ABBREVIATIONS
ADB – Asian Development Bank AWP – Australian Water Partnership
CDTA – capacity development technical assistance DMF – design and monitoring framework IIASA – International Institute for Applied Systems Analysis IWRM – integrated water resources management
PATA – policy advisory technical assistance PPTA – project preparatory technical assistance
RETA – regional technical assistance WFPF – Water Financing Partnership Facility WFP – Water Financing Program
NOTES
(i) In preparing any country program or strategy, financing any project, or by making any
designation of, or reference to, a particular territory or geographic area in this document, the Asian Development Bank does not intend to make any judgment as to the legal or other status of any territory or area.
(ii) In this document, "$" refers to US dollars.
WFPF Steering Committee Chair
Governance of the Water Financing Partnership Facility
Ma. Carmela D. Locsin, Director General, Sustainable Development and Climate Change Department (SDCC)
WFPF Steering Committee Members
Sean O’Sullivan, Director General, Central and West Asia Department (CWRD) Ayumi Konishi, Director General, East Asia Department (EARD) Xianbin Yao, Director General, Pacific Department (PARD) Todd Freeland, Director General, Private Sector Operations Department
(PSOD) Hun Kim, Director General, South Asia Department (SARD) James Nugent, Director General, Southeast Asia Department (SERD)
Water Sector Committee Chair
Qingfeng Zhang, Director, Environment, Natural Resources, and Agriculture Division, EARD
Water Sector Committee Members
Akmal Siddiq, Director, Environment, Natural Resources, and Agriculture
Division, CWRD
Anand Chiplunkar, Director, Urban Development and Water Division, CWRD
Sangay Penjor, Director, Urban and Social Sectors Division, EARD
Emma Veve, Director, Urban, Social Development, and Public Management
Division, PARD
Takashi Matsuo, Director, Environment, Natural Resources, and Agriculture
Division, SARD
Sekhar Bonu, Director, Urban Development and Water Division, SARD
Jiangfeng Zhang, Director, Environment, Natural Resources, and Agriculture
Division, SERD
Tatiana Gallego-Lizon, Director, Urban Development and Water Division,
SERD
Facility Manager
Gil-Hong Kim, Senior Director, Sector Advisory Service Division, SDCC
Secretariat Vijay Padmanabhan, Technical Adviser (Urban and Water) Yasmin Siddiqi, Principal Water Resources Specialist, SDCC Alain Baird, Senior Water Supply and Sanitation Specialist, SDCC Michiel de Lijster, Senior Water Resources Specialist, SDCC Ellen Pascua, Consultant, SDCC
Francisco Roble, Consultant, SDCC
Office of Cofinancing Operations (OCO)
Rune Stroem, Head
Sujata Gupta, Director
Toshimasa Dojima, Principal Financing Partnerships Specialist
Kyung Nam (Kevin) Shin, Principal Financing Partnerships Specialist
Ilaria Caetani, Senior Financing Partnerships Specialist
Rikard Elfving, Senior Financing Partnerships Specialist
CONTENTS
I. INTRODUCTION ............................................................................................................. 1
II. 2016 PROJECTED DEMAND FOR RESOURCES .......................................................... 1
III. 2016 AVAILABLE RESOURCES ..................................................................................... 5
IV. PROJECT SELECTION AND PRIORITIZATION ............................................................. 5
V. 2016 ACTIVITIES ............................................................................................................ 6
APPENDIX
1. 2016 Programmed Water Lending 2. 2016 Programmed Project Preparatory Technical Assistance
10 13
3. 2016 Programmed Technical Assistance on Policy Advisory and Capacity Development
4. List of 2016 Priority Projects/Activities Received from Regional Departments
14
15
I. INTRODUCTION
1. This annual work program presents the program of priorities and activities for the Water Financing Partnership Facility (WFPF or "Facility"), as administered by the Asian Development Bank (ADB) on behalf of its financing partners contributing to the Facility, covering the period January to December 2016. Activities are to be financed from the balance of contributions to the Facility’s three trust funds: (i) the Multi-Donor Trust Fund, with contributions from the governments of Australia, Austria, Norway, Spain, and Switzerland; (ii) the Netherlands Trust Fund; and (iii) the Sanitation Financing Partnership Trust Fund. 2. The operation of WFPF in 2016 will continue to be guided by the Water Operational Plan 2011-2020, and the Facility’s Design and Monitoring Framework (DMF) as revised following the 2015 external evaluation.
