Top Banner

of 73

W4.6 Strategic Corridor Study[1]

Jun 04, 2018

Download

Documents

scribdstorage
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
  • 8/13/2019 W4.6 Strategic Corridor Study[1]

    1/73

  • 8/13/2019 W4.6 Strategic Corridor Study[1]

    2/73

  • 8/13/2019 W4.6 Strategic Corridor Study[1]

    3/73

  • 8/13/2019 W4.6 Strategic Corridor Study[1]

    4/73

  • 8/13/2019 W4.6 Strategic Corridor Study[1]

    5/73

  • 8/13/2019 W4.6 Strategic Corridor Study[1]

    6/73

  • 8/13/2019 W4.6 Strategic Corridor Study[1]

    7/73

  • 8/13/2019 W4.6 Strategic Corridor Study[1]

    8/73

  • 8/13/2019 W4.6 Strategic Corridor Study[1]

    9/73

  • 8/13/2019 W4.6 Strategic Corridor Study[1]

    10/73

  • 8/13/2019 W4.6 Strategic Corridor Study[1]

    11/73

  • 8/13/2019 W4.6 Strategic Corridor Study[1]

    12/73

  • 8/13/2019 W4.6 Strategic Corridor Study[1]

    13/73

  • 8/13/2019 W4.6 Strategic Corridor Study[1]

    14/73

  • 8/13/2019 W4.6 Strategic Corridor Study[1]

    15/73

  • 8/13/2019 W4.6 Strategic Corridor Study[1]

    16/73

  • 8/13/2019 W4.6 Strategic Corridor Study[1]

    17/73

  • 8/13/2019 W4.6 Strategic Corridor Study[1]

    18/73

  • 8/13/2019 W4.6 Strategic Corridor Study[1]

    19/73

  • 8/13/2019 W4.6 Strategic Corridor Study[1]

    20/73

  • 8/13/2019 W4.6 Strategic Corridor Study[1]

    21/73

  • 8/13/2019 W4.6 Strategic Corridor Study[1]

    22/73

  • 8/13/2019 W4.6 Strategic Corridor Study[1]

    23/73

  • 8/13/2019 W4.6 Strategic Corridor Study[1]

    24/73

  • 8/13/2019 W4.6 Strategic Corridor Study[1]

    25/73

  • 8/13/2019 W4.6 Strategic Corridor Study[1]

    26/73

  • 8/13/2019 W4.6 Strategic Corridor Study[1]

    27/73

  • 8/13/2019 W4.6 Strategic Corridor Study[1]

    28/73

  • 8/13/2019 W4.6 Strategic Corridor Study[1]

    29/73

  • 8/13/2019 W4.6 Strategic Corridor Study[1]

    30/73

  • 8/13/2019 W4.6 Strategic Corridor Study[1]

    31/73

  • 8/13/2019 W4.6 Strategic Corridor Study[1]

    32/73

    *LPI = Link, Place, Interchange

    Issues

    Solutions

    Segment LPI*Status

    M/L termS/M term

    Locations:Segments

    Objective/mode

    Specific issues

    PlannedSchemes

    Issues

    Solutions

    Segment LPI*Status

    M/L termS/M term

    Locations:Segments

    Objective/mode

    Specific issues

    PlannedSchemes

    Issues

    Solutions

    Segment LPI*Status

    Medium-termShort-term

    Locations:Segments Objective/mode Specific issues

    PlannedSchemes

    Long-term

  • 8/13/2019 W4.6 Strategic Corridor Study[1]

    33/73

  • 8/13/2019 W4.6 Strategic Corridor Study[1]

    34/73

  • 8/13/2019 W4.6 Strategic Corridor Study[1]

    35/73

  • 8/13/2019 W4.6 Strategic Corridor Study[1]

    36/73

  • 8/13/2019 W4.6 Strategic Corridor Study[1]

    37/73

  • 8/13/2019 W4.6 Strategic Corridor Study[1]

    38/73

  • 8/13/2019 W4.6 Strategic Corridor Study[1]

    39/73

  • 8/13/2019 W4.6 Strategic Corridor Study[1]

    40/73

  • 8/13/2019 W4.6 Strategic Corridor Study[1]

