Water Plant #3 Concentrate Pre-treatment Project
Feb 23, 2016
Water Plant #3Concentrate Pre-treatment
Project
Project Goalso Meet Strategic Action Plan Performance Measure Strategy 4.1.1: Utilize nature’s water supply resources effectively for water supplyo Meet the Conservation Policy Principles of The Cityo Meet the Best Management Practices of the St. Johns River Water Management Districto Meet the Department of Environmental Protection regulatory requirements
Water Plant #3 Concentrate Pre-treatment
Project
Water Plant #3 Concentrate Pre-treatment
Project
Regulatory Requirements:o WTP#3 has a discharge permit limit for iron of 0.3
mg/Lo WTP#3 Concentrate is greater than 0.3 mg/Lo Florida Department of Environmental Protection
Administrative Order 154NE provides a schedule to meet the iron discharge limitation
o Concentrate is permitted as a source water at WTP#1o Color Compliance at WTP #1 is dependent on color
reduction treatment by ozone treatment at WTP#3
o Sawcross Inc. was determined to be the low bidder at the Bid opening on May 1, 2014 to complete the Concentrate Pre-treatment Project at Water Plant #3
o At the May 13, 2014 workshop, staff presented the Sawcross Inc. contract for Council consideration
o Signing of the construction contract was held in abeyance until the State appropriated the $375,000.00 grant funding for the project
Water Plant #3 Concentrate Pre-treatment
Project
Water Plant #3 Concentrate Pre-treatment
Project
Process Components:Primary Systemo Ozone system for color reduction o Recovers up to 750,ooo gallons per daySecondary Systemo Cartridge filtration system for iron reduction
Funding:o Total Project Cost - $1,580,000o Design & Permitting - $162,345o Construction Cost including contingency - $1,407,680 o Source of Funds: 5 Year CIP bond fundso St. Johns River Water Management District (SJRWMD)
Cooperative Cost Share Grant - $494,800o Florida Legislative Funding Grant - $375,000
Water Plant #3 Concentrate Pre-treatment Project
July 15, 2014 Council Actions:
o Resolution to initiate a Construction Contract with Sawcross Inc. for improvements at Water Plant#3
o Resolution to authorize the City Manager to finalize a Department of Environmental Protection Grant Funding agreement
Water Plant #3 Concentrate Pre-treatment
Project
Questions?