Page 1: WATERLINE REPLACEMENT PROJECT Tempe Neighborhoods

WATERLINEREPLACEMENT PROJECTTempe Neighborhoods

NEIGHBORHOOD MEETINGWednesday, April 26, 2017

5:30 p.m. – 6:30 p.m.Tempe History Museum, 809 E. Southern Avenue, Tempe, AZ

Page 2: WATERLINE REPLACEMENT PROJECT Tempe Neighborhoods

Welcome, Goals and Introductions

Marilyn DeRosa, R.G., P.E.City of Tempe

Deputy Director - Water Utilities Division

Neighborhood Meeting

Page 3: WATERLINE REPLACEMENT PROJECT Tempe Neighborhoods

Neighborhood Meeting

Welcome, Goals and Introductions Overview of WUD CIP Project Development Project Specifics Ongoing Communications Contacts Questions

Page 4: WATERLINE REPLACEMENT PROJECT Tempe Neighborhoods

Project DevelopmentMark Weber, P.E.

City of TempePrincipal Engineer – Water Utilities Division

Neighborhood Meeting

Page 5: WATERLINE REPLACEMENT PROJECT Tempe Neighborhoods

Water Treatment Plants7%

Potable Water Transmission & Distribution System31%

Water System Pumping Stations, Reservoirs & Tanks

7%Computer Control Systems and Security

2%

Wells4%

Billing and Customer Service

5%

Admin. Buildings

1%Water Resources

2%

Flood Irrigation1%

Storm Drains0%

Wastewater Collection System

7%

Regional Wastewater Treatment & Conveyance

7%

Wastewater Mechanical Stations

3%

Water Reclamation Facility11%

Rio Salado Siphon Capacity Relief 

Project12%

Water Utilities Division5‐Year Capital Improvements Program

Water and Wastewater

$260M Over 5 Years

Page 6: WATERLINE REPLACEMENT PROJECT Tempe Neighborhoods

Waterline Replacement Project Selection

~850 Miles of Waterline Pipe Age Material Type

Cast Iron (CIP) ~225 miles Asbestos Cement (ACP) ~360 miles Ductile Iron (DIP) ~235 miles Steel Transmission Mains ~30 miles

Break History

Page 7: WATERLINE REPLACEMENT PROJECT Tempe Neighborhoods

Pipe Age

Pipe Type

Prior to 1970

1970 to 19901990 to Present

CIP

ACPDIP

Page 8: WATERLINE REPLACEMENT PROJECT Tempe Neighborhoods

1998 1999 2000 2001 2002 2003 2004 2005 2006 2007 2008 2009 2010 2011 2012 2013 2014 2015 2016Total Water Breaks 32 26 24 28 33 32 32 41 29 67 47 49 52 67 59 68 43 48 81Unknown Material 12 1 2 0 1 4 3 1 0 7 8 2 0 1 0 0 1 1 0DIP 0 1 0 2 2 1 1 1 1 0 1 2 0 1 2 1 0 6 8ACP 5 5 5 4 5 5 7 8 2 15 5 8 10 5 9 5 9 7 6CIP 15 19 17 22 25 22 21 31 26 45 33 37 42 60 48 62 33 34 67

3226 24

2833 32 32

41

29

67

47 49 52

6759

68

4348

81

0

10

20

30

40

50

60

70

80

90

100Water Main Breaks by Year and Pipe Type

858 Main BreaksSince FY1998

Page 9: WATERLINE REPLACEMENT PROJECT Tempe Neighborhoods

Alameda Drive

Southern Avenue

Rura

l Roa

d

Col

lege

Ave

nue

Project Area

46 Total Main Breaks!

Page 10: WATERLINE REPLACEMENT PROJECT Tempe Neighborhoods

Project SpecificsKen Halloran, P.E.

City of TempeSr. Civil Engineer – Engineering Division

Neighborhood Meeting

Page 11: WATERLINE REPLACEMENT PROJECT Tempe Neighborhoods

Neighborhood Meeting

Typical Street Section showing: Waterlines and other Underground Utilities

Work Locations Water Line Design Tentative Construction Schedule & Project Cost What to expect to see during construction

Page 12: WATERLINE REPLACEMENT PROJECT Tempe Neighborhoods

TYPICAL STREET SECTION: WATERLINES  and OTHER UNDERGROUND UTILITIES

Flood Irrigation and/or Storm Drain (Exaggerated)

Causes of pipe failure:System exceeded its useful life.Natural deterioration.Damaged pipe.Faulty connections.Poor construction.

