VA VA CONDUCT LIVABLE CENTERS STUDIES CYCLE 6 7 - STBG $1700000 $0 $0 $0 $1700000Add TXDOT CSJ
18086 0912-72-607 HARRIS 2022 MEMORIAL HEIGHTS REDEVELOPMENT AUTHORITYIH-610 EB FR W 15TH STReconstruct roadway and various cross streets (24th 20th 19th 18th 16th and 15th St at various limits) including re-configuration of travel lanes from 4 to 3 intersections addition of bike facilities and pedestrian infrastructure
MPOID CSJ COUNTY TIP FYPROJECT
SPONSORSTREET FROM TO DESCRIPTION
FUNDING
CATEGORYFEDERAL STATE LOCAL
LOCAL
CONTRIBUTIONS
TOTAL
PROGRAMEDH-GAC COMMENTS
280 0500-01-107 GALVESTON2020
2021
TXDOT HOUSTON
DISTRICTIH 45 S OF TEXAS CITY WYE N OF CAUSEWAY
RECONSTRUCT AND WIDEN FROM 6 TO 8 MAIN
LANES RECONSTRUCT TWO 2-LANE FRONTAGE
ROADS (FROM S OF TEXAS CITY WYE TO N OF
BNSF RR) AND CONSTRUCT FRONTAGE ROADS
(FROM N OF BNSF RR TO N OF CAUSEEWAY)
2 - METRO TMA $76000000 $19000000 $0 $0 $95000000
2019 TIP project was LET in 820 It was
double listed in 2021 TIP adopted in
062020
2 - METRO TMA $0 $116270000 $0 $0 $116270000
4 - ST WIDE $0 $11730000 $0 $0 $11730000
2 - METRO TMA $0 $79200000 $0 $0 $79200000
4 - ST WIDE $0 $26800000 $0 $0 $26800000
16315 0523-04-017 WALLER2020
2021
TXDOT HOUSTON
DISTRICTFM 1488 W OF JOSEPH RD
MONTGOMERY
CL
RECONSTRUCT AND WIDEN FROM 2-LANE TO 4-
LANE DIVIDED2 - METRO TMA $0 $2000000 $0 $0 $2000000
2019 TIP project was LET in 720 It was
double listed in 2021 TIP adopted in
062020
7569 0912-72-595 HARRIS2020
2021HARRIS COUNTY LYNCHBURG FERRY
AT 1001
INDEPENDANCE
PKWY
REBUILD BERTHING AREA BULKHEAD AND ADD
ADDITIONAL SHEET PILE SHORE PROTECTION
ALONG THE NORTH LANDING APPROACH
10 - MISC $1991644 $0 $497911 $0 $2489555
2019 TIP project was LET in 820 It was
double listed in 2021 TIP adopted in
062020
10 - MISC $347898 $86975 $0 $0 $434873
9 - TASA $800000 $200000 $0 $0 $1000000
16324 0508-01-345 HARRIS2020
2021
TXDOT HOUSTON
DISTRICTIH 10 E SPUR 330 THOMPSON RD CONSTRUCT EAST BOUND ENTRANCE RAMP
11 - ST DISCT
DISC$0 $8244000 $0 $0 $8244000
2021 TIP project was LET in 1020 It will
be removed form 2021 STIP
17064 0675-08-111 MONTGOMERY2020
2021
TXDOT HOUSTON
DISTRICTIH 45 WALKER CL LEAGUE LINE RD
INSTALL NEW ITS EQUIPMENT AND
INFRASTRUCTURE5 - CMAQ $5866400 $1466600 $0 $0 $7333000
2019 TIP project was LET in 420 It was
double listed in 2021 TIP adopted in
062020
18646 0192-02-053 BRAZORIA2020
2021
TXDOT HOUSTON
DISTRICTSH 6 FORT BEND CL SH 288
INSTALL NEW ITS EQUIPMENT AND
INFRASTRUCTURE5 - CMAQ $2743200 $685800 $0 $0 $3429000
2019 TIP project was LET in 820 It was
double listed in 2021 TIP adopted in
062020
17044 0192-01-099 FORT BEND2020
2021
TXDOT HOUSTON
DISTRICTSH 6
FORT BEND PARKWAY
TOLLWAYBRAZORIA CL
INSTALL NEW ITS EQUIPMENT AND
INFRASTRUCTURE5 - CMAQ $1917000 $479400 $0 $0 $2396400
2019 TIP project was LET in 820 It was
double listed in 2021 TIP adopted in
