RENCANA/ RELISASI PENGADAAN TA 2009 * Unit Kerja No Kode Nama Paket Estimasi Biaya (Rp) Estimasi Biaya eqv(US$) Metode Pengadaan 1 2 3 4 5 6 I KEGIATAN YANG DIBIAYAI LOAN & GOI/ PENDAMPING RIM B (Category 6) Sub Prject A1 (Category 7) Sub Prject A2 (Category 8) Consulting Services (Category 3) Training, Workshop (Category 4) RIM A (Category 5) Water Resources and Irrigation Sector Management Project (WISMP) APL I Komponen B & C Civil Works (Category 1) Goods (Category 2) Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized
17
Embed
Water Resources and Irrigation Sector Management Project ......Pekerjaan Konstruksi (Civil Works) : Water Resources and Irrigation Sector Management Project (WISMP) APL I Komponen
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
RENCANA/ RELISASI PENGADAAN TA 2009 *
Unit Kerja
No Kode Nama PaketEstimasi
Biaya (Rp)
Estimasi Biaya
eqv(US$)
Metode Pengadaan
1 2 3 4 5 6
I KEGIATAN YANG DIBIAYAI LOAN & GOI/ PENDAMPING
RIM B (Category 6)
Sub Prject A1 (Category 7)
Sub Prject A2 (Category 8)
Consulting Services (Category 3)
Training, Workshop (Category 4)
RIM A (Category 5)
Water Resources and Irrigation Sector Management Project (WISMP) APL IKomponen B & C
Civil Works (Category 1)
Goods (Category 2)
Pub
lic D
iscl
osur
e A
utho
rized
Pub
lic D
iscl
osur
e A
utho
rized
Pub
lic D
iscl
osur
e A
utho
rized
Pub
lic D
iscl
osur
e A
utho
rized
Pub
lic D
iscl
osur
e A
utho
rized
Pub
lic D
iscl
osur
e A
utho
rized
Pub
lic D
iscl
osur
e A
utho
rized
Pub
lic D
iscl
osur
e A
utho
rized
II KEGIATAN YANG DIBIAYAI GOI (PARALEL FINANCING/APBD)
Sub Total Keg Cat 3 (Loan + Pend) - -Sub Total Keg Selain Cat 3 (Loan) - -TOTAL KEGIATAN I (Loan + Pend) - -
TOTAL KEGIATAN II (GOI-PF/APBD) - 0
KETERANGAN : 1 US$ = Rp. 8.500 PETUNJUK PENGISIANI. Kegiatan yang dibiayai (Loan + GOI pendamping/APBN)
1. Force Account (FA) untuk pekerjaan Rim - B < Rp. 127,500,0002. Comm. Driven Development (CDD) untuk pek Irigasi < Rp. 425,000,0003. Small Works (SW) < Rp. 212,500,0004. National Competitive Bidding (NCB) < Rp. 4,250,000,000
Category 3: Estimasi biaya (Loan + GOI pendamping/APBN) > dalam Rp2. Pengadaan Barang (Goods) :
1. National Shopping (NS) < Rp. 212,500,000 Category 3: Estimasi biaya (Loan + GOI pendamping/APBN) > eqv. US$ 2. National Competitive Bidding (NCB) < Rp. 1,700,000,000
3. Pengadaan Konsultan (Consulting Services) :1. Consultant Qualification Selection (CQS) < Rp. 850,000,0002. Quality and Cost Based Selection (QCBS) < Rp. 3,400,000,0003. Quality Based Selection (QBS) < Rp. 3,400,000,0004. Individual Consultant (IC) < Rp. 425,000,000 Bila sudah terkontrak, agar diisi
* dilaporkan setiap triwulan oleh para PIU / KPIU ke NPMU melalui PPMU/KPMU
** Untuk Prior Review Kontrak I: dipilih salah satu paket untuk minta persetujuan NOL Bank Dunia, Bila sudah terkontrak, agar diisi paket lainnya cukup Post Review, & dilaksanakan setelah paket yang pertama mendapat NOLII. Kegiatan yang dibiayai GOI (Paralel Financing/APBD)(termasuk paket kontrak I pekerjaan sejenis sudah mendapat NOL pada TA sebelumnya).