II. 2016 PROJECTED DEMAND FOR RESOURCES
A. Direct Project Support 3. About 70% of the Facility’s resources is intended for direct project support to allow WFPF to support the development of investment projects as well as implementation of on-going ones. There are two ways by which direct project support is provided:
Support to investment projects through grant component of loans and technical assistance (TA) attached to loans.
Support to project preparation and implementation through cofinancing of project preparation technical assistance (PPTAs) or financing of other project development and implementation activities through the direct charge modality.
4. The Water Financing Program is well on track towards meeting the investment targets for Phase 2 (2011-2020) at $2.0-$2.5 billion annually or a total of $20-$25 billion by 2020, building on the achievement under Phase 1 (2006-2010). Table 1 presents the summary of approved investments for the period 2011-2015.
Table 1: 2011-2015 Approved Water Investments (in Billion)
Water Financing Program Investment Areas
2011 2012 2013 2014 2015 Total
Water Supply, Sanitation and Wastewater Management
1.37 0.92 1.47 1.34 1.38 6.48
Irrigation and Drainage 0.68 0.36 0.44 0.33 0.19 2.00
Flood Management 0.08 0.15 0..25 0.19 0.34 1.00
Water Resources Management, Wetlands and Watershed Protection
0.09 0.40 0.13 0.17 0.28 1.07
Hydropower Generation 0.41 0.52 0.18 0.46 0.07 1.64
Total 2.63 2.35 2.47 2.48 2.26 12.19
Support to Investment Projects
5. The 2016 programmed investments currently stand at $3.902 million, about the same as in 2015 at $3.908 billion.
2
6. The breakdown of programmed investments by sub-sector and by region is provided in Tables 2 and 3 below and the list of projects is presented in Appendix 1.
Table 2: 2016 Programmed Water Investments
by Sub-Sector (in Million)
Sub-Sector Amount
Water Supply, Sanitation and Wastewater Management 2,249
Irrigation and Drainage 572
Flood Management 555
Water Resources Management, Wetlands, and Watershed Protection 426
Hydropower Generation 100
Total 3,902
Table 3: 2016 Programmed Water Investments by
Region (in Million)
Region Amount
Central and West Asia 776
East Asia 729
Pacific 40
South Asia 1,466
Southeast Asia 891
Total 3,902
7. The approval ratio in 2015 went down to 57% from 68% in 2014. Assuming an approval ratio of 60% in 2016, the projected approvals for the year would be around $2.341 billion, thus meeting the $2.0 billion annual target. 8. The 2016 programmed investments provide an indication of the likely demand for grant component of loans and TA attached to loans. In terms of grant component of loans, the Facility will continue to take a cautious approach because of slow implementation associated with this modality. However, support to TAs attached to loans can continue to be considered. Already as of this writing, an application for TA attached to one of the loans included in the 2016 programmed investments is under evaluation for the 31 January 2016 submission deadline. The proposed TA addresses management and reuse of sludge in Mongolia1 and is targeted for Board approval in April 2016. Support to Project Preparation 9. A total of $ 13.595 million in PPTAs is programmed for 2016 which is a significant drop from $18.0 million in 2015. The breakdown is summarized by sub-sector and by region in Tables 4 and 5 below and the list of projects is provided in Appendix 2.
1 Mongolia: TA Attached to Loan-Additional Financing for Southeast Gobi Urban and Border Town
Development Project (Management and Reuse of Sewage Sludge from On-Site Sanitation Facilities and Decentralized Wastewater Treatment Plants).
3
Table 4: 2016 Programmed PPTA by Sub-Sector (in ‘000)
Sub-Sector Amount
Water Supply, Sanitation and Wastewater Management 6,250
Irrigation and Drainage 2,245
Flood Management 200
Water Resources Management, Wetlands, and Watershed Protection 1,000
Hydropower Generation 3,900
Total 13,595
Table 5: 2016 Programmed PPTA by Region (in ‘000)
Region Amount
Central and West Asia 6,260
East Asia 1,300
Pacific 285
South Asia 600
Southeast Asia 5,150
Total 13,595
10. The programmed PPTAs provide an indication of likely demand for additional funding to top-up PPTA budget and direct charges to support other project preparation activities. Included in the applications for the 31 January 2016 submission deadline currently being processed is a request for topping up the PPTA budget for a $300 million multitranche financing for an urban development project in Bangladesh to address sanitation, sewerage, drainage and flood management. Program Quality Support Window 11. About 30% of the Facility’s resources are intended for program quality support. WFPF will continue to support reforms and capacity development through policy advisory TAs (PATA), and capacity development TAs (CDTA). Tables 6 and 7 below summarize the 2016 programmed PATAs and CDTAs by sub-sector and by region and detailed in Appendix 3.
