WaveRoller Present And Future Developments Jussi Åkerberg / CTO AW-Energy Oy
WaveRollerPresent And Future Developments
Jussi Åkerberg / CTO AW-Energy Oy
WaveRoller
Panel
PTO
Foundation
https://youtu.be/-Z94liCl9pI
AW-Energy, Finland, Since 2003
Coherent Development & Significant milestones
Grid connected sea
trials
Performance verified by
DNV GL
Full scalePTO test facility
Technology qualified
Company ISO 9001
EiB financing through InnovFin
programme
Lloyd’s Register certified
design and manufacture
WaveRoller assembled and
deployed
Bankable insurance
criteria met
2014 2015 2016 2016 2018 20192019
WaveRoller awarded Solar Impulse Label
= both ecological &
profitable
Sea Trials, Demonstration Unit 2012-14In Peniche, Portugal
WaveRoller Test Facility for PTO
WaveRoller First-Of-A-Kind Manufacturing
Foundation Manufacturing in Portugal
Panel and PTO transportation to Portugal
STRICTLY CONFIDENTIAL
11
Panel and PTO Unloading in Peniche
Final Assembly in Peniche
Final Assembly in Peniche
Shore Substation in Peniche
Subsea Cable Assembly
Installation in Peniche
Installation in Peniche
Working Together, Time for a Toast
Grid Connected, CommissioningOptimise settings & power performance
Artificial Reef Created by the Foundation
Low Visual Impact
2/2014
Validation of power
performance
9/2015
Endorsement of TQ plan
2/2015
Statement of Feasibility
11/2014
Inspection after operation ISO 9001
9/20166/2016
Technology Qualification
certificate
8/2017
Design appraisal certificate
2/2019
Manufacturing certificate
Third Party Validation
Third Party Certification
Efficient Insurance Efficient FinanceMet criteria for Business Interruption Insurance
5/2019
58/21
79
MegaRoller -Project▪ EU funded Horizon 2020 –project
▪ Designing, building and testing the Power-Take-Off of the first megawatt-level Oscillating Wave Surge Converter
24
Research institute SME Large enterpriseUniversity
In-Kind contributions
This project has received funding from the European Union's Horizon 2020 research and innovation programme under grant agreement No 763959
Process Innovation
This project has received funding from the European Union's Horizon 2020 research and innovation programme under grant agreement No 763959
YES WE CAN!
26This project has received funding from the European Union's Horizon 2020 research and innovation programme under grant agreement No 763959
Total theoretical wave
energy potential:
32 000 TWh / year
Wave energy potential at US coast
is 64% of 2018 electricity generation
Several sites under development ~65MW
Customer financed studies & development
Many other projects in discussion globally
This
Global Opportunity - let’s do it!
http://commons.wikimedia.org/wiki/file:started_point-right-arrow.utf-8.svg