Version: January 27, 2017‐ APPROVED Pittsburgh Water and Sewer Authority 20172021 Capital Improvement Program  (CIP) 
66

Water and Sewer Authority Improvement Programapps.pittsburghpa.gov/pwsa/2017-2021_CIP_1.2017.pdf · 2017-04-19 · Sustainability – Energy efficiency and “green” approach to

Jun 08, 2020

Download

Documents

dariahiddleston
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: Water and Sewer Authority Improvement Programapps.pittsburghpa.gov/pwsa/2017-2021_CIP_1.2017.pdf · 2017-04-19 · Sustainability – Energy efficiency and “green” approach to

Version: January 27, 2017‐ APPROVED 

Pittsburgh Water and Sewer Authority 

2017‐2021 Capital Improvement Program  (CIP) 

Page 2: Water and Sewer Authority Improvement Programapps.pittsburghpa.gov/pwsa/2017-2021_CIP_1.2017.pdf · 2017-04-19 · Sustainability – Energy efficiency and “green” approach to

This page was intentionally left blank 

Page 3: Water and Sewer Authority Improvement Programapps.pittsburghpa.gov/pwsa/2017-2021_CIP_1.2017.pdf · 2017-04-19 · Sustainability – Energy efficiency and “green” approach to

Page 1  

TableofContentsIntroduction ............................................................................................................................................................... 2 

Capital Improvement Program .................................................................................................................................. 2 

Overview ................................................................................................................................................................ 2 

Development and Approval Process ...................................................................................................................... 2 

Capital Project Prioritization .................................................................................................................................. 3 

Funding Sources ..................................................................................................................................................... 3 

Capital Improvement Plan Organization ............................................................................................................... 3 

2017 to 2021 Capital Improvement Program Summary ............................................................................................ 5 

Page 4: Water and Sewer Authority Improvement Programapps.pittsburghpa.gov/pwsa/2017-2021_CIP_1.2017.pdf · 2017-04-19 · Sustainability – Energy efficiency and “green” approach to

Page 2  

Introduction

In February 1984, the City of Pittsburgh (City) established The Pittsburgh Water and Sewer Authority (PWSA) under the provisions of the Commonwealth of Pennsylvania. The City charged the PWSA with the responsibility of carrying out a major Capital Improvements Program (CIP) designed to refurbish the infrastructure of the entire water system, including the water treatment plant and distribution system. This project was to ensure that the water system met the rapidly expanding water quality requirements of the federal and state Safe Drinking Water Acts. 

In 1995, PWSA also became responsible for producing and supplying the water for City of Pittsburgh residents and maintaining and operating the water distribution system. Then, in 1999 PWSA became responsible for operating and maintaining the entire City of Pittsburgh sewer system. 

Today, PWSA provides quality water and quality services to approximately 83,000 customers throughout the City of Pittsburgh.  PWSA operates and maintains a 117 million gallons per day (MGD) rapid sand type treatment plant, a 26 MGD microfiltration plant, approximately 1,000 miles of water mains, over 25,000 valves and 7,400 fire hydrants, 1 raw water pump station, 10 finished water pump stations, 4 in‐ground reservoirs, 13 storage tanks (2 of which are above‐ground reservoirs), approximately 1,220 miles of sanitary, storm, and combined sewers, 29,000 manholes, 27,000 catch basins and inlets, 38 Combined Sewer Overflow (CSO) outfalls, 185 storm outfalls, and four wastewater pump stations. 

PWSA's vision is to provide water and wastewater services that meet or exceed regulations and customer expectations at the lowest possible cost. 

CapitalImprovementProgram

Overview 

PWSA's Capital Improvement Program focuses on sustaining cost‐effective operations, while optimizing the system's asset performance and life expectancy.  The 2017‐2021 Capital Improvement Program invests in programs which consider risk and consequence of asset failure and levels of service benefits. 

Development and Approval Process 

PWSA’s CIP process begins each year in January when project nominations are solicited from the entire organization.  At the completion of the nomination period, the Planning Department screens and evaluates the nominated projects using a predefined scoring system and recommends which projects should be considered for further planning.  Further planning efforts consist of the preparation of a Project Sheet, which provides more detailed information on a project’s potential scope options, risks, schedule, and the development of a preliminary cost estimate.  This process lasts several months and culminates with the presentation of the updated CIP to PWSA’s Board of Directors. 

Page 5: Water and Sewer Authority Improvement Programapps.pittsburghpa.gov/pwsa/2017-2021_CIP_1.2017.pdf · 2017-04-19 · Sustainability – Energy efficiency and “green” approach to

Page 3  

Projects that are not selected for execution at any stage will be re‐assessed during the next year’s CIP development process. 

Capital Project Prioritization 

Due to funding limitations and the need to renew/replacing a significant amount of aging infrastructure, the following criteria are used to evaluate and prioritize capital projects: 

Safety ‐ Potential health and safety risks to personnel and the public if action is not taken Regulatory Compliance – Regulatory compliance schedule and potential fines for non‐compliance Reliability/Operational Flexibility – Location, age, and condition of infrastructure and risk if action is not

taken Capacity – Meets community health needs and growth, as needed Operations and Maintenance Efficiency – Potential for operating cost savings Regional Cooperation/Stewardship – Coordination with external stakeholders or meeting the

communities needs Level of Service – Improvement to customer service Sustainability – Energy efficiency and “green” approach to improving water quality

Funding Sources 

The PWSA Capital Improvement Program is funded through several primary sources to which specific programs and projects are allocated. These funding sources include, but are not limited to, PWSA Future Capital Bond Authorizations, cost shares with other utilities, and grants.  PWSA is dedicated to identifying and pursuing funding from all potential sources to offset planned capital investments. 

Capital Improvement Plan Organization  

The CIP is organized into seven project classes (types): 

Water Treatment Plant Water Pumping and Storage Water Distribution System, which includes lead service line replacements Wastewater System Stormwater System Green Infrastructure Miscellaneous

Each project class is then made up of individual projects.  Projects are defined based upon current information, which range from annual allowances for asset renewal and/or replacement activities, to major, multiple phase facility renewal projects. 

Page 6: Water and Sewer Authority Improvement Programapps.pittsburghpa.gov/pwsa/2017-2021_CIP_1.2017.pdf · 2017-04-19 · Sustainability – Energy efficiency and “green” approach to

Page 4  

The following information is provided for each project: 

Project Class – Type of project. 

Project Name – Descriptive name assigned to the project. 

Project No. – Unique number assigned to track the project from inception to completion. This number is established once a project is approved. 

Neighborhood/Ward – Project location(s) based on the City of Pittsburgh’s Geographical Information System (GIS). 

Status – Phase in the project life‐cycle (i.e. assessment/design/construction). 

Priority – Criteria utilized to prioritize the project. 

Project Description ‐ A basic understanding of the project’s intent and scope of work. 

Project Justification ‐ A detailed explanation to why the project is needed. 

Risk(s) ‐ Outlines the risk(s) to PWSA if the project is delayed or is not selected. 

Impact on Operations – Describes the anticipated impact to PWSA’s operations when the project is completed. 

Alternatives to the Recommended Action – Lists the alternatives that were considered or evaluated. 

Funding Source(s) – Proposed funding source(s) for the project. 

Commitment Schedule – Preliminary award schedule for the project in thousands of dollars. 

Cash Flow Summary – Preliminary cash flow for the project in thousands of dollars. 

Note: Costs shown are concept level costs, including contingencies, and are based on previous reports, CIPs, or similar type projects, and are subject to change as the projects are more completely assessed through the project phases.  Construction costs shown are escalated from the estimated midpoint of construction, at 3% per year, and include allowances for construction management and inspection and design services during construction.  Design costs shown are based on pre‐defined percentages based on the estimated construction cost. 

Page 7: Water and Sewer Authority Improvement Programapps.pittsburghpa.gov/pwsa/2017-2021_CIP_1.2017.pdf · 2017-04-19 · Sustainability – Energy efficiency and “green” approach to

Page 5  

2017to2021CapitalImprovementProgramSummary

The charts below illustrate the proposed breakdown of the project classes and yearly cash flows for the 2017 to 2021 CIP.  Costs shown are in Millions. 

2017‐2021 Proposed Capital Cash Flow by Project Class 

Page 8: Water and Sewer Authority Improvement Programapps.pittsburghpa.gov/pwsa/2017-2021_CIP_1.2017.pdf · 2017-04-19 · Sustainability – Energy efficiency and “green” approach to

Page 6  

Proposed Yearly Capital Cash Flow by Project Class 

Page 9: Water and Sewer Authority Improvement Programapps.pittsburghpa.gov/pwsa/2017-2021_CIP_1.2017.pdf · 2017-04-19 · Sustainability – Energy efficiency and “green” approach to

  

FY 2017 to 2021Ca

pital Improvem

ent P

lan 

 PR

OJECT

 CLA

SS 

Water Treatmen

t Plant 

NEIGHBO

RHOOD/W

ARD

System

wide 

 

 

PROJECT

 NAM

E Aspinw

all W

ater Treatmen

t Plant Utility

 Water Piping Im

provem

ents

PROJECT

 NO. 

Unassigne

d STAT

US 

Desig

n PR

IORITY

Safety, R

eliability/Ope

ratio

nal Flexibility, Ope

ratio

ns 

and Mainten

ance Efficien

cy 

PROJECT

 DESCR

IPTION 

Replacem

ent o

f the

 utility

 water sy

stem

s in the Screen

 Roo

m, R

oss P

ump Station, and

 Che

mical Building. 

PROJECT

 JUSTIFICAT

ION 

Num

erou

s pipe failures h

ave occurred

 due

 to corrosio

n.  A

ddition

ally, m

any of th

e iso

latio

n valves in

 the piping

 system

 are on

ly m

arginally fu

nctio

nal and

 do no

t provide

 a tight shu

t‐off.  Failure of this system prevents c

hemical add

ition

.  Ad

ditio

nally, the

 utility

 water sy

stem

 is not prope

rly isolated

 from

 the po

table water sy

stem

 through the use of 

backflo

w preventers, which present sa

fety hazards to

 staff. 

RISK

(S) 

An unsched

uled

/unp

lann

ed interrup

tion in th

e supp

ly of service water due

 to pipe failure(s).  

IMPA

CT ON OPE

RATIONS 

Increased op

erating efficiency, flexibility, and

 reliability. 

ALTERN

ATIVES TO THE RE

COMMEN

DED

 ACT

ION 

There are no

 practical alte

rnatives to

 the recommen

ded actio

n. 

COMMITMEN

TSCHED

ULE* (000

’s)

FUNDING SOURC

E(S)

Phase 

Pre 20

17 

2017

 20

1820

1920

2020

21Po

st 202

1 To

tal

☒Capital  

☐Expe

nse: ☐

Engine

ering ☐Sewer ☐

Water 

☐Co

st Share 

☐Other 

Assessmen

t/Stud

y  

  

0De

sign 

0 12

0  

120

Constructio

n  

600 

 60

0To

tal Project Cost 

0 72

0 0

00

00 

720

CASH

 FLO

W SUMMAR

Y**(000

’s)

 Pre 20

17 

2017

 20

1820

1920

2020

21Po

st 202

1 To

tal

Total 

0 12

0 60

00

00

0 72

0*C

oncept level costs based

 on previous re

ports, Capita

l Improvem

ent P

lans develop

ed by othe

rs, or sim

ilar type projects. 

**Includ

es con

tingencies.

Page 10: Water and Sewer Authority Improvement Programapps.pittsburghpa.gov/pwsa/2017-2021_CIP_1.2017.pdf · 2017-04-19 · Sustainability – Energy efficiency and “green” approach to

  

FY 2017 to 2021Ca

pital Improvem

ent P

lan 

  

PROJECT

 CLA

SS 

Water Treatmen

t Plant 

NEIGHBO

RHOOD/W

ARD

System

wide 

 PR

OJECT

 NAM

E Clarifier and

 Solids H

andling Im

provem

ents

PROJECT

 NO. 

Unassigne

d STAT

US 

Desig

n PR

IORITY

Safety, R

eliability/Ope

ratio

nal Flexibility 

PROJECT

 DESCR

IPTION 

Improvem

ents to

 clarifiers, sed

imen

ation, and

 associated system

s, includ

ing evaluatin

g process c

onditio

ns to

 optim

ize 

treatm

ent.  

PROJECT

 JUSTIFICAT

ION 

Existing clarifiers d

o no

t ope

rate as inten

ded du

e to equ

ipmen

t and

 process issues.  Ad

dressin

g these will im

prove 

system

 ope

ratio

n, effc

iency, and

 solids h

andling/slu

dge removal. 

RISK

(S) 

The bu

ildup

 of solids a

nd slud

ge in

 the clarifiers a

nd se

dimen

tatio

n basin

s impact treatm

ent capacity

. The

 clarifier 

building will con

tinue

 to be subject to furthe

r degradatio

n and the roadway utilize

d for che

mical delivery may not be 

navigable du

ring winter m

onths.  Leakage m

ay und

ermine the structural su

pport o

f the

 building. 

IMPA

CT ON OPE

RATIONS 

Completed

 project will increase ope

ratin

g effectiven

ess b

y increasin

g safety fo

r staff, re

storing integrity

 to th

e bu

ilding structure, providing

 reliable de

livery truck access to

 the chem

ical fe

ed area du

ring the winter m

onths, and

 fle

xibility of clarifier o

peratio

n, and

 improve solids h

andling and slu

dge disposal. 

ALTERN

ATIVES TO THE RE

COMMEN

DED

 ACT

ION 

There are no

 practical alte

rnatives to

 the recommen

ded actio

n. 

COMMITMEN

TSCHED

ULE* (000

’s)

FUNDING SOURC

E(S)

Phase 

Pre 20

17 

2017

 20

1820

1920

2020

21Po

st 202

1 To

tal

☒Capital  

☐Expe

nse: ☐

Engine

ering ☐Sewer ☐

Water 

☐Co

st Share 

☐Other 

Assessmen

t/Stud

y  

  

0De

sign 

0 3,410 

 3,410

Constructio

n  

1,060 

19,830

 20

,890

Total Project Cost 

0 4,47

0 0

19,830

00

0 24

,300

CASH

 FLO

W SUMMAR

Y** (000

’s)

 Pre 20

17 

2017

 20

1820

1920

2020

21Po

st 202

1 To

tal

Total 

0 1,10

0 2,71

02,55

07,56

07,56

02,82

0 24

,300

*Con

cept level costs based

 on previous re

ports, Capita

l Improvem

ent P

lans develop

ed by othe

rs, or sim

ilar type projects. 

**Includ

es con

tingencies.

Page 11: Water and Sewer Authority Improvement Programapps.pittsburghpa.gov/pwsa/2017-2021_CIP_1.2017.pdf · 2017-04-19 · Sustainability – Energy efficiency and “green” approach to

  

FY 2017 to 2021Ca

pital Improvem

ent P

lan 

 PR

OJECT

 CLA

SS 

Water Treatmen

t Plant 

NEIGHBO

RHOOD/W

ARD

System

wide 

 PR

OJECT

 NAM

E Pretreatmen

t System Che

mical Im

provem

ents

PROJECT

 NO. 

Unassigne

d STAT

US 

Desig

n PR

IORITY

Safety, R

egulatory Co

mpliance, 

Reliability/Ope

ratio

nal Flexibility, Ope

ratio

ns and

 Mainten

ance Efficien

cy 

PROJECT

 DESCR

IPTION 

Improvem

ents to

 pretreatm

ent che

mical sy

stem

s to provide im

proved

 water treatm

ent capabilitie

s. 

PROJECT

 JUSTIFICAT

ION 

Chem

ical treatm

ent systems a

re a critical com

pone

nt to

 produ

cing

 safe drin

king

 water. Com

pone

nts o

f the

 chem

ical treatm

ent systems c

an no longer be op

erated

 in a sa

fe, effe

ctive, or reliable manne

r to meet w

ater 

quality

 requ

iremen

ts. M

any bu

lk water treatm

ent che

micals p

resent sa

fety hazards to

 staff. Th

e storage and 

pumping

 system

s associated  with

 these chem

icals h

ave reache

d the en

d of th

eir u

seful life

. Failures resultin

g in 

dust creation and chem

ical sp

ills c

an place ope

rators in

 unsafe working

 con

ditio

ns and

 can

 cause physical 

damage to equ

ipmen

t and

 structures, as w

ell as e

nviro

nmen

tal con

tamination. 

RISK

(S) 

Inefficient ope

ratio

n of che

mical sy

stem

s result in increased op

erating costs, includ

ing chem

ical con

sumption, 

labo

r, solids g

eneration an

d disposal, and

 wear o

n eq

uipm

ent.   Failure of a

 che

mical sy

stem

 poses a significant 

health and

 safety risk to

 personn

el as w

ell as a

n increased risk to water quality compliance.

IMPA

CT ON OPE

RATIONS 

Increased op

erating efficiency, flexibility, reliability, and

 life expectancy and im

proved

 safety con

ditio

ns fo

r staff. 

ALTERN

ATIVES TO THE RE

COMMEN

DED

 ACT

ION 

There are no

 practical alte

rnatives to

 the recommen

ded actio

n. 

cFU

NDING SOURC

E(S)

Phase 

Pre 20

17 

2017

 20

1820

1920

2020

21Po

st 202

1 To

tal

☒Capital  

☐Expe

nse: ☐

Engine

ering ☐Sewer ☐

Water 

☐Co

st Share 

☐Other 

Assessmen

t/Stud

y  

  

0De

sign 

 54

5  

545

Constructio

n  

2,805 

 2,805

Total Project Cost 

0 3,35

0 0

00

00 

3,35

0CA

SH FLO

W SUMMAR

Y** (000

’s)

 Pre 20

17 

2017

 20

1820

1920

2020

21Po

st 202

1 To

tal

Total 

0 53

0 2,82

00

00

0 3,35

0*C

oncept level costs based

 on previous re

ports, Capita

l Improvem

ent P

lans develop

ed by othe

rs, or sim

ilar type projects. 

**Includ

es con

tingencies.

Page 12: Water and Sewer Authority Improvement Programapps.pittsburghpa.gov/pwsa/2017-2021_CIP_1.2017.pdf · 2017-04-19 · Sustainability – Energy efficiency and “green” approach to

  

FY 2017 to 2021Ca

pital Improvem

ent P

lan 

  

PROJECT

 CLA

SS 

Water Treatmen

t Plant 

NEIGHBO

RHOOD/W

ARD

System

wide 

 PR

OJECT

 NAM

E Aspinw

all W

ater Treatmen

t Plant Fiberglass R

einforced Plastic

 Che

mical Tank Inspectio

ns and

 Re

habilitation/Re

placem

ent 

PROJECT

 NO. 

Unassigne

d STAT

US 

Desig

n PR

IORITY

Safety, R

eliability/Ope

ratio

nal Flexibility 

PROJECT

 DESCR

IPTION 

Inspectio

n and rehabilitation and/or re

placem

ent o

f the

 fibe

rglass re

inforced

 plastic che

mical ta

nks. 

PROJECT

 JUSTIFICAT

ION 

Existing tanks a

re near to a cond

ition

 in which a catastrop

hic failure can

 occur with

out n

otice.  Sod

ium Hypochlorite

 Tank

 No. 2 is currently out of service due

 to active leaks a

nd needs to

 be relined

.  With

out a

 backup tank, disrup

tion to 

delivery will quickly im

pact th

e ability to

 provide

 regulatory‐req

uired disin

fection. 

RISK

(S) 

Failure of a

 che

mical storage tank

 poses a significant health

 and

 safety risk to

 personn

el as w

ell as a

n increased risk to 

water quality compliance. 

IMPA

CT ON OPE

RATIONS 

Increased system

 reliability and im

proved

 safety con

ditio

ns fo

r staff. 

ALTERN

ATIVES TO THE RE

COMMEN

DED

 ACT

ION 

The plant d

esign requ

ires c

hlorine to be available.  The

re are no practical alte

rnatives to

 the recommen

ded actio

n. 

COMMITMEN

TSCHED

ULE* (000

’s)

FUNDING SOURC

E(S)

Phase 

Pre 20

17 

2017

 20

1820

1920

2020

21Po

st 202

1 To

tal

☒Capital  

☐Expe

nse: ☐

Engine

ering ☐Sewer ☐

Water 

☐Co

st Share 

☐Other 

Assessmen

t/Stud

y  

  

0De

sign 

 25

  

25Co

nstructio

n  

68 

 68

Total Project Cost 

0 93

 0

00

00 

93CA

SH FLO

W SUMMAR

Y**(000

’s)

 Pre 20

17 

2017

 20

1820

1920

2020

21Po

st 202

1 To

tal

Total 

0 60

 33

00

00 

93*C

oncept level costs based

 on previous re

ports, Capita

l Improvem

ent P

lans develop

ed by othe

rs, or sim

ilar type projects. 

**Includ

es con

tingencies.

Page 13: Water and Sewer Authority Improvement Programapps.pittsburghpa.gov/pwsa/2017-2021_CIP_1.2017.pdf · 2017-04-19 · Sustainability – Energy efficiency and “green” approach to

  

FY 2017 to 2021Ca

pital Improvem

ent P

lan 

 PR

OJECT

 CLA

SS 

Water Treatmen

t Plant 

NEIGHBO

RHOOD/W

ARD

System

wide 

 PR

OJECT

 NAM

E Aspinw

all W

ater Treatmen

t Plant Calcium

 Hypochlorite

 Storage

PROJECT

 NO. 

Unassigne

d STAT

US 

Desig

n PR

IORITY

Safety, R

egulatory Co

mpliance, 

Reliability/Ope

ratio

nal Flexibility 

PROJECT

 DESCR

IPTION 

Procurem

ent o

f a storage bu

ilding for calcium

 hypochlorite

PROJECT

 JUSTIFICAT

ION 

Calcium hypochlorite

 are so

lid ta

blets w

hich can

 be used

 for d

isinfectio

n of pipes and

 tanks.  A

 supp

ly of the

se ta

blets 

is maintaine

d to provide

 plann

ed and

 emergency disin

fection of water storage facilities a

ssociated with

 water 

prod

uctio

n.  Currently th

ese tablets a

re stored

 in an existing garage which doe

s not m

eet the

 safety standards for th

is chem

ical.  Storage of th

e tablets in this garage has also

 deteriorated the bu

ilding.  

RISK

(S) 

With

out a

 supp

ly of calcium

 hypochlorite

 available, emergency disin

fection of water storage facilities c

anno

t occur, 

impacting water quality and prod

uctio

n. 

IMPA

CT ON OPE

RATIONS 

Improved

 safety con

ditio

ns fo

r staff. 

ALTERN

ATIVES TO THE RE

COMMEN

DED

 ACT

ION 

A custom

 storage room

 cou

ld be de

signe

d with

in an existing area

 of the

 water plant.  This will likely be at a highe

r cost 

to m

eet fire

 and

 building code

s for storage and to integrate into an existing structure. 

COMMITMEN

TSCHED

ULE* (000

’s)

FUNDING SOURC

E(S)

Phase 

Pre 20

17 

2017

 20

1820

1920

2020

21Po

st 202

1 To

tal

☒Capital  

☐Expe

nse: ☐

Engine

ering ☐Sewer ☐

Water 

☐Co

st Share 

☐Other 

Assessmen

t/Stud

y  

  

0De

sign 

 18

  

18Co

nstructio

n  

105 

 10

5To

tal Project Cost 

0 12

3 0

00

00 

123

CASH

 FLO

W SUMMAR

Y**(000

’s)

 Pre 20

17 

2017

 20

1820

1920

2020

21Po

st 202

1 To

tal

Total 

0 11

5 8

00

00 

123

*Con

cept level costs based

 on previous re

ports, Capita

l Improvem

ent P

lans develop

ed by othe

rs, or sim

ilar type projects. 

