- 1. Water Management System at CCWVenue:CII- Godrej GBC
HyderabadDate :16.12.2008Name of the Presenter:A.K. Srivastava Head
Plant Operations Chaibasa Cement WorksThis report is solely for the
internal use. No part of it may be circulated, quoted, or
reproduced for distribution outside the company organization
without prior written approval from ACC Limited. This material was
used during an oral presentation; it is not a complete record of
the discussion.
2. Company ProfileEstablished in 1947.Part of ACC/ Holcim,
anational and global l dti l d l b l leaderExpansion &
modernizationin 2005. 1.2MTPAintegrated cement plantSituated i K
lhSi d in Kolhan region i A hard core tribal belt ,80 Km. from
Jamshedpur.QMS & EMS established asper IS/ISO 9001 &
14001.OHSMS established as per Reliable and respected Holcim
OH&S pyramid. 2 ACC LimitedCII Water Excellence Award
200816.12.2008 3. Process DetailsHighly sophisticated and modern
plant with state of the arttechnology.Semi d process (up to 23%
enriched slurry feed in VRM)Si dry ( t i h d lf diRaw mat.
extraction Raw material preparation Pyro processing Raw meal
preparationShippingCement Grinding Shipping 3 ACC Limited CII Water
Excellence Award 200816.12.2008 4. Roadmap for meeting the
Environment goals 200820092010 2011Stack emissions 50 30 30 30
(mg/nm3) Fugitive Emission SPM500040003000 2000 (g/nm3) Kg of CO2/
ton of650634 618602 Cementitious Material CEMS Installation on 1
kiln Kiln StackWater Consumption-30%-20%-15% -10% EnvironmentRoad
Map Power Consumption88.7 86.4 84.3 82.2 KWh / ton Tonnage of
alternative840014024 1515022201 fuels & raw mat. (tons)Thermal
Substitution0.53 1.43 1.62 1.99 Rate (%) AFR Installation0.95 2.8
5.00.5 Capex Rs. Cr Total GAV (Savings) Rs.0.29 3.47 4.30 5.89 Cr4
ACC LimitedCII Water Excellence Award 200816.12.2008 5. Water
Conservation InitiativesAnnual Water InvestmenYear ofSavingst
madePayback Sl. Water conservationImplemenperiod No.
initiativestationRs.R (months) m3Rs. Lakhs Lakhs Strengthening of
water monitoring system byg y y 1 installation of water 2005-06-
-2.22- metersatsource points Recycling of Effluent by rerouting of
reject pit 2 2006-07 165000 4.8525 discharge to abandoned mine pit
Zero effluent d hffl discharge byproviding 3 sedimentation tanks
2007-08 3300009.7 12.115 andreutilization of effluentffl5 ACC
Limited CII Water Excellence Award 2008 16.12.2008 6. Specific
Water Consumption 3.00 3 002.502.40 2.28 2.02 2.005% m3/MT
1.501.211.00 0.700.500.000 000.000 00 0.002004 05 2005 06 2006
072007 08 Benchmark 6 ACC LimitedCII Water Excellence Award 2008
16.12.2008 7. Road map to achieve global benchmark Objective &
targets Plan of ActionExpected Technical justification Dateof
Completion Strengthening of waterInstallationofDec. 2009Water
recycled from reject pit is monitoring system atwater metersat
collected in mines abandoned pit user enduser end (A block) for
further use inplant, this reutilized water isagain counted as fresh
waterdue to lack of monitoringsystem.At present, water meters
areinstalled only at sources and weare unable to take
initiativesdepartment wise.dtt i To achieve specific installation
of Dec. 2011At present water consumption in water consumption 700
modernized floatation process is about 950 ltr./ MT of Clinker
fromFiltration Floatationltr. per tonnes of clinker. By present
level of 1519 Plant (FFP)(FFP).implementingthis proposed ltr./ MTof
Clinker project dry cake will be fed toVRM and 130 ltr. water
pertonnesof clinkerwill beconsumed in this process.7ACC Limited CII
Water Excellence Award 2008 16.12.2008 8. Sustainability Indices 8
ACC LimitedCII Water Excellence Award 2008 16.12.2008 9.
Environment Performance Index (PEP) Systematic monitoring and
evaluation of environmental performance Identification of strengths
and weaknesses (self-assessment) Supporting tool in (environmental)
business planning Environmental programs, CAPEX projects, budgeting
etc. Database for communication purposes Group and Group company
internal benchmarking 85 Enval Performance Indicator Atmospheric
Emission: PM 8080 75 7675 73 70 66 EPI (% )65 6260 55
5020052006200720082007 2006 Year CCW PerformanceCCW TargetACC Avg.
Performance HOLCIM Avg. Performance9ACC Limited CII Water
Excellence Award 2008 16.12.2008 10. Commitment towards reduction
in GHG EmissionOur objective is to reduce by the year 2010 the
average specific net CO2 emission by 20 % from the reference year
1990, l l 1990 calculated per WBCSD CO2 protocol.dl Clinker Factor
Specific Net CO2 Emission75.0 75 0 73 900.0 900 0876.0 880.0Kg.