062020
17023 0912-00-541 MUTIPLE2020
2021
HOUSTON
TRANSTAR
HOUSTON
TRANSTARVA VA
REGIONAL ITS INFRASTRUCTURE -
HARDWARESOFTWARE UTILITIES AND
COMMUNICATIONS (FY 2018)
7 - STBG $1600000 $400000 $0 $0 $2000000
2019 TIP project was LET in 820 It was
double listed in 2021 TIP adopted in
062020
11081 0912-00-555 MUTIPLE2020
2021
HOUSTON
TRANSTAR
HOUSTON
TRANSTARVA VA
REGIONAL ITS INFRASTRUCTURE -
HARDWARESOFTWARE UTILITIES AND
COMMUNICATIONS FY 2020
7 - STBG $1600000 $0 $400000 $0 $2000000
2019 TIP project was LET in 120 It was
double listed in 2021 TIP adopted in
062020
17092 0912-72-392 HARRIS2020
2021
MIDTOWN
MANAGEMENT
DISTRICT
BRAZOS ST ELGIN ST PIERCE ST
RECONSTRUCT BACK OF CURB INFRASTRUCTURE
(SIDEWALKS CURBS ADA RAMPS PEDESTRIAN
LIGHTING AND LANDSCAPING)
7 - STBG $4115200 $0 $1028800 $0 $5144000 Project transferred to FTA in 1020
11716 0912-00-546 MUTIPLE2020
2021METRO
METRO SERVICE
AREAVA VA METRO STAR VANPOOL (STBG) FY 2019 7 - STBG $4500000 $0 $1125000 $0 $5625000
2019 TIP project was LET in 1019 It was
double listed in 2021 TIP adopted in
062020
PROJECTS LET SINCE 21 TIP WAS ADOPTED IN 62020 BEING REMOVED FROM 21 TIPSTIP - FOR INFORMATION ONLY
2020
2021HARRIS0980-02-01817074
CITY OF
HOUSTON
2019 TIP project was LET in 820 It was
double listed in 2021 TIP adopted in
062020
2019 TIP project was LET in 520 It was
double listed in 2021 TIP adopted in
062020
CONSTRUCT 10 FT SHARED USED PATH AND 5-6
FT SIDEWALKS IN SECTIONSIH 10NOLA CTFM 526
RECONSTRUCT AND WIDEN FROM 6 TO 8 MAIN
LANES AND RECONSTRUCT TWO 2 LANE
FRONTAGE ROADS
N OF TEXAS CITY
WYE
2019 TIP project was LET in 820 It was
double listed in 2021 TIP adopted in
062020
TXDOT HOUSTON
DISTRICTIH 45 S N OF TEXAS CITY WYE
S OF TEXAS CITY
WYE
RECONSTRUCT IH 45SH 146SH 6 INTERCHANGE
AND WIDEN IH 45 MAIN LANES FROM 6 TO 8
2020
2021
2020
2021
0500-04-103
0500-04-104 GALVESTON
GALVESTON6047
6046TXDOT HOUSTON
DISTRICTIH 45 S N OF FM 519
ATTACHMENT B - PROJECTS LET SINCE 2021 TIP ADOPTION IN 0620 BEING REMOVED FROM 2021 TIPSTIP - FOR INFORMATION ONLY
3
TPC - ITEM - 10B 01152021
3
MPOID CSJ COUNTY TIP FYPROJECT
SPONSORSTREET FROM TO DESCRIPTION
FUNDING
CATEGORYFEDERAL STATE LOCAL
LOCAL
CONTRIBUTIONS
TOTAL
PROGRAMEDH-GAC COMMENTS
PROJECTS LET SINCE 21 TIP WAS ADOPTED IN 62020 BEING REMOVED FROM 21 TIPSTIP - FOR INFORMATION ONLY
18038 0912-72-592 HARRIS2020
2021
WESTCHASE
MANAGEMENT
DISTRICT
DEERWOOD
SHARED USE PATH
On CITYWEST BLVD
BRIAR FOREST DR
WALNUT BEND LN
BLUE WILLOW
DEERWOOD SL 8
TERRY HERSHEY
TRAIL
CONSTRUCT 8 SHARED USE PATH REPLACING
EXISTING SIDEWALK IN SECTIONS REPAIR
SIDEWALK AND SHARED USE PATH IN SECTIONS
INSTALL SUPPLEMENTAL BIKEWAYWAY-
FINDING SIGNAGE
9TASA $1040036 $0 $260047 $0 $1300083
2019 TIP project was LET in 220 It was
double listed in 2021 TIP adopted in
062020
16354 0912-00-614 MUTIPLE2020
