Generic Production Value Stream Map - Example Excel Generated VSM CUSTOMER PLANNING SUPPLIER TAKT Time (s) 600 PURCHASING Demand 48 Frequency Daily C/T (s) 600 C/O (s) 0 Uptime (%) 100 Yield (%) 99.3 Shifts 4 Frequency Daily STORES KITS GOODS AWAITING TEST AWAITING FINAL INSPECTION FINISHED GOODS Frequency Daily Quantity Quantity Quantity Quantity Quantity INSPECTION Time 6000 KITTING Time 6000 ASSEMBLY Time 6000 TEST Time 6000 INSPECTION Time 6000 SHIPPING GOODS-IN Quantity Frequency Daily Time 6000 C/T (s) 600 C/T (s) 600 C/T (s) 600 C/T (s) 900 C/T (s) 300 C/T (s) 600 C/O (s) 0 C/O (s) 0 C/O (s) 0 C/O (s) 60 C/O (s) 0 C/O (s) 0 Uptime (%) 100 Uptime (%) 100 Uptime (%) 100 Uptime (%) 80 Uptime (%) 100 Uptime (%) 100 Yield (%) 100 Yield (%) 90 Yield (%) 90 Yield (%) 90 Yield (%) 100 Yield (%) 100 Shifts 1 Shifts 1 Shifts 1 Shifts 1 Shifts 1 Shifts 1 LEAD 6000 6000 6000 6000 6000 6000 6000 TIME (s) 42000 VALUE 600 600 600 600 900 300 600 TIME (s) 4200 MANUFACTURING CELL MANAGER
11

Vs m Template

Jan 21, 2016

Download

Documents

Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: Vs m Template

Generic Production Value Stream Map - Example Excel Generated VSM

CUSTOMERPLANNING

SUPPLIER TAKT Time (s) 600

PURCHASINGDemand 48

Frequency Daily

C/T (s) 600C/O (s) 0

Uptime (%) 100Yield (%) 99.3

Shifts 4

Frequency DailySTORES KITS GOODS AWAITING TEST AWAITING FINAL INSPECTION FINISHED GOODS

Frequency Daily Quantity Quantity Quantity Quantity Quantity

INSPECTIONTime 6000

KITTINGTime 6000

ASSEMBLYTime 6000

TESTTime 6000

INSPECTIONTime 6000

SHIPPING

GOODS-INQuantity Frequency Daily

Time 6000

C/T (s) 600 C/T (s) 600 C/T (s) 600 C/T (s) 900 C/T (s) 300 C/T (s) 600C/O (s) 0 C/O (s) 0 C/O (s) 0 C/O (s) 60 C/O (s) 0 C/O (s) 0

Uptime (%) 100 Uptime (%) 100 Uptime (%) 100 Uptime (%) 80 Uptime (%) 100 Uptime (%) 100Yield (%) 100 Yield (%) 90 Yield (%) 90 Yield (%) 90 Yield (%) 100 Yield (%) 100

Shifts 1 Shifts 1 Shifts 1 Shifts 1 Shifts 1 Shifts 1

LEAD6000 6000 6000 6000 6000 6000 6000 TIME (s) 42000

VALUE600 600 600 600 900 300 600 TIME (s) 4200

MANUFACTURINGCELL MANAGER

Page 2: Vs m Template

Generic Production Value Stream Map - Example Excel Generated VSM

PLANNING

SUPPLIER

PURCHASING

C/T (s) 600C/O (s) 0

Uptime (%) 100Yield (%) 99.3

Shifts 4

STORES KITS GOODS AWAITING TEST AWAITING FINAL INSPECTION FINISHED GOODS

Frequency Daily Quantity Quantity Quantity Quantity Quantity

TRAZOTime 6000

CORTETime 6000

PERFORADOTime 6000

ARMADOTime 6000

SOLDADURATime 6000

GOODS-INQuantity

Time 6000

C/T (s) 600 C/T (s) 600 C/T (s) 600 C/T (s) 900 C/T (s) 300C/O (s) 0 C/O (s) 0 C/O (s) 0 C/O (s) 60 C/O (s) 0

Uptime (%) 100 Uptime (%) 100 Uptime (%) 100 Uptime (%) 80 Uptime (%) 100Yield (%) 100 Yield (%) 90 Yield (%) 90 Yield (%) 90 Yield (%) 100

Shifts 1 Shifts 1 Shifts 1 Shifts 1 Shifts 1

LEAD6000 6000 6000 6000 6000 6000 6000 TIME (s) 42000

VALUE600 600 600 600 900 300 600 TIME (s) 4200

MANUFACTURINGCELL MANAGER

Page 3: Vs m Template

PROCESS

Pitch Duration

OUTSIDE SOURCE

C/T (s) C/T (s)C/O (s) C/O (s)

Uptime (%) Uptime (%)Yield (%) Yield (%)

Shifts Shifts

Lead Time (s)

Lead Time (s)

MAX PCS

Page 4: Vs m Template

CUSTOMER

TAKT Time (s)Demand

Frequency

C/T (s)C/O (s)

Uptime (%)Yield (%)

STORAGEQuantity

Time

OUTSIDE SOURCE

PLANNINGCONTROL

Page 5: Vs m Template

Frequency

Frequency

Frequency

Frequency

Frequency

LEADTIME (s) 0VALUE

TIME (s) 0

PLANNINGCONTROL

Page 6: Vs m Template
Page 7: Vs m Template

OPERACIÓN 1

2

C/T (s) 266Available 68400

Uptime (%) 0.39%Shifts 2

BODEGA DE MATERIAS PRIMAS

Page 8: Vs m Template

PROVEEDOR

C/T (s)Frequency sobre pedido C/O (s)

Uptime (%)Yield (%)

Shifts

OPERACIÓN 2

2

C/T (s) 36C/O (s) 68400

Uptime (%) 0.05%INVENTARIO Shifts 2 INVENTARIO

Cantidad 0 Cantidad 0Tiempo 0 Tiempo 0

BODEGA DE MATERIAS PRIMAS

sistemas de control

Page 9: Vs m Template

PEDIDO

OPERACIÓN 3 OPERACIÓN 4

3 3

C/T (s) 45 C/T (s) 45C/O (s) 68400 C/O (s) 68400

Uptime (%) 0.07% Uptime (%) 0.07%Shifts 2 INVENTARIO Shifts 2

Cantidad 0Tiempo 0

CONTROL DE PRODUCCIÓN

sistemas de control

Page 10: Vs m Template

CLIENTE

PEDIDO Demanda 186Turnos 2

Takt-Time

Frequency

ENSAMBLE

7

C/T (s) 2514C/O (s) 68400

Uptime (%) 3.68%INVENTARIO Shifts 2 INVENTARIO

Cantidad 0 Cantidad 0Tiempo 0 Tiempo 0

sistemas de control

Page 11: Vs m Template

sobre pedido

bodega de producto terminado