Top Banner
Frank Belock Deputy General Manager January 31, 2012
35
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: Water Talks: Emergency Storage Project

Frank Belock

Deputy General Manager January 31, 2012

Page 2: Water Talks: Emergency Storage Project

$3.5 billion CIP (1989 – 2030) $1.5 billion Emergency Storage Program (ESP)

Dozens of major projects – completed or under construction

2 Olivenhain Reservoir and Lake Hodges

Page 3: Water Talks: Emergency Storage Project

Four Phases

System of pipelines, pump stations and reservoirs

Store water locally

Provide more flexible water deliveries

Over 90,000 AF

Meet needs through 2030

3

Page 4: Water Talks: Emergency Storage Project

Pipeline

Dam and Reservoir

Pump Station

4

Page 5: Water Talks: Emergency Storage Project

Project: Olivenhain Pipeline

Completed: 2002

Cost: $33 million

Benefit: Improved Water Delivery

Page 6: Water Talks: Emergency Storage Project

6

Project: Olivenhain Dam & Reservoir

Completed: 2003

Cost: $198 million

Benefit: 24,000 AF of storage

Page 7: Water Talks: Emergency Storage Project

Completed: 2004

Olivenhain Pump Station Project: Olivenhain Pump Station

Completed: 2005

Cost: $45 million

Benefit: 24,000 AF of storage

Page 8: Water Talks: Emergency Storage Project

Pipeline

Pump Station

Transmission Line

Hydroelectric Power generation

8

Page 9: Water Talks: Emergency Storage Project

9

Page 10: Water Talks: Emergency Storage Project

Project: Lake Hodges Pump Station and Pumped

Storage Projects

Completed: 2012

Cost: $181 million

Benefits: 20,000 AF ESP storage; 40MW power 10

Page 11: Water Talks: Emergency Storage Project

120 feet deep

Equivalent to a 10 story building underground

Helps to capture runoff

Pumps up 770 feet to Olivenhain Reservoir

Page 12: Water Talks: Emergency Storage Project

Generate hydroelectric power during peak power demands

25-year Power Purchase and Sale Agreement with SDG&E

SDG&E Revenues + Energy Savings

~ $6 M / yr

12

Page 13: Water Talks: Emergency Storage Project
Page 14: Water Talks: Emergency Storage Project

14

Project: San Vicente Pipeline, Pump Station &

Surge Tank

Completed: 2011

Cost: $459 million

Benefit: Improved Water Delivery

Page 15: Water Talks: Emergency Storage Project
Page 16: Water Talks: Emergency Storage Project

16

Project: San Vicente Dam Raise Complete: 2013 Cost: $449.5 million

16

Benefit: Increase reservoir capacity by 152,000 acre-feet

Page 17: Water Talks: Emergency Storage Project

17

Rendering of Dam Raised by 117 Feet

Page 18: Water Talks: Emergency Storage Project

18

Page 19: Water Talks: Emergency Storage Project
Page 20: Water Talks: Emergency Storage Project

20

San Vicente Reservoir After Fill

Page 21: Water Talks: Emergency Storage Project

Marina RCC Batch Plant

21

Page 22: Water Talks: Emergency Storage Project

22

RCC Conveyor System

Page 23: Water Talks: Emergency Storage Project

23

Dam Raise RCC Placement

Page 24: Water Talks: Emergency Storage Project

24

San Vicente Marina Facilities

Page 25: Water Talks: Emergency Storage Project

2004 OLIVENHAIN

24,000 AF

HODGES

20,000 AF 2010

SAN VICENTE

152,000 AF 2013

TOTAL- 196,000 AF (90K Emergency + 100K

Carryover + 6K Operational)

Enhancing Regional Water Supply Reliability

25

Page 26: Water Talks: Emergency Storage Project

Construction of first facilities began in 2000

Final phase complete in 2014

Costs spread out over several decades to minimize

water rate impacts

Provides 90,100 acre-feet of water storage for

emergency use

Environmental mitigation is included to make up for

construction impacts

26

Page 27: Water Talks: Emergency Storage Project

San Diego County Water Authority

Page 28: Water Talks: Emergency Storage Project

The amount of money at stake in the Water Authority’s rate lawsuit vs. MWD (over 45 years):

$1.3 billion to $2.1 billion

28

Page 29: Water Talks: Emergency Storage Project

In October 2003, Colorado River QSA is executed: ◦ Water Authority signs 45- to 75-year deal to buy 200,000

AF annually from the Imperial Irrigation District

◦ Water Authority agrees to line the All American and Coachella canals and receive 80,000 AF annually for 110 years

◦ Requires transportation rate from MWD to move supplies to San Diego through MWD’s system

29

Page 30: Water Talks: Emergency Storage Project

MWD had to disaggregate its uniform water rate to develop a transportation charge for the Water Authority’s transfer supplies

Facing a loss of water sales revenues due to the Water Authority’s supply diversification, MWD took vast majority of its water supply costs and misallocated them to its transportation charge to move the Water Authority’s IID and Canal Lining transfer supplies

30

Page 31: Water Talks: Emergency Storage Project

Charged for Transportation

Charged for Purchase of MWD Water 31

< 2003 2003>

System

Access

Rate

Power

Rate

Water

Stewardship

Rate

Water

Supply

Rate

Uniform

Water

Rate

MWD

System

Costs

Water

Supply

Costs

Water Supply Costs

MWD System Costs

MWD Must

Disaggregate

Its Costs

New Rate Structure Misallocates Water Supply

Costs to Transportation Charge

Page 32: Water Talks: Emergency Storage Project

32

Charged for Transportation

Charged for Purchase of MWD Water

System

Access

Rate

Power

Rate

Water

Supply

Rate

Water Supply Costs

MWD System Costs

Page 33: Water Talks: Emergency Storage Project

MWD is required to place disputed payments made by the Water Authority into an escrow account ◦ By end of 2012, escrow balance will grow to

approximately $78 million

◦ By the end of 2013, escrow balance will grow to approximately $135 million

If the Water Authority wins the case, MWD must return the money to the Water Authority

33

Page 34: Water Talks: Emergency Storage Project

Case assigned to San Francisco Superior Court Judge Richard Kramer ◦ Case has been designated as “complex” Assigned to single judge for all purposes

Complex cases generally get more attention and resources from the court

Estimated trial court decision in late 2012

Imperial Irrigation District and Utility Consumers’ Action Network (UCAN) are litigants on Water Authority’s side

Jan. 6, 2012: Court granted Water Authority and IID motion to allow discovery in case

Next hearing: Feb. 17, 2012 (case management conference)

34

Page 35: Water Talks: Emergency Storage Project

Visit our website: SDCWA.org

35

sdcwa.org/mobile-news-app