WATERBORNE TRANSPORT DEVELOPMENT STRATEGY WATERBORNE TRANSPORT DEVELOPMENT STRATEGY IN THE REPUBLIC OF SERBIA IN THE REPUBLIC OF SERBIA 2015 - 2025 2015 - 2025 Ministry of Construction, Transport and Infrastructure Republic of Serbia Danube Commission, Technical Working Group, 14-17 April 2015
23
Embed
WATERBORNE TRANSPORT DEVELOPMENT STRATEGY IN THE REPUBLIC OF SERBIA 2015 - 2025 2015 - 2025 Ministry of Construction, Transport and Infrastructure Republic.
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
WATERBORNE TRANSPORT DEVELOPMENT WATERBORNE TRANSPORT DEVELOPMENT
STRATEGYSTRATEGYIN THE REPUBLIC OF SERBIAIN THE REPUBLIC OF SERBIA
2015 - 20252015 - 2025
Ministry of Construction, Transport and InfrastructureRepublic of Serbia
Danube Commission, Technical Working Group, 14-17 April 2015
1. INTRODUCTION (New EU transport Infrastructure Policy, EU Strategy for the Danube Region – Priority Area 1а, Process of Harmonization of National Legislation with the EU Legislation, EU Projects Relevant for Further Strategic Planning)
2. MODERNIZATION OF THE NATIONAL FLEET (SWOT)
3. DEVELOPING ECONOMIC POTENTIALS OF SERBIAN PORTS (SWOT)
4. DEVELOPOMENT OF SERBIAN INLAND WATERWAYS (SWOT)
5. PROFESSIONAL TRAINING AND EMPLOYMENT IN THE FIELD OF IWT (SWOT)
6. DEVELOPMENT OF MARITIME ECONOMY (SWOT)
7. FINAL CONSIDERATIONS (Measures and Instruments for Strategy implementation, Promotion of the Strategy)
Danube Commission, Technical Working Group, 14-17 April 2015
Content
8. APPENDICES
Appendix 1: - INTERNATIONAL LEGAL FRAMEWORK FOR
INLAND NAVIGATION
- INTERNATIONAL LEGAL FRAMEWORK FOR MARITIME NAVIGATION
- THE EUROPEAN REGULATIONS ON WATERBORNE TRANSPORT
(IWT+Maritime)
- EXISTING AND PROJECTED LEGAL AND REGULATORY FRAMEWORK OF THE
REPUBLIC OF SERBIA
Danube Commission, Technical Working Group, 14-17 April 2015
Content
8. APPENDICESAppendix 2 PROMOTING THE POTENTIALS OF IWT IN
THE REPUBLIC OF SERBIA AND FREIGHT TRANSPORT FORECASTS UP TO 2025
Appendix 3 AVAILABLE FLEET AS PER THE NUMBER OF VESSELS AND CARRYING CAPACITY
TONNES, YEARS OF CONSTRUCTION OF THE FLEET AND MAIN DRIVE ENGINES
Appendix 4 ANALYSIS OF TRANSPORT IN PORTS AND
THE FORECAST FOR PASSENGER RIVER TRANSPORT FOR THE PERIOD 2015 - 2025.
Danube Commission, Technical Working Group, 14-17 April 2015
Content
Comparative bar chart showing the quantity of goods transported, tonne-kilometers performed and the number of employees in the period
from 1990 to 2012 on inland waterways of the Republic of Serbia
Statistic 1990-2012 / potentials of the IWT in Serbia
Danube Commission, Technical Working Group, 14-17 April 2015
The share of the cargo transported by the national fleet in the total cargo transport by rail, road and inland waterways
Danube Commission, Technical Working Group, 14-17 April 2015
Statistic 2008-2012 / potentials of the IWT in Serbia
Cargo transport by inland waterways (in thousands of tonnes)
Statistic 2008-2012 / potentials of the IWT in Serbia
Danube Commission, Technical Working Group, 14-17 April 2015
Transport of goods performed through ports of the Republic of Serbia in 2010 according to the type of transport (in tonnes)
Statistic / Ports 2010
Danube Commission, Technical Working Group, 14-17 April 2015
MethodologyThe scenario is based on the key macroeconomic indicator of economic activity – the percentage growth rate of the real gross domestic product (GDP) of the Republic of Serbia (Source: MMF October 2014)
…and results of the earlier studies:
Master plan and feasibility study for the inland waterway transport in Serbia (2006)
General transport master plan in Serbia (GTMP) (2006) PLATINA The forecast for the European inland waterway
transport (2011) Project: „Preparation of the documentation for river training and
dredging works on the critical sectors of the Danube River” (2012).