Table 6: 2016 Programmed TAs Supporting Program Quality by Sub-Sector (in ‘000)
Sub-Sector PATA CDTA Total
Water Supply, Sanitation and Wastewater Management
400 3,295 3,695
Irrigation and Drainage 0 00
Flood Management 0 00
Water Resources Management, Wetlands, and Watershed Protection
150 3,240 3,390
Hydropower Generation 0 400 400
Total 550 6,935 7,485
4
Table 7: 2016 Programmed TAs Supporting Program Quality
by Region (in ‘000)
Region PATA CDTA Total
Central and West Asia 150 2,740 2,890
East Asia 400 0 400
Pacific 0 0 0
South Asia 0 2,975 2,975
Southeast Asia 0 720 720
Regional 0 500 500
Total 550 6,935 7,485
12. The programmed PATAs and CDTAs provide an indication of likely demand for additional resources from the Facility to continue supporting policy reforms and capacity development. The applications for 31 January 2016 submission deadline include a request to top-up an on-going CDTA on water supply and sanitation strategy in Uzbekistan which seeks to improve delivery of rural water supply and sanitation services. Demand for Funding from User Departments 13. As in previous years, the user departments provided the Facility Secretariat with their expected demand for WFPF resources in 2016 guided by the knowledge that available resources are extremely limited. Table 8 below summarizes the expected demand and Appendix 4 provides the details.
Table 8: 2016 Expected Demand for Funding from User Departments
Regional Department
Amount
Project Support
Program Quality
Total
Central and West Asia Department 0 250,000 250,000
East Asia Department 1,380,000 310,000 1,690,000
Pacific Department 200,000 75,000 275,000
South Asia Department 542,500 527,500 1,070,000
Southeast Asia Department 2,910,000 135,000 3,045,000
Inter-Regional 0 0 0
Total 5,032,500 1,297,500 6,330,000
14. This year’s level of expected demand is only about 60% of the 2015 level which reflects the user departments recognition of the need to scale down the resources they expect to obtain from WFPF considering the limited balance left. 15. The detailed information on expected demand provided in Appendix 4 includes the proposed source of fund to allow a quick assessment of demand versus available resources from each of the trust funds. The result is summarized in Table 9 below.
5
Table 9: Distribution Per Trust Fund of 2016 Expected Demand for Funding
WFPF Trust Fund Expected Demand
Multidonor Trust Fund 1,760,000
Netherlands Trust Fund 1,170,000
Sanitation Financing Partnership Trust Fund 3,400,000
Total 6,330,000
III. 2016 AVAILABLE RESOURCES
16. Based on the WFPF Secretariat tabulation, the balance available for new allocation in 2016 is $8.791 million as summarized in Table 10 below.
Table 10: Summary Available Resources as Tabulated by the WFPF Secretariat (in $ Million)
Financing Partners
Resources Available Allocated
Uncommitted Balance Committed
Interest Income
Total Projects/ Activities
Fees and
Charges Total
Multi-Donor Australia Austria Norway Spain Switzerland
52.049 24.209 8.468 4.669 9.500
a
5.203
0.690 52.739 49.709 2.210 51.919 0.820
Netherlands 34.753 0.195 34.948 31.472 1.337 32.809 2.139
Sanitation 15.000 0.017 15.017 8.773 0.412 9.185 5.832
Total 101.802 0.902 102.704 89.954 3.959 93.913 8.791 a Net of $0.5 million earmarked for water expert.
17. The $2.139 million available under the Netherlands Trust Fund are earmarked for specific countries2, while the $5.832 million under the Sanitation Financing Partnership Trust Fund are only intended for supporting non-sewered sanitation and septage management. For all other proposals not eligible under those two trust funds, only the $0.820 million balance under the multidonor trust fund may be accessed.