**Includ

es con

tingencies. 

Page 14: Water and Sewer Authority Improvement Programapps.pittsburghpa.gov/pwsa/2017-2021_CIP_1.2017.pdf · 2017-04-19 · Sustainability – Energy efficiency and “green” approach to

  

FY 2017 to 2021Ca

pital Improvem

ent P

lan 

 PR

OJECT

 CLA

SS 

Water Treatmen

t Plant 

NEIGHBO

RHOOD/W

ARD

System

wide 

 PR

OJECT

 NAM

E Aspinw

all W

ater Treatmen

t Plant Electricaland Ba

ckup

 Pow

erIm

provem

ents

PROJECT

 NO. 

Unassigne

d STAT

US 

Desig

n PR

IORITY

Safety, R

egulatory Co

mpliance, 

Reliability/Ope

ratio

nal Flexibility, Ope

ratio

ns and

 Mainten

ance Efficien

cy 

PROJECT

 DESCR

IPTION 

Improvem

ents to

 electrical sy

stem

s at A

spinwall W

ater Treatmen

t Plant (W

TP), includ

ing provision

s for stand‐by

 or 

backup

 pow

er sy

stem

s, upgrade

s to existing electrical distrib

ution system

, rep

lacemen

t of m

otor con

trol cen

ters, and

 associated

 panels, con

duit, wiring, and

 system

s. 

PROJECT

 JUSTIFICAT

ION 

Electrical sy

stem

s at the

 WTP

 have gene

rally m

et th

e en

d of th

eir u

seful lives and

 spare/replacem

ent p

arts are 

unavailable.  Electrical panels d

o no

t meet current sa

fety standards, includ

ing lack of arc flash protectio

n.  

Additio

nally, the

 WTP

 doe

s not have redu

ndant p

ower sy

stem

s or a

 means fo

r stand

‐by po

wer fo

r critical pum

ping

 and treatm

ent systems. 

RISK

(S) 

Electrical pow

er is critical to

 maintain pu

mping

 and

 treatm

ent o

f water.  Failure of the

se sy

stem

s will re

sult in th

e inability to

 produ

ce water to

 meet d

emand and/or quality requ

iremen

ts. 

IMPA

CT ON OPE

RATIONS 

Increased op

erating efficiency, flexibility, and

 reliability and im

proved

 safety con

ditio

ns fo

r staff. 

ALTERN

ATIVES TO THE RE

COMMEN

DED

 ACT

ION 

There are no

 practical alte

rnatives to

 the recommen

ded actio

n. 

COMMITMEN

TSCHED

ULE* (000

’s)

FUNDING SOURC

E(S)

Phase 

Pre 20

17 

2017

 20

1820

1920

2020

21Po

st 202

1 To

tal

☒Capital  

☐Expe

nse: ☐

Engine

ering ☐Sewer ☐

Water 

☐Co

st Share 

☐Other 

Assessmen

t/Stud

y  

  

Desig

n  

2,970 

 2,970

Constructio

n  

 23

,350

 23

,350

Total Project Cost 

0 2,97

0 0

23,350

00

0 26

,320

CASH

 FLO

W SUMMAR

Y(000’s)

 Pre 20

17 

2017

 20

1820

1920

2020

21Po

st 202

1 To

tal

Total 

0 54

0 1,81

02,94

08,87

08,86

03,30

0 26

,320

*Con

cept level costs based

 on previous re

ports, Capita

l Improvem

ent P

lans develop

ed by othe

rs, or sim

ilar type projects. 

**Includ

es con

tingencies. 

.

Page 15: Water and Sewer Authority Improvement Programapps.pittsburghpa.gov/pwsa/2017-2021_CIP_1.2017.pdf · 2017-04-19 · Sustainability – Energy efficiency and “green” approach to

  

FY 2017 to 2021Ca

pital Improvem

ent P

lan 

 PR

OJECT

 CLA

SS 

Water Treatmen

t Plant 

NEIGHBO

RHOOD/W

ARD

System

wide 

 

 

PROJECT

 NAM

E Clearw

ell D

emolition

 PR

OJECT

 NO. 

Unassigne

d STAT

US 

Not Started

 PR

IORITY

Safety, R

egulatory Co

mpliance, 

Reliability/Ope

ratio

nal Flexibility, Level of Service 

PROJECT

 DESCR

IPTION 

Demolition

 of the

 existing 108 year old clearwell (fin

ished

 water structure). 

PROJECT

 JUSTIFICAT

ION 

The clearw

ell w

as con

structed

 in 1908 and has n

ot und

ergone

 any

 major m

odificatio

ns or u

pgrade

s since.  The en

tire 

plant m

ust b

e shutdo

wn to inspect a

nd perform

 mainten

ance of the

 clearwell. It has two main functio

ns: p

roviding

 eq

ualization storage that allows the

 filte

rs to

 ope

rate inde

pend

ently

 of p

oten

tial fluctuatio

ns in

 system

 dem

ands and

 providing sufficien

t reten

tion contact tim

e for d

isinfectio

n agen

ts to

 meet the

 requ

iremen

ts of the

 Surface W

ater 

Treatm

ent R

ule and Long

‐Term 2 Enh

anced Surface Water Treatmen

t Rule. Con

sidering age and cond

ition

 of the

 clearw

ell, it is the water sy

stem

’s weakest link

 as the

re are no practical m

eans to

 deliver water by bypassing the 

clearw

ell, while m

aintaining

 the requ

ired volume, quality, and

 con

tact time. 

RISK

(S) 

Clearw

ell failure will cease all water delivery to all the Au

thority

’s customers (resid

entia

l, commercial, ind

ustrial, 

institu

tional, bu

lk ra

te customers, pub

lic health

 and

 safety provide

rs, fire

 protection, governm

ental facilitie

s, other 

water distrib

utors, etc.), creating a pu

blic health

 emergency. 

IMPA

CT ON OPE

RATIONS 

Ability to

 meet system re

liability and water quality regulatio

ns. 

ALTERN

ATIVES TO THE RE

COMMEN

DED

 ACT

ION 

There are no

 practical alte

rnatives to

 the recommen

ded actio

n as th

e clearw

ell is a

n essential elemen

t of the

 water 

distrib

ution system

. CO

MMITMEN

T SCHED

ULE* (000

’s)

FUNDING SOURC

E(S)

Phase 

Pre 20

17 

2017

 20

1820

1920

2020

21Po

st 202

1 To

tal

☒Capital  

☐Expe

nse: ☐

Engine

ering ☐Sewer ☐

Water 

☐Co

st Share 

☐Other 

Assessmen

t/Stud

y  

  

0De

sign 

  

1,570 

1,570

Constructio

n  

 10

,780

 10

,780

Total Project Cost 

0 0 

00

00

12,350

 12

,350

CASH

 FLO

W SUMMAR

Y**(000

’s)

 Pre 20

17 

2017

 20

1820

1920

2020

21Po

st 202

1 To

tal

Total 

0 0 

00

00

12,350

 12

,350

*Con

cept level costs based

 on previous re

ports, Capita

l Improvem

ent P

lans develop

ed by othe

rs, or sim

ilar type projects. 

**Includ

es con

tingencies. 

Page 16: Water and Sewer Authority Improvement Programapps.pittsburghpa.gov/pwsa/2017-2021_CIP_1.2017.pdf · 2017-04-19 · Sustainability – Energy efficiency and “green” approach to

FY 2017 to 2021Ca

pital Improvem

ent P

lan 

PROJECT

 CLA

SS 

Water Treatmen

t Plant 

NEIGHBO

RHOOD/W

ARD

System

wide 

PROJECT

 NAM

E Clearw

ell Emergency Re

spon

se Project

PROJECT

 NO. 

2013

‐930

‐231

‐0 

STAT

US 

Desig

n PR

IORITY

Safety, R

egulatory Co

mpliance, 

Reliability/Ope

ratio

nal Flexibility, Level of Service 

PROJECT

 DESCR

IPTION 

Installatio

n of tw

o pu

mp suction wet wells at Aspinwall and

 Bruecken Pu

mp Stations and

 associated piping

 and

 appu

rten

ances to bypass th

e existing clearw

ell.  

PROJECT

 JUSTIFICAT

ION 

This project w

ill provide

 a m

eans to

 bypass the

 existing clearw

ell.  Note: Disinfectio

n requ

iremen

ts will not be 

achieved

 while bypassin

g is occurin

g.  A

ddition

ally, this infrastructure will be requ

ired to m

aintain water su

pply 

to PWSA

’s customers for th

e rehabilitation or re

placem

ent o

f the

 existing clearw

ell.

RISK

(S) 

Clearw

ell failure will cease all water delivery to all the Au

thority

’s customers (resid

entia

l, commercial, ind

ustrial, 

institu

tional, bu

lk ra

te customers, pub

lic health

 and

 safety provide

rs, fire

 protection, governm

ental facilitie

s, other 

water distrib

utors, etc.), creating a pu

blic health

 emergency. 

IMPA

CT ON OPE

RATIONS 

Ability to

 meet system re

liability and water quality regulatio

ns. 

ALTERN

ATIVES TO THE RE

COMMEN

DED

 ACT

ION 

There are no

 practical alte

rnatives to

 the recommen

ded actio

n as th

e clearw

ell is a

n essential elemen

t of the

 water 

distrib

ution system

. CO

MMITMEN

TSCHED

ULE* (000

’s)

FUNDING SOURC

E(S)

Phase 

Pre 20

17 

2017

 20

1820

1920

2020

21Po

st 202

1 To

tal

☒Capital  

☐Expe

nse: ☐

Engine

ering ☐Sewer ☐

Water 

☐Co

st Share 

☐Other 

Assessmen

t/Stud

y 17

170

Desig

n3,060

3,060

Constructio

n24

,570

24,570

Total Project Cost 

170 

3,06

0 0

24,570

00

0 27

,800

CASH

 FLO

W SUMMAR

Y**(000

’s)

Pre 20

17 

2017

 20

1820

1920

2020

21Po

st 202

1 To

tal

Total 

170 

440 

1,79

03,29

013

,960

8,15

00 

27,800

* Co

ncep

t level costs based

 on previous re

ports, m

inus im

provem

ents to

 Aspinwall P.S., Brue

cken

 P.S., Highland

 Reservoir P.S. and

 Rising

 Main, and

 Aspinwall Pum

p Station to Lanph

er Reservoir Risin

g Main. 

**Includ

es con

tingencies. 

Page 17: Water and Sewer Authority Improvement Programapps.pittsburghpa.gov/pwsa/2017-2021_CIP_1.2017.pdf · 2017-04-19 · Sustainability – Energy efficiency and “green” approach to

  

FY 2017 to 2021Ca

pital Improvem

ent P

lan 

 PR

OJECT

 CLA

SS 

Water Treatmen

t Plant 

NEIGHBO

RHOOD/W

ARD

System

wide 

 PR

OJECT

 NAM

E Clearw

ell Improvem

ents 

PROJECT

 NO. 

Unassigne

d STAT

US 

Not Started

 PR

IORITY

Safety, R

egulatory Co

mpliance, 

Reliability/Ope

ratio

nal Flexibility, Level of Service 

PROJECT

 DESCR

IPTION 

Replacem

ent o

f the

 existing 10

8 year old clearwell (fin

ished

 water structure). 

PROJECT

 JUSTIFICAT

ION 

The clearw

ell w

as con

structed

 in 1908 and has n

ot und

ergone

 any

 major m

odificatio

ns or u

pgrade

s since. It h

as tw

o main functio

ns: p

roviding

 equ

aliza

tion storage that allows the

 filte

rs to

 ope

rate inde

pend

ently

 of p

oten

tial 

fluctuatio

ns in

 system

 dem

ands and

 providing

 sufficien

t reten

tion contact tim

e for d

isinfectio

n agen

ts to

 meet the

 requ

iremen

ts of the

 Surface W

ater Treatmen

t Rule and Long

‐Term 2 Enh

anced Surface Water Treatmen

t Rule. 

Considering the age and cond

ition

 of the

 clearwell, it is the water sy

stem

’s weakest link

 as the

re are no practical 

means to

 deliver water by bypassing the clearw

ell, while m

aintaining

 the requ

ired volume, quality, and

 con

tact time. 

RISK

(S) 

Clearw

ell failure will cease all water delivery to all the Au

thority

’s customers (resid

entia

l, commercial, ind

ustrial, 

institu

tional, bu

lk ra

te customers, pub

lic health

 and

 safety provide

rs, fire

 protection, governm

ental facilitie

s, other 

water distrib

utors, etc.), creating a pu

blic health

 emergency. 

IMPA

CT ON OPE

RATIONS 

Ability to

 meet system re

liability and water quality regulatio

ns. 

ALTERN

ATIVES TO THE RE

COMMEN

DED

 ACT

ION 

There are no

 practical alte

rnatives to

 the recommen

ded actio

n as th

e clearw

ell is a

n essential elemen

t of the

 water 

distrib

ution system

. CO

MMITMEN

T SCHED

ULE* (000

’s)

FUNDING SOURC

E(S)

Phase 

Pre 20

17 

2017

 20

1820

1920

2020

21Po

st 202

1 To

tal

☒Capital  

☐Expe

nse: ☐

Engine

ering ☐Sewer ☐

Water 

☐Co

st Share 

☐Other 

Assessmen

t/Stud

y  

  

0De

sign 

  

4,400

 4,400

Constructio

n  

 35

,290

 35

,290

Total Project Cost 

0 0 

00

4,40

00

35,290

 39

,690

CASH

 FLO

W SUMMAR

Y**(000

’s)

 Pre 20

17 

2017

 20

1820

1920

2020

21Po

st 202

1 To

tal

Total 

0 0 

00

755

2,49

536

,440

 39

,690

*Con

cept level costs based

 on previous re

ports, Capita

l Improvem

ent P

lans develop

ed by othe

rs, or sim

ilar type projects. 

**Includ

es con

tingencies. 

Page 18: Water and Sewer Authority Improvement Programapps.pittsburghpa.gov/pwsa/2017-2021_CIP_1.2017.pdf · 2017-04-19 · Sustainability – Energy efficiency and “green” approach to

  

FY 2017 to 2021Ca

pital Improvem

ent P

lan 

 PR

OJECT

 CLA

SS 

Water Treatmen

t Plant 

NEIGHBO

RHOOD/W

ARD

System

wide 

 PR

OJECT

 NAM

E Highland

 Park Mem

brane Filtration Plant A

ssessm

ent a

nd Critical Process Im

provem

ents 

PROJECT

 NO. 

Unassigne

d STAT

US 

Assessmen

t/Stud

y PR

IORITY

Safety, R

egulatory Co

mpliance, 

Reliability/Ope

ratio

nal Flexibility, Capacity

, Ope

ratio

ns and

 Mainten

ance Efficien

cy, Level of 

Service 

PROJECT

 DESCR

IPTION 

Complete a cond

ition

 assessm

ent o

f systems sup

porting the treatm

ent p

rocess and

 perform

 critical im

provem

ents to

 maintain water treatm

ent a

nd allow fu

ll warranty of re

placem

ent m

odules.  Im

provem

ents m

ay includ

e electrical, 

chem

ical fe

ed, straine

rs, and

 other su

pport systems. 

PROJECT

 JUSTIFICAT

ION 

Mem

brane mod

ule failure ra

te has con

tinually increased over th

e last se

veral years and

 are m

ore than

 5 years beyon

d the manufacturer’s

 recommen

ded replacem

ent cycle.  To

 allow m

odule mem

brane manufacturers to

 exten

d a full 

warranty, a sy

stem

 con

ditio

n assessmen

t is n

eede

d.  A

 detailed cond

ition

 assessm

ent is n

eede

d to add

ress other 

critical w

orker safety and de

gradation of equ

ipmen

t that a

re essen

tial to maintain the water treatm

ent p

rocess. 

RISK

(S) 

Expo

ses the

 Autho

rity to highe

r costs to

 add

ress emergency failures a

nd exposes th

e Highland

 No. 1 Service Area to a 

potentially deficient or n

on‐com

plaint water su

pply. 

IMPA

CT ON OPE

RATIONS 

Increase ope

ratin

g fle

xibility and reliability. 

ALTERN

ATIVES TO THE RE

COMMEN

DED

 ACT

ION 

Provide covered system

 storage for the

 Highland No. 1 Service Area and elim

inate the microfiltration plant. 

COMMITMEN

TSCHED

ULE* (000

’s)

FUNDING SOURC

E(S)

Phase 

Pre 20

17 

2017

 20

1820

1920

2020

21Po

st 202

1 To

tal

☒Capital  

☒Expe

nse: ☒

Engine

ering ☐Sewer ☐

Water 

☐Co

st Share 

☐Other 

Assessmen

t/Stud

y  

10 

 10

Desig

n  

130 

 13

0Co

nstructio

n  

 84

845

Total Project Cost 

0 14

0 84

50

00

0 98

5CA

SH FLO

W SUMMAR

Y**(000

’s)

 Pre 20

17 

2017

 20

1820

1920

2020

21Po

st 202

1 To

tal

Total 

0 80

 85

550

00

0 98

5*C

oncept level costs based

 on previous re

ports, Capita

l Improvem

ent P

lans develop

ed by othe

rs, or sim

ilar type projects. 

**Includ

es con

tingencies. 

 

Page 19: Water and Sewer Authority Improvement Programapps.pittsburghpa.gov/pwsa/2017-2021_CIP_1.2017.pdf · 2017-04-19 · Sustainability – Energy efficiency and “green” approach to

  

FY 2017 to 2021Ca

pital Improvem

ent P

lan 

 PR

OJECT

 CLA

SS 

Water Treatmen

t Plant 

NEIGHBO

RHOOD/W

ARD

System

wide 

 PR

OJECT

 NAM

E Highland

 Park Mem

brane Filtration Plant T

ransform

er Rep

air a

nd UPS Rep

lacemen

t PR

OJECT

 NO. 

Unassigne

d STAT

US 

Desig

n PR

IORITY

Safety, R

egulatory Co

mpliance, 

Reliability/Ope

ratio

nal Flexibility, Capacity

, Ope

ratio

ns and

 Mainten

ance Efficien

cy, Level of 

Service 

PROJECT

 DESCR

IPTION 

Replacem

ent o

f a failed cooling fan on

 the electrical transformer su

pplying all pow

er to

 the Mem

brane Filtration Plant 

(MFP) and

 replacem

ent o

f the

 2nd Floor UPS providing

 backup po

wer to

 process con

trols. 

PROJECT

 JUSTIFICAT

ION 

The Au

thority

 owns th

e electrical transformer su

pplying po

wer to

 the MFP.  The transfom

er includ

es th

ree cooling 

fans which permit continue

d op

eration du

ring summer m

onths, but one

 of the

se fans has failed and requ

ires 

replacem

ent to en

sure con

tinuo

us facility po

wer.  The UPS on the 2n

d  floor needs to

 be replaced

 to provide

 continuo

us backup po

wer to

 process con

trol panels o

n the 2n

d  floor.  The existing UPS has not been un

der w

arranty 

since 201

1 and a sim

ilar U

PS failed in 2016, at w

hich time it was re

placed

. RISK

(S) 

Loss of e

lectrical pow

er to

 the MFP will re

sult in loss of w

ater se

rvice to th

e Highland

 Reservoir No. 1 se

rvice area. 

IMPA

CT ON OPE

RATIONS 

Provides electrical pow

er to

 facility to allow con

tinual w

ater treatm

ent. 

ALTERN

ATIVES TO THE RE

COMMEN

DED

 ACT

ION 

There are no

 practical alte

rnatives to

 the recommen

ded actio

n. 

COMMITMEN

TSCHED

ULE* (000

’s)

FUNDING SOURC

E(S)

Phase 

Pre 20

17 

2017

 20

1820

1920

2020

21Po

st 202

1 To

tal

☒Capital  

☐Expe

nse: ☐

Engine

ering ☐Sewer ☐

Water 

☐Co

st Share 

☐Other 

Assessmen

t/Stud

y  

  

0De

sign 

 10

  

10Co

nstructio

n  

61 

 61

Total Project Cost 

0 71

 0

00

00 

71CA

SH FLO

W SUMMAR

Y**(000

’s)

 Pre 20

17 

2017

 20

1820

1920

2020

21Po

st 202

1 To

tal

Total 

0 71

 0

00

00 

71*C

oncept level costs based

 on previous re

ports, Capita

l Improvem

ent P

lans develop

ed by othe

rs, or sim

ilar type projects. 

**Includ

es con

tingencies. 

Page 20: Water and Sewer Authority Improvement Programapps.pittsburghpa.gov/pwsa/2017-2021_CIP_1.2017.pdf · 2017-04-19 · Sustainability – Energy efficiency and “green” approach to

  

FY 2017 to 2021Ca

pital Improvem

ent P

lan 

 PR

OJECT

 CLA

SS 

Water Treatmen

t Plant 

NEIGHBO

RHOOD/W

ARD

System

wide 

   

PROJECT

 NAM

E Highland

 Park Mem

brane Filtration Plant F

iberglass R

einforced Plastic

 Che

mical Tank Inspectio

ns 

and Re

habilitation/Re

placem

ent 

PROJECT

 NO. 

Unassigne

d STAT

US 

Desig

n PR

IORITY

Safety, R

eliability/Ope

ratio

nal Flexibility 

PROJECT

 DESCR

IPTION 

Inspectio

n and rehabilitation and/or re

placem

ent o

f the

 fibe

rglass re

inforced

 plastic che

mical ta

nks. 

PROJECT

 JUSTIFICAT

ION 

Based on

 the age, se

rvice, and

 visu

al observatio

ns of the

 tanks ,rehabilitation is ne

eded

 to m

aintain the integrity

 of 

the tanks.  Kno

wn repairs includ

e the replacem

ent o

f the

 300

 gallon sodium

 hypochlorite

 day ta

nk and

 repair/mod

ificatio

n of th

e vent piping on

 the caustic

 tank. 

RISK

(S) 

Failure of a

 che

mical storage tank

 poses a significant health

 and

 safety risk to

 personn

el.  Expo

ses the

 Autho

rity and 

the Highland

 No. 1 Service Area to a poten

tially deficient or n

on‐com

plaint water su

pply, w

here 

emergency/un

planne

d repairs will ty

pically add

 30 to 50%

 to th

e capital expen

ses req

uired. 

IMPA

CT ON OPE

RATIONS 

Increased fle

xibility and reliability and im

proved

 safety con

ditio

ns fo

r staff. 

ALTERN

ATIVES TO THE RE

COMMEN

DED

 ACT

ION 

There are no

 practical alte

rnatives to

 the recommen

ded actio

n. 

COMMITMEN

TSCHED

ULE* (000

’s)

FUNDING SOURC

E(S)

Phase 

Pre 20

17 

2017

 20

1820

1920

2020

21Po

st 202

1 To

tal

☒Capital  

☐Expe

nse: ☐

Engine

ering ☐Sewer ☐

Water 

☐Co

st Share 

☐Other 

Assessmen

t/Stud

y  

  

0De

sign 

0 18

  

18Co

nstructio

n  

51 

 51

Total Project Cost 

0 69

 0

00

00 

69CA

SH FLO

W SUMMAR

Y**(000

’s)

 Pre 20

17 

2017

 20

1820

1920

2020

21Po

st 202

1 To

tal

Total 

0 40

 29

00

00 

69*C

oncept level costs based

 on previous re

ports, Capita

l Improvem

ent P

lans develop

ed by othe

rs, or sim

ilar type projects. 