Categary yang tidak ada tidak perlu ditulis
1. Pekerjaan Konstruksi (Civil Works) :
Sub Prject B1/B2 (Category 9)
Status : Januari 2009
Post/ Prior Review
Pengumuman
Pengadaan
Pemasukan
PenawaranEval/ Nego
Penandata-nganan Kontrak
Jangka Waktu
Kontrak
Keterangan: Permasalahan/
7 8 9 10 11 12 13
PETUNJUK PENGISIANI. Kegiatan yang dibiayai (Loan + GOI pendamping/APBN)
Kolom 1 : Nomor UrutKolom 2: Kode pengadaan, mis. barang : Gd 1, Gd 2, konstruksi : CW 1, CW 2, konsultan : CS 1, dstKolom 3: Nama paket pekerjaan, agar ditulis setiap paketKolom 4: Selain Category 3: Estimasi biaya (Loan 100%) > dalam Rp
Category 3: Estimasi biaya (Loan + GOI pendamping/APBN) > dalam RpKolom 5: Selain Category 3: Estimasi biaya (Loan 100%) > eqv. US$
Category 3: Estimasi biaya (Loan + GOI pendamping/APBN) > eqv. US$ Kolom 6: Metoda Pengadaan, mis NS, DC, NCB, ICB, SW, CDD, CQS, QCBS, SSS, QBS, ICKolom 7: Post Review, Prior Review Kontrak I **, Prior ReviewKolom 8: Rencana pengumuman (status triwulan I: bln/ tahun, bila sdh terealisasi tgl/ bln/ thn)Kolom 9: Rencana pemasukan penawaran (status triwulan I: bln/ tahun, bila sdh terealisasi tgl/ bln/ thn)Kolom 10: Rencana evaluasi/negosiasi (status triwulan I: bln/ tahun, bila sdh terealisasi tgl/ bln/ thn)Kolom 11: Rencana penandatanganan kontrak (status triwulan I: bln/ tahun, bila sdh terealisasi tgl/ bln/ thn)
Bila sudah terkontrak, agar diisi Tgl & No. KontrakKolom 12: Hari/Bulan Kalender
Kolom 13: Penjelasan yang perlu, atau bila ada permasalahan, mis. TOR atau NOL belum disetujui BD
Bila sudah terkontrak, agar diisi Nilai Kontrak & Nama Rekanan
II. Kegiatan yang dibiayai GOI (Paralel Financing/APBD)Kolom : 1, 2, 8, 9, 10, 11, 12, 13 > cara pengisian sama dg kegiatan I
Kolom 3: Nama paket pekerjaan, agar ditulis setiap paketKolom 4: Estimasi biaya, dalam RpKolom 5 : diisi (0) Kolom 6: Metoda Pengadaan sesuai Keppres 80/2003Kolom 7 : diisi (–)
RENCANA/ RELISASI PENGADAAN TA 2010 *
Unit Kerja : Bappeda Prov. Jawa Barat Status
No Kode Nama PaketEstimasi
Biaya (Rp)
Estimasi Biaya
eqv(US$)
Metode Pengadaa
n
Post/ Prior Review
Pengumuman Pengadaan
Pemasukan Penawaran
Eval/ NegoPenandata-
nganan Kontrak
Jangka Waktu
Kontrak
Keterangan: Permasalahan/
1 2 3 4 5 6 7 8 9 10 11 12 13
I KEGIATAN YANG DIBIAYAI LOAN & GOI/ PENDAMPING
II KEGIATAN YANG DIBIAYAI GOI (PARALEL FINANCING/APBD)
Sub Total Keg Cat 3 (Loan + Pend) - -Sub Total Keg Selain Cat 3 (Loan) - -TOTAL KEGIATAN I (Loan + Pend) - -
TOTAL KEGIATAN II (GOI-PF/APBD) - 0
Sub Prject A2 (Category 8)
Water Resources and Irrigation Sector Management Project (WISMP) APL IKomponen B & C
RENCANA/ RELISASI PENGADAAN TA 2010 *
Unit Kerja BAPPEDA Kabupaten Bekasi Status
No Kode Nama PaketEstimasi Biaya
(Rp) Estimasi Biaya
eqv(US$) Metode
PengadaanPost/ Prior
Review
Pengumuman
Pengadaan
Pemasukan Penawaran
Eval/ NegoPenandata-
nganan Kontrak
Jangka Waktu
Kontrak
Keterangan: Permasalahan/
1 2 3 4 5 6 7 8 9 10 11 12 13
1 CS 1
