REVISIONS: DATE: DESIGNED BY: DRAWN BY: CHECKED BY: Q.C. BY: SHEET #: SCALE: PROJECT #: 223 N Graham Street Charlotte, NC 28202 V: 704.333.0325 F: 704.332.3246 www.LandDesign.com TM WALDRON GROVE SINGLE FAMILY TOWNHOMES CHARLOTTE, MECKLENBURG COUNTY, NORTH CAROLINA MARCH 4, 2015 1015420 05/27/16 2ND LD SUBMITTAL NC Engineering Firm License # C-0658 SEAL CORPORATE 08/26/16 3RD LD AND 2ND CTL WATER SUBMITTAL 5008 PINEVILLE-MATTHEWS ROAD CHARLOTTE, NC 28226 KAG KAG RAK RAK N/A C1.0 COVER SHEET R.B. Pharr & Associates, P.A. 420 Hawthorne Lane Charlotte, NC 28204 (704)376-2186 Contact: Andy Baker The Waldron Group, LLC. 1235-E East Blvd., Suite 155 Charlotte, NC 28203 (704)604-7452 Contact: Tim Pratt City of Charlotte, Mecklenburg County, North Carolina The Waldron Group, LLC DEVELOPER CIVIL ENGINEER/ LANDSCAPE ARCHITECT LandDesign, Inc. 223 N. Graham Street Charlotte, NC 28202 (704)333-0325 Contact: Kate Goodman SURVEYOR Waldron Grove Single Family Townhomes VICINITY MAP NTS NC HWY #51 REA ROAD CARY RIDGE DRIVE TRIVENY ROAD SITE NORA'S PATH ROAD BINFORD'S RIDGE ROAD FLETCHER COURT Sheet Index: C-3.0 Site Plan C-1.0 Survey C-1.1 Chapter 1 - Existing Conditions Chapter 2 - Erosion Control C-2.0 Chapter 3 - Site Cover Sheet Chapter 4 - Grading Plan & Stormwater C-4.0 Grading Plan Chapter 5 - Utilities C-5.0 Utility Plan 1st Land Development Submittal: March 22, 2016 Chapter 6 - Planting C-6.0 Required Planting Plan C-2.1 Erosion Control Plan - Phase I C-5.1 Sewer Profiles C-5.2 Utility Details Erosion Control Plan - Phase II Planting Details C-3.1 Site Details Utility Details C-2.2 Erosion Control Details C-4.1 Stormwater Plan C-4.2 Stormwater Management Plan C-3.2 Turning Movements C-5.3 Chapter 7 - Elevations A-1 Building Elevations Demolition Plan C-1.5 C-4.5 Stormwater Profile Stormwater Details C-4.6 Utility Details Rezoning - Technical Data C-1.2 Intersection Sight Distance C-3.4 Traffic Control C-3.5 Traffic Details C-3.6 Rezoning - Schematic Building Elevations Rezoning - Schematic Building Elevations C-1.3 C-1.4 C-4.4 BMP Enlargement Plan & Detail C-4.3 Post Drainage Area Plan C-6.1 C-2.3 Erosion Control Details Site Details C-3.3 Stormwater Details C-4.7 March 22, 2016 March 22, 2016 March 22, 2016 March 22, 2016 March 22, 2016 March 22, 2016 March 22, 2016 March 22, 2016 March 22, 2016 March 22, 2016 March 22, 2016 March 22, 2016 March 22, 2016 March 22, 2016 March 22, 2016 March 22, 2016 March 22, 2016 March 22, 2016 March 22, 2016 March 22, 2016 March 22, 2016 March 22, 2016 March 22, 2016 March 22, 2016 March 22, 2016 March 22, 2016 March 22, 2016 March 22, 2016 March 22, 2016 March 22, 2016 March 22, 2016 WATER LINES TO BE PERMITTED SIZE (INCHES) MATERIAL LENGTH TOTAL CLT WATER TRACKING NUMBER: __________________________ Issuing Project Permit Number: ________________________ Date: __________ Signing Official: _________________________Title: ______________________ C-4.8 Pre-Developed Drainage Plan March 22, 2016 2nd Land Development Resubmittal: June 10, 2016 June 10, 2016 June 10, 2016 June 10, 2016 June 10, 2016 June 10, 2016 June 10, 2016 June 10, 2016 June 10, 2016 June 10, 2016 June 10, 2016 June 10, 2016 June 10, 2016 June 10, 2016 June 10, 2016 June 10, 2016 June 10, 2016 June 10, 2016 June 10, 2016 June 10, 2016 June 10, 2016 June 10, 2016 June 10, 2016 June 10, 2016 June 10, 2016 June 10, 2016 June 10, 2016 June 10, 2016 June 10, 2016 June 10, 2016 June 10, 2016 June 10, 2016 June 10, 2016 2016197 649 3 PVC 649 3rd Land Development Resubmittal and 2nd CTL Water Submittal: August 26, 2016 August 26, 2016 August 26, 2016 August 26, 2016 August 26, 2016 August 26, 2016 August 26, 2016 August 26, 2016 August 26, 2016 August 26, 2016 August 26, 2016 August 26, 2016 August 26, 2016 August 26, 2016 August 26, 2016 August 26, 2016 August 26, 2016 August 26, 2016 August 26, 2016 August 26, 2016 August 26, 2016 August 26, 2016 August 26, 2016 August 26, 2016 August 26, 2016 August 26, 2016 August 26, 2016 August 26, 2016 August 26, 2016 August 26, 2016 August 26, 2016 August 26, 2016 August 26, 2016 A-2 Building Elevations March 22, 2016 June 10, 2016 August 26, 2016 Land Development RTAP: Feb. 27, 2017 02-27-17 LD RTAP August 26, 2016 August 26, 2016 August 26, 2016 August 26, 2016 Feb. 27, 2017 August 26, 2016 August 26, 2016 August 26, 2016 August 26, 2016 Feb. 27, 2017 August 26, 2016 August 26, 2016 Feb. 27, 2017 August 26, 2016 August 26, 2016 August 26, 2016 Feb. 27, 2017 Feb. 27, 2017 Feb. 27, 2017 Feb. 27, 2017 Feb. 27, 2017 Feb. 27, 2017 Feb. 27, 2017 August 26, 2016 August 26, 2016 Feb. 27, 2017 Feb. 27, 2017 August 26, 2016 August 26, 2016 Jan. 9, 2017 August 26, 2016 August 26, 2016 Jan. 9, 2017 Land Development RTAP 2nd Submittal: April. 21, 2017 August 26, 2016 August 26, 2016 August 26, 2016 August 26, 2016 August 26, 2016 August 26, 2016 August 26, 2016 August 26, 2016 August 26, 2016 August 26, 2016 August 26, 2016 Feb. 27, 2017 August 26, 2016 August 26, 2016 Feb. 27, 2017 Feb. 27, 2017 August 26, 2016 August 26, 2016 August 26, 2016 August 26, 2016 April. 21, 2017 April. 21, 2017 April. 21, 2017 April. 21, 2017 April. 21, 2017 April. 18, 2017 April. 21, 2017 April. 21, 2017 April. 21, 2017 April. 18, 2017 04-21-17 LD RTAP 2nd SUBMITTAL April. 21, 2017 April. 21, 2017 April. 21, 2017