CO2/ MT of Cem. Mat. 69.5 70.0860.0 840.0 65.0 65 0 820.0804.0 %
800.060.3 800.0 60.0781.0 780.055.955.055.0 55.0760.0.740.0
50.0720.02005 2006 200720082007 2006 20052006 20072008 Year YearCCW
Performance CCW Target CCW Performance CCW TargetACC Avg.
PerformanceHOLCIM Avg. Performance10 ACC Limited CII Water
Excellence Award 200816.12.2008 11. Commitment towards reduction in
GHG EmissionThis reduction will be achieved through improving the
four key eco-efficiencyparameters: clinker factor specific thermal
energy consumption specific electrical energy consumption thermal
substitution rate Specific Thermal Energy ConsumptionSpecific
Electrical Energy Consumption 1050.0 1050 0 110.0 995.01061000.0
kWh/ MT of Cement 105.0950.0KCal/ Kg. of Clinker900.0 876 100.0
C850.095.0800.0 91.991.42 755.0 750.0 748.8 75190.089.0750.085.6 85
6 85.085 0K 700.0700 085.0650.0 80.0600.0 2005 2006 2007 2008
20072006200520062007 2008 20072006YearYea YearCCW Performance CCW
TargetACC Avg. PerformanceHOLCIM Avg. Performance 11ACC LimitedCII
Water Excellence Award 200816.12.2008 12. Water Conservation
InitiativesPhase 1st :Strengthening of water monitoring systemPhase
2nd :Recycling of EffluentPhase 3rd :Zero effluent discharge 12 ACC
LimitedCII Water Excellence Award 2008 16.12.2008 13. Phase 1st
:Strengthening of water monitoring systemObjectives Compliance with
environmental legal requirements To improve Environmental
Performance Indicator (EPI) of the plant Regular monitoring of
water consumption Conservation of natural resourcesProject Mission
Installation of water meters at source levelProject Organization
Client:Mr. A. Roy Choudhary, Vice President Project Manager: Mr.
A.K. Srivastava, Manager Engineering Project Member:Mr. S.K.
MazumdarMr S K Mazumdar, HOD Water SupplyMr. Pradeep Singh, HOD
EnvironmentMr. P.K. Bhattacharya, Asst. Officer, WS13 ACC Limited
CII Water Excellence Award 2008 16.12.2008 14. Phase 1st
:Strengthening of water monitoring system Identified Risks in
planning phase Sr. Identified Risks Remedial Actions No.
1.Unavailability of layout drawings (plant established Study and
develop water line layout in the year 1947) 2.Procurement of the
water meters in the time frameAdherence with delivery schedule.
Attributes Action plan Att ib t & A til PlannedActual date
Sr.Accomplished Planned date ofActual date ofActivitydate of of No.
bycommencementcommencementcompletioncompletionStudy of existing lay
outHOD: Water1. and generate requirement 05.04.200505.04.2005
15.04.2005 10.04.2005Supply for water metersProcurement of
water2.HOD: Purchase 15.04.200510.04.2005 30.06.2005 10.08.2005
metersInstallation of waterHOD: Water3.01.07.200512.08.2005
31.07.2005 25.09.2005 meters SupplyEstablishment of system4.4for
daily waterMgr. Engee.Mgr Engee 01.08.200501 08 200501.10.200501 10
2005Cont.Cont Cont. Cont consumption monitoring 14ACC Limited CII
Water Excellence Award 2008 16.12.2008 15. Phase 1st :Strengthening
of water monitoring systemOut come of Team WorkMonitoring of water
consumption started on daily basis.Monitored water consumption was
double than derived from formula onmonthly production
basis.SourceEnd userQuarryAbandonedQuarry PitM (G
Block)ClinkerisationPlant Active Quarry Pit M Captive PC i
PowerPlant Check DamM(River) Floatation PlantAbandonedQuarry Pit
Cement (A Block)MGrinding & Packing PlantDomestic 15 ACC
Limited CII Water Excellence Award 200816.12.2008 16. Phase 2nd
:Recycling of EffluentObjectives To improve life of reject pit To
improve stability of reject pit To improve Environmental
Performance Indicator (EPI) of the plant Conservation of natural
resourcesProject Mission Recycling of Effluent by rerouting of
reject pit discharge to abandoned mine pitProject Organization
Client:Mr. A.K. Srivastava, GM (Tech.) Project Manager: Mr. KRK
Prusty, Manager Mining Project Member:Mr. P.K. Nanda, Jt. Manager
MiningMr. Rajesh Kumar, Jt. Manager MiningMr. Y Kumar, Dy.Mr Y.