II KEGIATAN YANG DIBIAYAI GOI (PARALEL FINANCING/APBD)1
Sub Total Keg Cat 3 (Loan + Pend) - -Sub Total Keg Selain Cat 3 (Loan) - -TOTAL KEGIATAN I (Loan + Pend) - -
TOTAL KEGIATAN II (GOI-PF/APBD) - -
Water Resources and Irrigation Sector Management Project (WISMP) APL IKomponen B & C
Sub Prject A2 (Category 8)
RENCANA/ RELISASI PENGADAAN TA 2010*
Unit Kerja BAPPEDA Kab. Karawang Status :
No Kode Nama PaketEstimasi Biaya
(Rp) Estimasi Biaya
eqv(US$) Metode
PengadaanPost/ Prior
Review
Pengumuman
Pengadaan
Pemasukan Penawaran
Eval/ NegoPenandata-nganan
Kontrak Jangka Waktu
KontrakKeterangan: Permasalahan/
1 2 3 4 5 6 7 8 9 10 11 12 13
I KEGIATAN YANG DIBIAYAI LOAN & GOI/ PENDAMPING
1 Gd 1
2 CS 1
II KEGIATAN YANG DIBIAYAI GOI (PARALEL FINANCING/APBD)1
Sub Total Keg Cat 3 (Loan + Pend) - -Sub Total Keg Selain Cat 3 (Loan) - -TOTAL KEGIATAN I (Loan + Pend) - -
TOTAL KEGIATAN II (GOI-PF/APBD) - -
Water Resources and Irrigation Sector Management Project (WISMP) APL IKomponen B & C
Goods (Category 2)
Sub Prject A2 (Category 8)
RENCANA/ RELISASI PENGADAAN TA 2010 *
Unit Kerja : Bappeda Kab. Sukabumi
No Kode Nama PaketEstimasi
Biaya (Rp)
Estimasi Biaya
eqv(US$)
Metode Pengadaan
1 2 3 4 5 6
I KEGIATAN YANG DIBIAYAI LOAN & GOI/ PENDAMPING
Tidak Ada Kegiatan Pengadaan
II KEGIATAN YANG DIBIAYAI GOI (PARALEL FINANCING/APBD)
Sub Total Keg Cat 3 (Loan + Pend) - -Sub Total Keg Selain Cat 3 (Loan) - -TOTAL KEGIATAN I (Loan + Pend) - -
TOTAL KEGIATAN II (GOI-PF/APBD) - 0
KETERANGAN : 1 US$ = Rp. 8.500 PETUNJUK PENGISIANI. Kegiatan yang dibiayai (Loan + GOI pendamping/APBN)
1. Force Account (FA) untuk pekerjaan Rim - B < Rp. 127,500,0002. Comm. Driven Development (CDD) untuk pek Irigasi < Rp. 425,000,0003. Small Works (SW) < Rp. 212,500,0004. National Competitive Bidding (NCB) < Rp. 4,250,000,000
Category 3: Estimasi biaya (Loan + GOI pendamping/APBN) > dalam Rp2. Pengadaan Barang (Goods) :
1. National Shopping (NS) < Rp. 212,500,000 Category 3: Estimasi biaya (Loan + GOI pendamping/APBN) > eqv. US$ 2. National Competitive Bidding (NCB) < Rp. 1,700,000,000
3. Pengadaan Konsultan (Consulting Services) :1. Consultant Qualification Selection (CQS) < Rp. 850,000,0002. Quality and Cost Based Selection (QCBS) < Rp. 3,400,000,0003. Quality Based Selection (QBS) < Rp. 3,400,000,0004. Individual Consultant (IC) < Rp. 425,000,000 Bila sudah terkontrak, agar diisi
Sub Prject B1/B2 (Category 9)
1. Pekerjaan Konstruksi (Civil Works) :
Water Resources and Irrigation Sector Management Project (WISMP) APL IKomponen B & C
* dilaporkan setiap triwulan oleh para PIU / KPIU ke NPMU melalui PPMU/KPMU
** Untuk Prior Review Kontrak I: dipilih salah satu paket untuk minta persetujuan NOL Bank Dunia, Bila sudah terkontrak, agar diisi paket lainnya cukup Post Review, & dilaksanakan setelah paket yang pertama mendapat NOLII. Kegiatan yang dibiayai GOI (Paralel Financing/APBD)(termasuk paket kontrak I pekerjaan sejenis sudah mendapat NOL pada TA sebelumnya).