**Includ

es con

tingencies. 

Page 21: Water and Sewer Authority Improvement Programapps.pittsburghpa.gov/pwsa/2017-2021_CIP_1.2017.pdf · 2017-04-19 · Sustainability – Energy efficiency and “green” approach to

  

FY 2017 to 2021Ca

pital Improvem

ent P

lan 

 PR

OJECT

 CLA

SS 

Water Treatmen

t Plant 

NEIGHBO

RHOOD/W

ARD

System

wide 

 PR

OJECT

 NAM

E Highland

 Park Mem

brane Filtration Floo

r Drainage Mod

ificatio

nsPR

OJECT

 NO. 

Unassigne

d STAT

US 

Not Started

 PR

IORITY

Safety, R

eliability/Ope

ratio

nal Flexibility, Ope

ratio

ns 

and Mainten

ance Efficien

cy 

PROJECT

 DESCR

IPTION 

Install curbing

 aroun

d flo

or pen

etratio

ns on flo

or to

 prevent water from

 draining do

wn to lower level. Re

‐slope

 or 

grind flo

or to

 provide

 water drainage to existing flo

or drains. 

PROJECT

 JUSTIFICAT

ION 

The existing concrete floo

r whe

re th

e mem

brane racks sit is no

t level or slope

d to drains.  Leakage ro

utinely occurs 

from

 the racks d

ue to

 mod

ule failures a

nd expansio

n/contraction of th

e racks.  Floor pen

etratio

ns are not curbe

d resulting

 in water ru

nning do

wn on

 to electrical equ

ipmen

t on the lower level,  damaging eq

uipm

ent a

nd th

e interio

r walls. 

RISK

(S) 

Continue

d damage to electrical and

 mechanic eq

uipm

ent a

nd th

e bu

ilding structure.  Poten

tial safety risk to staff 

enterin

g and working

 in th

e bu

ilding.  Exposes th

e Au

thority

 and

 the Highland

 No. 1 Service Area to a poten

tially 

deficient or n

on‐com

plaint water su

pply.  Em

ergency/un

planne

d repairs will ty

pically add

 30 to 50%

 to th

e capital 

expe

nses re

quire

d. 

IMPA

CT ON OPE

RATIONS 

Increased fle

xibility and reliability and im

proved

 safety con

ditio

ns fo

r staff. 

ALTERN

ATIVES TO THE RE

COMMEN

DED

 ACT

ION 

Provide covered system

 storage for the

 Highland No. 1 Service Area and elim

inate the Mem

brane Filtration Plant. 

COMMITMEN

TSCHED

ULE* (000

’s)

FUNDING SOURC

E(S)

Phase 

Pre 20

17 

2017

 20

1820

1920

2020

21Po

st 202

1 To

tal

☒Capital  

☐Expe

nse: ☐

Engine

ering ☐Sewer ☐

Water 

☐Co

st Share 

☐Other 

Assessmen

t/Stud

y  

  

0De

sign 

  

140

 14

0Co

nstructio

n  

 73

730

Total Project Cost 

0 0 

00

140

730

0 87

0CA

SH FLO

W SUMMAR

Y**(000

’s)

 Pre 20

17 

2017

 20

1820

1920

2020

21Po

st 202

1 To

tal

Total 

0 0 

00

100

730

40 

870

*Con

cept level costs based

 on previous re

ports, Capita

l Improvem

ent P

lans develop

ed by othe

rs, or sim

ilar type projects. 

**Includ

es con

tingencies

Page 22: Water and Sewer Authority Improvement Programapps.pittsburghpa.gov/pwsa/2017-2021_CIP_1.2017.pdf · 2017-04-19 · Sustainability – Energy efficiency and “green” approach to

  

FY 2017 to 2021Ca

pital Improvem

ent P

lan 

 PR

OJECT

 CLA

SS 

Water Treatmen

t Plant 

NEIGHBO

RHOOD/W

ARD

System

wide 

 PR

OJECT

 NAM

E Highland

 Park Mem

brane Filtration Mod

ule Re

placem

ent P

rogram

PROJECT

 NO. 

Unassigne

d STAT

US 

Desig

n PR

IORITY

Safety, R

egulatory Co

mpliance, 

Reliability/Ope

ratio

nal Flexibility, Capacity

, Ope

ratio

ns and

 Mainten

ance Efficien

cy, Level of 

Service 

PROJECT

 DESCR

IPTION 

Replace mem

brane mod

ules.  The Mem

brane Filtration Plant (MFP) include

s a to

tal of 1

0 racks e

ach with

 80 mod

ules. 

PROJECT

 JUSTIFICAT

ION 

Mem

brane mod

ules have reache

d the en

d of th

eir u

seful life

 and

 are beginning

 to fail at an increasin

g rate. 

RISK

(S) 

Expo

ses the

 Autho

rity to highe

r costs to

 add

ress emergency facility failures a

nd th

e Highland

 No. 1 Service Area to a 

potentially deficient or n

on‐com

plaint water su

pply. 

IMPA

CT ON OPE

RATIONS 

Increase ope

ratin

g fle

xibility and reliability. 

ALTERN

ATIVES TO THE RE

COMMEN

DED

 ACT

ION 

There are no

 short term practical alte

rnatives to

 the recommen

ded actio

n.  Lon

g term

 alte

rnative is providing covered 

finish

ed water storage for the

 Highland No. 1 Service Area and elim

inating the MFP. 

COMMITMEN

TSCHED

ULE* (000

’s)

FUNDING SOURC

E(S)

Phase 

Pre 20

17 

2017

 20

1820

1920

2020

21Po

st 202

1 To

tal

☒Capital  

☐Expe

nse: ☐

Engine

ering ☐Sewer ☐

Water 

☐Co

st Share 

☐Other 

Assessmen

t/Stud

y  

  

0De

sign 

  

1515

 30

Constructio

n  

 1,460

1,460

 2,920

Total Project Cost 

0 0 

1,47

51,47

50

00 

2,95

0CA

SH FLO

W SUMMAR

Y**(000

’s)

 Pre 20

17 

2017

 20

1820

1920

2020

21Po

st 202

1 To

tal

Total 

0 0 

480

1,48

099

00

0 2,95

0*C

oncept level costs based

 on previous re

ports, Capita

l Improvem

ent P

lans develop

ed by othe

rs, or sim

ilar type projects. 

**Includ

es con

tingencies. 

Page 23: Water and Sewer Authority Improvement Programapps.pittsburghpa.gov/pwsa/2017-2021_CIP_1.2017.pdf · 2017-04-19 · Sustainability – Energy efficiency and “green” approach to

  

FY 2017 to 2021Ca

pital Improvem

ent P

lan 

 PR

OJECT

 CLA

SS 

Water Pum

ping

 and

 Storage 

NEIGHBO

RHOOD/W

ARD

Garfie

ld/9 

 

 

PROJECT

 NAM

E Garfie

ld W

ater Storage Tank Im

provem

ents 

PROJECT

 NO. 

Unassigne

d STAT

US 

Desig

n PR

IORITY

Safety, R

egulatory Co

mpliance, Reliability, Capacity

, Level of Service 

PROJECT

 DESCR

IPTION 

Perform a com

preh

ensiv

e inspectio

n of th

e existing elevated

 storage tank, evaluate the system

's ne

ed fo

r the

 installatio

n of an additio

nal tank, and

 rehabilitation of th

e existing tank. 

PROJECT

 JUSTIFICAT

ION 

The Garfie

ld Elevated Storage Tank

 was con

structed

 in 195

9 and last re

habilitated

 in 1992.  The

 existing tank

 doe

s not 

have su

fficien

t capacity

 to m

eet P

A DE

P's req

uiremen

ts fo

r sizing, w

hich states th

at a ta

nk m

ust h

ave sufficien

t capacity to

 meet a

verage day dem

and plus fire flow

 dem

and.  A

ddition

ally, the

re are no second

ary feed

s into this 

system

, which m

akes ta

king

 this tank

 out of service ope

ratio

nally difficult.  This p

roject will provide

 ade

quate storage 

through system

 redu

ndancy to

 meet the

 pressure district's dem

and, fire flow

 con

ditio

ns if th

e (New

) Highland Pu

mp 

Station expe

riences outages, and

 con

tinual service to

 critical customers d

uring main breaks and

 pum

p station ou

tages. 

RISK

(S) 

Expo

ses the

 Autho

rity's c

ustomers to po

or water quality from

 coatin

g prob

lems o

r a poten

tially deficient water 

supp

ly.  Du

e to th

e pressure district's dem

and, th

e existing tank

 canno

t be removed

 from

 service for cleaning or 

rehabilitation. 

IMPA

CT ON OPE

RATIONS 

Increased fle

xibility and reliability, sy

stem

 com

pliance, and

 improved

 safety con

ditio

ns fo

r staff. 

ALTERN

ATIVES TO THE RE

COMMEN

DED

 ACT

ION 

Due to th

is pressure district's dem

and, critical customers served, and

 lack of e

xisting capacity, rep

lacemen

t of the

 existing tank

 may be warranted

. CO

MMITMEN

TSCHED

ULE* (000

’s)

FUNDING SOURC

E(S)

Phase 

Pre 20

17 

2017

 20

1820

1920

2020

21Po

st 202

1 To

tal

☒Capital  

☐Expe

nse: ☐

Engine

ering ☐Sewer ☐

Water 

☐Co

st Share 

☐Other 

Assessmen

t/Stud

y  

  

0De

sign 

 59

0  

590

Constructio

n  

 3,380

 3,380

Total Project Cost 

0 59

0 3,38

00

00

0 3,97

0CA

SH FLO

W SUMMAR

Y**(000

’s)

 Pre 20

17 

2017

 20

1820

1920

2020

21Po

st 202

1 To

tal

Total 

0 17

0 89

02,73

018

00

0 3,97

0*C

oncept level costs based

 on previous re

ports, Capita

l Improvem

ent P

lans develop

ed by othe

rs, or sim

ilar type projects. 

**Includ

es con

tingencies. 

Page 24: Water and Sewer Authority Improvement Programapps.pittsburghpa.gov/pwsa/2017-2021_CIP_1.2017.pdf · 2017-04-19 · Sustainability – Energy efficiency and “green” approach to

  

FY 2017 to 2021Ca

pital Improvem

ent P

lan 

 PR

OJECT

 CLA

SS 

Water Pum

ping

 and

 Storage 

NEIGHBO

RHOOD/W

ARD

Lincoln‐Lemington

/12 

 

 

PROJECT

 NAM

E Lincoln Water Storage Tank Im

provem

ents or R

eplacemen

tPR

OJECT

 NO. 

Unassigne

d STAT

US 

Desig

n PR

IORITY

Safety, R

egulatory Co

mpliance, Reliability, Capacity

, Level of Service 

PROJECT

 DESCR

IPTION 

Perform a com

preh

ensiv

e inspectio

n of th

e existing storage tank

 and

 rehabilitation or re

placem

ent o

f the

 existing 

tank. 

PROJECT

 JUSTIFICAT

ION 

Constructed in 1939, th

is tank

 is nearin

g the en

d of its u

seful life

.  The last inspectio

n, which was perform

ed in

 200

8, 

noted de

ficiencies that n

eed to be addressed to ensure water quality standards a

re m

et. 

RISK

(S) 

Expo

ses the

 Autho

rity's c

ustomers to po

or water quality from

 coatin

g prob

lems o

r a poten

tially deficient water su

pply 

in th

e even

t of tank failure. 

IMPA

CT ON OPE

RATIONS 

Increased fle

xibility and reliability and system

 com

pliance. 

ALTERN

ATIVES TO THE RE

COMMEN

DED

 ACT

ION 

Rehabilitation of th

e existing tank, w

hich m

ay be a larger investmen

t than replacem

ent. 

COMMITMEN

TSCHED

ULE* (000

’s)

FUNDING SOURC

E(S)

Phase 

Pre 20

17 

2017

 20

1820

1920

2020

21Po

st 202

1 To

tal

☒Capital  

☐Expe

nse: ☐

Engine

ering ☐Sewer ☐

Water 

☐Co

st Share 

☐Other 

Assessmen

t/Stud

y  

  

0De

sign 

 61

0 0

 61

0Co

nstructio

n  

 3,500

 3,500

Total Project Cost 

0 61

0 3,50

00

00

0 4,11

0CA

SH FLO

W SUMMAR

Y**(000

’s)

 Pre 20

17 

2017

 20

1820

1920

2020

21Po

st 202

1 To

tal

Total 

0 17

0 93

02,83

018

00

0 4,11

0*C

oncept level costs based

 on previous re

ports, Capita

l Improvem

ent P

lans develop

ed by othe

rs, or sim

ilar type projects. 

**Includ

es con

tingencies.

Page 25: Water and Sewer Authority Improvement Programapps.pittsburghpa.gov/pwsa/2017-2021_CIP_1.2017.pdf · 2017-04-19 · Sustainability – Energy efficiency and “green” approach to

  

FY 2017 to 2021Ca

pital Improvem

ent P

lan 

  

PROJECT

 CLA

SS 

Water Pum

ping

 and

 Storage 

NEIGHBO

RHOOD/W

ARD

City View, Spring Hill, Spring Garde

n, Troy Hill/24

,26 

 PR

OJECT

 NAM

E Sprin

g Hill Water Storage Tanks

Improvem

ents or R

eplacemen

tPR

OJECT

 NO. 

Unassigne

d STAT

US 

Not Started

 PR

IORITY

Safety, R

egulatory Co

mpliance, Reliability, Capacity

, Level of Service 

PROJECT

 DESCR

IPTION 

Perform a com

preh

ensiv

e inspectio

n of th

e existing storage tanks a

nd re

habilitation or re

placem

ent o

f the

 existing 

tanks. 

PROJECT

 JUSTIFICAT

ION 

Constructed in 1929 of riveted steel, the coatings and

 structure of th

ese tanks m

ay re

quire

 rehabilitation du

e to 

corrosion.

The

 existing shell ladde

r, ladd

er cage, and

 rolling

 roof ladd

er do no

t meet current OSH

A dimen

sional 

requ

iremen

ts. 

RISK

(S) 

Expo

ses the

 Autho

rity's c

ustomers to po

or water quality from

 coatin

g prob

lems o

r a poten

tially deficient water su

pply 

in th

e even

t of tank failure.  Ad

ditio

nally, it e

xposes th

e Au

thority

’s staff and

 con

tractors to

 safety issues. 

IMPA

CT ON OPE

RATIONS 

Increased fle

xibility and reliability and system

 com

pliance. 

ALTERN

ATIVES TO THE RE

COMMEN

DED

 ACT

ION 

Rehabilitation of th

e existing tank, w

hich m

ay be a larger investmen

t than replacem

ent. 

COMMITMEN

TSCHED

ULE* (000

’s)

FUNDING SOURC

E(S)

Phase 

Pre 20

17 

2017

 20

1820

1920

2020

21Po

st 202

1 To

tal

☒Capital  

☐Expe

nse: ☐

Engine

ering ☐Sewer ☐

Water 

☐Co

st Share 

☐Other 

Assessmen

t/Stud

y  

  

0De

sign 

  

310

 31

0Co

nstructio

n  

 1,820

 1,820

Total Project Cost 

0 0 

310

1,81

00

00 

2,13

0CA

SH FLO

W SUMMAR

Y** (000

’s)

 Pre 20

17 

2017

 20

1820

1920

2020

21Po

st 202

1 To

tal

Total 

0 0 

9048

01,46

010

00 

2,13

0*C

oncept level costs based

 on previous re

ports, Capita

l Improvem

ent P

lans develop

ed by othe

rs, or sim

ilar type projects. 

**Includ

es con

tingencies. 

Page 26: Water and Sewer Authority Improvement Programapps.pittsburghpa.gov/pwsa/2017-2021_CIP_1.2017.pdf · 2017-04-19 · Sustainability – Energy efficiency and “green” approach to

  

FY 2017 to 2021Ca

pital Improvem

ent P

lan 

 PR

OJECT

 CLA

SS 

Water Pum

ping

 and

 Storage 

NEIGHBO

RHOOD/W

ARD

System

wide 

 PR

OJECT

 NAM

E Aspinw

all Pum

p Station Im

provem

ents

PROJECT

 NO. 

Unassigne

d STAT

US 

Assessmen

t/Stud

y PR

IORITY

Safety, R

eliability/Ope

ratio

nal Flexibility, Capacity

, Ope

ratio

ns and

 Mainten

ance Efficien

cy, Level of 

Service 

PROJECT

 DESCR

IPTION 

Replacem

ent o

f aged pu

mp and valve eq

uipm

ent, electrical equ

ipmen

t, HV

AC, and

 auxiliary system

s and

 rehabilitation 

of th

e bu

ilding archite

ctural and

 ene

rgy managem

ent systems. 

PROJECT

 JUSTIFICAT

ION 

The pu

mp station was con

structed

 in 1914 and many of th

e compo

nents w

ere installed in 1958.  The

 pum

p station is 

in need of re

novatio

ns and

 upgrade

s to maintain service, re

store a 20

 to 25 year useful life

 expectancy, and

 to provide

 safer con

ditio

ns fo

r the

 staff.  Add

ition

ally, installatio

n of variable freq

uency drives will re

duce water pressure surges 

durin

g start‐up

 that can

 detrim

entally im

pact th

e 60

‐inch risin

g main to Lanph

er Reservoir, allow th

e pu

mps to

 op

erate over a wide range of flow

, and

 will re

duce th

e requ

ired size of th

e ne

w clearwell. 

RISK

(S) 

Expo

ses the

 Autho

rity's to higher capita

l costs to

 add

ress emergency failures a

nd its c

ustomers to a po

tentially 

deficient water su

pply.  Po

tential increase of ope

ratio

ns and

 mainten

ance expen

ses. Staff mem

bers m

ay be expo

sed 

to electrical arc flashe

s due

 to th

e age of th

e electrical sy

stem

s. 

IMPA

CT ON OPE

RATIONS 

Increased op

erating efficiency, flexibility, and

 reliability and im

proved

 safety con

ditio

ns fo

r staff. 

ALTERN

ATIVES TO THE RE

COMMEN

DED

 ACT

ION 

Constructio

n of a new

 facility to re

place the existing pu

mp station. 

COMMITMEN

TSCHED

ULE*1

(000’s)

FUNDING SOURC

E(S)

Phase 

Pre 20

17 

2017

 20

1820

1920

2020

21Po

st 202

1 To

tal

☒Capital  

☒Expe

nse: ☒

Engine

ering ☐Sewer ☐

Water 

☐Co

st Share 

☐Other 

Assessmen

t/Stud

y 10

0  

 10

0De

sign 

 2,770 

 2,770

Constructio

n  

 26

,590

 26

,590

Total Project Cost 

100 

2,77

0 0

26,590

00

0 29

,460

CASH

 FLO

W SUMMAR

Y**1

(000

’s)

 Pre 20

17 

2017

 20

1820

1920

2020

21Po

st 202

1 To

tal

Total 

0 40

0 1,82

03,29

010

,095

10,095

3,76

0 29

,460

*Con

cept level costs based

 on previous re

ports, Capita

l Improvem

ent P

lans develop

ed by othe

rs, or sim

ilar type projects. 

**Includ

es con

tingencies. 

1  Pen

ding

 com

pletion and review

 of the

 recommen

datio

ns from

 the Re

commen

ded Pu

mp Station Assessmen

t Project, the

 com

mitm

ent a

nd cash flo

w will be refin

ed. 

Page 27: Water and Sewer Authority Improvement Programapps.pittsburghpa.gov/pwsa/2017-2021_CIP_1.2017.pdf · 2017-04-19 · Sustainability – Energy efficiency and “green” approach to

  

FY 2017 to 2021Ca

pital Improvem

ent P

lan 

 PR

OJECT

 CLA

SS 

Water Pum

ping

 and

 Storage 

NEIGHBO

RHOOD/W

ARD

System

wide 

 PR

OJECT

 NAM

E Brue

cken

 Pum

p Station Im

provem

ents

PROJECT

 NO. 

Unassigne

d STAT

US 

Assessmen

t/Stud

y PR

IORITY

Safety, R

eliability/Ope

ratio

nal Flexibility, Capacity

, Ope

ratio

ns and

 Mainten

ance Efficien

cy, Level of 

Service 

PROJECT

 DESCR

IPTION 

Replacem

ent o

f aged pu

mp and valve eq

uipm

ent, electrical equ

ipmen

t, HV

AC, and

 auxiliary system

s and

 rehabilitation 

of th

e bu

ilding archite

ctural and

 ene

rgy managem

ent systems. 

PROJECT

 JUSTIFICAT

ION 

The pu

mp station was con

structed

 in 1931.  The

 pum

p station is in need of re

novatio

ns and

 upgrade

s to maintain 

service, re

store a 20

 to 25 year useful life

 expectancy, and

 to provide

 safer con

ditio

ns fo

r the

 staff.  Add

ition

ally, 

installatio

n of variable freq

uency drives will re

duce water pressure surges during start‐up

, allow th

e pu

mps to

 ope

rate 

more efficiently over a

 wide range of flow

 dem

ands, and

 will re

duce th

e requ

ired size of th

e ne

w clearwell. 

RISK

(S) 

Expo

ses the

 Autho

rity to highe

r capita

l costs to

 add

ress emergency facility failures a

nd its c

ustomers to a po

tentially 

deficient water su

pply.  Po

tential increase of ope

ratio

ns and

 mainten

ance expen

ses. Staff mem

bers m

ay be expo

sed 

to electrical arc flashe

s due

 to th

e age of th

e electrical sy

stem

s. 

IMPA

CT ON OPE

RATIONS 

Increased op

erating efficiency, flexibility, and

 reliability and im

proved

 safety con

ditio

ns fo

r staff. 

ALTERN

ATIVES TO THE RE

COMMEN

DED

 ACT

ION 

Constructio

n of a new

 facility to re

place the existing pu

mp station. 

COMMITMEN

TSCHED

ULE*1

(000’s)

FUNDING SOURC

E(S)

Phase 

Pre 20

17 

2017

 20

1820

1920

2020

21Po

st 202

1 To

tal

☒Capital  

☒Expe

nse: ☒

Engine

ering ☐Sewer ☐

Water 

☐Co

st Share 

☐Other 

Assessmen

t/Stud

y 10

0  

 10

0De

sign 

 2,410 

 2,410

Constructio

n  

 22

,570

 22

,570

Total Project Cost 

100 

2,41

0 0

22,570

00

0 25

,080

CASH

 FLO

W SUMMAR

Y**1

(000

’s)

 Pre 20

17 

2017

 20

1820

1920

2020

21Po

st 202

1 To

tal

Total 

0 36

5 1,58

02,82

08,56

08,56

03,19

5 25

,080

*Con

cept level costs based

 on previous re

ports, Capita

l Improvem

ent P

lans develop

ed by othe

rs, or sim

ilar type projects. 

**Includ

es con

tingencies. 

1  Pen

ding

 com

pletion and review

 of the

 recommen

datio

ns from

 the Re

commen

ded Pu

mp Station Assessmen

t Project, the

 com

mitm

ent a

nd cash flo

w will be refin

ed. 

Page 28: Water and Sewer Authority Improvement Programapps.pittsburghpa.gov/pwsa/2017-2021_CIP_1.2017.pdf · 2017-04-19 · Sustainability – Energy efficiency and “green” approach to

  

FY 2017 to 2021Ca

pital Improvem

ent P

lan 

 PR

OJECT

 CLA

SS 

Water Pum

ping

 and

 Storage 

NEIGHBO

RHOOD/W

ARD

Garfie

ld/10 

 

 

PROJECT

 NAM

E Garfie

ld Pum

p Station Im

provem

ents

PROJECT

 NO. 

