNE AIRPORT VIC 3045

C 31/10/2018

236 Turner & Townsend Pty Ltd 16/10/2018 Install new and alter existing conveyor equipment to provide Virgin Airlines with one new make Up carousel within the existing T3 bag room.

Terminals : T3MELBOURNE AIRPORT VIC 3045

238 115 SOLUTIONS PTY LTD 17/10/2018 Installation of Digital Signage plus Audio installation

Airside : Melbourne International Arrivals Dufry Duty Free StoreMELBOURNE AIRPORT VIC 3045

239

CNG Systems Pty Ltd 23/10/2018 Installation of additional GPO's and data outlets to facilitate the tenant’s office layout.

Landside : Building 64 - Level 1MELBOURNE AIRPORT VIC 3045

244 Root Partnerships 19/10/2018 The project involves the enhancement of the existing fire protection and occupant warning services within the At Terminal 1, 2,3 Carpark at Melbourne Airport. This generally includes provision of new horn speakers throughout the carpark, improved signage to manual call, and extension of the existing fire sprinkler system within the ballroom storage area to adjacent storage areas.

Car Parks : @T1,@T2,@T3MELBOURNE AIRPORT VIC 3045

246Donald Cant Watts Corke

(Management) Pty Ltd22/10/2018 Construction of the concrete pavement on

top of JUHI's fuel pipe on stands F19, F24 and F25 and construction of the concrete surrounds for JUHI's hydrants on stands F21, F22 and F23.

Airside : Stands F19, F21, F22, F23, F24 and F25MELBOURNE AIRPORT VIC 3045

247 Turner & Townsend Pty Ltd 22/10/2018 The refurbishments of these vertical transportation units include:Lift 3 :1. Replace controller2. Upgrade door system3. Replace Car and landing doors panels4. Modernize car and landing appointments

Lift 20:1. Upgrade door system2. Replace Car and Landing doors panels3. Modernize car interiors, car and landing appointments

Lift 34:1. Upgrade door system2. Replace Car and Landing doors panels

Escalator 8:1. Replace controllers

Airside : Stands F19, F21, F22, F23, F24 and F25MELBOURNE AIRPORT VIC 3045

250 Root Partnerships 23/10/2018 Installing fire sprinkler protection to Short Term Car Park Car Hire Tenancies, Park Royal Lift Lobby and Short Term Car Park Loading Bay.

Car Parks : @T1,@T2,@T3,@T4MELBOURNE AIRPORT VIC 3045

Page 31:  · Web viewReplacement of cast iron water mains pipes A6 from Gate 39 along Service Rd to Departures Drv A8 Service Rd. Relocation of Fire Booster from forecourt area into :"At Terminal"

Section 2.04B Publications of decisions

Melbourne AirportReference number

Applicant / Company If MEL is the applicant,date application submitted

to ABC

If MEL is not the applicant

date which MEL received the application

Description of proposed building activity Location of proposed building activity Status:Consent ( C )Refusal ( R )

Withdrawn ( W )

Consent DateIssued

ABC determinationDate / Permit number

253 W T H PTY LTD 30/10/2018 1. Line Markings at state office2. Line Markings at returns area3. Concrete ground works for drains & repairs4. Electrical supply to containers

Business Park Tenancy : Avis Budget state officeCar Parks : @T1