IV. PROJECT SELECTION AND PRIORITIZATION
18. The target allocation ratio of about 70% for project support and about 30% for program quality will continue to serve as the overarching guide in allocating resources in 2016 although it has been made clear to user departments that direct project support will be given priority to allow the Facility to continue to help sustain, and further increase where possible, the investment level, as well as support project implementation to help improve portfolio performance and accelerate delivery of results on the ground. The Facility has been able to stay well within this target ratio with cumulative allocations to date translating to a ratio of 73%-27%.
2 Afghanistan, Bangladesh, Indonesia, Myanmar, and Viet Nam
6
19. The selection and prioritization of projects will also continue to be guided by the Facility’s newly revised DMF, along with geographic and thematic priorities of financing partners, and the specific priority thrusts set out in the Water Operational Plan 2011-2020.
20. Furthermore, the Facility will have to continue playing a key role in disseminating key messages and sharing good practices to keep water high on the development and political agenda of DMCs. The Asian Water Development Outlook which has been supported by the Facility has helped raise awareness on the urgency of addressing the region’s water security.
V. 2016 ACTIVITIES
21. Completion of the Midterm Review of ADB’s Water Operational Plan 2011-2020. The report on the midterm review of the Water Operational Plan was targeted to be completed in December 2015. However, in view of the emerging findings from the on-going Asia Water Futures and Solutions and Asian Water Development Outlook 3rd edition which have implications on the Water Operational Plan implementation, it was decided that the completion of the report be deferred until the first half of 2016 when the findings and recommendations from the two analytical work are already firmed up. 22. ADB-Financing Partners 9th Annual Consultation Meeting. The 9th Annual Consultation Meeting between ADB and financing partners is scheduled at the ADB Headquarters on 15-16 March 2016.
23. 2nd Asian Irrigation Forum 2015. The 2nd Asian Irrigation Forum was postponed from November 2015 to January 2016. As of this writing, the Forum has already been concluded. The number of participants reached a total of 232. WFPF financing partners - Australia and the Netherlands - participated and played an active role. Australia, through the Australian Water Partnership was one of ADB’s convening partners, along with the Food and Agriculture Organization (FAO) and the International Water Management Institute (IWMI). 24. Preparation of Asian Water Development Outlook 3rd Edition. The preparation is proceeding on schedule. The launch is scheduled in August at the Stockholm World Water Week as part of the ADB-led Eye on Asia Day. 25. Asia Water Futures and Solutions. The completion of this study which is being undertaken together with the International Institute for Applied Systems Analysis (IIASA) is being pushed back slightly in view of the need to harmonize the key messages with those of the Asian Water Development Outlook. Both reports recognize that clear and well targeted messaging would be key to securing high level support to addressing water security in the region.
26. Water accounting in pilot basins. Water accounting provides comprehensive information on the quantum and users of water resources. These are based on a coherent and consistent methodology that quantifies hydrological processes, water storage, base flow, distribution of water to various competing sectors, the consumption of water and the benefits and services - that result from consumption and the return flow of non-consumed water. 27. ADB will adopt the Water Accounting Plus (WA+) framework developed by UNESCO-IHE, IWMI and FAO. This provides information on water storage and flows for a variety of land use systems. The framework focuses on the use of publicly accessible remote sensing data from the National Aeronautics and Space Administration and European Space Agency. These include data for precipitation, water surface areas, land use etc.
7
28. Initial work has already begun in one pilot basin (the Tu Bon river basin) in Viet Nam in 2015. A similar undertaking is planned to commence in early 2016 in one river basin in Madhya Pradesh in India. The water accounting in Viet Nam will be a supplementary to the draft country water assessment. It will provide a detailed understanding of the overall water resources status, and how much is being used (and returned to the basin) by various users like industry and agriculture. As of this writing, discussions are underway to also include Cambodia in this undertaking. 29. Water productivity measurement and training. Water productivity is generally defined as crop yield per cubic meter of water consumption or more popularly expressed as “more crop per drop”. ADB projects on agricultural water management should lead to increased production. While most ADB financed projects target improved agriculture productivity (how many kilograms of crop produced per hectare), we have little understanding of the volume of water used to produce the crop. This is where water productivity (how many kilograms of crop produced per cubic metre of water) provides a much better measure of improved water use, or how much "crop per drop". It is therefore critical to know the status of water productivity at the start and at the end of each project. There is a large gap in the understanding of the concept of water productivity at various levels, and how to measure and implement it. 30. Water productivity measurement will commence in early 2016 on specific irrigation schemes in India, Indonesia, Sri Lanka, Pakistan, Uzbekistan and Viet Nam. The assessment forms part of a capacity building program aimed at enhancing the capacity of ADB staff and developing member countries (DMCs) on the concepts of crop water productivity. DMCs will also be trained on the use of remote sensing technologies to compute crop water productivity on a field-to-field basis, followed by a diagnosis of good and poor performing fields, as well as the determination of target values. A water productivity diagnosis of selected irrigation projects in these countries will be provided. This undertaking is expected to be completed by 2017.
