VTCA CULPEPER/FREDERICKSBURG DISTRICT DIALOGUE WARRENTON SOUTHERN INTERCHANGE US 15/17/29 Will Stowe, P.E., Culpeper Area Construction Engineer March 19, 2019
VTCA CULPEPER/FREDERICKSBURG DISTRICT DIALOGUE WARRENTON SOUTHERN INTERCHANGE US 15/17/29
Will Stowe, P.E., Culpeper Area Construction Engineer
March 19, 2019
• Project Overview
• Journey Through Hallowed
Ground
• Alternative Technical Concepts
• Plan Grid
• Current and Upcoming
Construction Activities
Agenda
Virginia Department of Transportation
• Two Phase Design-Build
Procurement Method
• Location
• Fauquier County, Virginia
• Project
• Constructing a grade-separated
interchange where U.S. Route
15/17/29 intersects Business U.S.
Route 15/17/29 to the west and
Lord Fairfax Drive (Route 808) to
the east.
Project Overview
Virginia Department of Transportation
Project Overview
Virginia Department of Transportation
Existing Condition ↓
Planned Interchange ↑
• Significantly reduce the number of rear
end collisions
• Increase overall safety
• Improve capacity & reduce congestion
• Interconnect multiple roadway types by way of
one interchange
• Provide parking for commuter traffic
Project Team
Virginia Department of Transportation
• Total Budget $26,930,540.00
• Contract Value $19,586,838.00
• Base Scope $19,383,818.00
• Option 1 (Construct SUP) $101,250.00
• Option 2 (Mill & Overlay Mainline) $101,770.00
• Contract Execution March 7, 2018
• Notice to Proceed March 26, 2018
• Milestone - Remove Existing Signal July 1, 2020
• Final Completion November 25, 2020
Project Budget/Schedule
Virginia Department of Transportation
Journey Through Hallowed Ground
Virginia Department of Transportation
Journey Through Hallowed Ground
Virginia Department of Transportation
• Proprietary Meeting #1 utilized to discuss general issues and questions
related to the project including any potential ATCs the Offeror is
considering.
• Proprietary Meeting #2 utilized for the Offeror to provide a presentation
of the ATCs the Offeror plans to submit as a formal ATCs.
• Formal submission of ATCs
Alternative Technical Concepts
Virginia Department of Transportation
Alternative Technical Concepts
Virginia Department of Transportation
• Roundabout shifted farther to the Southeast
• Ramp to NB Bypass relocated to eliminate a retaining wall adjacent to
Turkey Run residents
Alternative Technical Concepts
Virginia Department of Transportation
• 20 Space Park and Ride relocated within VDOT right-of-way eliminating the need
to acquire property for the lot
• Elected to purchase nutrient credits; eliminated all SWM quality facilities
PlanGrid
Virginia Department of Transportation
PlanGrid
Virginia Department of Transportation
Upcoming Subcontracting Opportunities
Virginia Department of Transportation
• Landscaping – 70,000 SF
• Pavement Markings• Permanent – 34,497 LF
• Temporary – 103,131 LF
• Eradication – 34,377 LF
• Pedestrian Fencing
• Underdrain
• Regular Excavation – 122,700 CY
• Drainage Pipe – 2,440 LF
• Drainage Structures – 88 EA
• Asphalt – 22,890 TN
• Flexible Planing – 11,500 SF
• Guardrail – 6,025 LF
• Median Barrier – 2,450 LF
• Bridge Deck – 760 SY
Major Planned Quantities
Virginia Department of Transportation
For More Information About Warrenton
Southern Interchange Project:http://www.virginiadot.org/projects/culpeper/warrentoninterchange.asp
Or Google: “Warrenton Southern Interchange”
Virginia Department of Transportation