    41/73

  • 8/13/2019 W4.6 Strategic Corridor Study[1]

    42/73

  • 8/13/2019 W4.6 Strategic Corridor Study[1]

    43/73

  • 8/13/2019 W4.6 Strategic Corridor Study[1]

    44/73

    Appendix A Workshop Notes

  • 8/13/2019 W4.6 Strategic Corridor Study[1]

    45/73

  • 8/13/2019 W4.6 Strategic Corridor Study[1]

    46/73

  • 8/13/2019 W4.6 Strategic Corridor Study[1]

    47/73

  • 8/13/2019 W4.6 Strategic Corridor Study[1]

    48/73

  • 8/13/2019 W4.6 Strategic Corridor Study[1]

    49/73

  • 8/13/2019 W4.6 Strategic Corridor Study[1]

    50/73

    Appendix B Identified Issues Plans

  • 8/13/2019 W4.6 Strategic Corridor Study[1]

    51/73

  • 8/13/2019 W4.6 Strategic Corridor Study[1]

    52/73

  • 8/13/2019 W4.6 Strategic Corridor Study[1]

    53/73

  • 8/13/2019 W4.6 Strategic Corridor Study[1]

    54/73

  • 8/13/2019 W4.6 Strategic Corridor Study[1]

    55/73

  • 8/13/2019 W4.6 Strategic Corridor Study[1]

    56/73

    Appendix C Identified Issues Table

  • 8/13/2019 W4.6 Strategic Corridor Study[1]

    57/73

    C6 IssuesTableIssue

    Reference

    Number IssueThemeandDescrtionbyIssuesPlanArea

    AreaoneTrafficmanagement

    1

    Eastbound

    link

    at

    capacity

    in

    the

    PM

    peak

    (101%

    vol/c)