31. Resource Mobilization. A more aggressive resource mobilization has been under
discussion within the Secretariat. Scarcity of cash is acknowledged. The 2015 Annual Report
makes mention of ADB’s recent Memorandum of Understanding with the newly established
Australian Water Partnership (AWP). This collaboration will allow ADB to gain access to about
AUD 1.0 million annually that AWP will mobilize to support an agreed set of activities. This
provides an example of how additional resources may be mobilized if replenishment of cash
contributions is far from being realized either from existing or new financing partners. Moreover,
the Secretariat is working closely with the Office of Cofinancing (OCO) in its outreach to private
foundations using as example the success of WFPF in securing contributions from the Gates
Foundation. Roadshow presentations are currently planned between the second and third
quarter of 2016 and participation by Gates Foundation in some of the presentations is being
worked out by the Secretariat.
32. Knowledge Sharing Events. Organization of and participation in several international
events will form part of ADB’s major activities in 2016. The year started with the 2nd Asian
Irrigation Forum in January. Other major events planned for the year include: (i) Asia Water
Council (March), (ii) Asia-Netherlands Water Learning Week (June), (iii) Singapore International
Water Week (July), (iv) Stockholm World Water Week (August), (v) International River
Symposium (September), (vi) World Water Congress (October), (vii) World Irrigation Forum
(November), and (viii) ADB-Australia Water Learning Week (November). The Stockholm World
Water Week which features the ADB-led Eye on Asia Day will include the launch of the Asian
Water Development Outlook 3rd edition.
8
33. 2016 Detailed Activities on WFPF Operation. The detailed activities in 2016 with respect to the operation of the Facility are presented in Table 11 below.
Table 11: Detailed Activities on WFPF Operation in 2016
Facility Activity Output Outcome
1. Screening and evaluation of applications for funding
Finance at least $4.2 million in PPTAs, grant component of investment, TAs attached to loans, and direct charges that support project development
Finance at least $1.8 million in TAs and direct charges supporting reforms and knowledge and capacity development
Note: Proposed allocations are based on the 70%-30% ratio
$1 M allocation for PPTAs $1.2 million allocation for TA attached to loan $2.0 million allocation for direct charges $1.0 million allocation for PATAs and CDTAs $0.8 million allocation for direct charges
At least 5 million additional people are leveraged from WFPF-supported investment projects. Policy and institutional reform measures set in motion Improved capacity of sector organizations
2. Approval of eligible applications
Applications for TAs approved by WFPF Steering Committee within a maximum period of 15 working days Application for direct charges approved by the Facility Manager within 7 working days
Timely approval of WFPF allocations that meet the overall project processing timetable
3. Implementation and Monitoring Notice of approval released to proponents within 2 working days after Steering Committee or Facility Manager approval Disbursements monitored and disbursement schedule updated regularly in coordination with project officers and Controllers Department Compliance with 70%-30% ratio between project support and program quality support tracked Closure of accounts for direct charges facilitated after release of final payments Progress reports and work program submitted to financing partners based on agreed
WFPF efficiently managed and client responsiveness sustained
9
Facility Activity Output Outcome
timetable
4. Continuing knowledge sharing and information dissemination on WFPF results
Updates on the Facility disseminated to user departments regularly WFPF marketing material updated as needed
