Waste Management Perspectives in St.Petersburg St.Petersburg City Improvement Committee Denis Zavyalov Head of the Development and Investment Projects Department
12

Waste management perspectives_ in st.petersburg

Oct 18, 2014

Download

Business

Team Finland Future Watch report
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: Waste management perspectives_ in st.petersburg

Waste Management Perspectives in St.Petersburg

St.Petersburg City Improvement Committee

Denis ZavyalovHead of the Development and Investment Projects Department

Page 2: Waste management perspectives_ in st.petersburg

St.Petersburg

St.Petersburg: Russia’s second largest city, industrial, scientific & culture centre Supportive local authorities Strong FDI – Toyota, General Motors, Ford, Nokian Tyres Major tourist destination – “Venice of the North”

Key Facts: Population – 5,028 million people Area –1,439 km² Area of industrial zones –

240 km² Gross Regional Product 2012 –

US$ 67 billion

Page 3: Waste management perspectives_ in st.petersburg

«The Western High Speed Diameter Road»Project description:

Whole length of the route: 46,6 km

Traffic capacity: up to 128 000 vehicle per day

Financing form: PPP

The Northern and Southern parts of the road have alreadybeen finished till this moment. Only the Central part isbuilding now

«Pulkovo Airport Development Project»Project description:

Passenger traffic capacity: up to 17 million per year

Financing form: PPP

Construction is completed and testing of airport operationsbegan on October 1, 2013

St.Petersburg Key Projects

Page 4: Waste management perspectives_ in st.petersburg

St.Petersburg generates about 10 million m3

of MSW annually

Waste treatment plants treat about 15% oftotal amount of waste

The rest 85% are disposed at the landfills

Forecast for 2020 is more than 12 million m3

(2 million tons) of MSW to be generated

Waste Treatment Industryin figures

Page 5: Waste management perspectives_ in st.petersburg

2 plants«Yanino» and «Volkhonka»Using technology: mechanical-biological treatmentUseful materials such as paper, plastic and metals arerecovered first through the mechanical separation stage.The rest organic material goes through the compostingstage. The end product is CLO (Compost-like output).

2 landfill sites«Novosyolki»Capacity: 34 million tons (residual capacity in 2012 -3,7 million tons)«Novy Svet»Capacity: 18 million tons (residual capacity in 2012 -7 million tons)

Existing Infrastructure of the WasteTreatment Industry

Page 6: Waste management perspectives_ in st.petersburg

Waste Collection System

St.Petersburg has 25 060 wastecollection sites including:

arranged collection sites (outside thebuildings and structures) – 8 951

collection sites with undergroundcontainers – 271

collection systems (inside thebuildings and structures) – 15 838

Page 7: Waste management perspectives_ in st.petersburg

According to the «Regional target program for municipal and industrial wastemanagement in St.Petersburg in 2012-2020» the key directions of waste managementdevelopment are the following:

Waste Management Perspectives

MSW treatment facilities construction Hazardous and medical treatment facilities construction Construction of modern landfill sites Improving of the waste collection system Establishing the efficient monitoring system Development of the general scheme of the city sanitation

Page 8: Waste management perspectives_ in st.petersburg

Modernization of the Sorting Unit of the Plant «Yanino»

Technology: mechanical-biological treatment Current stage: the design works are carrying out Planning capacity after modernization: 250 000 tons per year Planning commissioning date: end of 2014

Page 9: Waste management perspectives_ in st.petersburg

Investor: Helector S.A.–Aktor Concessions S.A.–Aktor S.A. Capacity: 350 000 tons per year Financing form: PPP Technology:

- mechanical and optical separation- biological treatment – biodrying- residual fraction of the plant is not more than 20%

Current stage:- tender procedure took place in 2009-2010- due to Greek financial crisis the project was suspended and now is under negotiation

Waste Treatment Plant

Page 10: Waste management perspectives_ in st.petersburg

Medical Waste Management Complex

Technology: the high temperature incineration system of all typesof medical waste with flue gas treatment

Current stage:- expertise of the design documentation- equipment ordered

Planning capacity: 5 000 tons per year Planning commissioning date: July 2014

Page 11: Waste management perspectives_ in st.petersburg

Technology: reclamation with active degassing process Current stage: expertise of the design documentation Planning commissioning date: 2017

Reclamation of the landfill «Novosyolki»

Page 12: Waste management perspectives_ in st.petersburg

Thank You for Your attention