Unassigne

d STAT

US 

Desig

n PR

IORITY

Safety, R

eliability/Ope

ratio

nal Flexibility, Capacity

, Ope

ratio

ns and

 Mainten

ance Efficien

cy, Level of 

Service 

PROJECT

 DESCR

IPTION 

Installatio

n of an interim

 skid m

ounted

, fully enclosed, packaged pu

mp station with

 a pum

ping

 capacity

 of 5

 MGD, 

emergency pipe

 con

nections, and

 integration into PWSA

’s SCA

DA sy

stem

 for rem

ote mon

itorin

g and op

eration. At a

 minim

um, reh

abilitatio

n of th

e existing station will includ

e installatio

n of new

 electrical com

pone

nts, variable 

freq

uency drives, pum

ps, m

otors, and

 valves.  In additio

n, im

provem

ents to

 HVA

C and ancillary building system

s are 

anticipated

.  Upo

n completion of th

e rehabilitation, th

e interim

 pum

p station will be removed

 and

 utilize

d for future 

pump station rehabilitation and up

grade projects, and

 will be available for e

mergency service. 

PROJECT

 JUSTIFICAT

ION 

The Garfie

ld Pum

p Station supp

lies w

ater from

 Highland Re

servoir N

o. 1 to

 the Garfie

ld Tank and is the on

ly m

eans of 

service to th

e Garfie

ld Tank, with

 no othe

r pum

p station or intercon

nection available to su

pply water to

 the district.  

Due to sa

fety and

 reliability concerns, O

peratio

ns has determined

 it is no longer sa

fe to

 enter th

e pu

mp station. 

RISK

(S) 

An interrup

tion in th

e supp

ly of w

ater, including

 fire flow

, to the Garfie

ld pressure district.  Significant h

ealth

 and

 safety risk to

 staff. 

IMPA

CT ON OPE

RATIONS 

Increased op

erating efficiency, flexibility, and

 reliability and im

proved

 safety con

ditio

ns fo

r staff. 

ALTERN

ATIVES TO THE RE

COMMEN

DED

 ACT

ION 

Constructio

n of a new

 facility to re

place the existing pu

mp station and allow fo

r pum

ping

 from

 Highland No. 2 

Reservoir to Highland

 No. 1 Service Area.  See

 Highland Re

servoir P

ump Station and Risin

g Main. 

COMMITMEN

TSCHED

ULE*1

(000’s)

FUNDING SOURC

E(S)

Phase 

Pre 20

17 

2017

 20

1820

1920

2020

21Po

st 202

1 To

tal

☒Capital  

☐Expe

nse: ☐

Engine

ering ☐Sewer ☐

Water 

☐Co

st Share 

☐Other 

Assessmen

t/Stud

y  

  

0De

sign 

90 

610 

 70

0Co

nstructio

n 62

0  

3,530

 4,150

Total Project Cost 

710 

610 

3,53

00

00

0 4,85

0CA

SH FLO

W SUMMAR

Y**1

(000

’s)

 Pre 20

17 

2017

 20

1820

1920

2020

21Po

st 202

1 To

tal

Total 

0 88

0 68

02,86

542

50

0 4,85

0*C

oncept level costs based

 on previous re

ports, Capita

l Improvem

ent P

lans develop

ed by othe

rs, or sim

ilar type projects. 

**Includ

es con

tingencies. 

1  Pen

ding

 com

pletion and review

 of the

 recommen

datio

ns from

 the Re

commen

ded Pu

mp Station Assessmen

t Project, the

 com

mitm

ent a

nd cash flo

w will be refin

ed. 

Page 29: Water and Sewer Authority Improvement Programapps.pittsburghpa.gov/pwsa/2017-2021_CIP_1.2017.pdf · 2017-04-19 · Sustainability – Energy efficiency and “green” approach to

  

FY 2017 to 2021Ca

pital Improvem

ent P

lan 

 PR

OJECT

 CLA

SS 

Water Pum

ping

 and

 Storage 

NEIGHBO

RHOOD/W

ARD

System

wide 

 PR

OJECT

 NAM

E Highland

 Reservoir Pu

mp Station and Risin

g Main

PROJECT

 NO. 

Unassigne

d STAT

US 

New

 PR

IORITY

Regulatory Com

pliance, Reliability/Ope

ratio

nal 

Flexibility, C

apacity

, Level of Service 

PROJECT

 DESCR

IPTION 

Constructio

n of a new

 finished

 water pum

p station and transm

ission main to su

pply water to

 the Highland

 No.1 

Service Area from

 Highland No. 2 Reservoir. 

PROJECT

 JUSTIFICAT

ION 

All com

pliant water su

pply fo

r the

 Highland No. 1 Service Area curren

tly flow

s throu

gh th

e Highland

 No. 1 Reservoir 

and the Mem

brane Filtration Plant (MFP).  The

re is no othe

r sou

rce water su

pply fo

r the

 Highland No. 1 Service Area.  

In add

ition

 to providing

 alte

rnate supp

ly, this p

roject is to

 tempo

rarily provide fin

ished

 water th

at m

eets th

e chlorin

e disin

fection rules to the Highland

 No. 1 Service Area du

ring the Clearw

ell Rep

lacemen

t Project.  Ad

ditio

nally, this n

ew 

facility could also be de

signe

d to se

rvice the Garfie

ld pressure district, thus elim

inating the rehabilitation of th

e (New

) Highland

 Pum

p Station. 

RISK

(S) 

Failure of the

 two Risin

g Mains (N

o.1 or No. 2), MFP, or B

ruecken Pu

mp Station wou

ld re

sult in th

e loss of com

pliant 

water su

pply to

 app

roximately 40

% of the

 Autho

rity’s c

ustomer base. 

IMPA

CT ON OPE

RATIONS 

Increased op

eration and mainten

ance labo

r and

 expen

ses.  Increased

 ope

ratin

g fle

xibility in th

e future. 

ALTERN

ATIVES TO THE RE

COMMEN

DED

 ACT

ION 

Alternative 1: Con

struction of a new

 clearwell at the

 site of the

 existing west sed

imen

tatio

n basin

.  Ho

wever, a 

previous stud

y cond

ucted by an en

gine

ering consultant still re

commen

ded the additio

n of th

ese assets as p

art o

f the

 Clearw

ell Rep

lacemen

t project. 

Alternative 2: Inclusion in th

e expansion and rehabilitation of th

e existing (New

) Highland Pu

mp Station. 

COMMITMEN

TSCHED

ULE* (000

’s)

FUNDING SOURC

E(S)

Phase 

Pre 20

17 

2017

 20

1820

1920

2020

21Po

st 202

1 To

tal

☒Capital  

☐Expe

nse: ☐

Engine

ering ☐Sewer ☐

Water 

☐Co

st Share 

☐Other 

Assessmen

t/Stud

y  

  

0De

sign 

 3,520 

 3,520

Constructio

n  

 28

,170

 28

,170

Total Project Cost 

0 3,52

0 0

28,170

00

0 31

,690

CASH

 FLO

W SUMMAR

Y**(000

’s)

 Pre 20

17 

2017

 20

1820

1920

2020

21Po

st 202

1 To

tal

Total 

0 61

0 1,99

02,80

010

,700

10,700

4,89

0 31

,690

*Con

cept level costs based

 on previous re

ports, Capita

l Improvem

ent P

lans develop

ed by othe

rs, or sim

ilar type projects. 

**Includ

es con

tingencies. 

Page 30: Water and Sewer Authority Improvement Programapps.pittsburghpa.gov/pwsa/2017-2021_CIP_1.2017.pdf · 2017-04-19 · Sustainability – Energy efficiency and “green” approach to

  

FY 2017 to 2021Ca

pital Improvem

ent P

lan 

 PR

OJECT

 CLA

SS 

Water Pum

ping

 and

 Storage 

NEIGHBO

RHOOD/W

ARD

Squirrel Hill, R

egen

t Squ

are, Point Breeze, 

Green

field/14 

 

PROJECT

 NAM

E He

rron

 Hill Pum

p Station Im

provem

ents

PROJECT

 NO. 

Unassigne

d STAT

US 

Assessmen

t/Stud

y PR

IORITY

Safety, R

eliability/Ope

ratio

nal Flexibility, Ope

ratio

ns 

and Mainten

ance Efficien

cy, Level of Service 

PROJECT

 DESCR

IPTION 

Replacem

ent o

f aged pu

mp and valve eq

uipm

ent, electrical equ

ipmen

t, HV

AC, and

 auxiliary system

s and

 rehabilitation 

of th

e bu

ilding archite

ctural and

 ene

rgy managem

ent systems a

s prio

ritize

d by

 the recommen

ded Finished

 Water 

Pump Stations Con

ditio

n Assessmen

t Project. 

PROJECT

 JUSTIFICAT

ION 

The pu

mp station was orig

inally con

structed

 in th

e late 1890's.  The

 pum

p station is in need of re

novatio

ns and

 up

grades to

 maintain service, re

store a 20

 to 25 year useful life

 expectancy, and

 to provide

 safer con

ditio

ns fo

r the

 staff.  To op

timize

 capita

l expen

ditures a

nd m

inim

ize disrup

tions, con

struction projects m

ust b

e prioritize

d and 

coordinated. 

RISK

(S) 

Lack of facility plann

ing expo

ses P

WSA

 to highe

r capita

l costs to

 add

ress emergency failures a

nd its c

ustomers to a 

potentially deficient water su

pply.  Po

tential increase of ope

ratio

ns and

 mainten

ance expen

ses. Staff mem

bers m

ay 

be exposed

 to electrical arc flashe

s due

 to th

e age of th

e electrical sy

stem

s. 

IMPA

CT ON OPE

RATIONS 

Increased op

erating efficiency, flexibility, and

 reliability and im

proved

 safety con

ditio

ns fo

r staff. 

ALTERN

ATIVES TO THE RE

COMMEN

DED

 ACT

ION 

Constructio

n of a new

 facility to re

place the existing pu

mp station. 

COMMITMEN

T SCHED

ULE*1

(000’s)

FUNDING SOURC

E(S)

Phase 

Pre 20

17 

2017

 20

1820

1920

2020

21Po

st 202

1 To

tal

☒Capital  

☒Expe

nse: ☒

Engine

ering ☐Sewer ☐

Water 

☐Co

st Share 

☐Other 

Assessmen

t/Stud

y 50

  

 50

Desig

n  

 1,130 

1,130

Constructio

n  

 9,180 

9,180

Total Project Cost 

50 

0 0

00

010

,310

 10

,360

CASH

 FLO

W SUMMAR

Y**1

(000

’s)

 Pre 20

17 

2017

 20

1820

1920

2020

21Po

st 202

1 To

tal

Total 

0 50

 0

00

010

,310

 10

,360

*Con

cept level costs based

 on previous re

ports, Capita

l Improvem

ent P

lans develop

ed by othe

rs, or sim

ilar type projects. 

**Includ

es con

tingencies. 

1  Pen

ding

 com

pletion and review

 of the

 recommen

datio

ns from

 the Re

commen

ded Pu

mp Station Assessmen

t Project, the

 com

mitm

ent a

nd cash flo

w will be refin

ed. 

Page 31: Water and Sewer Authority Improvement Programapps.pittsburghpa.gov/pwsa/2017-2021_CIP_1.2017.pdf · 2017-04-19 · Sustainability – Energy efficiency and “green” approach to

  

FY 2017 to 2021Ca

pital Improvem

ent P

lan 

 PR

OJECT

 CLA

SS 

Water Pum

ping

 and

 Storage 

NEIGHBO

RHOOD/W

ARD

Upp

er Hill/5 

 PR

OJECT

 NAM

E He

rron

 Hill Tank Pu

mp Station Im

provem

ents

PROJECT

 NO. 

Unassigne

d STAT

US 

Assessmen

t/Stud

y PR

IORITY

Safety, R

eliability/Ope

ratio

nal Flexibility, Ope

ratio

ns 

and Mainten

ance Efficien

cy, Level of Service 

PROJECT

 DESCR

IPTION 

Replacem

ent o

f aged pu

mp and valve eq

uipm

ent, electrical equ

ipmen

t, HV

AC, and

 auxiliary system

s and

 rehabilitation 

of th

e bu

ilding archite

ctural and

 ene

rgy managem

ent systems a

s prio

ritize

d by

 the recommen

ded Finished

 Water 

Pump Stations Con

ditio

n Assessmen

t Project. 

PROJECT

 JUSTIFICAT

ION 

The pu

mp station is in need of re

novatio

ns and

 upgrade

s to maintain service, re

store a 20

 to 25 year useful life

 expe

ctancy, and

 to provide

 safer con

ditio

ns fo

r the

 staff.  To op

timize

 capita

l expen

ditures a

nd m

inim

ize disrup

tions, 

constructio

n projects m

ust b

e prioritize

d and coordinated.   

RISK

(S) 

Lack of facility plann

ing expo

ses P

WSA

 to highe

r capita

l costs to

 add

ress emergency failures a

nd its c

ustomers to a 

potentially deficient water su

pply.  Po

tential increase of ope

ratio

ns and

 mainten

ance expen

ses. Staff mem

bers m

ay 

be exposed

 to electrical arc flashe

s due

 to th

e age of th

e electrical sy

stem

s. 

IMPA

CT ON OPE

RATIONS 

Increased op

erating efficiency, flexibility, and

 reliability and im

proved

 safety con

ditio

ns fo

r staff. 

ALTERN

ATIVES TO THE RE

COMMEN

DED

 ACT

ION 

Constructio

n of a new

 facility to re

place the existing pu

mp station. 

COMMITMEN

T SCHED

ULE*1

(000’s)

FUNDING SOURC

E(S)

Phase 

Pre 20

17 

2017

 20

1820

1920

2020

21Po

st 202

1 To

tal

☒Capital  

☒Expe

nse: ☒

Engine

ering ☐Sewer ☐

Water 

☐Co

st Share 

☐Other 

Assessmen

t/Stud

y 8 

  

8De

sign 

  

130 

130

Constructio

n  

 89

0 89

0To

tal Project Cost 

8 0 

00

00

1,02

0 1,02

8CA

SH FLO

W SUMMAR

Y**1

(000

’s)

 Pre 20

17 

2017

 20

1820

1920

2020

21Po

st 202

1 To

tal

Total 

0 8 

00

00

1,02

0 1,02

8*C

oncept level costs based

 on previous re

ports, Capita

l Improvem

ent P

lans develop

ed by othe

rs, or sim

ilar type projects. 

**Includ

es con

tingencies. 

1  Pen

ding

 com

pletion and review

 of the

 recommen

datio

ns from

 the Re

commen

ded Pu

mp Station Assessmen

t Project, the

 com

mitm

ent a

nd cash flo

w will be refin

ed. 

Page 32: Water and Sewer Authority Improvement Programapps.pittsburghpa.gov/pwsa/2017-2021_CIP_1.2017.pdf · 2017-04-19 · Sustainability – Energy efficiency and “green” approach to

  

FY 2017 to 2021Ca

pital Improvem

ent P

lan 

 PR

OJECT

 CLA

SS 

Water Pum

ping

 and

 Storage 

NEIGHBO

RHOOD/W

ARD

Brighton

 Heights, C

alifo

rnia Kirk

bride, M

arshall‐

Shadeland, Northview

 Heights, Perry, Pineview, 

Sprin

g Garde

n, Sum

mer Hill/21, 24, 25, 26, 27 

 

 

PROJECT

 NAM

E Ho

ward Pu

mp Station Im

provem

ents

PROJECT

 NO. 

Unassigne

d STAT

US 

Assessmen

t/Stud

y PR

IORITY

Safety, R

eliability/Ope

ratio

nal Flexibility, Ope

ratio

ns 

and Mainten

ance Efficien

cy, Level of Service 

PROJECT

 DESCR

IPTION 

Replacem

ent o

f aged pu

mp and valve eq

uipm

ent, electrical equ

ipmen

t, HV

AC, and

 auxiliary system

s and

 rehabilitation 

of th

e bu

ilding archite

ctural and

 ene

rgy managem

ent systems a

s prio

ritize

d by

 the recommen

ded Finished

 Water 

Pump Stations Con

ditio

n Assessmen

t Project. 

PROJECT

 JUSTIFICAT

ION 

The pu

mp station was orig

inally con

structed

 between 19

00 and

 1904.  The

 pum

p station is in need of re

novatio

ns and

 up

grades to

 maintain service, re

store a 20

 to 25 year useful life

 expectancy, and

 to provide

 safer con

ditio

ns fo

r the

 staff.  To op

timize

 capita

l expen

ditures a

nd m

inim

ize disrup

tions, con

struction projects m

ust b

e prioritize

d and 

coordinated. 

RISK

(S) 

Lack of facility plann

ing expo

ses P

WSA

 to highe

r capita

l costs to

 add

ress emergency failures a

nd its c

ustomers to a 

potentially deficient water su

pply.  Po

tential increase of ope

ratio

ns and

 mainten

ance expen

ses. Staff mem

bers m

ay 

be exposed

 to electrical arc flashe

s due

 to th

e age of th

e electrical sy

stem

s. 

IMPA

CT ON OPE

RATIONS 

Increased op

erating efficiency, flexibility, and

 reliability and im

proved

 safety con

ditio

ns fo

r staff. 

ALTERN

ATIVES TO THE RE

COMMEN

DED

 ACT

ION 

Constructio

n of a new

 facility to re

place the existing pu

mp station. 

COMMITMEN

TSCHED

ULE*1

(000’s)

FUNDING SOURC

E(S)

Phase 

Pre 20

17 

2017

 20

1820

1920

2020

21Po

st 202

1 To

tal

☒Capital  

☒Expe

nse: ☒

Engine

ering ☐Sewer ☐

Water 

☐Co

st Share 

☐Other 

Assessmen

t/Stud

y 85

  

 85

Desig

n  

 1,900 

1,900

Constructio

n  

 15

,410

 15

,410

Total Project Cost 

85 

0 0

00

017

,310

 17

,395

CASH

 FLO

W SUMMAR

Y**1

(000

’s)

 Pre 20

17 

2017

 20

1820

1920

2020

21Po

st 202

1 To

tal

Total 

0 85

 0

00

017

,310

 17

,395

*Con

cept level costs based

 on previous re

ports, Capita

l Improvem

ent P

lans develop

ed by othe

rs, or sim

ilar type projects. 

**Includ

es con

tingencies. 

1  Pen

ding

 com

pletion and review

 of the

 recommen

datio

ns from

 the Re

commen

ded Pu

mp Station Assessmen

t Project, the

 com

mitm

ent a

nd cash flo

w will be refin

ed. 

Page 33: Water and Sewer Authority Improvement Programapps.pittsburghpa.gov/pwsa/2017-2021_CIP_1.2017.pdf · 2017-04-19 · Sustainability – Energy efficiency and “green” approach to

  

FY 2017 to 2021Ca

pital Improvem

ent P

lan 

 PR

OJECT

 CLA

SS 

Water Pum

ping

 and

 Storage 

NEIGHBO

RHOOD/W

ARD

Bloo

mfie

ld//8 

 PR

OJECT

 NAM

E Inline Pu

mp Station (Coral and

 Pacific) Im

provem

ents

PROJECT

 NO. 

Unassigne

d STAT

US 

Assessmen

t/Stud

y PR

IORITY

Safety, R

eliability/Ope

ratio

nal Flexibility, Ope

ratio

ns 

and Mainten

ance Efficien

cy, Level of Service 

PROJECT

 DESCR

IPTION 

Replacem

ent o

f aged pu

mp and valve eq

uipm

ent, electrical equ

ipmen

t, HV

AC, and

 auxiliary system

s and

 rehabilitation 

of th

e bu

ilding archite

ctural and

 ene

rgy managem

ent systems a

s prio

ritize

d by

 the recommen

ded Finished

 Water 

Pump Stations Con

ditio

n Assessmen

t Project. 

PROJECT

 JUSTIFICAT

ION 

The pu

mp station is in need of re

novatio

ns and

 upgrade

s to maintain service, re

store a 20

 to 25 year useful life

 expe

ctancy, and

 to provide

 safer con

ditio

ns fo

r the

 staff.  To op

timize

 capita

l expen

ditures a

nd m

inim

ize disrup

tions, 

constructio

n projects m

ust b

e prioritize

d and coordinated.   

RISK

(S) 

Lack of facility plann

ing expo

ses P

WSA

 to highe

r capita

l costs to

 add

ress emergency failures a

nd its c

ustomers to a 

potentially deficient water su

pply.  Po

tential increase of ope

ratio

ns and

 mainten

ance expen

ses. Staff mem

bers m

ay 

be exposed

 to electrical arc flashe

s due

 to th

e age of th

e electrical sy

stem

s. 

IMPA

CT ON OPE

RATIONS 

Increased op

erating efficiency, flexibility, and

 reliability and im

proved

 safety con

ditio

ns fo

r staff. 

ALTERN

ATIVES TO THE RE

COMMEN

DED

 ACT

ION 

Constructio

n of a new

 facility to re

place the existing pu

mp station. 

COMMITMEN

TSCHED

ULE*1

(000’s)

FUNDING SOURC

E(S)

Phase 

Pre 20

17 

2017

 20

1820

1920

2020

21Po

st 202

1 To

tal

☒Capital  

☒Expe

nse: ☒

Engine

ering ☐Sewer ☐

Water 

☐Co

st Share 

☐Other 

Assessmen

t/Stud

y 10

  

 10

Desig

n  

80 

 80

Constructio

n  

 51

510

Total Project Cost 

10 

80 

510

00

00 

600

CASH

 FLO

W SUMMAR

Y**1

(000

’s)

 Pre 20

17 

2017

 20

1820

1920

2020

21Po

st 202

1 To

tal

Total 

0 65

 51

025

00

0 60

0*C

oncept level costs based

 on previous re

ports, Capita

l Improvem

ent P

lans develop

ed by othe

rs, or sim

ilar type projects. 

**Includ

es con

tingencies.  

1  Pen

ding

 com

pletion and review

 of the

 recommen

datio

ns from

 the Re

commen

ded Pu

mp Station Assessmen

t Project, the

 com

mitm

ent a

nd cash flo

w will be refin

ed. 

Page 34: Water and Sewer Authority Improvement Programapps.pittsburghpa.gov/pwsa/2017-2021_CIP_1.2017.pdf · 2017-04-19 · Sustainability – Energy efficiency and “green” approach to

  

FY 2017 to 2021Ca

pital Improvem

ent P

lan 

 PR

OJECT

 CLA

SS 

Water Pum

ping

 and

 Storage 

NEIGHBO

RHOOD/W

ARD

Lincoln‐Lemington

/12 

 PR

OJECT

 NAM

E Lincoln Pu

mp Station Im

provem

ents

PROJECT

 NO. 

Unassigne

d STAT

US 

Assessmen

t/Stud

y PR

IORITY

Safety, R

eliability/Ope

ratio

nal Flexibility, Ope

ratio

ns 

and Mainten

ance Efficien

cy, Level of Service 

PROJECT

 DESCR

IPTION 

Replacem

ent o

f aged pu

mp and valve eq

uipm

ent, electrical equ

ipmen

t, HV

AC, and

 auxiliary system

s and

 rehabilitation 

of th

e bu

ilding archite

ctural and

 ene

rgy managem

ent systems a

s prio

ritize

d by

 the recommen

ded Finished

 Water 

Pump Stations Con

ditio

n Assessmen

t Project. 

