Viterbi Decoder: Presentation #7 M1 Overall Project Objective: Design a high speed Viterbi Decoder Stage 7: 1st Mar. 2004 Component layout (corrected) Design Manager: Yaping Zhan Omar Ahmad Prateek Goenka Saim Qidwai Lingyan Sun
Dec 21, 2015
Viterbi Decoder: Presentation #7
M1
Overall Project Objective:
Design a high speed Viterbi Decoder
Stage 7: 1st Mar. 2004
Component layout (corrected)
Design Manager: Yaping Zhan
Omar Ahmad
Prateek Goenka
Saim Qidwai
Lingyan Sun
Status
18-525, Integrated Circuits Design Project
Design Proposal (Done)Architecture Proposal (Done)Gate level Design(Done)Component Layout (DRC & LVS): (Done)Major Blocks Layout: (Almost)
BCU: 100%Trace Back: 100%ACS/ML Search: 80%
To be done:Chip LayoutSpice Simulation of Entire Chip
18-525, Integrated Circuits Design Project
Old Floorplan
18-525, Integrated Circuits Design Project
M4
M2
M3
New Floorplan
18-525, Integrated Circuits Design Project
Dimensions
18-525, Integrated Circuits Design Project
Old: 318 x 285 sq. um ~22,500 transistors Density – 0.248
New: 319 x 219 sq. um ~21,000 transistors Density – 0.3005
3 bits stage in MLSearch(Old)
18-525, Integrated Circuits Design Project
18-525, Integrated Circuits Design Project
3 bits stage in MLSearch(New)
Old ACS Unit (Schematic)
18-525, Integrated Circuits Design Project
New ACS Unit (Schematic)
18-525, Integrated Circuits Design Project
Top Level Schematic (Old)
18-525, Integrated Circuits Design Project
18-525, Integrated Circuits Design Project
Top Level Schematic (New)
Simulations still match!!
18-525, Integrated Circuits Design Project
Trace Back
18-525, Integrated Circuits Design Project
18-525, Integrated Circuits Design Project
BCU Cell
BCU Unit (Layout)
18-525, Integrated Circuits Design Project
New Comparator Layout
18-525, Integrated Circuits Design Project
Comparator 8b (50 fF)Propagation Delay
Worst Case: 2.23 ns
New comparator Propagation Delay
Worst Case = 812 ps.
New comparator falling
Worst Case = 805 ps.