Page 13: WATERLINE REPLACEMENT PROJECT Tempe Neighborhoods

Waterline Replacement Area bound by:

College Avenue east to Dorsey Lane,Southern Avenue north to Alameda Drive,

Including Rural Road from Southern Ave to Alameda Dr,Southern Avenue from College Ave to Rural Rd

And Alameda Drive from College Ave to Rural Rd

Neighborhood Meeting

Page 14: WATERLINE REPLACEMENT PROJECT Tempe Neighborhoods

AERIAL MAP ‐WATERLINE REPLACEMENT – TEMPE NEIGHBORHOODS

Alameda Drive

Southern Avenue

Rural Road

College Avenu

e

Page 15: WATERLINE REPLACEMENT PROJECT Tempe Neighborhoods

PROJECT DESIGN  PLAN and PIPE PROFILE SHEET

Key points:• A pressurized Water system.• 17 months to complete the design.• 50,000 LF (about 9½ miles) of 

Ductile Iron Pipe (DIP).• 835 Water service taps to homes & 

businesses.• 85 Fire Hydrants.• More than 175,000 SF of 

Pavement Trenching• CMAR construction in lieu of Low 

Bid process.

DESIGN – Waterline

Page 16: WATERLINE REPLACEMENT PROJECT Tempe Neighborhoods

A DESIGN PLAN ‐ LOCATIONS OF EXISTING UTILITIES

Page 17: WATERLINE REPLACEMENT PROJECT Tempe Neighborhoods

TENTATIVE CONSTRUCTION SCHEDULE

TOTAL PROJECT COSTSDesign costs were approximately $600,000.

Construction costs are expected to be up to $11M.

Page 18: WATERLINE REPLACEMENT PROJECT Tempe Neighborhoods

DUCTILE IRON PIPE

PIPE FITTING/CONNECTION VALVE

Page 19: WATERLINE REPLACEMENT PROJECT Tempe Neighborhoods

UTILITY LOCATING akaPOTHOLING

Page 20: WATERLINE REPLACEMENT PROJECT Tempe Neighborhoods

PAVEMENT SAWCUTTING

Page 21: WATERLINE REPLACEMENT PROJECT Tempe Neighborhoods

EXCAVATION

Page 22: WATERLINE REPLACEMENT PROJECT Tempe Neighborhoods

TRENCH

Page 23: WATERLINE REPLACEMENT PROJECT Tempe Neighborhoods

TRENCH SHORING

Page 24: WATERLINE REPLACEMENT PROJECT Tempe Neighborhoods

INSIDE TRENCH

Page 25: WATERLINE REPLACEMENT PROJECT Tempe Neighborhoods

EXISTING UTILITIES

Page 26: WATERLINE REPLACEMENT PROJECT Tempe Neighborhoods

LAYING WATER PIPE

Page 27: WATERLINE REPLACEMENT PROJECT Tempe Neighborhoods

LAYING WATER PIPE

Page 28: WATERLINE REPLACEMENT PROJECT Tempe Neighborhoods

LAYING WATER PIPE

Page 29: WATERLINE REPLACEMENT PROJECT Tempe Neighborhoods

NEW FIRE HYDRANT

Page 30: WATERLINE REPLACEMENT PROJECT Tempe Neighborhoods

WATER SERVICE CONNECTION

Page 31: WATERLINE REPLACEMENT PROJECT Tempe Neighborhoods

WATER LINE UNDER EXISTING UTILITIES

Page 32: WATERLINE REPLACEMENT PROJECT Tempe Neighborhoods

WATER LINE IN TRENCH

Page 33: WATERLINE REPLACEMENT PROJECT Tempe Neighborhoods

TRENCH BACKFILL

Page 34: WATERLINE REPLACEMENT PROJECT Tempe Neighborhoods

TRENCH PLATES

Page 35: WATERLINE REPLACEMENT PROJECT Tempe Neighborhoods

TRENCH PAVING

Page 36: WATERLINE REPLACEMENT PROJECT Tempe Neighborhoods

FINISHED WATER VALVE

Page 37: WATERLINE REPLACEMENT PROJECT Tempe Neighborhoods

FINISHED MANHOLE

Page 38: WATERLINE REPLACEMENT PROJECT Tempe Neighborhoods

PAVEMENT SLURRY SEAL

Page 39: WATERLINE REPLACEMENT PROJECT Tempe Neighborhoods

Neighborhood ContactLaura KajfezCity of Tempe

Neighborhood Services Specialist

Neighborhood Meeting

Page 40: WATERLINE REPLACEMENT PROJECT Tempe Neighborhoods

Stay connected…

Look for postcard updates

Sign up for email updates

Facebook posts to neighborhoods’ pages

City webpage: www.tempe.gov/waterprojectupdates

Patrick Donahue @ Achen-Gardner: 480-710-4239

Page 41: WATERLINE REPLACEMENT PROJECT Tempe Neighborhoods

Project Contacts

City of Tempe Neighborhood ServicesLaura Kajfez [email protected]

City of TempeConstruction ManagerJerome [email protected]

Achen Gardner Construction, LLCProject ManagerPatrick [email protected]

CWCEConstruction ManagerCliff [email protected]

Page 42: WATERLINE REPLACEMENT PROJECT Tempe Neighborhoods

Neighborhood Meeting

Questions?

Page 43: WATERLINE REPLACEMENT PROJECT Tempe Neighborhoods

Neighborhood Meeting

THANK YOU FOR ATTENDING!

From YOUR PROJECT TEAM