PROJECT

 JUSTIFICAT

ION 

The pu

mp station was orig

inally con

structed

 in 195

2.  The

 pum

p station is in need of re

novatio

ns and

 upgrade

s to 

maintain service, re

store a 20

 to 25 year useful life

 expectancy, and

 to provide

 safer con

ditio

ns fo

r the

 staff.  To 

optim

ize capita

l expen

ditures a

nd m

inim

ize disrup

tions, con

struction projects m

ust b

e  prioritize

d and coordinated.   

RISK

(S) 

Lack of facility plann

ing expo

ses P

WSA

 to highe

r capita

l costs to

 add

ress emergency failures a

nd its c

ustomers to a 

potentially deficient water su

pply.  Po

tential increase of ope

ratio

ns and

 mainten

ance expen

ses. Staff mem

bers m

ay 

be exposed

 to electrical arc flashe

s due

 to th

e age of th

e electrical sy

stem

s. 

IMPA

CT ON OPE

RATIONS 

Increased op

erating efficiency, flexibility, and

 reliability and im

proved

 safety con

ditio

ns fo

r staff. 

ALTERN

ATIVES TO THE RE

COMMEN

DED

 ACT

ION 

Constructio

n of a new

 facility to re

place the existing pu

mp station. 

COMMITMEN

T SCHED

ULE*1

(000’s)

FUNDING SOURC

E(S)

Phase 

Pre 20

17 

2017

 20

1820

1920

2020

21Po

st 202

1 To

tal

☒Capital  

☒Expe

nse: ☒

Engine

ering ☐Sewer ☐

Water 

☐Co

st Share 

☐Other 

Assessmen

t/Stud

y 20

  

 20

Desig

n  

 35

0 35

0Co

nstructio

n  

 2,550 

2,550

Total Project Cost 

20 

0 0

00

02,90

0 2,92

0CA

SH FLO

W SUMMAR

Y**1

(000

’s)

 Pre 20

17 

2017

 20

1820

1920

2020

21Po

st 202

1 To

tal

Total 

0 20

 0

00

02,90

0 2,92

0*C

oncept level costs based

 on previous re

ports, Capita

l Improvem

ent P

lans develop

ed by othe

rs, or sim

ilar type projects. 

**Includ

es con

tingencies. 

1  Pen

ding

 com

pletion and review

 of the

 recommen

datio

ns from

 the Re

commen

ded Pu

mp Station Assessmen

t Project, the

 com

mitm

ent a

nd cash flo

w will be refin

ed. 

Page 35: Water and Sewer Authority Improvement Programapps.pittsburghpa.gov/pwsa/2017-2021_CIP_1.2017.pdf · 2017-04-19 · Sustainability – Energy efficiency and “green” approach to

  

FY 2017 to 2021Ca

pital Improvem

ent P

lan 

 PR

OJECT

 CLA

SS 

Water Pum

ping

 and

 Storage 

NEIGHBO

RHOOD/W

ARD

Sheradan, Elliott, West E

nd, W

estw

ood, Ridgemon

t, Du

quesne

 Heights, Sou

th Sho

re, M

ount W

ashington, 

Allentow

n, Sou

thsid

e Slop

es/16, 17, 18, 20 

 

PROJECT

 NAM

E Mission Pu

mp Station Im

provem

ents

PROJECT

 NO. 

Unassigne

d STAT

US 

Assessmen

t/Stud

y PR

IORITY

Safety, R

eliability/Ope

ratio

nal Flexibility, Ope

ratio

ns 

and Mainten

ance Efficien

cy, Level of Service 

PROJECT

 DESCR

IPTION 

Replacem

ent o

f aged pu

mp and valve eq

uipm

ent, electrical equ

ipmen

t, HV

AC, and

 auxiliary system

s and

 rehabilitation 

of th

e bu

ilding archite

ctural and

 ene

rgy managem

ent systems a

s prio

ritize

d by

 the recommen

ded Finished

 Water 

Pump Stations Con

ditio

n Assessmen

t Project. 

PROJECT

 JUSTIFICAT

ION 

The Mission Pu

mp Station is the on

ly pum

ping

 station located south of th

e Mon

ongahe

la River and

 was orig

inally 

constructed be

tween 1910

 and

 1912.  The

 pum

p station is in need of re

novatio

ns and

 upgrade

s to maintain service, 

restore a 20

 to 25 year useful life

 expectancy, and

 to provide

 safer con

ditio

ns fo

r the

 staff.  To op

timize

 capita

l expe

nditu

res a

nd m

inim

ize disrup

tions, con

struction projects m

ust b

e prioritize

d and coordinated.   

RISK

(S) 

Lack of facility plann

ing expo

ses P

WSA

 to highe

r capita

l costs to

 add

ress emergency failures a

nd its c

ustomers to a 

potentially deficient water su

pply.  Po

tential increase of ope

ratio

ns and

 mainten

ance expen

ses. Staff mem

bers m

ay 

be exposed

 to electrical arc flashe

s due

 to th

e age of th

e electrical sy

stem

s. 

IMPA

CT ON OPE

RATIONS 

Increased op

erating efficiency, flexibility, and

 reliability and im

proved

 safety con

ditio

ns fo

r staff. 

ALTERN

ATIVES TO THE RE

COMMEN

DED

 ACT

ION 

Constructio

n of a new

 facility to re

place the existing pu

mp station. 

COMMITMEN

TSCHED

ULE*1

(000’s)

FUNDING SOURC

E(S)

Phase 

Pre 20

17 

2017

 20

1820

1920

2020

21Po

st 202

1 To

tal

☒Capital  

☒Expe

nse: ☒

Engine

ering ☐Sewer ☐

Water 

☐Co

st Share 

☐Other 

Assessmen

t/Stud

y 65

  

 65

Desig

n  

 1,725 

1,725

Constructio

n  

 13

,995

 13

,995

Total Project Cost 

65 

0 0

00

015

,720

 15

,785

CASH

 FLO

W SUMMAR

Y**1

(000

’s)

 Pre 20

17 

2017

 20

1820

1920

2020

21Po

st 202

1 To

tal

Total 

0 65

 0

00

015

,720

 15

,785

*Con

cept level costs based

 on previous re

ports, Capita

l Improvem

ent P

lans develop

ed by othe

rs, or sim

ilar type projects. 

**Includ

es con

tingencies. 

1  Pen

ding

 com

pletion and review

 of the

 recommen

datio

ns from

 the Re

commen

ded Pu

mp Station Assessmen

t Project, the

 com

mitm

ent a

nd cash flo

w will be refin

ed. 

Page 36: Water and Sewer Authority Improvement Programapps.pittsburghpa.gov/pwsa/2017-2021_CIP_1.2017.pdf · 2017-04-19 · Sustainability – Energy efficiency and “green” approach to

  

FY 2017 to 2021Ca

pital Improvem

ent P

lan 

 PR

OJECT

 CLA

SS 

Water Pum

ping

 and

 Storage 

NEIGHBO

RHOOD/W

ARD

Glen Ha

zel, Ha

zelwoo

d, Squ

irrel Hill Sou

th, Swisshe

lm 

Park/ 1

4, 15 

 

PROJECT

 NAM

E Saline Pu

mp Station Im

provem

ents

PROJECT

 NO. 

Unassigne

d STAT

US 

Assessmen

t/Stud

y PR

IORITY

Safety, R

eliability/Ope

ratio

nal Flexibility, Ope

ratio

ns 

and Mainten

ance Efficien

cy, Level of Service 

PROJECT

 DESCR

IPTION 

Replacem

ent o

f aged pu

mp and valve eq

uipm

ent, electrical equ

ipmen

t, HV

AC, and

 auxiliary system

s and

 rehabilitation 

of th

e bu

ilding archite

ctural and

 ene

rgy managem

ent systems a

s prio

ritize

d by

 the recommen

ded Finished

 Water 

Pump Stations Con

ditio

n Assessmen

t Project. 

PROJECT

 JUSTIFICAT

ION 

The pu

mp station was orig

inally con

structed

 in 193

5.  The

 pum

p station is in need of re

novatio

ns and

 upgrade

s to 

maintain service, re

store a 20

 to 25 year useful life

 expectancy, and

 to provide

 safer con

ditio

ns fo

r the

 staff.  To 

optim

ize capita

l expen

ditures a

nd m

inim

ize disrup

tions, con

struction projects m

ust b

e prioritize

d and coordinated.   

RISK

(S) 

Lack of facility plann

ing expo

ses P

WSA

 to highe

r capita

l costs to

 add

ress emergency failures a

nd its c

ustomers to a 

potentially deficient water su

pply.  Po

tential increase of ope

ratio

ns and

 mainten

ance expen

ses. Staff mem

bers m

ay 

be exposed

 to electrical arc flashe

s due

 to th

e age of th

e electrical sy

stem

s. 

IMPA

CT ON OPE

RATIONS 

Increased op

erating efficiency, flexibility, and

 reliability and im

proved

 safety con

ditio

ns fo

r staff. 

ALTERN

ATIVES TO THE RE

COMMEN

DED

 ACT

ION 

Constructio

n of a new

 facility to re

place the existing pu

mp station. 

COMMITMEN

TSCHED

ULE*1

(000’s)

FUNDING SOURC

E(S)

Phase 

Pre 20

17 

2017

 20

1820

1920

2020

21Po

st 202

1 To

tal

☒Capital  

☒Expe

nse: ☒

Engine

ering ☐Sewer ☐

Water 

☐Co

st Share 

☐Other 

Assessmen

t/Stud

y 15

  

 15

Desig

n  

 40

0 40

0Co

nstructio

n  

 2,900 

2,900

Total Project Cost 

15 

0 0

00

03,30

0 3,31

5CA

SH FLO

W SUMMAR

Y**1

(000

’s)

 Pre 20

17 

2017

 20

1820

1920

2020

21Po

st 202

1 To

tal

Total 

0 15

 0

00

03,30

0 3,31

5*C

oncept level costs based

 on previous re

ports, Capita

l Improvem

ent P

lans develop

ed by othe

rs, or sim

ilar type projects. 

**Includ

es con

tingencies. 

1  Pen

ding

 com

pletion and review

 of the

 recommen

datio

ns from

 the Re

commen

ded Pu

mp Station Assessmen

t Project, the

 com

mitm

ent a

nd cash flo

w will be refin

ed. 

Page 37: Water and Sewer Authority Improvement Programapps.pittsburghpa.gov/pwsa/2017-2021_CIP_1.2017.pdf · 2017-04-19 · Sustainability – Energy efficiency and “green” approach to

  

FY 2017 to 2021Ca

pital Improvem

ent P

lan 

 . 

PROJECT

 CLA

SS 

Water Pum

ping

 and

 Storage 

NEIGHBO

RHOOD/W

ARD

System

wide 

 PR

OJECT

 NAM

E Aspinw

all Pum

p Station to Lanph

er Reservoir Risin

g Main

PROJECT

 NO. 

2013

‐930

‐231

‐0 

STAT

US 

Desig

n PR

IORITY

Regulatory Com

pliance, Reliability/Ope

ratio

nal 

Flexibility, Level of Service 

PROJECT

 DESCR

IPTION 

Constructio

n of a new

, red

undant risin

g main from

 Aspinwall Pum

p Station to Lanph

er Reservoir. 

PROJECT

 JUSTIFICAT

ION 

The existing 60

‐inch risin

g main that su

pplies the

 Lanph

er Reservoir is a 15

0 year old riveted steel pipe, has se

veral tap

 conn

ectio

ns to

 critical and

 bulk custom

ers, and

 has experienced

 recent pipe failures.  The

 new

 propo

sed rising main 

wou

ld se

rve as a prim

ary supp

ly so

urce fo

r Lanph

er Reservoir du

ring the Clearw

ell Rep

lacemen

t Project and

 a 

redu

ndant sup

ply line in case of a failure or p

lann

ed cleaning and rehabilitation of th

e existing 60

‐inch su

pply m

ain. 

RISK

(S) 

Failure of the

 risin

g main could im

pact up to half o

f PWSA

’s customers, includ

ing St. M

argaret H

ospital, and othe

r bulk 

custom

ers, includ

ing Aspinw

all, Blaw

nox, Etna, Sharpsburg, Fox Chape

l, and Shaler. 

IMPA

CT ON OPE

RATIONS 

Increased op

erating fle

xibility and reliability. 

ALTERN

ATIVES TO THE RE

COMMEN

DED

 ACT

ION 

Rehabilitation of th

e existing 60

‐inch su

pply m

ain and constructio

n of a parallel m

ain in se

ctions th

at canno

t be 

curren

tly isolated

 to clean, inspe

ct, or reh

abilitate. 

COMMITMEN

TSCHED

ULE* (000

’s)

FUNDING SOURC

E(S)

Phase 

Pre 20

17 

2017

 20

1820

1920

2020

21Po

st 202

1 To

tal

☒Capital  

☐Expe

nse: ☐

Engine

ering ☐Sewer ☐

Water 

☐Co

st Share 

☐Other 

Assessmen

t/Stud

y  

  

0De

sign 

156 

5,160 

 5,316

Constructio

n  

 43

,520

 43

,520

Total Project Cost 

156 

5,16

0 0

43,520

00

0 48

,836

CASH

 FLO

W SUMMAR

Y**(000

’s)

 Pre 20

17 

2017

 20

1820

1920

2020

21Po

st 202

1 To

tal

Total 

156 

510 

2,72

02,10

024

,770

18,580

0 48

,836

*Con

cept level costs based

 on previous re

ports, Capita

l Improvem

ent P

lans develop

ed by othe

rs, or sim

ilar type projects. 

**Includ

es con

tingencies. 

Page 38: Water and Sewer Authority Improvement Programapps.pittsburghpa.gov/pwsa/2017-2021_CIP_1.2017.pdf · 2017-04-19 · Sustainability – Energy efficiency and “green” approach to

                

This page was intentiona

lly left blank

 

Page 39: Water and Sewer Authority Improvement Programapps.pittsburghpa.gov/pwsa/2017-2021_CIP_1.2017.pdf · 2017-04-19 · Sustainability – Energy efficiency and “green” approach to

  

FY 2017 to 2021Ca

pital Improvem

ent P

lan 

 PR

OJECT

 CLA

SS 

Water Distrib

ution System

 NEIGHBO

RHOOD/W

ARD

System

wide 

 

 

PROJECT

 NAM

E Lead

 Service Line Re

placem

ent P

rogram

PROJECT

 NO. 

2016

‐325

‐105

‐0 

STAT

US 

Desig

n PR

IORITY

Safety, R

egulatory Co

mpliance

PROJECT

 DESCR

IPTION 

Replacem

ent o

f 7% of lead service lines per year. 

PROJECT

 JUSTIFICAT

ION 

Due to th

e exceed

ance of the

 action levels from

 com

pliance tests for lead

 and

 cop

per, the Pe

nnsylvania Dep

artm

ent 

of Enviro

nmen

tal Protection requ

ired the Au

thority

 to perform

 add

ition

al distrib

ution system

 water quality 

mon

itorin

g, optim

izatio

n of corrosio

n control treatmen

t, pu

blic edu

catio

n, and

 lead

 service line replacem

ent. 

RISK

(S) 

Failure to

 com

ply will re

sult in re

gulatory fine

s and

 poses a pub

lic health

 risk. 

IMPA

CT ON OPE

RATIONS 

Redu

ction in se

rvice line failure due

 to re

placing with

 new

 infrastructure, red

ucing de

mands on Ope

ratio

ns Rep

air 

Crew

s. 

ALTERN

ATIVES TO THE RE

COMMEN

DED

 ACT

ION 

There are no

 practical alte

rnatives to

 the recommen

ded actio

n. 

COMMITMEN

TSCHED

ULE* (000

’s)

FUNDING SOURC

E(S)

Phase 

Pre 20

17 

2017

 20

1820

1920

2020

21Po

st 202

1 To

tal

☒Capital  

☐Expe

nse: ☐

Engine

ering ☐Sewer ☐

Water 

☐Co

st Share 

☐Other 

Assessmen

t/Stud

y  

  

0De

sign 

 78

0 55

557

058

561

5Ongoing

 3,105

Constructio

n  

22,920

 16

,305

16,800

17,295

17,825

Ongoing

 91

,145

Total Project Cost 

0 23

,700

 16

,860

17,370

17,880

18,440

Ongoing

 94

,250

CASH

 FLO

W SUMMAR

Y**(000

’s)

 Pre 20

17 

2017

 20

1820

1920

2020

21Po

st 202

1 To

tal

Total 

0 11

,480

 16

,490

16,990

17,500

18,030

Ongoing

 80

,490

+

*Con

cept level costs based

 on previous re

ports, Capita

l Improvem

ent P

lans develop

ed by othe

rs, or sim

ilar type projects. 

**Includ

es con

tingencies. 

+ Total sh

own is expe

nditu

res throu

gh FY202

1. 

 

Page 40: Water and Sewer Authority Improvement Programapps.pittsburghpa.gov/pwsa/2017-2021_CIP_1.2017.pdf · 2017-04-19 · Sustainability – Energy efficiency and “green” approach to

  

FY 2017 to 2021Ca

pital Improvem

ent P

lan 

 PR

OJECT

 CLA

SS 

Water Distrib

ution System

 NEIGHBO

RHOOD/W

ARD

System

wide 

 PR

OJECT

 NAM

E Large Diam

eter W

ater M

ain Re

habilitation or Rep

lacemen

t Program

PROJECT

 NO. 

Annu

al 

STAT

US 

Not Started

 PR

IORITY

Safety, R

egulatory Co

mpliance, 

Reliability/Ope

ratio

nal Flexibility, Level of Service 

PROJECT

 DESCR

IPTION 

Strategic replacem

ent o

r reh

abilitatio

n of large diam

eter water m

ains (1

6‐inch and

 larger) and

 app

urtenances to

 im

prove system

 reliability and hydraulics, includ

ing internal and

 external inspe

ctions. 

PROJECT

 JUSTIFICAT

ION 

PWSA

's water sy

stem

 has app

roximately 12

2 miles o

f large diameter water m

ains. B

y maintaining

 a proactiv

e approach to

 asset m

anagem

ent, efforts c

an be directed

 towards re

med

ying

 assets b

efore their failure, thu

s resultin

g in a sa

vings in the replacem

ent cost a

s com

pared to emergency/reactiv

e repair costs.  Typically, large diameter pipe  is 

not readily available and has a

 6 to

 8 week lead

 time for d

elivery.  A

 large pe

rcen

tage of the

 Autho

rity's large diameter 

mains are riveted steel, which canno

t be easily repaire

d with

out the

 use of field fa

bricated

 specialty

 fittings. 

RISK

(S) 

The conseq

uences of failure fo

r larger m

ains are m

uch greater than for smaller d

istrib

ution mains, w

hich ty

pically 

includ

e sig

nificant service outages (larger a

rea and longer time fram

e im

pacts), as w

ell as p

rope

rty and roadway 

damage.  This is e

specially true

 for the

 Highland No. 1 Pressure District a

nd all districts fe

d  by

 Highland No. 1. 

IMPA

CT ON OPE

RATIONS 

Increased system

 reliability and im

proved

 sytem m

anagem

ent. 

ALTERN

ATIVES TO THE RE

COMMEN

DED

 ACT

ION 

Continue

 to exten

d utility com

pone

nt life until a high

 failure ra

te justifies re

placem

ent. 

COMMITMEN

TSCHED

ULE* (000

’s)

FUNDING SOURC

E(S)

Phase 

Pre 20

17 

2017

 20

1820

1920

2020

21Po

st 202

1 To

tal

☒Capital  

☒Expe

nse: ☐

Engine

ering ☐Sewer ☒

Water 

☐Co

st Share 

☐Other 

Assessmen

t/Stud

y  

 13

02,400

2,480

2,550

Ongoing

 7,560

Desig

n  

 1,360

1,390

1,440

Ongoing

 4,190

Constructio

n  

 11

,100

Ongoing

 11

,100

Total Project Cost 

0 0 

130

3,76

03,87

015

,090

Ongoing

 22

,850

CASH

 FLO

W SUMMAR

Y**(000

’s)

 Pre 20

17 

2017

 20

1820

1920

2020

21Po

st 202

1 To

tal

Total 

0 0 

901,51

53,76

06,16

0Ongoing

 11

,525

+

*Con

cept level costs based

 on previous re

ports, Capita

l Improvem

ent P

lans develop

ed by othe

rs, or sim

ilar type projects. 

**Includ

es con

tingencies. 

+ Total sh

own is expe

nditu

res throu

gh FY202

1. 

Page 41: Water and Sewer Authority Improvement Programapps.pittsburghpa.gov/pwsa/2017-2021_CIP_1.2017.pdf · 2017-04-19 · Sustainability – Energy efficiency and “green” approach to

  

FY 2017 to 2021Ca

pital Improvem

ent P

lan 

 PR

OJECT

 CLA

SS 

Water Distrib

ution System

 NEIGHBO

RHOOD/W

ARD

System

wide 

 PR

OJECT

 NAM

E Large Va

lve Re

placem

ent P

rogram

PROJECT

 NO. 

Annu

al 

STAT

US 

Not Started

 PR

IORITY

Safety, R

egulatory Co

mpliance, 

Reliability/Ope

ratio

nal Flexibility, Level of Service 

PROJECT

 DESCR

IPTION 

Replacem

ent o

f existing (defectiv

e or non

‐ope

ratio

nal) or installatio

n of new

 large diam

eter valves, includ

ing pressure 

redu

cing

 valves a

nd air release valves, on 16

‐inch and

 larger diameter water m

ains th

rougho

ut th

e water distrib

ution 

system

. PR

OJECT

 JUSTIFICAT

ION 

Increasin

g the nu

mbe

r of o

perable valves in

 the system

 will re

duce th

e nu

mbe

r of customers that m

ay be im

pacted

 and the nu

mbe

r of valves that w

ould need to be closed

 during em

ergency cond

ition

s.  A

ddition

ally, the

y are requ

ired 

for the

 inspectio

n and rehabilitation of th

e mains. 

RISK

(S) 

The conseq

uences of failure fo

r larger m

ains are m

uch greater than for smaller d

istrib

ution mains, w

hich cou

ld includ

e sig

nificant service outages. 

IMPA

CT ON OPE

RATIONS 

Increased op

erating fle

xibility and reliability. 

ALTERN

ATIVES TO THE RE

COMMEN

DED

 ACT

ION 

Utilize

 Autho

rity staff and

 equ

ipmen

t to pe

rform all repairs. This w

ould re

quire

 an increase in

 ope

ratio

ns expen

ses for 

both personn

el and

 equ

ipmen

t. 

COMMITMEN

TSCHED

ULE* (000

’s)

FUNDING SOURC

E(S)

Phase 

Pre 20

17 

2017

 20

1820

1920

2020

21Po

st 202

1 To

tal

☒Capital  

☐Expe

nse: ☐

Engine

ering ☐Sewer ☐

Water 

☐Co

st Share 

☐Other 

Assessmen

t/Stud

y  

  

0De

sign 

  

460

475

490

500

Ongoing

 1,925

Constructio

n  

 3,425

3,530

3,640

Ongoing

 10

,595

Total Project Cost 

0 0 

460

3,90

04,02

04,14

0Ongoing

 12

,520

CASH

 FLO

W SUMMAR

Y**(000

’s)

 Pre 20

17 

2017

 20

1820

1920

2020

21Po

st 202

1 To

tal

Total 

0 0 

400

3,09

53,87

53,99

5Ongoing

 11

,365

+

*Con

cept level costs based

 on previous re

ports, Capita

l Improvem

ent P

lans develop

ed by othe

rs, or sim

ilar type projects. 