WFPF progress disseminated and results shared Increase in number of financing partners
10
Appendix 1
2016 PROGRAMMED WATER LENDING (Amount in $ Million)
Country Project
Number Project Name Estimated
Total Loan Amount
Estimated Water
Component
CENTRAL AND WEST ASIA
Afghanistan 48042-001 Panj-Amu Basin Project 13.00 13.00
Armenia 46220-006 Infrastructure Sustainability Support Program
60.00 20.00
Azerbaijan 42408-044 Water Supply and Sanitation Investment Program - Tranche 4
75.00 75.00
Georgia 43405-028 Urban Services Improvement Investment Program - Tranche 6
99.00 99.00
Kyrgyz Republic 49013-002 Toktogul Hydropower Plant Phase 3 110.00 99.00
Kyrgyz Republic 41548-024 Issyk-Kul Sustainable Development Project Additional Financing
30.00 30.00
Pakistan 47024-004 Pehur High Level Canal Extension (formerly: Khyber Pakhtunkhwa Water Resources Project)
90.00 20.00
Pakistan 46526-003 Punjab Intermediate Cities Improvement Investment – Tranche 1
80.00 77.60
Pakistan 46528-002 Punjab Irrigation 200.00 197.00
Tajikistan 47181-002 Water Resources Management in Pyanj River Basin
25.00 25.00
Uzbekistan 46135-004 Tashkent Region Water Supply System Development Project
120.00 120.00
Total Central and West Asia 902.00 775.60
EAST ASIA
Mongolia 42184-025 Southeast Gobi Urban and Border Town Development Project (additional financing)
19.48 19.48
PRC 46080-002 Jiangxi Xinyu Kongmu River Watershed Flood Control and Environmental Improvement
150.00 150.00
PRC 47047-002 Shandong Groundwater Allocation and Protection Project
150.00 150.00
PRC 47069-002 Henan Hebi Qihe River Basin Environment Improvement & Ecological Conservation
150.00 150.00
PRC 47071-002 Fujian Farmland Sustainable Utilization and Demonstration
100.00 35.00
PRC 48036-002 Xinjiang Kelamayi Ecological Forest Infrastructure
100.00 75.00
PRC 48102-002 Qinghai Haidong Urban Rural Eco Development
150.00 150.00
Total East Asia 819.48 729.48
PACIFIC
Timor Leste 47364-002 Urban Services Improvement Sector Project Water Supply and Wastewater Management Project
40.00 40.00
Total Pacific 40.00 40.00
11
Country Project Number
Project Name Estimated Total Loan
Amount
Estimated Water
Component
SOUTH ASIA
Bangladesh 47254-003 Dhaka Water Supply Network Improvement
250.00 250.00
Bhutan 44240-014 Urban Infrastructure Development Additional Financing
4.26 3.96
India 38412-033 Assam Integrated Flood & Riverbank Erosion Risk Mgt Investment Program-Tranche 2
70.10 70.10
India 40156-033 MFF - Sustainable Coastal Protection and Management Investment Program - Tranche 2
75.00 75.00
India 41603-024 Bihar Urban Development Investment Program - Tranche 2
80.00 80.00
India 42265-025 Assam Urban Infrastructure Investment Program - Tranche 2
139.00 139.00
India 47176-002 Delhi Water Supply Improvement Investment Program
200.00 200.00
India 43253-027 Karnataka Integrated Urban Water Management Investment Program - Tranche 2
75.00 75.00
India 44429-013 Climate Adaptation in Vennar sub-basin of Cauvery Delta
100.80 100.80
India 45371-003 Support for National Water Use Efficiency Improvement Support Program
15.00 15.00
India 48434-003 Visakhapatnam-Chennai Industrial Corridor Devt Program-Tranche 1
250.00 45.00
India 48434-005 Visakhapatnam-Chennai Industrial Corridor Devt Program-Tranche 2
125.00 22.50
India 48229-003 Innovative Municipal Financing Facility for India
250.00 250.00
Sri Lanka 47381-005 Mahaweli Water Security Investment Program – Tranche 2
130.00 130.00
Sri Lanka 42459-000 Local Government Enhancement Sector Project-Additional Financing
40.00 9.80
Total South Asia 1,804.16 1,466.16
SOUTHEAST ASIA
Indonesia 35182-043 Flood Management in Selected River Basins Sector Project
108.70 108.70
Myanmar 48175-002 Third GMS Corridor Towns Development Project
83.00 83.00
Myanmar 47152-002 Irrigation Command Area Development Project
75.00 75.00
Philippines 41665-013 Water District Development Sector Project
