Wastewater Treatment Plant Resita, Romania Strabag SRL, Direction IF Environmental Service area Contract value Project duration Wastewater treatment (protected) - Project description: ISPA-Project for the complete demolition of the existing WWTP Resita and reconstruc- tion and the extension of the WWTP (~ 125,000 PE) incl.: • New construction of the mechanical treatment stage • New construction of the intermediate pumping station • New construction of the two-stage-acti- vated-sludge process • New construction of the aeration tanks as cascade denitrification tanks • New construction of the final sedimenta- tion • New construction of 2 digesters with 1,550 m³ volume each and a central mixer • New construction of a combined heat and power plant (CHP) with a total capacity of 1 MWel. • New construction of the sludge drainage • Reconstruction of the existing preliminary sedimentation to a stormwater retention tank Further project data: • Renovation measures during ongoing operation • Working language: English Purpose: • Modernization of the mechanical treat- ment stage • Anaerobic sludge treatment and biogas utilization Our services: • Basic Design • Preparation of approval documents ac- cording to Romanian law • Detail Design • Planning of structural framework accord- ing to Romanian regulations • Assistance in start-up Client benefits: • General planner • Modern WWTP with biological treatment (AB technology)