Categary yang tidak ada tidak perlu ditulis
Status : Februari 2010
Post/ Prior Review
Pengumuman
Pengadaan
Pemasukan
PenawaranEval/ Nego
Penandata-nganan Kontrak
Jangka Waktu
Kontrak
Keterangan: Permasalahan/
7 8 9 10 11 12 13
PETUNJUK PENGISIANI. Kegiatan yang dibiayai (Loan + GOI pendamping/APBN)
Kolom 1 : Nomor UrutKolom 2: Kode pengadaan, mis. barang : Gd 1, Gd 2, konstruksi : CW 1, CW 2, konsultan : CS 1, dstKolom 3: Nama paket pekerjaan, agar ditulis setiap paketKolom 4: Selain Category 3: Estimasi biaya (Loan 100%) > dalam Rp
Category 3: Estimasi biaya (Loan + GOI pendamping/APBN) > dalam RpKolom 5: Selain Category 3: Estimasi biaya (Loan 100%) > eqv. US$
Category 3: Estimasi biaya (Loan + GOI pendamping/APBN) > eqv. US$ Kolom 6: Metoda Pengadaan, mis NS, DC, NCB, ICB, SW, CDD, CQS, QCBS, SSS, QBS, ICKolom 7: Post Review, Prior Review Kontrak I **, Prior ReviewKolom 8: Rencana pengumuman (status triwulan I: bln/ tahun, bila sdh terealisasi tgl/ bln/ thn)Kolom 9: Rencana pemasukan penawaran (status triwulan I: bln/ tahun, bila sdh terealisasi tgl/ bln/ thn)Kolom 10: Rencana evaluasi/negosiasi (status triwulan I: bln/ tahun, bila sdh terealisasi tgl/ bln/ thn)Kolom 11: Rencana penandatanganan kontrak (status triwulan I: bln/ tahun, bila sdh terealisasi tgl/ bln/ thn)
Bila sudah terkontrak, agar diisi Tgl & No. Kontrak
Kolom 12: Hari/Bulan Kalender
Kolom 13: Penjelasan yang perlu, atau bila ada permasalahan, mis. TOR atau NOL belum disetujui BD
Bila sudah terkontrak, agar diisi Nilai Kontrak & Nama Rekanan
II. Kegiatan yang dibiayai GOI (Paralel Financing/APBD)Kolom : 1, 2, 8, 9, 10, 11, 12, 13 > cara pengisian sama dg kegiatan I
Kolom 3: Nama paket pekerjaan, agar ditulis setiap paketKolom 4: Estimasi biaya, dalam RpKolom 5 : diisi (0) Kolom 6: Metoda Pengadaan sesuai Keppres 80/2003Kolom 7 : diisi (–)
RENCANA/ RELISASI PENGADAAN TA 2010 *
Unit Kerja BAPPEDA Kabupaten Purwakarta Status
No Kode Nama PaketEstimasi Biaya
(Rp) Estimasi Biaya
eqv(US$) Metode
PengadaanPost/ Prior
ReviewPengumuman
PengadaanPemasukan Penawaran
Eval/ NegoPenandata-nganan
Kontrak Jangka Waktu
KontrakKeterangan:
Permasalahan/
1 2 3 4 5 6 7 8 9 10 11 12 13
I KEGIATAN YANG DIBIAYAI LOAN & GOI/ PENDAMPING
1 S1/S2
2 CS 1
II KEGIATAN YANG DIBIAYAI GOI (PARALEL FINANCING/APBD)
Sub Total Keg Cat 3 (Loan + Pend) - -Sub Total Keg Selain Cat 3 (Loan) - -TOTAL KEGIATAN I (Loan + Pend) - -
TOTAL KEGIATAN II (GOI-PF/APBD) - -
Water Resources and Irrigation Sector Management Project (WISMP) APL IKomponen B & C
Goods (Category 2)
Sub Prject A2 (Category 8)
RENCANA/ RELISASI PENGADAAN TA 2010 *
Unit Kerja : Bappeda Kab. Cianjur Status
No Kode Nama PaketEstimasi
Biaya (Rp)
Estimasi Biaya
eqv(US$)
Metode Pengadaa
n
Post/ Prior Review
Pengumuman
Pengadaan
Pemasukan
PenawaranEval/ Nego
Penandata-nganan Kontrak
Jangka Waktu
Kontrak
Keterangan: Permasalahan/
1 2 3 4 5 6 7 8 9 10 11 12 13
I KEGIATAN YANG DIBIAYAI LOAN & GOI/ PENDAMPING
II KEGIATAN YANG DIBIAYAI GOI (PARALEL FINANCING/APBD)1
