Wastewater Treatment Plant Upgrade and Expansion Project Public Works Commission Study Session July 12, 2017
20

Wastewater Treatment Plant Upgrade and Expansion Project

Mar 23, 2022

Download

Documents

dariahiddleston
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: Wastewater Treatment Plant Upgrade and Expansion Project

Wastewater Treatment Plant Upgrade and Expansion Project

Public Works Commission Study SessionJuly 12, 2017

Page 2: Wastewater Treatment Plant Upgrade and Expansion Project

Agenda

WWTP Upgrade & Expansion ProjectSpecial Use Permit Process—Questions & Feedback

2

Page 3: Wastewater Treatment Plant Upgrade and Expansion Project

Wastewater Treatment Plant Upgrade & Expansion Project

3

Page 4: Wastewater Treatment Plant Upgrade and Expansion Project

Clean Water Program Drivers & Goals

4

Page 5: Wastewater Treatment Plant Upgrade and Expansion Project

WWTP Site Location

5

Page 6: Wastewater Treatment Plant Upgrade and Expansion Project

WWTP Site Location

6

Page 7: Wastewater Treatment Plant Upgrade and Expansion Project

Technology Approach; Dual Purpose Facilities for Improved Year‐Round Operations – Dry Weather 

7

Recycled Water

Page 8: Wastewater Treatment Plant Upgrade and Expansion Project

8

Dual use facilities maximize City’s investment and improve plant operations 

Technology Approach; Dual Purpose Facilities for Improved Year‐Round Operations – Wet Weather

Page 9: Wastewater Treatment Plant Upgrade and Expansion Project

WWTP Integrated Site Layout

9

1. HEADWORKS (PRELIMINARY TREATMENT)

2. DUAL‐USE CLARIFIERS (PRIMARY TREATMENT)

3. BIOLOGICAL NUTRIENT REMOVAL (BNR)

4. MEMBRANE BIOREACTOR (MBR)

5. DUAL‐USE CONTACT TANK

6. FLOW EQUALIZATION BASIN

7. ODOR CONTROL

8. CHEMICAL SYSTEMS

9. EXISTING DISINFECTION IMPROVEMENTS

10. ADMINISTRATION BUILDING

11. MAINTENANCE WAREHOUSE

* Existing facilities to be demolished prior to start of major construction are shown in red.

12

Page 10: Wastewater Treatment Plant Upgrade and Expansion Project

10

Highlights juxtaposition of industrial and natural water treatment systems

Architectural & Landscape Design

Page 11: Wastewater Treatment Plant Upgrade and Expansion Project

Community Access

11

Pedestrian Access Improvements and Educational Components 

Page 12: Wastewater Treatment Plant Upgrade and Expansion Project

12

Public Interface; Gateway to the WWTP

Administration Building

Page 13: Wastewater Treatment Plant Upgrade and Expansion Project

13

Inspired by City’s sustainable initiative for healthy environmental, economic and social development

Pursuing LEED Silver Certification

Following ENVISION guidelines for sustainable infrastructure

Sustainability

Page 14: Wastewater Treatment Plant Upgrade and Expansion Project

System Wide Approach and Robust Treatment for Odor Control

14

Cover and Vent Headworks, PCs and EQ

Two Stage Treatment with Biotrickling Filters & Carbon Scrubbers

Chemical Injection and Vapor Phase Treatment in the Collection System

Page 15: Wastewater Treatment Plant Upgrade and Expansion Project

Alternative Delivery by Integrated Team

15

City of San Mateo and Partners

DesignerHDR

Construction Manager at Risk

SUNDT 

Clean Water Program (City and CH2M)

Page 16: Wastewater Treatment Plant Upgrade and Expansion Project

Project Evolution – Where We Are

16

Page 17: Wastewater Treatment Plant Upgrade and Expansion Project

Special Use Permit (SUP) Process – Why?Required by PEIR (Certified by Council June 2016)City Zoning Code requires that public facilities in the Shoreline ("S") Zoning District require the approval of a Special Use PermitPermit processed by the City of San Mateo Planning Division

17

Page 18: Wastewater Treatment Plant Upgrade and Expansion Project

Special Use Permit Process – Two StagesPre‐Application—Neighborhood Meeting (Completed June 12)—Planning Commission Study Session (August 8)

Formal Application—Development Review Board (DRB)

• Planning, Building, Public Works, Fire, Police, Landscaping—Planning Commission Public Hearing—City Council Public Hearing

18

Page 19: Wastewater Treatment Plant Upgrade and Expansion Project

Special Use Permit Tentative Schedule

19

8/18: City determines necessity of additional CEQA Review

Page 20: Wastewater Treatment Plant Upgrade and Expansion Project

20

Questions & Feedback