WARC - ACCESS ROAD Waste and Recovery Center Access Road and Off Leash Park Parking Lot Reconstruction, CRP-91074 Project Description Includes pulverizing the existing access road which is located on landfill material, re-grading, re-paving, stormwater improvements, improved channelization, lighting, additional parking, security and more. Project Location Waste and Recovery Center at Hawks Prairie, Hogum Bay Rd NE, just north of Interstate 5 at Exit 111 (Marvin Rd NE) in Lacey, Washington Waste & Recovery Center Contacts: Scott Schimelfenig WARC Operations Mgr. 360-867-2900 Jo Evans WARC Sr. Office Assistant 360-867-2901 Project Schedule March - July 2016 Project Benefits Replaces existing settled access road and parking lot along with significant improvements to safety, security, lighting, and more. Stay Informed: http://www.co.thurston.wa.us/ publicworks/ ***During the construction, parking for the Dog Park and Closed Loop Park will be in the Intercity Transit Park-n-Ride lot. ***All traffic throughout the site will be one-way in and one-way out. Look at the attached drawing/map for additional information on traffic flow. ***Please follow the signs. Thank you for your patience during our construction process. Public Works Contacts: Brandon Hicks, P.E. Construction Manager 360-867-2358 Scott Lindblom County Engineer 360-867-2329