Kumar Dy Manager CSR 16 ACC Limited CII Water Excellence Award 2008
16.12.2008 17. Phase 2nd :Recycling of Effluent Identified Risks in
planning phase Sr. Identified Risks Remedial Actions No. 1.During
project bund may be collapsed and lead to Strengthening of bund.
flood in near by areas.Dewatering of reject pit.Attributes &
Action plan PlannedldActual date ld Sr. AccomplishedPlanned date
ofActual date ofActivity date ofof No.by commencementcommencement
completion completionStrengthening of bund by1.Mgr. Mining
gg10.10.2006 07.10.2006 15.11.2006 23.11.2006 dumping overburden
soilDewatering of reject pit2.Mgr. Mining15.11.2006 23.11.2006
30.11.2006 07.12.2006 through diesel pump Laying of pipe with
valvesy gpp & strainer in bund for3. regular dewatering ofMgr.
Mining20.11.2006 27.11.2006 30.11.2006 05.12.2006 clean water
through gravity. Development of natural4. drain for the
recirculationMgr. Mining20.11.2006 29.11.2006 31.01.2007 20.02.2007
of mine discharge water 17ACC Limited CII Water Excellence Award
2008 16.12.2008 18. Phase 2nd :Recycling of Effluent Source End
user Q Quarryy Abandoned Quarry Pit M(G Block) ClinkerisationPlant
Active Quarry Pit MCaptive Power PlantCheck DamM (River) Floatation
oatat o Reject j Abandoned Evaporation/p /Plant Mine Pit Natural
seepage Abandoned Quarry Pit Cement(A Block) M Grinding
&Packing Pl tP kiPlantDomestic18ACC Limited CII Water
Excellence Award 2008 16.12.2008 19. Phase 2nd :Recycling of
Effluent Out come of Team WorkPit life increased by 1
year.Dewatering pump operation not required ( Rs 10 Lakhs/ annum)
Rs.annum).Stability of bund increased.Clean water is being recycled
(approximately 2000 KL per day) in A block pitfor reutilization in
cement plantplant.Water Silica 19ACC Limited CII Water Excellence
Award 2008 16.12.2008 20. Phase 3rd :Zero effluent
dischargeObjectives Conservation of natural resources (water &
energy) Control of water pollution To improve Environmental
Performance Indicator (EPI) of the plantProject Mission To achieve
Zero effluent dischargeProject Organization Client:Mr. I.M. Sharma,
Plant Head Project Manager: Mr. A.K. Srivastava, GM (Tech) Project
Member:Mr. P Singh, Asst. Manager EnvironmentMr.Mr J N Prasad Jt
Manager Civil Prasad, Jt.Mr. Y Singh, Dy. Manager CR-RMMr. M Singh,
Asst. Engineer CR-RMMr. P K Bhattacharya, Asst. Officer WS20 ACC
Limited CII Water Excellence Award 2008 16.12.2008 21. Phase 3rd
:Zero effluent dischargeAttributes & Action planPlanned Actual
date Sr.AccomplishedPlanned date ofActual date ofActivitydate ofof
No. byy commencementcommencementcompletion completionDy. Manager
& Initial Cleaning & Asst. Engr. CR- 1.
12.09.200712.09.200730.09.2007 25.09.2007 Arresting leakages RM,
Asst. MgrEnv. Construction of effluent collectionsump Jt. Mgr.
Civil 2.(1mX1mX1m) to collect Asst.Officer
12.09.200712.09.200730.09.2007 25.09.2007 compressor cooling water
WS & pump installation Revamping of old settling Dy. Manager
& tank and procurement & 3.CR-RM, Jt.
Mgr.01.10.200726.09.200731.01.2008 31.01.2008 installation
ofrecycle Civil pump. Minimising water AsstAsst. Officer
4.consumptioninWet WS, Asst. Engr. 12.09.200712.09.200730.09.2007
30.09.2008 grinding & thickening. CR-RM Recycling effluent in
wet Asst. Mgr Env., grinding & stopping river 5.Asst.Officer
01.02.200801.02.200815.02.2008 15.02.2008 water consumption in the
WS same.21 ACC Limited CII Water Excellence Award 2008 16.12.2008
22. Phase 3rd :Zero effluent discharge SourceEnd user Quarry
Abandoned Quarry Pit M(G Block) ClinkerisationPlant ActiveE Quarry
Pit M Captive PowerPlantSTFF Check DamM L (River) (Ri )Floatation
PlantSTU AbandonedE Quarry Pit Cement((A Block)) M ST N Grinding
&Packing Plant TDomestic 22ACC Limited CII Water Excellence
Award 200816.12.2008 23. Phase 3rd :Zero effluent dischargeOut come
of Team Work Conservation of water (approx. 1000 KL per day)
Conservation of energy energy. Control of pollutionPump installed
to recycle effluent.Pumping facility installed to recycle effluent.
23 ACC Limited CII Water Excellence Award 200816.12.2008 24. HAND
IN HAND - TOGETHER EACH ACHIEVE MORE Thank you for your benign
presence & support y yg p pp 24 ACC LimitedCII Water Excellence
Award 2008 16.12.2008