**Includ

es con

tingencies. 

+ Total sh

own is expe

nditu

res throu

gh FY202

1. 

 

Page 42: Water and Sewer Authority Improvement Programapps.pittsburghpa.gov/pwsa/2017-2021_CIP_1.2017.pdf · 2017-04-19 · Sustainability – Energy efficiency and “green” approach to

  

FY 2017 to 2021Ca

pital Improvem

ent P

lan 

 PR

OJECT

 CLA

SS 

Water Distrib

ution System

 NEIGHBO

RHOOD/W

ARD

System

wide 

 PR

OJECT

 NAM

E Va

lve Re

placem

ent P

rogram

 PR

OJECT

 NO. 

Annu

al 

STAT

US 

Constructio

n PR

IORITY

Safety, R

eliability/Ope

ratio

nal Flexibility, Level of 

Service 

PROJECT

 DESCR

IPTION 

Replacem

ent o

f defectiv

e or non

‐ope

ratio

nal valves o

n transm

ission and distrib

ution mains th

rougho

ut th

e water 

distrib

ution system

, excluding

 valves rep

laced du

ring waterline relays. 

PROJECT

 JUSTIFICAT

ION 

Increasin

g the nu

mbe

r of o

perable valves in

 the system

 will re

duce th

e nu

mbe

r of customers that m

ay be im

pacted

 and the nu

mbe

r of valves that w

ould need to be closed

 during em

ergency cond

ition

s. 

RISK

(S) 

A larger num

ber o

f customers m

ay be subject to service ou

tages. 

IMPA

CT ON OPE

RATIONS 

Increased op

erating fle

xibility and reliability. 

ALTERN

ATIVES TO THE RE

COMMEN

DED

 ACT

ION 

Utilize

 Autho

rity staff and

 equ

ipmen

t to pe

rform all repairs. This w

ould re

quire

 an increase in

 ope

ratio

ns expen

ses for 

both personn

el and

 equ

ipmen

t. 

COMMITMEN

TSCHED

ULE* (000

’s)

FUNDING SOURC

E(S)

Phase 

Pre 20

17 

2017

 20

1820

1920

2020

21Po

st 202

1 To

tal

☒Capital  

☐Expe

nse: ☐

Engine

ering ☐Sewer ☐

Water 

☐Co

st Share 

☐Other 

Assessmen

t/Stud

y  

  

0De

sign 

 30

 30

3535

35Ongoing

 16

5Co

nstructio

n 2,400 

2,915 

3,155

3,265

3,380

3,380

Ongoing

 18

,495

Total Project Cost 

2,40

0 2,94

5 3,18

53,30

03,41

53,41

5Ongoing

 18

,660

CASH

 FLO

W SUMMAR

Y**(000

’s)

 Pre 20

17 

2017

 20

1820

1920

2020

21Po

st 202

1 To

tal

Total 

1,14

0 2,21

0 3,77

02,99

03,36

03,42

0Ongoing

 16

,890

+

*Con

cept level costs based

 on previous re

ports, Capita

l Improvem

ent P

lans develop

ed by othe

rs, or sim

ilar type projects. 

**Includ

es con

tingencies. 

+ Total sh

own is expe

nditu

res throu

gh FY202

1. 

Page 43: Water and Sewer Authority Improvement Programapps.pittsburghpa.gov/pwsa/2017-2021_CIP_1.2017.pdf · 2017-04-19 · Sustainability – Energy efficiency and “green” approach to

  

FY 2017 to 2021Ca

pital Improvem

ent P

lan 

 PR

OJECT

 CLA

SS 

Water Distrib

ution System

 NEIGHBO

RHOOD/W

ARD

System

wide 

 

 

PROJECT

 NAM

E Hy

drant R

eplacemen

t Program

 PR

OJECT

 NO. 

Annu

al 

STAT

US 

Desig

n PR

IORITY

Safety, R

egulatory Co

mpliance, 

Reliability/Ope

ratio

nal Flexibility, Level of Service 

PROJECT

 DESCR

IPTION 

Replacem

ent o

f broken hydrants th

rougho

ut th

e water distrib

ution system

.  Program goal is to replace a minim

um of 

100 hydrants per year, exclud

ing hydrants re

placed

 during waterline relays. 

PROJECT

 JUSTIFICAT

ION 

Increasin

g the nu

mbe

r of o

peratio

nal hydrants p

rovide

s better fire

 protection for the

 City

 of P

ittsburgh. 

RISK

(S) 

Custom

ers w

ill be subject to inadeq

uate pressure for fire

fighting activ

ities. 

IMPA

CT ON OPE

RATIONS 

Increased op

erating fle

xibility and reliability. 

ALTERN

ATIVES TO THE RE

COMMEN

DED

 ACT

ION 

Utilize

 Autho

rity staff and

 equ

ipmen

t to pe

rform all repairs. This w

ould re

quire

 an increase in

 ope

ratio

ns expen

ses for 

both personn

el and

 equ

ipmen

t. 

COMMITMEN

TSCHED

ULE* (000

’s)

FUNDING SOURC

E(S)

Phase 

Pre 20

17 

2017

 20

1820

1920

2020

21Po

st 202

1 To

tal

☒Capital  

☐Expe

nse: ☐

Engine

ering ☐Sewer ☐

Water 

☐Co

st Share 

☐Other 

Assessmen

t/Stud

y  

  

0De

sign 

 20

 20

2020

20Ongoing

 10

0Co

nstructio

n  

1,160 

1,295

1,295

1,410

1,410

Ongoing

 6,570

Total Project Cost 

0 1,18

0 1,31

51,31

51,43

01,43

0Ongoing

 6,67

0CA

SH FLO

W SUMMAR

Y**(000

’s)

 Pre 20

17 

2017

 20

1820

1920

2020

21Po

st 202

1 To

tal

Total 

0 39

0 1,22

01,32

01,35

01,43

0Ongoing

 5,71

0+*C

oncept level costs based

 on previous re

ports, Capita

l Improvem

ent P

lans develop

ed by othe

rs, or sim

ilar type projects. 

**Includ

es con

tingencies. 

+ Total sh

own is expe

nditu

res throu

gh FY202

1. 

Page 44: Water and Sewer Authority Improvement Programapps.pittsburghpa.gov/pwsa/2017-2021_CIP_1.2017.pdf · 2017-04-19 · Sustainability – Energy efficiency and “green” approach to

  

FY 2017 to 2021Ca

pital Improvem

ent P

lan 

 PR

OJECT

 CLA

SS 

Water Distrib

ution System

 NEIGHBO

RHOOD/W

ARD

System

wide 

 PR

OJECT

 NAM

E Sm

all D

iameter M

ain Re

placem

ent a

nd Fire

 Protection Distrib

ution System

 Improvem

ents

PROJECT

 NO. 

2013

‐325

‐288

‐0, 2013‐325‐21

1‐0, Ann

ual

STAT

US 

Desig

n PR

IORITY

Safety, R

eliability/Ope

ratio

nal Flexibility, Regional 

Coop

eration/Stew

ardship, Level of Service 

PROJECT

 DESCR

IPTION 

Strategic replacem

ent o

f water m

ains to

 improve system

 reliability as well as improve water pressure, m

aintain water 

quality

, and

 minim

ize disturbance to th

e commun

ity. Program

 will initially fo

cus o

n replacing existing 4‐inch and

 6‐

inch unlined

 cast iron mains and

 mains with

 a history of freq

uent breaks. 

PROJECT

 JUSTIFICAT

ION 

By m

aintaining

 a proactiv

e approach to

 asset m

anagem

ent, efforts c

an be directed

 towards re

med

ying

 assets b

efore 

their failure, thu

s saving in overall replacem

ent cost. Ad

ditio

nally, projects w

ill be coordinated with

 other utilities to

 minim

ize disturbance to th

e commun

ity and

 street su

rface restoration costs. W

ater quality will also

 improve by 

removing tube

rculated

 mains. 

RISK

(S) 

Custom

ers m

ay be subject to service ou

tages o

r the

 poten

tial for inadeq

uate pressure for fire

fighting activ

ities. 

IMPA

CT ON OPE

RATIONS 

Increased op

erating fle

xibility and reliability. 

ALTERN

ATIVES TO THE RE

COMMEN

DED

 ACT

ION 

Continue

 to exten

d utility com

pone

nt life until a high

 failure ra

te justifies re

placem

ent. 

COMMITMEN

TSCHED

ULE* (000

’s)

FUNDING SOURC

E(S)

Phase 

Pre 20

17 

2017

 20

1820

1920

2020

21Po

st 202

1 To

tal

☒Capital  

☐Expe

nse: ☐

Engine

ering ☐Sewer ☐

Water 

☐Co

st Share 

☐Other 

Assessmen

t/Stud

y  

  

0De

sign 

364 

1,330 

2,015

2,680

3,455

Ongoing

Ongoing

 9,844

Constructio

n 5,406 

0 9,195

14,060

19,170

24,705

Ongoing

 72

,536

Total Project Cost 

5,77

0 1,33

0 11

,210

16,740

22,625

24,705

Ongoing

 82

,380

CASH

 FLO

W SUMMAR

Y**(000

’s)

 Pre 20

17 

2017

 20

1820

1920

2020

21Po

st 202

1 To

tal

Total 

4,07

0 2,36

0 5,33

015

,290

19,770

22,600

Ongoing

 69

,420

+

*Con

cept level costs based

 on previous re

ports, Capita

l Improvem

ent P

lans develop

ed by othe

rs, or sim

ilar type projects. 

**Includ

es con

tingencies. 

+ Total sh

own is expe

nditu

res throu

gh FY202

1. 

Page 45: Water and Sewer Authority Improvement Programapps.pittsburghpa.gov/pwsa/2017-2021_CIP_1.2017.pdf · 2017-04-19 · Sustainability – Energy efficiency and “green” approach to

  

FY 2017 to 2021Ca

pital Improvem

ent P

lan 

 PR

OJECT

 CLA

SS 

Water Distrib

ution System

 NEIGHBO

RHOOD/W

ARD

System

wide 

 

 

PROJECT

 NAM

E Urgen

t Water Relay 

PROJECT

 NO. 

2016

‐325,102

‐0, A

nnual 

STAT

US 

Constructio

n PR

IORITY

Safety, R

eliability/Ope

ratio

nal Flexibility, Level of 

Service 

PROJECT

 DESCR

IPTION 

Replacem

ent o

f existing water m

ains, valves, fittings, service con

nections, and

 hydrants d

ue to

 emergency situatio

ns. 

PROJECT

 JUSTIFICAT

ION 

The existing water distrib

ution system

 is aging

 and

 immed

iate re

pairs are re

quire

d to add

ress failures that cou

ld be 

significant p

ublic sa

fety hazards. 

RISK

(S) 

Custom

ers w

ill be subject to service ou

tages o

r inade

quate pressure fo

r fire

fighting activ

ities until break is addressed. 

IMPA

CT ON OPE

RATIONS 

Increased op

erating fle

xibility and reliability. 

ALTERN

ATIVES TO THE RE

COMMEN

DED

 ACT

ION 

Utilize

 Autho

rity staff and

 equ

ipmen

t to pe

rform all repairs. This w

ould re

quire

 an increase in

 ope

ratio

ns expen

ses for 

both personn

el and

 equ

ipmen

t. 

COMMITMEN

TSCHED

ULE* (000

’s)

FUNDING SOURC

E(S)

Phase 

Pre 20

17 

2017

 20

1820

1920

2020

21Po

st 202

1 To

tal

☒Capital  

☐Expe

nse: ☐

Engine

ering ☐Sewer ☐

Water 

☐Co

st Share 

☐Other 

Assessmen

t/Stud

y  

  

0De

sign 

45 

165 

180

195

195

195

Ongoing

 97

5Co

nstructio

n 1,225 

1,305 

1,420

1,525

1,525

1,525

Ongoing

 8,525

Total Project Cost 

1,27

0 1,47

0 1,60

01,72

01,72

01,72

0Ongoing

 9,50

0CA

SH FLO

W SUMMAR

Y**(000

’s)

 Pre 20

17 

2017

 20

1820

1920

2020

21Po

st 202

1 To

tal

Total 

270 

1,42

0 1,51

01,63

01,72

01,72

0Ongoing

 8,27

0+*C

oncept level costs based

 on previous re

ports, Capita

l Improvem

ent P

lans develop

ed by othe

rs, or sim

ilar type projects. 

**Includ

es con

tingencies. 

+ Total sh

own is expe

nditu

res throu

gh FY202

1.  

Page 46: Water and Sewer Authority Improvement Programapps.pittsburghpa.gov/pwsa/2017-2021_CIP_1.2017.pdf · 2017-04-19 · Sustainability – Energy efficiency and “green” approach to

  

FY 2017 to 2021Ca

pital Improvem

ent P

lan 

 PR

OJECT

 CLA

SS 

Water Distrib

ution System

 NEIGHBO

RHOOD/W

ARD

North Sho

re & Cen

tral Business D

istrict/1,22

  

PROJECT

 NAM

E Ft. D

uque

sne Bridge W

ater Air Re

lease Va

lve Re

pair

PROJECT

 NO. 

Unassigne

d STAT

US 

Desig

n PR

IORITY

Safety, R

eliability/Ope

ratio

nal Flexibility, Regional 

Coop

eration/Stew

ardship, Level of Service 

PROJECT

 DESCR

IPTION 

Perform transie

nt analysis

 along

 existing 30

‐inch water m

ain that is su

spen

ded from

 the Fort Duq

uesne Bridge.  De

sign 

and construct n

ew pipe supp

orts and

 thrust re

straint b

ased

 on the results of the

 analysis.  Includ

es th

e replacem

ent o

f the existing air‐release valve on

 the 30

‐inch water m

ain, includ

ing  insulatio

n or heat tracing

 to re

duce poten

tial for 

freezin

g and cracking

 of the

 valve. 

PROJECT

 JUSTIFICAT

ION 

A recent PEN

NDO

T inspectio

n of th

e Fort Duq

uesne Bridge iden

tified priority code

 1 defects in

 the supp

ort o

f the

 existing 30

‐inch diameter water m

ain.  A

ddition

ally, the

 existing 2‐inch diameter air‐release valve located on

 the main 

has a

 history of failure. The

 water m

ain is located be

low th

e lower deck of th

e Fort Duq

uesne Bridge and

 serves as a

n em

ergency intercon

nection be

tween pressure gradien

ts and

 is a vita

l com

pone

nt to

 the system

 ope

ratio

n. 

RISK

(S) 

Custom

ers m

ay be subject to service ou

tages o

r the

 poten

tial for inadeq

uate pressure for fire

fighting activ

ities. 

IMPA

CT ON OPE

RATIONS 

Increased op

erating fle

xibility and reliability. 

ALTERN

ATIVES TO THE RE

COMMEN

DED

 ACT

ION 

There are no

 practical alte

rnatives to

 the recommen

ded actio

n. 

COMMITMEN

TSCHED

ULE* (000

’s)

FUNDING SOURC

E(S)

Phase 

Pre 20

17 

2017

 20

1820

1920

2020

21Po

st 202

1 To

tal

☒Capital  

☐Expe

nse: ☐

Engine

ering ☐Sewer ☐

Water 

☐Co

st Share 

☐Other 

Assessmen

t/Stud

y  

  

0De

sign 

 13

5  

135

Constructio

n  

635 

 63

5To

tal Project Cost 

0 77

0 0

00

00 

770

CASH

 FLO

W SUMMAR

Y**(000

’s)

 Pre 20

17 

2017

 20

1820

1920

2020

21Po

st 202

1 To

tal

Total 

0 10

0 64

030

00

0 77

0*C

oncept level costs based

 on previous re

ports, Capita

l Improvem

ent P

lans develop

ed by othe

rs, or sim

ilar type projects. 

**Includ

es con

tingencies. 

Page 47: Water and Sewer Authority Improvement Programapps.pittsburghpa.gov/pwsa/2017-2021_CIP_1.2017.pdf · 2017-04-19 · Sustainability – Energy efficiency and “green” approach to

  

FY 2017 to 2021Ca

pital Improvem

ent P

lan 

 PR

OJECT

 CLA

SS 

Water Distrib

ution System

 NEIGHBO

RHOOD/W

ARD

System

wide 

PROJECT

 NAM

E Washo

ut Disc

onne

ction Program

PROJECT

 NO. 

Annu

al 

STAT

US 

Not Started

 PR

IORITY

Safety, R

egulatory Co

mpliance, Level of Service

PROJECT

 DESCR

IPTION 

Investigation and, if necessary, disc

onne

ction of large water m

ain washo

uts from th

e sewer sy

stem

PROJECT

 JUSTIFICAT

ION 

A nu

mbe

r of o

lder washo

uts o

n larger m

ains were directly con

nected

 to se

wers w

ith a closed valve du

ring 

constructio

n.  The

se washo

uts m

ust b

e completely discon

nected

 from

 the sewer. 

RISK

(S) 

Custom

ers m

ay be subject to he

alth im

pacts, if th

e valves were accide

ntally ope

ned or broken, due

 to cross 

contam

ination. 

IMPA

CT ON OPE

RATIONS 

Increased op

erating fle

xibility. 

ALTERN

ATIVES TO THE RE

COMMEN

DED

 ACT

ION 

There are no

 practical alte

rnatives to

 the recommen

ded actio

n. 

COMMITMEN

TSCHED

ULE* (000

’s)

FUNDING SOURC

E(S)

Phase 

Pre 20

17 

2017

 20

1820

1920

2020

21Po

st 202

1 To

tal

☒Capital  

☐Expe

nse: ☐

Engine

ering ☐Sewer ☐

Water 

☐Co

st Share 

☐Other 

Assessmen

t/Stud

y  

  

0De

sign 

  

2,120 

2,120

Constructio

n  

 11

,590

 11

,590

Total Project Cost 

0 0 

00

00

13,710

 13

,710

CASH

 FLO

W SUMMAR

Y**(000

’s)

 Pre 20

17 

2017

 20

1820

1920

2020

21Po

st 202

1 To

tal

Total 

0 0 

00

00

13,710

 13

,710

*Con

cept level costs based

 on previous re

ports, Capita

l Improvem

ent P

lans develop

ed by othe

rs, or sim

ilar type projects. 

**Includ

es con

tingencies. 

+ Total sh

own is expe

nditu

res throu

gh FY202

1.  

 

Page 48: Water and Sewer Authority Improvement Programapps.pittsburghpa.gov/pwsa/2017-2021_CIP_1.2017.pdf · 2017-04-19 · Sustainability – Energy efficiency and “green” approach to

                

This page was intentiona

lly left blank

 

Page 49: Water and Sewer Authority Improvement Programapps.pittsburghpa.gov/pwsa/2017-2021_CIP_1.2017.pdf · 2017-04-19 · Sustainability – Energy efficiency and “green” approach to

  

FY 2017 to 2021Ca

pital Improvem

ent P

lan 

 PR

OJECT

 CLA

SS 

Wastewater System 

NEIGHBO

RHOOD/W

ARD

System

wide 

   

  

PROJECT

 NAM

E Urgen

t Sew

er Recon

struction 

PROJECT

 NO. 

Annu

al 

STAT

US 

Constructio

n PR

IORITY

Safety, R

egulatory Co

mpliance, 

Reliability/Ope

ratio

nal Flexibility, Level of Service 

PROJECT

 DESCR

IPTION 

Reconstructio

n of existing sewers, m

anho

les, catch basins, and

 inlets due

 to emergency situatio

ns or p

ipe failures. 

PROJECT

 JUSTIFICAT

ION 

The existing sewer sy

stem

 is aging

 and

 immed

iate re

pairs are re

quire

d to add

ress failures that cou

ld be sig

nificant 

public sa

fety hazards. 

RISK

(S) 

Custom

ers m

ay be subject to basemen

t backups or o

verflows m

ay occur due

 to collapsed

 pipes. The

 Autho

rity may be 

subject to related fin

es due

 to se

wer overflows o

r for non

‐com

pliance as outlined

 in th

e Co

nsen

t Order and

 Ag

reem

ent. 

IMPA

CT ON OPE

RATIONS 

Increased op

erating fle

xibility and reliability. 

ALTERN

ATIVES TO THE RE

COMMEN

DED

 ACT

ION 

Utilize

 Autho

rity staff and

 equ

ipmen

t to pe

rform all repairs. This w

ould re

quire

 an increase in

 ope

ratio

ns expen

ses for 

both personn

el and

 equ

ipmen

t. 

COMMITMEN

TSCHED

ULE* (000

’s)

FUNDING SOURC

E(S)

Phase 

Pre 20

17 

2017

 20

1820

1920

2020

21Po

st 202

1 To

tal

☒Capital  

☐Expe

nse: ☐

Engine

ering ☐Sewer ☐

Water 

☐Co

st Share 

☐Other 

Assessmen

t/Stud

y  

  

0De

sign 

 16

5 18

019

519

519

5Ongoing

 93

0Co

nstructio

n 1,005 

1,305 

1,420

1,525

1,525

1,525

Ongoing

 8,305

Total Project Cost 

1,00

5 1,47

0 1,60

01,72

01,72

01,72

0Ongoing

 9,23

5CA

SH FLO

W SUMMAR

Y**(000

’s)

 Pre 20

17 

2017

 20

1820

1920

2020

21Po

st 202

1 To

tal

Total 

10 

1,41

5 1,51

01,63

01,72

01,72

0Ongoing

 8,00

5+*C

oncept level costs based

 on previous re

ports, Capita

l Improvem

ent P

lans develop

ed by othe

rs, or sim

ilar type projects. 

**Includ

es con

tingencies. 

+ Total sh

own is expe

nditu

res throu

gh FY202

1. 

Page 50: Water and Sewer Authority Improvement Programapps.pittsburghpa.gov/pwsa/2017-2021_CIP_1.2017.pdf · 2017-04-19 · Sustainability – Energy efficiency and “green” approach to

  

FY 2017 to 2021Ca

pital Improvem

ent P

lan 

 PR

OJECT

 CLA

SS 

Wastewater System 

NEIGHBO

RHOOD/W

ARD

System

wide 

 

 

PROJECT

 NAM

E Sewers U

nder Critical Structures P

rogram

PROJECT

 NO. 

Annu

al 

STAT

US 

Desig

n PR

IORITY

Safety, R

egulatory Co

mpliance, 

Reliability/Ope

ratio

nal Flexibility, Level of Service 

PROJECT

 DESCR

IPTION 

Rehabilitation, re

locatio

n, and

 aband

onmen

t, if applicable, of e

xisting sewer infrastructure located un

der o

r adjacen

t to buildings, brid

ges, or railro

ads o

r located

 on steep slo

pes. 

PROJECT

 JUSTIFICAT

ION 

In re

cent years, the

re has been an

 increasin

g rate of failure of this a

sset ty

pe due

 to limite

d accessibility and

 pipe age.  

By m

aintaining

 a proactiv

e approach to

 asset m

anagem

ent, efforts c

an be directed

 towards re

med

ying

 assets b

efore 

their failure, thu

s saving in overall replacem

ent cost. 

RISK

(S) 

Failure of this a

sset ty

pe cou

ld re

sult in significant prope

rty/structure damage, increased replacem

ent cost, and 

increased service ou

tages o

r bypass p

umping. 

IMPA

CT ON OPE

RATIONS 

Increased op

erating fle

xibility and reliability. 

ALTERN

ATIVES TO THE RE

COMMEN

DED

 ACT

ION 

Continue

 to exten

d utility com

pone

nt life until a high

 failure ra

te justifies re

placem

ent. 

