WA7890008967 Hanford Facility RCRA Permit Dangerous Waste Portion Change Control Log Waste Treatment and Immobilization Plant WASTE TREATMENT AND IMMOBILIZATION PLANT CHAPTER 4A FIGURES AND DRAWINGS CHANGE CONTROL LOG Change Control Logs ensure that changes to this unit are performed in a methodical, controlled, coordinated, and transparent manner. Each unit addendum will have its own change control log with a modification history table. The “Modification Number” represents Ecology’s method for tracking the different versions of the permit. This log will serve as an up to date record of modifications and version history of the unit. Modification History Table Modification Date Modification Number 09/05/2017 8C.2017.6F 08/2012
40
Embed
WASTE TREATMENT AND IMMOBILIZATION PLANT CHAPTER 4A ...
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Change Control Log Waste Treatment and Immobilization Plant
WASTE TREATMENT AND IMMOBILIZATION PLANT
CHAPTER 4A FIGURES AND DRAWINGS CHANGE CONTROL LOG
Change Control Logs ensure that changes to this unit are performed in a methodical, controlled, coordinated, and transparent manner. Each unit addendum will have its own change control log with a modification history table. The “Modification Number” represents Ecology’s method for tracking the different versions of the permit. This log will serve as an up to date record of modifications and version history of the unit.
Modification History Table
Modification Date Modification Number 09/05/2017 8C.2017.6F
Change Control Log Waste Treatment and Immobilization Plant
This page intentionally left blank.
WA7890008967 Waste Treatment and Immobilization Plant
Chapter 4A.1
1
CHAPTER 4A 2 FIGURES AND DRAWINGS 3
4
WA7890008967 Waste Treatment and Immobilization Plant
Chapter 4A.2
1 2
3 This page intentionally left blank. 4
5
WA7890008967 Waste Treatment and Immobilization Plant
Chapter 4A.3
1 CHAPTER 4A 2
ENGINEERING FIGURES 3
4 The figures listed below are included in this chapter, and are to be used in conjunction with the text in the 5 Dangerous Waste Permit (DWP) Chapter 4. 6
WA7890008967 Waste Treatment and Immobilization Plant
Chapter 4A.9
HMP-MLTR-00001HMP-MLTR-00002
Film CoolersHOP-FCLR-00001HOP-FCLR-00002
Glass FormerFeed Mixer
HLW MelterFeed Prep
VesselsHFP-VSL-00001-00005
Carbon BedAdsorber
H0P-ADBR-00002A/2B
SBSCondensate
VesselsHOP-VSL
-00903-00904
SBS ColumnsHOP-SCB-00001HOP-SCB-00002
WESPsHOP-WESP-00001HOP-WESP-00002
Stack
HLW MelterOffgas Treatment(System HOP)
HLW Melter ConcentrateReceipt & Preparation
Process (System HCP/HFP
Canisters
HLW MelterFeed
VesselsHFP-VSL-00002-00006
Pret
reat
men
t Fac
ility
Bala
nce
of F
acili
ties
HLW Facility
To PretreatmentPWD-VSL-00043
HydrogenPeroxide
HE
A
HE
A
HE
A
HE
A
TCO/SCR SkidsHOP-SKID-00005HOP-SKID-00007
AcidWasteVessel
RLD-VSL-00007
Note. 1 OffgasDrainsVessel
RLD-VSL-00002
2 MHNO3
CanisterDeconTank
HDH-VSL-00002-00004
Air Sparge
NeutralizationTank
HDH-VSL-00003
Air Sparge
H2O
Ceric Nitrate
HLW Melters
Plant Washand Drain
VesselRLD-VSL-
00008
Product CanisterDecontamination
(System HDH)
HeatExchanger
Vessel VentHeader
HEME
HEME
HOP-HEME-00001A/B
HOP-HEME-00002A/B
SilverMordeniteColumn
HOP-ABS-00002
HOP-ABS-00003
CanisterDeconBogieVessel
BoosterExtraction
Fans
StackExtraction
Fans
Pulse VentHeaders
HEPAs
HEPAs
ElectricHeater
HE
A
ElectricHeater HEPAs Extraction
Fan
Ammonia
ElectricHeater
HLWConcentrate from
Pretreatment
HDH-VSL-00001
To PretreatmentPWD-VSL-
00033/00043
1 2
Figure 4A-4 Primary HLW Vitrification Systems 3
11 11
~ -- 11 o- - _-_-___ .JI 11 11 11 11
11 11 11 11 11 11 11 11 11 1--11 r===__J ___ _
I 11r===-'---~
I 1--- 1 ---
11 11 11 11
__ I
WA7890008967 Waste Treatment and Immobilization Plant
Chapter 4A.10
SpentResinSlurryVessel
Cs ResinAdditionAir GapVessel
Cesium Resin AdditionProcess System (CRP)
Cs ResinAdditionVessel
Cs IonExchangeColumns
1
Resin / Caustic
Sodium Hydroxide
Demineralized WaterFresh Resin
Process Condensate toWaste Feed Evaporator
2
Caustic
Nitric Acid
Spent Reagents toRLD-VSL-00017A/B
Resin / Caustic
4
3
CXP-IXC-00001, CXP-IXC-00002,CXP-IXC-00003, CXP-IXC-00004are part of system CXP.Included here for clarity.