Freight transport forecasts up to 2025
Danube Commission, Technical Working Group, 14-17 April 2015
The forecast in thousands of tonnes, by national-flag and foreign-flag ships (inland transport. import and export)
Freight transport forecasts up to 2025
Danube Commission, Technical Working Group, 14-17 April 2015
The growth rate of the volume of transport on inland waterways
The forecast for the number of passenger ships in Belgrade 2014 - 2025 / Based on the announcements of shipping companies and tour operators
and indicators of increase during the last 12 years
Passenger transport forecasts up to 2025
Danube Commission, Technical Working Group, 14-17 April 2015
580 632 689 751 819 892 973 10411114119212751364
0
500
1000
1500
Године
Бр
ој б
род
ова
Increase by 35% in traffic (transit, import and export) on inland waterways of the
Republic of Serbia in comparison to 2012,
achieved via domestic and foreign ships by 2025
Strategic Objectives – general
Danube Commission, Technical Working Group, 14-17 April 2015
Annual growth of passenger ships and their passengers of 9% until 2020 to the annual growth of 7% in the period between
2021 and 2025 in Serbia (not only Belgrade)
Danube Commission, Technical Working Group, 14-17 April 2015
Strategic Objectives – general
Full supervision of the waterway network of the Republic of Serbia (1600 km)
Safe navigation with full acceptance of ecological corridors of international importance in the Republic of Serbia
Safety of dangerous goods transport in Serbia waterway network in accordance with the rules of ADN
Harmonized international and national regulations and simplified administrative procedures / border procedures
Modern national fleet and profitable domestic shipping companies Younger fleet / average age of cargo vessels now is more
than 35 years Tanker fleet with the technical standards in accordance
with the АDN rules / need to provide the investments
The development of container transport / regular container service on the Danube – Black Sea
Strategic concept of the companies / specialization
Strategic Objectives / Fleet
Danube Commission, Technical Working Group, 14-17 April 2015
High quality port infrastructure and superstructure, new port investments
Include at least three national ports in the Core Network Ports on 2025
Modern container terminals and connectivity with correspondent railway and adequate road infrastructure
Integration of ports in a multimodal logistic chain
Strategic Objectives / Ports
Danube Commission, Technical Working Group, 14-17 April 2015
Ecologically needs (extremely important)on the waterway network of the Republic of Serbia :
Defining the terminals with the infrastructure for collecting, disposing and treatment of waste produced during the exploitation of vessels
necessary to plan at least 4 terminals (station), two on
the Danube, one on the Sava and one on the Tisa river
Protection of favourable condition of ecologically important areas, ecological corridors of international importance and protection zones in the Republic of Serbia.
Strategic Objectives / Ports
Danube Commission, Technical Working Group, 14-17 April 2015
Improved waterways in accordance with requirements of AGN, with full protection of the environmental requirements
Respect of the recommendations from the Declaration on Effective Waterway Infrastructure Maintenance on the Danube and its Navigable Tributaries - Luxemburg Declaration
Advanced services provided by the RIS Network of roads and railways on a national level would
be efficiently connected by the ports Novi Sad and Belgrade to the TEN-T Corridor Rhines-Danube
Promotion of nautical potentials of waterways in the Republic of Serbia, nautical tourism, establishing of waterway classification for sports and recreation vessels
Strategic Objectives/ Inland Waterways Development
Danube Commission, Technical Working Group, 14-17 April 2015
Full realization of the
project for 6 critical sectors on the national part of the Danube from Backa Palanka to Belgrade/ hydro-technical work - the end of 2017
Preparation of the project documentation for the removal of the bottlenecks for navigation on the Sava River from Belgrade (rkm 0) to Brcko (rkm 231)
Inland Waterways Development / Priority projects
Danube Commission, Technical Working Group, 14-17 April 2015
Highly professional ship crews
under the Serbia flag Young personnel who will be
the crew of modern fleet on European inland waterways
Highly professional personnel of the Serbian ports and navigation administration
Establishing a full network of ADN safety advisers
Establishing of an accredited institution for education and training of seafarers in accordance with STCW Convention /Making the well-educated seafarers
Danube Commission, Technical Working Group, 14-17 April 2015
Strategic Objectives / Education and Training
By the end of April 2015, the Government shall adopt an Action Plan
The Action Plan shall regulate the implementation of each measure and instruments of Strategy implementation, including Preliminary Estimate of the Necessary Financial Resources in the Period 2015-2020
The Ministry shall report on the implementation of the Strategy and the Action Plan to the Government every 2 years
Establishment a cross-sector body to monitor implementation, evaluation and upgrading of the Strategy – The Strategy Implementation and Evaluation Board
Identification of leading organisations/persons within the key institutions
Action Plan for Implementation and Development of the Strategy 2015-2020
Danube Commission, Technical Working Group, 14-17 April 2015
Thank you for Your attentionThank you for Your attention!!
Ministry of Construction, Transport and Infrastructure Ministry of Construction, Transport and Infrastructure
Republic of SerbiaRepublic of Serbia