  • 8/12/2019 WBS FINAL1

    1/23

    WORK BREAKDOWN

    STRUCTURE (WBS)

    Presented by:- SUMIT DESHMUKH G01116ABHIJIT GOSAVI G01122

    NAVNATH KOLEKAR G01131

    NAVEEN P.V. G01145

    ROHIT PUNSHI G01146

  • 8/12/2019 WBS FINAL1

    2/23

    Project Management

  • 8/12/2019 WBS FINAL1

    3/23

    Project Management?

    Art and science of mobilizing and managing

    people.

    Materials, equipment and money to completethe assigned project work on time.

    Within budgeted cost &

    Specified technical performance standard.

  • 8/12/2019 WBS FINAL1

    4/23

    Management of Large Projects

    Planning- goal setting, project definition, teamorganization.

    Scheduling- relating people, money, andsupplies to specific activities and activities to oneand other.

    Controlling- monitoring resources, costs,quality, and budgets; revising plans and shiftingresources to meet time and cost demands.

  • 8/12/2019 WBS FINAL1

    5/23

  • 8/12/2019 WBS FINAL1

    6/23

    What is a Work BreakdownStructure?

    The WBS is a graphical display of theproject.

    WBS is a hierarchical listing of the sub-

    components of a project.

  • 8/12/2019 WBS FINAL1

    7/23

    What is the purpose of the WBS?

    The purpose of the WBS is to divide the totalproject into small pieces, sometimes called workpackages.

    Dividing the project into work packagesmakes itpossible to prepare project schedules and cost

    estimatesand to assign management and taskresponsibility

  • 8/12/2019 WBS FINAL1

    8/23

    ELEPHANT BREAKDOWN STRUCTURE

    Tail Legs Body Head

  • 8/12/2019 WBS FINAL1

    9/23

    Why use a WBS?

    Identifies the tasks, subtasks and units of worknecessary to complete the project

    Identifies the relationships between tasks

    Increases the probability that every requirement will

    be accounted Organize areas of responsibility and authority

    Used to estimate project cost and schedule

    Can be used to track the costs of each element

    Can be used to monitor progress by completion oftasks

  • 8/12/2019 WBS FINAL1

    10/23

    How should the project be brokendown?

    No magic formula!! Breakdown by:

    Functional or technological disciplines design/manufacturing/marketing/sales/finance

    Organizational structure

    Vendor/subcontractor responsibilities

    Physical location

    Systems and subsystems Or any combination, but generally end-product or

    hardware-oriented.!!

  • 8/12/2019 WBS FINAL1

    11/23

    Other WBS breakdown points

    May proceed top-down or any way that gets thejob done

    Need not be symmetrical

  • 8/12/2019 WBS FINAL1

    12/23

    WBS levels?

    Typically 5 levels:

    1 Main project

    2 Sub-project

    3 Task

    4 Sub-task

    5 Individual processes or actions

  • 8/12/2019 WBS FINAL1

    13/23

    WBS OF RESIDENCE

  • 8/12/2019 WBS FINAL1

    14/23

    A WBS planning key!!

    REMEMBER the rule that the people who must do the

    work should participate in planning it.

    Different levels may be done by different groups:

    Top management may do the first level or two andpass it on down to the operating levels for furtheramplification.

    Software can help.

  • 8/12/2019 WBS FINAL1

    15/23

    Basic guidelines

    work described in a higher level must be thesum of all the work in the next lower levels.

    work that will be performed by different peopleshould be clearly differentiated.

    WBS should be flexible enough to allow forchanges.

  • 8/12/2019 WBS FINAL1

    16/23

    WBS Structure

    The WBS has a hierarchical structure Most general units at the highest level

    Most specific units at the lowest level

    Use a tree structure to provide task

    details Split each top level general unit into subunits (level 2)

    Split each subunit into further subunits (level 3)

    For most projects it is unlikely to need to split subunits

    to below level 4 Each unit should have an identifier code representing

    the hierarchical, tree structure.

  • 8/12/2019 WBS FINAL1

    17/23

    WBS CONCEPT

    Outline of the Work to be Performed

    Provides a Framework for Defining the Workon the Project

    Provides a Framework for Planning

    Work Not in the WBS is Work Not inthe Project.

  • 8/12/2019 WBS FINAL1

    18/23

    At what level do you stop?

    Stop when you reach a point at which you canestimate required resources to the desired

    degree of accuracy.

    Or, when the work will take an amount of timeequal to the smallest units you want to

    schedule days, weeks, months, etc.

  • 8/12/2019 WBS FINAL1

    19/23

    WBS and Activities in MS Project

  • 8/12/2019 WBS FINAL1

    20/23

    WBS and Activities in P3

  • 8/12/2019 WBS FINAL1

    21/23

    WBS Software: WBS Chart Pro.

    Windows-based project

    management

    WBS Chart Pro can be

    used with Microsoft Project

    The interface is seamless

    and bi-directional.

    A WBS toolbar button

    can be installed into

    Microsoft Project

    for easy transfer of data.

  • 8/12/2019 WBS FINAL1

    22/23

    Summary

    The Work Breakdown Structure (WBS) helps youidentify and specify all the tasks associated with theproject.

    A good WBS is based upon

    A well defined scope for the project A set of system requirements

    A good understanding of the project priorities

    The WBS may need to be refined and updated for

    each project phase A complete and well organized WBS will help assure

    good schedule and cost estimates

  • 8/12/2019 WBS FINAL1

    23/23

    Thank You