Legend
LiquidSlurry
1
2 RDP-VSL-0002A is a part of systemRDP. Included here for clarity.
3 CRP-VSL-00001
4 CRP-VSL-00002
1 2
Figure 4A-11 Cesium Resin Addition Process System (CRP) 3
c:::>
c:::> c:::> c:::>
L--·-·-·-·-·-·-·-·-·-·-·-·-·-·-,
c:::>
WA7890008967 Waste Treatment and Immobilization Plant
Chapter 4A.11
LAW MelterProcess System
LAW Locator: LMP
Pressure Control Air
Process Air
Sparge Bubbler Air
Air in - Leakage fromMelter Enclosure
Low Pressure Steam
Process Figure
Liquid
SlurryGas
Legend
Solid
Film CoolerLOP-FCLR-1/3
Primary
( Note 2 )
LAW Melter
ContainerContainer
Notes:1.There are 2 melters LAW-MLTR-00001/2 each with a dedicated feed vessel and submerged Bed Scrubber.2.Each Melter has a Primary ( LOP-FCLR-00001/3 ) and a Standby (LOP- FCLR-00002/4 ) Film Cooler.3.Glass is poured from discharge chambers to containers one at a time in an alternating sequence.
Film CoolerLOP-FCLR-2/4
Standby
( Note 2 )
See Note 1
To Submerged Bed Scrubber
To Submerged Bed Scrubber
Instrument Air
LAW Blended Melter Feed (6 nozzles feedmelter LFP VSL00002/4)
WA7890008967 Waste Treatment and Immobilization Plant
Chapter 4A.13
HLW MelterProcess System
HLW Locator HMP
Pressure Control Air
Film Cooler Air
Sparge Bubbler Air
Air in - Leakage(from Melter Cave)
HLW Blended Melter FeedHFP-VSL-00002/6
Process Figure
Liquid
SlurryGas
Legend
Solid
Film CoolerHOP-FCLR-00001/2
PrimaryNote 2
HLW MelterCanister Canister
To Submerged Bed Scrubber HOP-SCB-00001
Instrument Air
Note 3 Note 3
See Note 1
Notes:1.There are two Melters, HLW-MLTR -00001/2, each with a dedicated Melter Feed Vessel and Submerged Bed Scrubber2 Each HLW Melter has one Film Cooler and one standby.3.Glass is poured from discharge chambers to containers one at a time, in alternating sequence.
WA7890008967 Waste Treatment and Immobilization Plant
Chapter 4A.20
1 2 3
This page intentionally left blank. 4 5
WA7890008967 Waste Treatment and Immobilization Plant
Chapter 4A.21
Figure 4A-59 Typical System - Containment Building Typical Design Features Crosswalk 1 (Sheet 2) 2
Containment Building Neg
ativ
e Ce
ll A
ir Pr
essu
re
Air
Flow
to H
EPA
Filt
ers
SS L
iner
With
Wel
ded
Seam
s
Impo
rt / E
xpor
t Hat
ch -
(Con
trolle
d A
ir G
ap)
Shie
ld W
indo
ws -
(Sea
led)
Stee
l Rei
nfor
ced
Con
cret
e Fl
oor/F
ound
atio
n
Stee
l Rei
nfor
ced
Con
cret
e W
alls
& C
eilin
gs
Thro
ugh
Wal
l MSM
s - (S
eale
d)
In -
Cell
Brid
ge C
rane
/ M
onor
ail
Hor
iz./V
ertic
al S
hiel
d D
oors
- (C
ontro
lled
Air
Gap
)
Misc
ella
neou
s In-
cell
Room
Equ
ipm
ent
Pretreatment Plant Pretreatment Hot Cell Containment Building (P-0123) X X X X X X X X X X X Pretreatment Maintenance Containment Building PM0124 Hot Cell Crane Maintenance Mezzanine X X X X X X P-0121A Spent Resin Dewatering X X X X X X X P-0122A Waste Packaging Area X X X X X X X P-0123A Remote Decontamination Maintenance Cave X X X X X X X X X P-0124 C3 Workshop X X X X X X X X P-012C1 C3 Workshop X X X X X X X X P-0125 Cask Lidding Airlock X X X X X X X X P-0125A Cask Lidding Room X X X X X X X X P-0128A MSM Repair Area X X X X X X X P-0128 Temporary Storage Room X X X X X Pretreatment Spent Filter Drum Handling Area Containment Building (P-0223) X X X X X X Pretreatment Filter Cave Room Containment Building (P-0335) X X X X X X X Pretreatment PJV Secondary HEPA Filter Room Containment Building (P-0431A) X X X X 3
WA7890008967 Waste Treatment and Immobilization Plant
Chapter 4A.22
Containment Building Neg
ativ
e Ce
ll A
ir Pr
essu
re
Air
Flow
to H
EPA
Filt
ers
SS L
iner
With
Wel
ded
Seam
s
Impo
rt / E
xpor
t Hat
ch -
(Con
trolle
d A
ir G
ap)
Shie
ld W
indo
ws -
(Sea
led)
Stee
