249 249 248 255 250 250 249 250 252 256 255 254 255 254 253 252 251 250 249 250 2 252 250 252 253 249 252 250 251 251 252 253 254 255 256 256 255 254 253 W W W W W W W W W W W W W U/E U/E U/E U/E W U/E U/E U/E CATV CATV CATV CATV CATV CATV CATV CATV U/E U/E U/E U/E U/E U/E U/E U/E U/E U/E U/E U/E U/E U/E U/E U/E C C W W U/E W W C C C C C C C C C C C G G G G G G G G G CATV CATV CATV CATV CATV CATV CATV CATV U/E U/E U/E U/E U/E U/E U/E U/E U/E U/E U/E U/E U/E U/E U/E W W U/E OSWEGO, NY 7/30/2019 WRIGHT'S LANDING MARINA REVITALIZATION PROJECT 2018.397.002 SCALE: 1" = 50'-0" 0' 50' 100' 25' PLAN NORTH BOAT LAUNCH WRIGHT'S LANDING BREITBECK PARK DELIVERY & EMERGENCY VEHICLE ACCESS CORRIDOR, SHARED WITH PEDESTRIANS ENTRY ARCH CONTROLLED VEHICLE ENTRANCE (GATE OR DROP-BOLLARDS) PEDESTRIAN CORRIDOR LEADING TO 4TH & LAKE STREET INTERSECTION PEDESTRAIN BOARDWALK FIRE PIT & PICNIC AREA PEDESTRIAN WALKWAY AROUND PIER PERIMETER RESTAURANT/ CONCESSIONS, ROOF DECK AT GRADE OF HILL-SIDE WALK OPEN SPACE RAISED HARBOR VIEW FOCAL POINT EXISTING YACHT CLUB HOUSE INTERNATIONAL PIER OPEN LAWN SPACE - FLEXIBLE USE SPACE FOR EVENTS - HARBORFEST ATTRACTIONS - CARNIVAL RIDES NEW DOCK & BOAT SLIPS PARKING RAISED ABOVE FLOOD ELEVATION NEW PAVILION, RAISED ABOVE FLOOD LEVEL INCREASED PARKING CONNECTION TO SIDEWALK NETWORK BATHHOUSE RENOVATIONS OPEN SPACE BOAT FUELING STATION MARINA AND BOATER SERVICES BUILDING (SEPARATE PROJECT) FUEL STORAGE TANK (SEPARATE PROJECT) AREA 1: INTERNATIONAL PIER IMPROVEMENT COST ESTIMATE A. PEDESTRIAN WALKWAYS $ 4,710,000 B. GATEWAY ARCH & FLAG POLES $ 641,000 C. VEHICLE PARKING & CONTROLS $ 270,000 D. LANDSCAPE IMPROVEMENTS $ 460,000 E. RELOCATE & REPLACE BOAT SLIPS $ 2,630,000 AREA 2: WRIGHT'S LANDING MARINA IMPROVEMENT COST ESTIMATE A. ELEVATE PARKING & AMENITIES $ 1,100,000 B. NEW FIRE PITS $ 2,550,000 C. RESTAURANT BUILDING $ 1,650,000 D. LANDSCAPE IMPROVEMENTS $ 50,000 AREA 3: DOCK SLIPS IMPROVEMENT COST ESTIMATE A. REPAIR/REPLACE DAMAGED DOCKS $ 2,950,000 GRAND TOTAL $ 17,011,000 EXISTING DOCK REPAIRS/REPLACEMENTS EXISTING DOCK REPAIRS / REPLACEMENTS EXISTING DOCK REPAIRS / REPLACEMENTS IMPROVED TRAFFIC CIRCULATION FOR INCREASED PARKING AND SAFETY APPROXIMATELY 200 L.F. OF NEW SHEET PILING WALLS TO BE COMPLETED UNDER FEMA PROGRAM