60.00 60.00
Philippines 46362-002 Angat Water Transmission Improvement Project
123.30 123.30
Philippines 48173-003 Metro Manila Water and Sanitation Development Project
100.00 100.00
Viet Nam 49404-002 Water Efficiency Improvement in Drought Affected Provinces
100.00 100.00
Viet Nam 47274-002 Secondary Cities Development Program 170.00 140.00
12
Country Project Number
Project Name Estimated Total Loan
Amount
Estimated Water
Component
(Green Cities)
Viet Nam 47276-001 Green Cities Project (Secondary Cities Development Program 2)
120.00 100.80
Total Southeast Asia 940.00 890.80
2016 TOTAL PROGRAMMED LENDING 4,505.64 3,902.04
13
Appendix 2
2016 PROGRAMMED PROJECT PREPARATION TAs (PPTAs) (Amount in $’000)
Country Project Name Total TA
Support Amount (Water
Component) CENTRAL AND WEST ASIA
Afghanistan Preparing the Helmand River Basin Project 800.00 560.00
Armenia Water Supply and Sanitation Improvement 800.00 800.00
Azerbaijan Second Water Supply and Investment Program 1,000.00 1,000.00
Kazakhstan Integrated Urban Development (Kyzyl-Orda Region) 800.00 800.00
Pakistan MFF Hydro Development Investment Program 1,500.00 1,500.00
Pakistan Punjab Irrigation Project 600.00 600.00
Uzbekistan Water Resources Management Sector Project Phase 2
1,000.00 1,000.00
Total Central and West Asia 6,500.00 6,260.00
EAST ASIA
PRC Guizhou High Efficiency Water Utilization Demonstration in Rocky Desertification Area
570.00 285.00
Total East Asia 570.00 285.00
PACIFIC
Vanuatu Port Vila Urban Development Project 600.00 600.00
Vanuatu Urban Development Project 1,000.00 700.00
Total Pacific 1,600.00 1,300.00
SOUTH ASIA
Bangladesh Preparing Dhaka Urban Environmental Improvement
400.00 400.00
Bangladesh Preparing the City Region Investment Program 400.00 200.00
Total South Asia 800.00 600.00
SOUTHEAST ASIA
Indonesia Preparing City-wide Sanitation Investment Program 1,500.00 1,500.00
Indonesia Preparing the Sumatra Pump Storage Hydro Power Project
2,400.00 2,400.00
Regional Second Greater Mekong Subregion Tourism Infrastructure for Inclusive Growth Project
1,500.00 450.00
Viet Nam Water Efficiency Improvement in Drought Affected Provinces
800.00 800.00
Total Southeast Asia 6,200.00 5,150.00
TOTAL PROGRAMMED PPTAs 15,670.00 13,595.00
14
Appendix 3
2016 PROGRAMMED CAPACITY DEVELOPMENT TAs (CDTAs)
AND POLICY ADVISORY TAs (PATAs) (Amount in $’000)
Country TA Title Total TA
Support Amount (Water
Component)
CENTRAL AND WEST ASIA
Afghanistan CDTA: Policy Support in Natural Resources 800.00 240.00
Pakistan CDTA: Institutional Transformation Punjab Irrigation to Water Resources Department
1,500.00 1,500.00
Pakistan PATA; Third Party Monitoring for FATA Water Resources
150.00 150.00
Regional CDTA: Enhancing Integrated Water Resources Management in the Aral Sea Basin
1,000.00 1,000.00
Total Central and West Asia 3,450.00 2,890.00
EAST ASIA
PRC PATA: Han River Source of Drinking Water Ecological Environment Protection Strategy Research in the Hubei Xiangyang City Central Area
400.00 400.00
Total East Asia 400.00 400.00
SOUTH ASIA
Bangladesh CDTA: Strengthening Capacity of City Corporation (earlier Comprehensive Development of City Governments)
1,000.00 700.00
India CDTA: Visakhapatnam-Chennai Industrial Corridor Development Program
750.00 225.00
Nepal CDTA: Far Western Region Urban Development Project
1,000.00 650.00
Nepal CDTA: Hydroelectricity Financing Facility 350.00 350.00
Nepal CDTA: Nepal Hydropower Forum Small Scale Technical Assistance
50.00 50.00
Sri Lanka CDTA: Additional Financing for Jaffna Kilinochi Water Supply Project
1,000.00 1,000.00
Total South Asia 4,150.00 2,975.00
SOUTHEAST ASIA
Cambodia CDTA: Mainstreaming Climate Resilience into Development Planning
3,000.00 720.00
Total Southeast Asia 3,000.00 720.00
REGIONAL
Regional CDTA: Knowledge and Innovation Support for ADB's Water Financing Program
500.00 500.00
Total Regional 500.00 500.00
TOTAL PROGRAMMED CDTAs, PATAs, RDTAs 11,500.00 7,485.00