l Rei
nfor
ced
Con
cret
e Fl
oor/F
ound
atio
n
Stee
l Rei
nfor
ced
Con
cret
e W
alls
& C
eilin
gs
Thro
ugh
Wal
l MSM
s - (S
eale
d)
In -
Cell
Brid
ge C
rane
/ M
onor
ail
Hor
iz./V
ertic
al S
hiel
d D
oors
- (C
ontro
lled
Air
Gap
)
Misc
ella
neou
s In-
cell
Room
Equ
ipm
ent
LAW Vitrification Plant LAW LSM Gallery Containment Building (L-0112) X X X X X X ILAW Container Finishing Containment Building L-0109B Swabbing Cell North Line X X X X X X X X X X L-0109C Decontamination Area North Line X X X X X X X X X X L-0109D Inert Fill / Welding Area North Line X X X X X X X X X X L-0115B Swabbing Cell South Line X X X X X X X X X X L-0115C Decontamination Area South Line X X X X X X X X X X L-0115D Inert Fill / Welding Area South Line X X X X X X X X X X L-0109E Container Monitoring/Export Area - North Line X X X X X X X X X X L-0115E Container Monitoring/Export Area - South Line X X X X X X X X X X LAW Vit Plant C3 Workshop Containment Building (L-226A) X X X X X X LAW Consumable Import/Export Containment Building (L-0119B) X X X X X X LAW Pour Cave Containment Building L-B015A Pour Cave (Melter 1) X X X X X X X X X X L-B013C Pour Cave (Melter 1) X X X X X X X X X X L-B013B Pour Cave (Melter 2) X X X X X X X X X X L-B011C Pour Cave (Melter 2) X X X X X X X X X X L-B011B (Spare) X X X X X X X X X X L-B009B (Spare) X X X X X X X X X X ILAW Container Buffer Storage Containment Building
L-B025C L-B025D
1
WA7890008967 Waste Treatment and Immobilization Plant
Chapter 4A.23
Containment Building Neg
ativ
e Ce
ll A
ir Pr
essu
re
Air
Flow
to H
EPA
Filt
ers
SS L
iner
With
Wel
ded
Seam
s
Impo
rt / E
xpor
t Hat
ch -
(Con
trolle
d A
ir G
ap)
Shie
ld W
indo
ws -
(Sea
led)
Stee
l Rei
nfor
ced
Con
cret
e Fl
oor/F
ound
atio
n
Stee
l Rei
nfor
ced
Con
cret
e W
alls
& C
eilin
gs
Thro
ugh
Wal
l MSM
s - (S
eale
d)
In -
Cell
Brid
ge C
rane
/ M
onor
ail
Hor
iz./V
ertic
al S
hiel
d D
oors
- (C
ontro
lled
Air
Gap
)
Misc
ella
neou
s In-
cell
Room
Equ
ipm
ent
HLW Vitrification Plant HLW Melter Cave 1 Containment Building: X X X X X X X X X X X H-0117 Melter Cave 1 X X X X X X X X X X X H-0116B Melter Cave 1 - C2/C3 Airlock X X X X X H-0310A Melter Cave 1 Equipment Decon Pit X X X X X X X X X X HLW Melter Cave2 Containment Building: X X X X X X X X X X X H-0106 Melter Cave 2 X X X X X X X X X X X H-0105B Melter Cave 2 - C2/C3/ Airlock X X X X X X 1 H-0304A Melter Cave 2 Equipment Decontamination Area X X X X X X X X X X IHLW Canister Handling Cave Containment Building (H-0136) X X X X X X X X X X X
IHLW Canister Swab and Monitoring Cave Containment Building (H-0133) X X X X X X X X X C3 Workshop Containment Building: X X X X X C3 Workshop (H-0311A) X X X X X C3 MSM Maintenance Workshop (H-0311B) X X X X HLW Filter Cave Containment Building (H-0104) X X X X X X X X X X HLW Waste Handling Area Containment Building: X X X X H-0410B E&I Room X X X X H-0411 Waste Handling Room X X X X HLW Pour Tunnel 1 Containment Building (H-B032) X X X X X X X HLW Pour Tunnel 2 Containment Building (H-B005A) X X X X X X X HLW Drum Swabbing and Monitoring Area Containment Building: X X X X X H-0126A Crane Maintenance Room X X X X H-0126B Swabbing and Monitoring Room X X X X H-B028 Cask Import/Export Room X X X X X 1 2
WA7890008967 Waste Treatment and Immobilization Plant
Chapter 4A.24
1 2 3
This page intentionally left blank. 4 5
WA7890008967 Waste Treatment and Immobilization Plant
Chapter 4A.25
1 Figure 4A-65 Simplified General Arrangement Pretreatment - Plan at El. 98 2
Some information, on this page, may appear to be illegible; however, the information necessary for assuring adequate design is legible 3