Sub Total Keg Cat 3 (Loan + Pend) - -Sub Total Keg Selain Cat 3 (Loan) - -TOTAL KEGIATAN I (Loan + Pend) - -
TOTAL KEGIATAN II (GOI-PF/APBD) - 0
Water Resources and Irrigation Sector Management Project (WISMP) APL IKomponen B & C
RENCANA/ RELISASI PENGADAAN TA 2010 *
Unit Kerja : Bappeda Kab. Bogor Status
No Kode Nama PaketEstimasi Biaya
(Rp)
Estimasi Biaya
eqv(US$)
Metode Pengadaan
Post/ Prior Review
Pengumuman
Pengadaan
Pemasukan
PenawaranEval/ Nego
Penandata-nganan Kontrak
Jangka Waktu
KontrakKeterangan: Permasalahan/
1 2 3 4 5 6 7 8 9 10 11 12 13
I KEGIATAN YANG DIBIAYAI LOAN & GOI/ PENDAMPING
1 CW 1
II KEGIATAN YANG DIBIAYAI GOI (PARALEL FINANCING/APBD)
Sub Total Keg Cat 3 (Loan + Pend) - -Sub Total Keg Selain Cat 3 (Loan) - -TOTAL KEGIATAN I (Loan + Pend) - -
TOTAL KEGIATAN II (GOI-PF/APBD) - 0
Sub Prject A2 (Category 8)
Water Resources and Irrigation Sector Management Project (WISMP) APL IKomponen B & C
RENCANA/ RELISASI PENGADAAN TA 2010 *
Unit Kerja : Bappeda Kab. Subang Status
No Kode Nama PaketEstimasi Biaya
(Rp)
Estimasi Biaya
eqv(US$)
Metode Pengadaa
n
Post/ Prior Review
Pengumuman
Pengadaan
Pemasukan
PenawaranEval/ Nego
Penandata-nganan Kontrak
Jangka Waktu
Kontrak
Keterangan: Permasalahan/
1 2 3 4 5 6 7 8 9 10 11 12 13
I KEGIATAN YANG DIBIAYAI LOAN & GOI/ PENDAMPING
1 CS 1
II KEGIATAN YANG DIBIAYAI GOI (PARALEL FINANCING/APBD)
Sub Total Keg Cat 3 (Loan + Pend) - -Sub Total Keg Selain Cat 3 (Loan) - -TOTAL KEGIATAN I (Loan + Pend) - -
TOTAL KEGIATAN II (GOI-PF/APBD) - 0
Sub Prject A2 (Category 8)
Sub Prject B1/B2 (Category 9)
Water Resources and Irrigation Sector Management Project (WISMP) APL IKomponen B & C
RENCANA/ RELISASI PENGADAAN TA 2010*
Unit Kerja : Bappeda Kab. Bandung Status
No Kode Nama PaketEstimasi Biaya
(Rp)
Estimasi Biaya
eqv(US$)
Metode Pengadaa
n
Post/ Prior Review
Pengumuman
Pengadaan
Pemasukan
PenawaranEval/ Nego
Penandata-nganan Kontrak
Jangka Waktu
Kontrak
Keterangan: Permasalahan/
1 2 3 4 5 6 7 8 9 10 11 12 13
I KEGIATAN YANG DIBIAYAI LOAN & GOI/ PENDAMPING
1 CS 1
II KEGIATAN YANG DIBIAYAI GOI (PARALEL FINANCING/APBD)
Sub Total Keg Cat 3 (Loan + Pend) - -Sub Total Keg Selain Cat 3 (Loan) - -TOTAL KEGIATAN I (Loan + Pend) - -
TOTAL KEGIATAN II (GOI-PF/APBD) - 0
Sub Prject A2 (Category 8)
Water Resources and Irrigation Sector Management Project (WISMP) APL IKomponen B & C
RENCANA/ RELISASI PENGADAAN TA 2010 *
Unit Kerja : Bappeda Kab. Bandung Barat Status
No Kode Nama PaketEstimasi
Biaya (Rp)
Estimasi Biaya
eqv(US$)
Metode Pengadaan
Post/ Prior Review
Pengumuman
Pengadaan
Pemasukan Penawaran
Eval/ NegoPenandata-nganan
Kontrak
Jangka Waktu
Kontrak
Keterangan: Permasalahan/
1 2 3 4 5 6 7 8 9 10 11 12 13
I KEGIATAN YANG DIBIAYAI LOAN & GOI/ PENDAMPING
1 Gd 1
II KEGIATAN YANG DIBIAYAI GOI (PARALEL FINANCING/APBD)
Sub Total Keg Cat 3 (Loan + Pend) - -Sub Total Keg Selain Cat 3 (Loan) - -TOTAL KEGIATAN I (Loan + Pend) - -
TOTAL KEGIATAN II (GOI-PF/APBD) - 0
Water Resources and Irrigation Sector Management Project (WISMP) APL IKomponen B & C