COMMITMEN

TSCHED

ULE* (000

’s)

FUNDING SOURC

E(S)

Phase 

Pre 20

17 

2017

 20

1820

1920

2020

21Po

st 202

1 To

tal

☒Capital  

☐Expe

nse: ☐

Engine

ering ☐Sewer ☐

Water 

☐Co

st Share 

☐Other 

Assessmen

t/Stud

y  

  

0De

sign 

 75

8 78

080

382

785

2Ongoing

 4,020

Constructio

n  

 5,824

5,993

6,173

6,363

Ongoing

 24

,353

Total Project Cost 

0 75

8 6,60

46,79

67,00

07,21

5Ongoing

 28

,373

CASH

 FLO

W SUMMAR

Y**(000

’s)

 Pre 20

17 

2017

 20

1820

1920

2020

21Po

st 202

1 To

tal

Total 

0 67

5 6,09

06,61

56,87

57,01

5Ongoing

 27

,270

+

*Con

cept level costs based

 on previous re

ports, Capita

l Improvem

ent P

lans develop

ed by othe

rs, or sim

ilar type projects. 

**Includ

es con

tingencies. 

+ Total sh

own is expe

nditu

res throu

gh FY202

1. 

Page 51: Water and Sewer Authority Improvement Programapps.pittsburghpa.gov/pwsa/2017-2021_CIP_1.2017.pdf · 2017-04-19 · Sustainability – Energy efficiency and “green” approach to

  

FY 2017 to 2021Ca

pital Improvem

ent P

lan 

 PR

OJECT

 CLA

SS 

Wastewater System 

NEIGHBO

RHOOD/W

ARD

System

wide 

 

 

PROJECT

 NAM

E Sm

all D

iameter Sew

er Reh

abilitatio

n Program

PROJECT

 NO. 

Annu

al 

STAT

US 

Desig

n PR

IORITY

Safety, R

egulatory Co

mpliance, 

Reliability/Ope

ratio

nal Flexibility, Level of Service 

PROJECT

 DESCR

IPTION 

Proactive, tren

chless re

habilitation of less th

an 36‐inch diameter se

wer m

ains to

 restore structural integrity

, red

uce 

root intrusion, and

 redu

ce infiltration and inflo

w; including

 cleaning and pre and po

st con

struction CC

TV inspectio

ns.   

PROJECT

 JUSTIFICAT

ION 

Provides th

e Au

thority

 with

 a m

eans to

 add

ress se

veral m

oderate/major structural defects in

 pipe segm

ents prio

r to 

complete failure. This trenchless p

ipe rene

wal m

etho

d rene

ws the

 asset, elim

inates disrup

tive excavatio

n, and

 is m

ore 

cost effe

ctive than

 replacem

ent. 

RISK

(S) 

If mod

erate/major structural defects are not proactiv

ely addressed, com

plete failure will eventually occur and

 excavatio

n will be requ

ired.  A

ny com

plete failure th

at occurs w

ill re

sult in dramatically increased expe

nditu

res for 

repair. 

IMPA

CT ON OPE

RATIONS 

Increased op

erating fle

xibility and reliability. 

ALTERN

ATIVES TO THE RE

COMMEN

DED

 ACT

ION 

Perform excavated

 point re

pairs to

 add

ress defectiv

e sections of p

ipe, re

place segm

ent in its entire

ty, or con

tinue

 to 

extend

 asset life until failure. 

COMMITMEN

TSCHED

ULE* (000

’s)

FUNDING SOURC

E(S)

Phase 

Pre 20

17 

2017

 20

1820

1920

2020

21Po

st 202

1 To

tal

☒Capital  

☐Expe

nse: ☐

Engine

ering ☐Sewer ☐

Water 

☐Co

st Share 

☐Other 

Assessmen

t/Stud

y  

  

0De

sign 

 67

0 82

098

51,165

1,320

Ongoing

 4,960

Constructio

n  

6,690 

8,290

9,985

11,795

13,620

Ongoing

 50

,380

Total Project Cost 

0 7,36

0 9,11

010

,970

12,960

14,940

Ongoing

 55

,340

CASH

 FLO

W SUMMAR

Y**(000

’s)

 Pre 20

17 

2017

 20

1820

1920

2020

21Po

st 202

1 To

tal

Total 

0 66

0 7,51

09,27

011

,150

13,120

Ongoing

 41

,710

+

*Con

cept level costs based

 on previous re

ports, Capita

l Improvem

ent P

lans develop

ed by othe

rs, or sim

ilar type projects. 

**Includ

es con

tingencies. 

+ Total sh

own is expe

nditu

res throu

gh FY202

1. 

 

Page 52: Water and Sewer Authority Improvement Programapps.pittsburghpa.gov/pwsa/2017-2021_CIP_1.2017.pdf · 2017-04-19 · Sustainability – Energy efficiency and “green” approach to

  

FY 2017 to 2021Ca

pital Improvem

ent P

lan 

 PR

OJECT

 CLA

SS 

Wastewater System 

NEIGHBO

RHOOD/W

ARD

System

wide 

     

 

PROJECT

 NAM

E Large Diam

eter Sew

er Reh

abilitatio

n Program

PROJECT

 NO. 

Annu

al 

STAT

US 

Desig

n PR

IORITY

Safety, R

egulatory Co

mpliance, 

Reliability/Ope

ratio

nal Flexibility, Level of Service 

PROJECT

 DESCR

IPTION 

Proactive, tren

chless re

habilitation of 36‐inch diameter or g

reater se

wer m

ains to

 restore structural integrity

, red

uce 

root intrusion, and

 redu

ce infiltration and inflo

w; including

 cleaning and pre and po

st con

struction CC

TV inspectio

ns. 

PROJECT

 JUSTIFICAT

ION 

Provides th

e Au

thority

 with

 a m

eans to

 add

ress se

veral m

oderate/major structural defects in

 pipe segm

ents prio

r to 

complete failure. This trenchless p

ipe rene

wal m

etho

d rene

ws the

 asset, elim

inates disrup

tive excavatio

n, and

 is m

ore 

cost effe

ctive than

 replacem

ent. 

RISK

(S) 

If mod

erate/major structural defects are not proactiv

ely addressed, com

plete failure will eventually occur and

 excavatio

n will be requ

ired.  A

ny com

plete failure th

at occurs w

ill re

sult in dramatically increased expe

nditu

res for 

repair. 

IMPA

CT ON OPE

RATIONS 

Increased op

erating fle

xibility and reliability. 

ALTERN

ATIVES TO THE RE

COMMEN

DED

 ACT

ION 

Perform excavated

 point re

pairs to

 add

ress defectiv

e sections of p

ipe, re

place segm

ent in its entire

ty, or con

tinue

 to 

extend

 asset life until failure. 

COMMITMEN

TSCHED

ULE* (000

’s)

FUNDING SOURC

E(S)

Phase 

Pre 20

17 

2017

 20

1820

1920

2020

21Po

st 202

1 To

tal

☒Capital  

☐Expe

nse: ☐

Engine

ering ☐Sewer ☐

Water 

☐Co

st Share 

☐Other 

Assessmen

t/Stud

y  

  

0De

sign 

 17

5 34

051

570

574

5Ongoing

 2,480

Constructio

n  

1,615 

3,400

5,235

7,155

7,365

Ongoing

 24

,770

Total Project Cost 

0 1,79

0 3,74

05,75

07,86

08,11

0Ongoing

 27

,250

CASH

 FLO

W SUMMAR

Y**(000

’s)

 Pre 20

17 

2017

 20

1820

1920

2020

21Po

st 202

1 To

tal

Total 

0 17

0 1,95

03,92

05,93

07,88

0Ongoing

 19

,850

+

*Con

cept level costs based

 on previous re

ports, Capita

l Improvem

ent P

lans develop

ed by othe

rs, or sim

ilar type projects. 

**Includ

es con

tingencies. 

+ Total sh

own is expe

nditu

res throu

gh FY202

1. 

Page 53: Water and Sewer Authority Improvement Programapps.pittsburghpa.gov/pwsa/2017-2021_CIP_1.2017.pdf · 2017-04-19 · Sustainability – Energy efficiency and “green” approach to

  

FY 2017 to 2021Ca

pital Improvem

ent P

lan 

 PR

OJECT

 CLA

SS 

Wastewater System 

NEIGHBO

RHOOD/W

ARD

Vario

us 

 

 

PROJECT

 NAM

E 20

18 W

astewater System Im

provem

ents

PROJECT

 NO. 

Unassigne

d STAT

US 

Desig

n PR

IORITY

Regulatory Com

pliance, Reliability/Ope

ratio

nal 

Flexibility, Level of Service 

PROJECT

 DESCR

IPTION 

Reconstructio

n of existing sewer m

ains on Wiese Street, Wilbur Street, Creedm

oor A

venu

e, Ornam

ent W

ay, 

Coop

erfie

ld Avenu

e, N. She

ridan

 Avenu

e, Port W

ay, and

 Swim

burne Street. 

PROJECT

 JUSTIFICAT

ION 

Repairs were issue

d on

 previou

s ann

ual con

tracts; h

owever, w

ere no

t perform

ed due

 to utility

 con

flicts a

nd limite

d site access. 

RISK

(S) 

Custom

ers m

ay be subject to basemen

t backups or o

verflows m

ay occur due

 to collapsed

 pipes. The

 Autho

rity may be 

subject to related fin

es due

 to se

wer overflows o

r for non

‐com

pliance as outlined

 in th

e Co

nsen

t Order and

 Ag

reem

ent. 

IMPA

CT ON OPE

RATIONS 

Increased op

erating reliability. 

ALTERN

ATIVES TO THE RE

COMMEN

DED

 ACT

ION 

Utilize

 Autho

rity staff and

 equ

ipmen

t to pe

rform all repairs and

 manho

le installatio

ns. This w

ould re

quire

 an increase 

in ope

ratio

ns expen

ses for both pe

rson

nel and

 equ

ipmen

t. 

COMMITMEN

TSCHED

ULE* (000

’s)

FUNDING SOURC

E(S)

Phase 

Pre 20

17 

2017

 20

1820

1920

2020

21Po

st 202

1 To

tal

☒Capital  

☐Expe

nse: ☐

Engine

ering ☐Sewer ☐

Water 

☐Co

st Share 

☐Other 

Assessmen

t/Stud

y  

  

0De

sign 

 88

0  

880

Constructio

n  

 4,390

 4,390

Total Project Cost 

0 88

0 4,39

00

00

0 5,27

0CA

SH FLO

W SUMMAR

Y**(000

’s)

 Pre 20

17 

2017

 20

1820

1920

2020

21Po

st 202

1 To

tal

Total 

0 36

5 3,12

01,78

50

00 

5,27

0*C

oncept level costs based

 on previous re

ports, Capita

l Improvem

ent P

lans develop

ed by othe

rs, or sim

ilar type projects. 

**Includ

es con

tingencies. 

Page 54: Water and Sewer Authority Improvement Programapps.pittsburghpa.gov/pwsa/2017-2021_CIP_1.2017.pdf · 2017-04-19 · Sustainability – Energy efficiency and “green” approach to

  

FY 2017 to 2021Ca

pital Improvem

ent P

lan 

 PR

OJECT

 CLA

SS 

Wastewater System 

NEIGHBO

RHOOD/W

ARD

Green

field/15 

 

 

PROJECT

 NAM

E Be

echw

ood Bo

ulevard/Green

field Brid

ge Sew

er Rep

lacemen

tPR

OJECT

 NO. 

Unassigne

d STAT

US 

Desig

n PR

IORITY

Regulatory Com

pliance, Reliability/Ope

ratio

nal 

Flexibility, Level of Service 

PROJECT

 DESCR

IPTION 

Installatio

n of a new

 sanitary se

wer and

 app

urtenances, including

 grin

der p

umps, on Expo

sition Way to

 existing 

manho

le M

H054

L013

 on Alger S

treet to provide pe

rmanen

t service fo

r 4101 and 4103

 Beechwoo

d Bo

ulevard. 

PROJECT

 JUSTIFICAT

ION 

Gray water began

 surfacing at th

e Green

field Brid

ge con

struction site.  D

ye te

sting at 4101 and 4103

 Beechwoo

d Bo

ulevard revealed

 that th

ese prop

ertie

s were the source of the

 gray water.  A concrete holding

 tank

 was installed to 

tempo

rarily collect th

e sanitary flow

s from th

ese prop

ertie

s until a ne

w sa

nitary se

wer is con

structed

 to se

rvice these 

prop

ertie

s. 

RISK

(S) 

The concrete holding

 tank

 was installed as a te

mpo

rary m

easure only and pe

rmanen

t sew

er se

rvice ne

eds to be

 restored

. IM

PACT

 ON OPE

RATIONS 

Increased op

erating fle

xibility and reliability. 

ALTERN

ATIVES TO THE RE

COMMEN

DED

 ACT

ION 

Installatio

n of a new

 sanitary se

wer and

 app

urtenances from

 Beechwoo

d Bo

ulevard to th

e existing 30

‐inch m

ain. 

COMMITMEN

TSCHED

ULE* (000

’s)

FUNDING SOURC

E(S)

Phase 

Pre 20

17 

2017

 20

1820

1920

2020

21Po

st 202

1 To

tal

☒Capital  

☐Expe

nse: ☐

Engine

ering ☐Sewer ☐

Water 

☐Co

st Share 

☐Other 

Assessmen

t/Stud

y  

  

0De

sign 

 14

0  

140

Constructio

n  

550 

 55

0To

tal Project Cost 

0 69

0 0

00

00 

690

CASH

 FLO

W SUMMAR

Y**(000

’s)

 Pre 20

17 

2017

 20

1820

1920

2020

21Po

st 202

1 To

tal

Total 

0 42

0 27

00

00

0 69

0*C

oncept level costs based

 on previous re

ports, Capita

l Improvem

ent P

lans develop

ed by othe

rs, or sim

ilar type projects. 

**Includ

es con

tingencies. 

Page 55: Water and Sewer Authority Improvement Programapps.pittsburghpa.gov/pwsa/2017-2021_CIP_1.2017.pdf · 2017-04-19 · Sustainability – Energy efficiency and “green” approach to

  

FY 2017 to 2021Ca

pital Improvem

ent P

lan 

 PR

OJECT

 CLA

SS 

Wastewater System 

NEIGHBO

RHOOD/W

ARD

Highland

 Park/11

  

 

PROJECT

 NAM

E Mellon Terrace Sewer System Im

provem

ents

PROJECT

 NO. 

Unassigne

d STAT

US 

Desig

n PR

IORITY

Regulatory Com

pliance, Reliability/Ope

ratio

nal 

Flexibility, R

egional Coo

peratio

n/ Stewardship, Level 

of Service 

PROJECT

 DESCR

IPTION 

Realignm

ent o

f app

roximately 66

5 linear feet o

f 24‐inch com

bine

d sewer m

ain on

 Mellon Terrace. 

PROJECT

 JUSTIFICAT

ION 

Repairs were issue

d on

 previou

s ann

ual con

tracts; h

owever, w

ere no

t perform

ed due

 to dep

th and

 soil cond

ition

s.  

Additio

nally, the

 Dep

artm

ent o

f Pub

lic W

orks is plann

ing to re

pair/rebu

ild th

e roadway. 

RISK

(S) 

Custom

ers m

ay be subject to basemen

t backups or o

verflows m

ay occur due

 to collapsed

 pipes. The

 Autho

rity may be 

subject to related fin

es due

 to se

wer overflows o

r for non

‐com

pliance as outlined

 in th

e Co

nsen

t Order and

 Ag

reem

ent. 

IMPA

CT ON OPE

RATIONS 

Increased op

erating reliability. 

ALTERN

ATIVES TO THE RE

COMMEN

DED

 ACT

ION 

Utilize

 Autho

rity staff and

 equ

ipmen

t to pe

rform th

e repairs. This w

ould re

quire

 an increase in

 ope

ratio

ns expen

ses 

for b

oth pe

rson

nel and

 equ

ipmen

t. 

COMMITMEN

TSCHED

ULE* (000

’s)

FUNDING SOURC

E(S)

Phase 

Pre 20

17 

2017

 20

1820

1920

2020

21Po

st 202

1 To

tal

☒Capital  

☐Expe

nse: ☐

Engine

ering ☐Sewer ☐

Water 

☒Co

st Share 

☐Other 

Assessmen

t/Stud

y  

  

0De

sign 

  

345

 34

5Co

nstructio

n  

 1,685

 1,685

Total Project Cost 

0 0 

00

2,03

00

0 2,03

0CA

SH FLO

W SUMMAR

Y**(000

’s)

 Pre 20

17 

2017

 20

1820

1920

2020

21Po

st 202

1 To

tal

Total 

0 0 

00

340

1,69

00 

2,03

0*C

oncept level costs based

 on previous re

ports, Capita

l Improvem

ent P

lans develop

ed by othe

rs, or sim

ilar type projects. 

**Includ

es con

tingencies. 

Page 56: Water and Sewer Authority Improvement Programapps.pittsburghpa.gov/pwsa/2017-2021_CIP_1.2017.pdf · 2017-04-19 · Sustainability – Energy efficiency and “green” approach to

  

FY 2017 to 2021Ca

pital Improvem

ent P

lan 

 PR

OJECT

 CLA

SS 

Wastewater System 

NEIGHBO

RHOOD/W

ARD

Lincoln Place/31

  

 

PROJECT

 NAM

E 31

st W

ard Sewer System 

PROJECT

 NO. 

Unassigne

d STAT

US 

Desig

n PR

IORITY

Regulatory Com

pliance, Reliability/Ope

ratio

nal 

Flexibility, R

egional Coo

peratio

n/ Stewardship, Level 

of Service 

PROJECT

 DESCR

IPTION 

Evaluatio

n to iden

tify and locate th

e source(s) o

f the

 infiltration and inflo

w (I/I), removal of p

ublic I/I sou

rces, and

 rehabilitation/replacem

ent o

f the

 Rogers S

treet a

nd M

ifflin

 Road Pu

mp Station and force main. 

PROJECT

 JUSTIFICAT

ION 

Both se

wage pu

mp stations and

 the force main that con

vey flo

w to

 the Streets R

un Sanita

ry Trunk

 Sew

er were 

constructed in th

e late 194

0’s a

nd are re

aching

 the en

d of th

eir u

seful life

. Add

ition

ally, past studies su

ggest this 

sewershed

 may be sig

nificantly

 impacted

 by high

 levels of infiltration/inflo

w. 

RISK

(S) 

The Au

thority

 may be subject to related fin

es due

 sanitary se

wer overflows c

aused by

 pum

p station system

 failures o

r excessive infiltration and inflo

w in

 the system

IMPA

CT ON OPE

RATIONS 

Increased op

erating fle

xibility and reliability. 

ALTERN

ATIVES TO THE RE

COMMEN

DED

 ACT

ION 

Abando

nmen

t of the

 existing pu

mp stations and

 installatio

n of a new

 gravity m

ain to con

vey flo

ws to the West M

ifflin

 Sanitary Autho

rity. 

COMMITMEN

TSCHED

ULE* (000

’s)

FUNDING SOURC

E(S)

Phase 

Pre 20

17 

2017

 20

1820

1920

2020

21Po

st 202

1 To

tal

☒Capital  

☐Expe

nse: ☐

Engine

ering ☐Sewer ☐

Water 

☐Co

st Share 

☐Other 

Assessmen

t/Stud

y  

  

0De

sign 

 1,520 

 1,520

Constructio

n  

 12

,000

 12

,005

Total Project Cost 

0 1,52

0 12

,000

00

00 

13,520

CASH

 FLO

W SUMMAR

Y**(000

’s)

 Pre 20

17 

2017

 20

1820

1920

2020

21Po

st 202

1 To

tal

Total 

0 48

0 1,91

09,73

01,40

00

0 13

,520

*Con

cept level costs based

 on previous re

ports, Capita

l Improvem

ent P

lans develop

ed by othe

rs, or sim

ilar type projects. 

**Includ

es con

tingencies. 

Page 57: Water and Sewer Authority Improvement Programapps.pittsburghpa.gov/pwsa/2017-2021_CIP_1.2017.pdf · 2017-04-19 · Sustainability – Energy efficiency and “green” approach to

  

FY 2017 to 2021Ca

pital Improvem

ent P

lan 

 PR

OJECT

 CLA

SS 

Stormwater System 

NEIGHBO

RHOOD/W

ARD

System

wide 

 

 

PROJECT

 NAM

E Stormwater System Im

provem

ents

PROJECT

 NO. 

Annu

al 

STAT

US 

Desig

n PR

IORITY

Regulatory Com

pliance, Reliability/Ope

ratio

nal 

Flexibility, C

apacity

, Regional Coo

peratio

n/ 

Stew

ardship, Level of Service 

PROJECT

 DESCR

IPTION 

Strategic replacem

ent o

r reh

abilitatio

n of storm m

ains to

 improve system

 reliability and minim

ize disturbance to th

e commun

ity. 

PROJECT

 JUSTIFICAT

ION 

By m

aintaining

 a proactiv

e approach to

 asset m

anagem

ent, efforts c

an be directed

 towards re

med

ying

 assets b

efore 

their failure, thu

s saving in overall replacem

ent cost.  Add

ition

ally, projects w

ill be coordinated with

 other utilities to

 minim

ize disturbance to th

e commun

ity and

 street su

rface restoration costs. 

RISK

(S) 

Overla

nd and

 street floo

ding

 cou

ld occur due

 to collapsed

 pipes or failed ou

tfall structures. 

IMPA

CT ON OPE

RATIONS 

Increased op

erating reliability. 

ALTERN

ATIVES TO THE RE

COMMEN

DED

 ACT

ION 

Continue

 to exten

d utility com

pone

nt life until a high

 failure ra

te justifies re

placem

ent. 

COMMITMEN

TSCHED

ULE* (000

’s)

FUNDING SOURC

E(S)

Phase 

Pre 20

17 

2017

 20

1820

1920

2020

21Po

st 202

1 To

tal

☒Capital  

☐Expe

nse: ☐

Engine

ering ☐Sewer ☐

Water 

☐Co

st Share 

☐Other 

Assessmen

t/Stud

y  

  

0De

sign 

 24

5 25

426

327

027

8Ongoing

 1,310

Constructio

n  

2,309 

2,374

2,453

2,521

2,598

Ongoing

 12

,255

Total Project Cost 

0 2,55

4 2,62

82,71

62,79

12,87

6Ongoing

 13

,565

CASH

 FLO

W SUMMAR

Y**(000

’s)

 Pre 20

17 

2017

 20

1820

1920

2020

21Po

st 202

1 To

tal

Total 

0 21

0 2,56

02,63

52,72

02,80

0Ongoing

 10

,925

+

*Con

cept level costs based

 on previous re

ports, Capita

l Improvem

ent P

lans develop

ed by othe

rs, or sim

ilar type projects. 

**Includ

es con

tingencies. 

+ Total sh

own is expe

nditu

res throu

gh FY202

1. 

 

Page 58: Water and Sewer Authority Improvement Programapps.pittsburghpa.gov/pwsa/2017-2021_CIP_1.2017.pdf · 2017-04-19 · Sustainability – Energy efficiency and “green” approach to

  

FY 2017 to 2021Ca

pital Improvem

ent P

lan 

 PR

OJECT

 CLA

SS 

Stormwater System 

NEIGHBO

RHOOD/W

ARD

Strip

 District/2 and Craw

ford‐Rob

erts/3 

 

 

PROJECT

 NAM

E 11

th Street S

torm

 Relief Sew

er 

PROJECT

 NO. 