15
Appendix 4
LIST OF 2016 PRIORITY PROJECTS/ACTIVITIES RECEIVED FROM USER DEPARTMENTS FOR WFPF FUNDING
Regional
Department Country Project/Activity Modality Amount Proposed
Fund Source
Central and West Asia
Afghanistan Support to water resources management – investments and reforms
TBD 200,000
Netherlands Trust Fund
Kyrgyz Republic
CDTA: Water Supply and Sanitation Strategy
TA 50,000 Multidonor Trust Fund
Total Central and West Asia 250,000
East Asia Mongolia Loan: Additional Financing for Souteast Gobi Urban and Border Town Development Project
TA Attached to Loan
1,000,000 Sanitation Trust Fund
Mongolia Strengthening Community Resilience to Dzud and Forest and Steepe Fires
Grant component of
loan
30,000 Multidonor Trust Fund
Mongolia Mongolia Country Water Security Assessment
Direct Charge 60,000 Multidonor Trust Fund
PRC Loan: Xinjiang Hetian Comprehensive Urban Development and Environmental Improvement
Grant Component of
Loan/TA Attached to
Loan
100,000 Multidonor Trust Fund
PRC Loan: Yunnan Lincang Border Economic Cooperation Zone Infrastructure Comprehensive Development
Grant Component of
Loan/TA Attached to
Loan
100,000 Multidonor Trust Fund
PRC PPTA 9072-PRC: Guizhou High Efficiency Water Utilization Demonstration in Rocky Desertification Area Project
TA top-up 50,000 Multidonor Trust Fund
PRC PPTA 8879-PRC: Heilongjiang Jiamusi Irrigation System Modernization Project
Direct Charge 50,000 Multidonor Trust Fund
PRC PPTA Jiangxi Xinyu Kongmu River Watershed Flood Control and Environmental Management Project
Direct Charge 50,000 Multidonor Trust Fund
PRC TA-PRC: Study on Natural Resources Appraisal System for National Key Ecological Function Zones (2016)
TA top-up 200,000 Multidonor Trust Fund
PRC PRC Country Water Assessment Direct charge 50,000 Multidonor Trust Fund
Total East Asia 1,690,000
Pacific Pacific Countries
Pacific Water Conference and Expo 2016
Direct Charge 75,000 Multidonor Trust Fund
Tonga PPTA: NIUDSP III PPTA TA 200,000 Multidonor Trust Fund
16
Regional Department
Country Project/Activity Modality Amount Proposed Fund Source
Total Pacific 275,000
South Asia Bangladesh PPTA: City Region Economic Development Investment Program
TA 212,500 Netherlands Trust Fund
Bangladesh Support to Participatory Water Resources Planning and Management Knowledge Transfer in the Southwest Region
Direct Charge 100,000 Netherlands Trust Fund
Bangladesh Preparation of Technical Note on Existing and Planned Water-related Projects and Programs
Direct Charge 112,500 Netherlands Trust Fund
India Support to Developing Institutional Strengthening Plan for the Assam Water Center
Direct Charge 190,000 Multidonor Trust Fund
India Capacity building for MPEIP improved project implementation start -up
Direct Charge 80,000 Multidonor Trust Fund
Nepal Support to the preparation of Bagmati River Basin Improvement Project (AF)
Direct Charge 150,000 Multidonor Trust Fund
Sri Lanka CDTA: Increasing water productivity of rural irrigation cascades through effective use of groundwater and surface water
TA 225,000 Multidonor Trust Fund
Total South Asia 1,070,000
Southeast Asia
Cambodia Country Water Assessment Direct Charge 100,000 Multidonor Trust Fund
Indonesia Scoping of the proposed 2018 Water Security Investment Program
Direct Charge 160,000 Netherlands Trust Fund
Indonesia Updating of the irrigation asset management software
Direct Charge 35,000 Netherlands Trust Fund
Myanmar Support to IWRM in the dry zone Direct Charge 225,000 Netherlands Trust Fund
Myanmar Project Design Advance for Third GMS Corridor Towns Development Project
Direct Charge 125,000 Netherlands Trust Fund
Viet Nam CDTA: Pilot Implementation of Innovative Sanitation and Septage Management: Support to the design of proposed MFF loan for wastewater
TA 2,400,000 Sanitation Trust Fund
Total Southeast Asia 3,045,000
Total 6,330,000 CDTA = Capacity Development TA, PPTA = Project Preparation TA