    132%

    vol/c

    in

    2031

    scenario2 WorseningAMpeakcongestion (+19%vol/c)in2031

    3 Clusterofpedestriancollisions (2slight,1serious)inthelast3years

    4 EastboundlinkatcapacityintheAMpeak(108%vol/c)

    5 EastboundlinkatcapacityintheAMandPMpeak(104%;100%vol/c)

    6 ObservedgeneralNBqueuinganddelays

    7 Signaltimingsinappropriate fortrafficflowsandcausedelays

    8 Busyaccesstoindustrialestate

    9 LinkatcapacityintheAMandPMpeaks(101%;108%vol/c)

    10 Observedgeneralqueuinganddelays

    Bus11 Poorbusstopaccessibilityatsetdownbaycausesdelays

    12 Operationaldeficiencies ineffectiveconductor

    13 Exposedandunpleasant busstand

    14 Obstructiveparkinganddeliveryaccessdelaysbuses

    15 Observedbus

    delays

    Pedestrians/cyclists

    16 Narrowfootwayandwaitingareaoutsideshoppingcentreentrance

    17 AbsenceofcycleroutesonamoredirectalignmenttoBrentCross

    Other

    18 UnderutilisedrailconnectioninproximityofBrentCrossshoppingcentre

    19 Substantialparkingdemandandassociatedtraffic

    20 IndustrialactivityandHGVmovements

    21 Outdatedschooltravelplan doesntfullyutilisebusrouteandcycleoptions

    Interchange22 Poorpublicrealm

    AreatwoTrafficmanagement

    23 Unsaferightturningoption

    24 Observedgeneralqueuinganddelays

    25 Busesinbaysblocktrafficflow

    26 SouthboundlinkovercapacityintheAMandPMpeaks(105%;101%vol/c)

    27 WorseninginAMpeakcongestionintheAM peaks(+13%vol/c)projected

    28 Observedgeneralqueuinganddelays

    29 Obstructiveandunregulatedparkingcausesdeliveryandloadingaccessissues

    30 WBlinkovercapacityintheAMpeak(101%vol/c)

    31 SouthboundlinkovercapacityintheAMpeak(108%vol/c)in2031scenario

    32 WestboundlinkovercapacityintheAMpeak(101%vol/c)

    33 NorthboundlinkovercapacityinthePMpeak(124%vol/c)and generalqueuinganddelaysobserved

    34 Observedgeneralqueuinganddelays

    35 SouthboundlinkovercapacityintheAMpeak(101%vol/c)

    36 Complexinteractionoftrafficmovementscreatesaccessissues

    37 Clusterofaccidents(3slight,2seriousand1fatalpedestrianand20slightvehicle)inlast3years

    Bus38 Parkinginbuslanedelaysnorthboundbusmovement

    39 Parkedcarscauseissuesforbusesaccessingbusbays

    40 Waitingbusesobstructtrafficflow

    41 Busesencounterdelaysandanextendedroute

    42 Parkedcarsreduceusablecarriagewaywidthcausingdelaystobuses

    Pedestrians/cyclists

    43 Unfulfilledcycleparkingdemand

    44 Cycling onthefootwayobserved.Intimidating cyclingenvironment

    45 Dangerouspedestriancrossingatinappropriate andwidesectionsofcarriageway

    46 Narrowfootway

    47 Limitedpedestriancrossingfacilities

    Other

    48 Deliveryand

    loading

    access

    issues

    Interchange

  • 8/13/2019 W4.6 Strategic Corridor Study[1]

    58/73

    49 Poorqualitypublicrealm

    AreathreeTrafficmanagement

    50 Observedgeneralqueuinganddelays

    51 SouthboundlinkatcapacityintheAMpeak(108%vol/c)

    52 Observedgeneralqueuinganddelays

    53 Parkingonfootway

    54 Northboundlink

    at

    capacity

    in

    the

    PM

    peak

    (100%

    vol/c)

    55 Obstructiveparking

    56 Unregulatedandobstructiveparkingresultsinawkwardmanoeuvring

    57 SouthboundlinkatcapacityinthePMpeak(105%vol/c

    58 DominantmovementwithahighproportionofHGVsresultsindelaystoalltrafficandnorthboundbuses

    59 Poorjunctionsightlinesduetoparkedvehicles

    60 SouthboundlinkatcapacityintheAMpeak(109%vol/c)

    61 Observedgeneralqueuinganddelays

    Buses62 Exposedbusstandwithnarrowfootway

    63 ParkedcarsreduceuseablecarriagewaywidthcausingdelaystobusesandconflictswithHGVs

    Pedestrians/cyclists

    64 AbsenceofcycleroutesontoWembleystadium/development, IKEAandmoredirectalignmenttoBrentCross

    65 Unappealingcycleroute

    66 Undesirablecyclelink

    Other

    67 Loading/unloadingissues

    68 HeavyflowofdeliveryvehiclesfromRoyalMailsite

    69 ParkRoyalOpportunity area developments willresultintripsto/fromthearea

    Interchange70 PoorpublicrealmandlimitedvisibilityforconnectiontoNBbuses

    71 Lackofinformation/ presenceatNBbusstop

    AreafourTrafficmanagement

    72 EastboundlinkovercapacityinthePMpeak(108%vol/c)

    73 NorthboundlinkovercapacityintheAMandPMpeaks(107%;127vol/c)

    74 WestboundvehiclesratrunningtoavoiddelaysatHangerLanejunction

    75 NorthboundlinkovercapacityintheAMandPMpeaks(117%;117%vol/c)

    76 Clusterofaccidents(2slightpedestriansand7slightvehiclecollisions) inlast3years

    77 EastboundlinkovercapacityinthePMpeak(105%vol/c)

    78 VehiclesratrunningtoavoidNorthCircular

    79 Clusterofaccidents(7slightand2seriousvehiclecollisions) inlast3years

    80 Obstructiveparkingandwaitingbusesresultinawkwardmanoeuvringanddelaytraffic

    81 SouthboundlinkatcapacityintheAMpeak(100%vol/c),163%vol/c2031scenario

    82 LinkovercapacityinthePMpeak(101110%vol/c)

    Buses83 Limitedstandingroomforwaitingbuspassengers

    Pedestrians/cyclists

    84 Unappealing

    subway

    85 Busyandnarrowlinkincycleroute

    86 Conflictingpedestrianandvehicleinteraction

    87 Lackofcrossingfacilities

    88 Cyclelanepoorlymarked

    Other

    89 MissingrailchordpreventsPiccadilly LinefromservingEalingBroadway

    AreafiveTrafficmanagement

    90 Rightturningvehiclesobstructtrafficflow

    91 Observedgeneralqueuinganddelays

    Buses92 RightturningbusesdelayedbyNBqueuingtraffic

  • 8/13/2019 W4.6 Strategic Corridor Study[1]