Unassigne

d STAT

US 

Not Started

 PR

IORITY

Regulatory Com

pliance, Reliability/Ope

ratio

nal 

Flexibility, C

apacity

, Regional Coo

peratio

n/ 

Stew

ardship, Level of Service 

PROJECT

 DESCR

IPTION 

Extension of ded

icated

 storm se

wer on 11

th Street from W

ashington Place to th

e Alleghen

y River. 

PROJECT

 JUSTIFICAT

ION 

As part o

f the

 Low

er Hill Red

evelop

men

t Project and

 capacity

 issues in

 the Fifth Av

enue

 system

, sep

arate storm 

sewers w

ere constructed to re

route and convey ra

inwater from

 this area, but were reconn

ected into th

e combine

d system

 at W

ashington Place and Ce

ntre Avenu

e.  To complete the separatio

n and ultim

ately redu

ce com

bine

d sewer 

overflo

ws, th

is last phase of w

ork is requ

ired. 

RISK

(S) 

Combine

d sewer overflows w

ill con

tinue

 to occur due

 to limite

d capacity of the

 existing mains. 

IMPA

CT ON OPE

RATIONS 

Increased op

erating reliability. 

ALTERN

ATIVES TO THE RE

COMMEN

DED

 ACT

ION 

Increase capacity

 of the

 com

bine

d sewer trun

k sewers o

r evaluate the suita

bility and effectiven

ess o

f green

 infrastructure fo

r this sew

ershed

COMMITMEN

T SCHED

ULE* (000

’s)

FUNDING SOURC

E(S)

Phase 

Pre 20

17 

2017

 20

1820

1920

2020

21Po

st 202

1 To

tal

☒Capital  

☐Expe

nse: ☐

Engine

ering ☐Sewer ☐

Water 

☐Co

st Share 

☐Other 

Assessmen

t/Stud

y  

  

0De

sign 

  

2,250 

2,250

Constructio

n  

 14

,030

 14

,030

Total Project Cost 

0 0 

00

00

16,280

 16

,280

CASH

 FLO

W SUMMAR

Y**(000

’s)

 Pre 20

17 

2017

 20

1820

1920

2020

21Po

st 202

1 To

tal

Total 

0 0 

00

00

16,280

 16

,280

*Con

cept level costs based

 on previous re

ports, Capita

l Improvem

ent P

lans develop

ed by othe

rs, or sim

ilar type projects. 

**Includ

es con

tingencies. 

Page 59: Water and Sewer Authority Improvement Programapps.pittsburghpa.gov/pwsa/2017-2021_CIP_1.2017.pdf · 2017-04-19 · Sustainability – Energy efficiency and “green” approach to

  

FY 2017 to 2021Ca

pital Improvem

ent P

lan 

 PR

OJECT

 CLA

SS 

Stormwater System 

NEIGHBO

RHOOD/W

ARD

Carrick/29

  

PROJECT

 NAM

E Maytid

e Storm System Im

provem

ents

PROJECT

 NO. 

Unassigne

d STAT

US 

Not Started

 PR

IORITY

Safety, R

egulatory Co

mpliance, 

Reliability/Ope

ratio

nal Flexibility, Level of Service 

PROJECT

 DESCR

IPTION 

Reconstructio

n of storm infrastructure from

 Merritt A

venu

e to th

e storm intercep

tor o

n Ra

villa Avenu

e and the 

realignm

ent o

f the

 10‐inch sa

nitary se

wer on Maytid

e (Sande

rson

 to Valline). 

PROJECT

 JUSTIFICAT

ION 

Localized

 prope

rty and street floo

ding

 has been well‐d

ocum

ented for several years at this location and the 

unde

velope

d rig

ht‐of‐w

ay of Sande

rson

 has significantly deteriorated.  A

ddition

ally, an inspectio

n of th

e 10

‐inch 

sanitary se

wer on Maytid

e Street re

vealed

 structural and

 con

struction de

fects. 

RISK

(S) 

Continual degradatio

n to a steep slo

pe cou

ld re

sult in prope

rty damage and an

 increased cost to

 stabilize.  Cu

stom

ers 

may be subject to basemen

t backups or o

verflows m

ay occur due

 to collapsed

 pipes. 

IMPA

CT ON OPE

RATIONS 

Increased op

erating reliability. 

ALTERN

ATIVES TO THE RE

COMMEN

DED

 ACT

ION 

There are no

 practical alte

rnatives to

 the recommen

ded actio

n. 

COMMITMEN

TSCHED

ULE* (000

’s)

FUNDING SOURC

E(S)

Phase 

Pre 20

17 

2017

 20

1820

1920

2020

21Po

st 202

1 To

tal

☒Capital  

☐Expe

nse: ☐

Engine

ering ☐Sewer ☐

Water 

☐Co

st Share 

☐Other 

Assessmen

t/Stud

y  

  

0De

sign 

  

320 

320

Constructio

n  

 1,420 

1,420

Total Project Cost 

0 0 

00

00

1,74

0 1,74

0CA

SH FLO

W SUMMAR

Y**(000

’s)

 Pre 20

17 

2017

 20

1820

1920

2020

21Po

st 202

1 To

tal

Total 

0 0 

00

00

1,74

0 1,74

0*C

oncept level costs based

 on previous re

ports, Capita

l Improvem

ent P

lans develop

ed by othe

rs, or sim

ilar type projects. 

** Includ

es con

tingencies. 

Page 60: Water and Sewer Authority Improvement Programapps.pittsburghpa.gov/pwsa/2017-2021_CIP_1.2017.pdf · 2017-04-19 · Sustainability – Energy efficiency and “green” approach to

  

FY 2017 to 2021Ca

pital Improvem

ent P

lan 

 PR

OJECT

 CLA

SS 

Stormwater System 

NEIGHBO

RHOOD/W

ARD

System

wide 

 PR

OJECT

 NAM

E Catch Ba

sin and

 Inlet R

eplacemen

tPR

OJECT

 NO. 

Annu

al 

STAT

US 

Constructio

n PR

IORITY

Safety, R

egulatory Co

mpliance, 

Reliability/Ope

ratio

nal Flexibility, Level of Service 

PROJECT

 DESCR

IPTION 

Strategic replacem

ent o

f catch basins a

nd storm inlets th

rougho

ut th

e system

 to re

place failed un

its, storm

water 

control reliability, and

 minim

ize disturbance to th

e commun

ity. 

PROJECT

 JUSTIFICAT

ION 

By m

aintaining

 a proactiv

e approach to

 asset m

anagem

ent, efforts c

an be directed

 towards re

med

ying

 assets b

efore 

their failure, thu

s saving in overall replacem

ent cost. 

RISK

(S) 

Overla

nd and

 street floo

ding

 cou

ld occur due

 to a defectiv

e or und

ersized

 catch basin or storm

 inlet, creatin

g a pu

blic 

health and

 safety hazard du

ring wet weather events.  Exposes Autho

rity to poten

tial fines and

 pen

altie

s for not 

meetin

g the annu

al re

quire

men

ts listed

 in th

e Minim

um Con

trol M

easures u

nder th

e NPD

ES permit. 

IMPA

CT ON OPE

RATIONS 

Increased op

erating reliability. 

ALTERN

ATIVES TO THE RE

COMMEN

DED

 ACT

ION 

Continue

 to exten

d utility com

pone

nt life until a high

 failure ra

te justifies re

placem

ent. 

COMMITMEN

TSCHED

ULE* (000

’s)

FUNDING SOURC

E(S)

Phase 

Pre 20

17 

2017

 20

1820

1920

2020

21Po

st 202

1 To

tal

☒Capital  

☐Expe

nse: ☐

Engine

ering ☐Sewer ☐

Water 

☐Co

st Share 

☐Other 

Assessmen

t/Stud

y  

  

0De

sign 

 25

 25

2525

25Ongoing

 12

5Co

nstructio

n 1,299 

3,550 

3,665

3,777

3,890

4,002

Ongoing

 20

,183

Total Project Cost 

1,29

9 3,57

5 3,69

03,80

23,91

54,02

7Ongoing

 20

,308

CASH

 FLO

W SUMMAR

Y**(000

’s)

 Pre 20

17 

2017

 20

1820

1920

2020

21Po

st 202

1 To

tal

Total 

425 

2,02

3 3,61

03,73

03,84

03,95

0Ongoing

 17

,578

+

*Con

cept level costs based

 on previous re

ports, Capita

l Improvem

ent P

lans develop

ed by othe

rs, or sim

ilar type projects. 

**Includ

es con

tingencies. 

+ Total sh

own is expe

nditu

res throu

gh FY202

1. 

 

Page 61: Water and Sewer Authority Improvement Programapps.pittsburghpa.gov/pwsa/2017-2021_CIP_1.2017.pdf · 2017-04-19 · Sustainability – Energy efficiency and “green” approach to

  

FY 2017 to 2021Ca

pital Improvem

ent P

lan 

 PR

OJECT

 CLA

SS 

Green

 Infrastructure 

NEIGHBO

RHOOD/W

ARD

System

wide 

 PR

OJECT

 NAM

E City‐W

ide Green

 Infrastructure Projects

PROJECT

 NO. 

Vario

us 

STAT

US 

Desig

n PR

IORITY

Regulatory Com

pliance, Capacity

, Regional 

Coop

eration/Stew

ardship, Level of Service, 

Sustainability 

PROJECT

 DESCR

IPTION 

Projects will be iden

tified, designe

d, con

structed

, mon

itored, and

 evaluated

 for com

pliance with

 PAD

EP and

 USEPA

 Source Red

uctio

n strategies.  The curren

t list of p

rojects to be

 con

structed

 for is a

ttache

d he

reto. 

PROJECT

 JUSTIFICAT

ION 

At th

e requ

est o

f the

 office of the

 Mayor of the

 City

 of P

ittsburgh, W

illiam Ped

uto, th

e Au

thority

 has been tasked

 with

 evaluatin

g the be

nefits o

f incorpo

ratin

g extensive and hydraulically/cost‐effective green infrastructure (G

I) througho

ut th

e en

tire City of P

ittsburgh

 to re

duce th

e pe

ak and

 sustaine

d stormwater flow

s to  the existing combine

d sewer sy

stem

RISK

(S) 

Significant capita

l expen

ditures in gray infrastructure re

quire

d to m

eet C

ombine

d Sewer Overflow (C

SO) red

uctio

ns, in 

additio

n to th

e abatem

ent o

f localize

d basemen

t backups and

 street floo

ding. In additio

n, th

e speed at which th

e project n

eeds to

 be de

signe

d, con

structed

, mon

itored, and

 docum

ented for the

 regulators’ accep

tance and 

acknow

ledged

 CSO

 redu

ction  and to m

eet the

 City

’s deadlines. 

IMPA

CT ON OPE

RATIONS 

Ongoing

 mainten

ance of any re

commen

ded Be

st M

anagem

ent P

ractices (B

MP) green

 facilities. 

ALTERN

ATIVES TO THE RE

COMMEN

DED

 ACT

ION 

Implem

ent g

ray infrastructure outlined

 in th

e Au

thority

’s W

et W

eather Feasib

ility Study. 

COMMITMEN

TSCHED

ULE* (000

’s)

FUNDING SOURC

E(S)

Phase 

Pre 20

17 

2017

 20

1820

1920

2020

21Po

st 202

1 To

tal

☒Capital  

☐Expe

nse: ☐

Engine

ering ☐Sewer ☐

Water 

☒Co

st Share 

☐Other 

Assessmen

t/Stud

y  

  

Desig

n 18

8 3,475 

6,000

6,000

6,000

6,000

Ongoing

 27

,663

Constructio

n 75

1 1,940 

14,000

14,000

14,000

14,000

Ongoing

 58

,691

Total Project Cost 

939 

5,41

5 20

,000

20,000

20,000

20,000

Ongoing

 86

,354

CASH

 FLO

W SUMMAR

Y**(000

’s)

 Pre 20

17 

2017

 20

1820

1920

2020

21Po

st 202

1 To

tal

Total 

400 

5,50

0 14

,000

14,000

14,000

14,000

Ongoing

 61

,900

*Con

cept level costs based

 on previous re

ports, Capita

l Improvem

ent P

lans develop

ed by othe

rs, or sim

ilar type projects. 

**Includ

es con

tingencies. 

Page 62: Water and Sewer Authority Improvement Programapps.pittsburghpa.gov/pwsa/2017-2021_CIP_1.2017.pdf · 2017-04-19 · Sustainability – Energy efficiency and “green” approach to

  

FY 2017 to 2021 Ca

pital Improvem

ent P

lan 

 

GRE

EN IN

FRAS

TRUCT

URE

 PRO

JECT

S  

PROJECT

 NAM

E PR

OJECT

 DESCR

IPTION 

COMMITMEN

T SCHED

ULE* (000

’s) 

Pre 

2017

 20

17 

2018

 20

19 

2020

 20

21 

TOTA

L  

Centre and

 Herron 

Project is located

 in th

e Hill District n

eighbo

rhoo

d of th

e City of 

Pittsburgh

 is tributary to th

e M‐19 ou

tfall and

 will capture and

 direct im

pervious ro

ad and

 side

walk runo

ff through a curb cut 

into a biosw

ale feature with

 subsurface storage. The

 biosw

ale will 

receive flo

w con

tribution from

 a 0.93 im

pervious acres area, with

 an

 overall 3.54

 acre area drainage area. 

94 

689 

0 0 

0 0 

783 

Hillcrest Street 

Project is located

 in th

e Garfie

ld neighbo

rhoo

dof th

e City of 

Pittsburgh

 and

 is tributary to th

e A‐22

 outfall.  This p

roject will 

direct stormwater from

 dow

nspo

uts a

s well as run

off from 

roadways a

nd side

walks into a vacant C

ity of P

ittsburgh

 owne

d parcel. The

 0.25 acre parcel w

ill be a visib

le asset to

 the 

commun

ity with

 land

scaping and a walkw

ay th

rough the parcel. 

Surface and subsurface storage will be bu

ilt into th

e project site

, effectively hand

ling 1.6 acres o

f impe

rvious su

rface from

 the 

surrou

nding area. 

167 

819 

0 0 

0 0 

986 

Lawn and Oph

elia Parks 

Project is located

 in th

e South Oakland

 neighbo

rhoo

d in th

e City 

of Pittsburgh

 and

 is tributary to th

e M‐19B

 outfall.  This project is 

intend

ed to

 be a commun

ity gathe

ring space combine

d with

 stormwater m

anagem

ent features.  It is a

nticipated

 that 1.9 

impe

rvious acres from

 neighbo

ring roads a

nd ro

ofs c

an be 

managed

0 16

0 68

5 0 

0 0 

845 

Maryland Av

enue

 Project is located

 in th

e Shadyside ne

ighb

orho

od in th

e City of 

Pittsburgh

 and

 is tributary to th

e A‐22

 outfall. This p

roject will 

consist of d

istrib

uted

 GI systems in fo

ur ta

rgeted

 areas. 

0 91

0 5,125 

140 

0 0 

6,175 

Page 63: Water and Sewer Authority Improvement Programapps.pittsburghpa.gov/pwsa/2017-2021_CIP_1.2017.pdf · 2017-04-19 · Sustainability – Energy efficiency and “green” approach to

  

FY 2017 to 2021 Ca

pital Improvem

ent P

lan 

 

GRE

EN IN

FRAS

TRUCT

URE

 PRO

JECT

S  

PROJECT

 NAM

E PR

OJECT

 DESCR

IPTION 

COMMITMEN

T SCHED

ULE* (000

’s) 

Pre 

2017

 20

17 

2018

 20

19 

2020

 20

21 

TOTA

L  

McKinley Park 

Project is located

 in th

e Be

ltzho

over neighbo

rhoo

d in th

e City of 

Pittsburgh

 and

 is tributary to th

e S‐29

 outfall in th

e Saw M

ill Run

 Ba

sin.  Th

is project is inten

ded to be a commun

ity gathe

ring 

space combine

d with

 stormwater m

anagem

ent features. 

0 30

0 0 

0 0 

0 30

Mellon Terrace 

Project is located

 in th

e Highland Park neighbo

rhoo

d of th

e City 

of Pittsburgh

 and

 is tributary to th

e A‐41

 outfall.  It is a

nticipated

 that 2.8 im

pervious acres can

 be managed

. 0 

0 0 

0 23

0 1,010 

1,240 

Melwoo

d Av

enue

 

Project is located

 in th

e Po

lish Hill neighbo

rhoo

d of th

e City of 

Pittsburgh

 and

 is tributary to th

e A‐22

 outfall.  Run

off from th

e adjacent streets o

f Melwoo

d Av

enue

, Cargill Street, and

 Be

thoven

 Street w

ill be captured

 and

 managed

 by roadsid

e bioreten

tion features located in th

e pu

blic right o

f  way. It is 

anticipated

 that 1.4 im

pervious acres from

 these adjacent ro

ads 

will be captured

 and

 managed

 through the bioswale features. 

158 

847 

0 0 

0 0 

1,005 

Poplar and

 Kearns 

Project is located

 in Green

 Tree Bo

rough and is tributary to th

e C‐

25 se

wershed

 and

 includ

es th

e installatio

n of 600

 line

ar fe

et of 

30‐in

ch diameter ded

icated

 storm se

wer on Po

pular S

treet. 

0 60

0 0 

0 0 

0 60

Saline Street 

Project is located

 in th

e Green

field and

 Squ

irrel Hill Sou

thne

ighb

orho

ods o

f the

 City

 of P

ittsburgh

 and

 is tributary to th

e M‐

29 outfall.  It is a

nticipated

 that 3.0 im

pervious acres from

 ne

ighb

oring roads c

an be managed

.  

0 24

5 1,080 

0 0 

0 1,325 

Page 64: Water and Sewer Authority Improvement Programapps.pittsburghpa.gov/pwsa/2017-2021_CIP_1.2017.pdf · 2017-04-19 · Sustainability – Energy efficiency and “green” approach to

  

FY 2017 to 2021 Ca

pital Improvem

ent P

lan 

 

GRE

EN IN

FRAS

TRUCT

URE

 PRO

JECT

S  

PROJECT

 NAM

E PR

OJECT

 DESCR

IPTION 

COMMITMEN

T SCHED

ULE* (000

’s) 

Pre 

2017

 20

17 

2018

 20

19 

2020

 20

21 

TOTA

L  

Sham

rock W

ay 

Project is located

 in th

e Garfie

ld neighbo

rhoo

d in th

e City of 

Pittsburgh

 and

 is tributary to th

e A‐22

 outfall.  Run

off from 

adjacent streets w

ill be captured

 and

 managed

 on 10

 con

tiguo

us 

vacant lots.  It is anticipated

 that 3.4 im

pervious acres from

 ne

ighb

oring roads c

an be managed

0 29

0 1,220 

0 0 

0 1,510 

Volunteer's Field 

Project is located

 in th

e Ca

rrick ne

ighb

orho

od of the

 City

 of 

Pittsburgh

 and

 is tributary to Saw

 Mill Run

.  Installatio

n of GI 

BMPs with

in th

e Park to

 redu

ce se

dimen

t and

 other pollutant 

loads a

long

 with

 stormwater volum

e and pe

ak flow

 redu

ction. 

0 12

0 50

0 0 

0 0 

620 

Washington Bo

ulevard 

To be de

term

ined

. 30

0 TB

D TB

D TB

D TB

D TB

D TB

Wightman

 Park 

Project is located

 in th

e Squirrel Hill neighbo

rhoo

d of th

e City of 

Pittsburgh

 and

 is tributary to th

e M‐29 ou

tfall. Stormwater 

managem

ent w

ithin th

e park itself as well as the

 necessary piping 

or inlet w

ork to dire

ct up to 3.25 im

pervious acres from

 the 

adjacent streets into the  park. The

 Wightman

 Park project a

long

 with

 future street biosw

ale projects are expected to increase th

e im

pervious acres captured as well as a

lleviate repo

rted

 sewer 

basemen

t backups in

 the ne

ighb

orho

od aroun

d Wightman

 Park. 

0 27

0 1,200 

0 0 

0 1,470 

Woo

ds Run

 Stream 

Removal – Phase 1 

This project w

ill re

direct an existing stream

 inflo

w locatio

n into a 

detain and

 slow

 release subsurface storage facility. The

 stream

 base and

 wet weather flow

 currently disc

harge directly into th

e 36

‐inch diameter PWSA

 com

bine

d sewer on Mairdale Av

enue

0 33

0 1,460 

0 0 

0 1,790 

TBD = To

 Be De

term

ined

 

Page 65: Water and Sewer Authority Improvement Programapps.pittsburghpa.gov/pwsa/2017-2021_CIP_1.2017.pdf · 2017-04-19 · Sustainability – Energy efficiency and “green” approach to

  

FY 2017 to 2021Ca

pital Improvem

ent P

lan 

 PR

OJECT

 CLA

SS 

Misc

ellane

ous 

NEIGHBO

RHOOD/W

ARD

System

wide 

   

PROJECT

 NAM

E Utility

 Cost S

hares 

PROJECT

 NO. 

Unassigne

d STAT

US 

Constructio

n PR

IORITY

Region

al Coo

peratio

n/Stew

ardship

PROJECT

 DESCR

IPTION 

Fund

ing for infrastructure replacem

ent d

ue to

 coo

rdination with

 other agencies o

r utilities. 

PROJECT

 JUSTIFICAT

ION 

Coordinatio

n with

 other utililties c

an re

duce expen

ditures u

p to 75%

 of the

 total project cost a

nd re

duces the

 length 

of time that th

e pu

blic is inconven

ienced

 due

 to con

struction efforts. 

RISK

(S) 

If infrastructure fails in

 a pub

lic ro

adway with

in th

e du

ratio

n of th

e De

partmen

t of P

ublic W

ork’s p

avem

ent 

moratorium, the

 Autho

rity will be requ

ired to re

store the roadway su

rface curb to

 curb. 

IMPA

CT ON OPE

RATIONS 

Increase re

liability. 

ALTERN

ATIVES TO THE RE

COMMEN

DED

 ACT

ION 

Accepting the presen

t con

ditio

n of th

e infrastructure. 

COMMITMEN

TSCHED

ULE* (000

’s)

FUNDING SOURC

EPh

ase 

Pre 20

17 

2017

 20

1820

1920

2020

21Po

st 202

1 To

tal

☒Capital  

☐Expe

nse: ☐

Engine

ering ☐Sewer ☐

Water 

☒Co

st Share 

☐Other 

Assessmen

t/Stud

y  

  

0De

sign 

 60

0 60

060

060

060

0Ongoing

 3,000

Constructio

n  

2,400 

2,400

2,400

2,400

2,400

Ongoing

 12

,000

Total Project Cost 

0 3,00

0 3,00

03,00

03,00

03,00

0Ongoing

 15

,000

CASH

 FLO

W SUMMAR

Y**(000

’s)

 Pre 20

17 

2017

 20

1820

1920

2020

21Po

st 202

1 To

tal

Total 

0 60

0 3,00

03,00

03,00

03,00

0Ongoing

 10

,200

+

*Con

cept level costs based

 on previous re

ports, Capita

l Improvem

ent P

lans develop

ed by othe

rs, or sim

ilar type projects. 

**Includ

es con

tingencies. 

+ Total sh

own is expe

nditu

res throu

gh FY202

1. 

   

Page 66: Water and Sewer Authority Improvement Programapps.pittsburghpa.gov/pwsa/2017-2021_CIP_1.2017.pdf · 2017-04-19 · Sustainability – Energy efficiency and “green” approach to

                

This page was intentiona

lly left blank