    59/73

    Appendix D Concept Solution Plans

  • 8/13/2019 W4.6 Strategic Corridor Study[1]

    60/73

  • 8/13/2019 W4.6 Strategic Corridor Study[1]

    61/73

  • 8/13/2019 W4.6 Strategic Corridor Study[1]

    62/73

  • 8/13/2019 W4.6 Strategic Corridor Study[1]

    63/73

  • 8/13/2019 W4.6 Strategic Corridor Study[1]

    64/73

  • 8/13/2019 W4.6 Strategic Corridor Study[1]

    65/73

    Appendix E Solution Impacts Table

  • 8/13/2019 W4.6 Strategic Corridor Study[1]

    66/73

    5m+

    5m+

    5m+

    5m+

    5m+

  • 8/13/2019 W4.6 Strategic Corridor Study[1]

    67/73

  • 8/13/2019 W4.6 Strategic Corridor Study[1]

    68/73

  • 8/13/2019 W4.6 Strategic Corridor Study[1]

    69/73

    Appendix F Prioritised Scheme Programme

  • 8/13/2019 W4.6 Strategic Corridor Study[1]

    70/73

  • 8/13/2019 W4.6 Strategic Corridor Study[1]

    71/73

  • 8/13/2019 W4.6 Strategic Corridor Study[1]

    72/73

  • 8/13/2019 W4.6 Strategic Corridor Study[1]

    73/73

    MVA Consultancy provides advice on transport, to central, regional and local

    government, agencies, developers, operators and financiers.

    A diverse group of results-oriented people, we are part of a strong team of

    professionals worldwide. Through client business planning, customer research

    and strategy development we create solutions that work for real people in the

    real world.

    For more information visit www.mvaconsultancy.com

    Abu Dhabi

    AS Business Centre, Suite 201, Al Ain Road, Umm al

    Nar, P.O. Box 129865, Abu Dhabi, UAE

    T: +971 2 510 2402 F: +971 2 510 2403

    Birmingham

    Second Floor, 37a Waterloo StreetBirmingham B2 5TJ United Kingdom

    T: +44 (0)121 233 7680 F: +44 (0)121 233 7681

    Dublin

    First Floor, 12/13 Exchange Place

    Custom House Docks, IFSC, Dublin 1, Ireland

    T: +353 (0)1 542 6000 F: +353 (0)1 542 6001

    Edinburgh

    Second Floor, Prospect House, 5 Thistle Street,

    Edinburgh EH2 1DF United Kingdom

    T: +44 (0)131 220 6966 F: +44 (0)131 220 6087

    Glasgow

    Seventh Floor, 78 St Vincent Street

    Glasgow G2 5UB United Kingdom

    T: +44 (0)141 225 4400 F: +44 (0)141 225 4401

    London

    Second Floor, 17 Hanover Square

    London W1S 1HU United Kingdom

    T: +44 (0)20 7529 6500 F: +44 (0)20 7529 6556

    Lyon

    11, rue de la Rpublique, 69001 Lyon, France

    T: +33 (0)4 72 10 29 29 F: +33 (0)4 72 10 29 28

    Manchester

    25th Floor, City Tower, Piccadilly Plaza

    Manchester M1 4BT United KingdomT: +44 (0)161 236 0282 F: +44 (0)161 236 0095

    Marseille

    76, rue de la Rpublique, 13002 Marseille, France

    T: +33 (0)4 91 37 35 15 F: +33 (0)4 91 91 90 14

    Paris

    12-14, rue Jules Csar, 75012 Paris, France

    T: +33 (0)1 53 17 36 00 F: +33 (0)1 53 17 36 01

    Woking

    Dukes Court, Duke Street, Woking

    Surrey GU21 5BH United Kingdom

    T: +44 (0)1483 728051 F: +44 (0)1483 755207