2021H-GAC
HOUSTON-
GALVESTON TMAVA VA
DEVELOP LIBERTY COUNTY MOBILITY PLAN AND
MONTGOMERY COUNTY PRECINCT 2 MOBILITY
PLAN
7 - STBG $1150000 $0 $0 $0 $1150000
2019 TIP project was LET in 320 It was
double listed in 2021 TIP adopted in
062020
Total $373545911
ATTACHMENT B - PROJECTS LET SINCE 2021 TIP ADOPTION IN 0620 BEING REMOVED FROM 2021 TIPSTIP - FOR INFORMATION ONLY
4
TPC - ITEM - 10B 01152021
4
MPOID CSJ COUNTYFISCAL
YEAR
PROJECT
SPONSORSTREET FROM TO DESCRIPTION
FUNDING
CATEGORYFEDERAL STATE LOCAL
LOCAL
CONTRIBUTIONS
TOTAL
PROGRAMED H-GAC Comment
17100
184040187-05-061 FORT BEND
2023
2025
TXDOT
HOUSTON
DISTRICT
SH 36SS 10 AUSTIN CL IH 69INSTALL NEW ITS EQUIPMENT AND
INFRASTRUCTURE
2 - METRO
TMA$11488000 $2872000 $0 $0 $14360000
Remove from 2021 TIP
Project will be grouped by
TxDOT and delayed to
fiscal year 2025 from
17140 0912-00-569 MUTIPLE2021
2025METRO
HOUSTON-
GALVESTON
TMA
VA VA REGIONAL VANPOOL STBG FY 2020 7 - STBG $3000000 $0 $750000 $0 $3750000
Remove from 2021 TIP
Project will be grouped by
TxDOT and delayed to
fiscal year 2025 from
11718 0912-00-548 MUTIPLE 2021 METROMETRO
SERVICE AREAVA VA METRO STAR VANPOOL (STBG) FY 2020 7 - STBG $3000000 $0 $750000 $0 $3750000
Remove from 2021 TIP
Project will be grouped by
TxDOT in fiscal year 2021
17134 0912-00-562 MUTIPLE2021
2023METRO
HOUSTON-
GALVESTON
TMA
VA VAREGIONAL VANPOOL PROGRAM STBG FY
20197 - STBG $3000000 $0 $750000 $0 $3750000
Remove from 2021 TIP
Project will be grouped by
TxDOT and delayed to
fiscal year 2023 from
17020 0912-00-539 MUTIPLE 2021 H-GAC
HOUSTON-
GALVESTON
TMA
VA VA
REGIONAL FREEWAY INCIDENT
MANAGEMENT - TOWING (FY 2017 -
2018)
7 - STBG $8000000 $0 $0 $0 $8000000
Remove from 2021 TIP
Project will be grouped by
TxDOT in fiscal year 2021
11808 0912-00-603 HARRIS2021
2025METRO
METRO
SERVICE AREAVA VA METRO STAR VANPOOL (STBG) FY 2021 7 - STBG $3000000 $0 $750000 $0 $3750000
Remove from 2021 TIP
Project will be grouped by
TxDOT and delayed to
fiscal year 2025 from
17046 0389-05-127 HARRIS2022
2021
TXDOT
HOUSTON
DISTRICT
SH 146FAIRMONT
PKWY WNASA 1
INSTALL NEW ITS EQUIPMENT AND
INFRASTRUCTURE
2 - METRO
TMA$2400000 $600000 $0 $0 $3000000
Remove from 2021 TIP
Project will be grouped by
TxDOT and advanced to
fiscal year 2021 from
17090 0598-02-120 BRAZORIA 2022
TXDOT
HOUSTON
DISTRICT
SH 288 SH 6 FM 1462INSTALL NEW ITS EQUIPMENT AND
INFRASTRUCTURE
2 - METRO
TMA$6425600 $1606400 $0 $0 $8032000
Remove from 2021 TIP
Project will be grouped by
TxDOT in fiscal year 2022
17075 3510-05-040 HARRIS 2023
TXDOT
HOUSTON
DISTRICT
SH 99 IH 10FORT BEND
CL
INSTALL NEW ITS EQUIPMENT AND
INFRASTRUCTURE
2 - METRO
TMA$3589600 $897400 $0 $0 $4487000
Remove from 2021 TIP
Project will be grouped by
TxDOT in fiscal year 2023
18366 0000-00-000 MUTIPLE 2022 METRO
HOUSTON-
GALVESTON
TMA
VA VA REGIONAL VANPOOL STBG FY 2022 7 - STBG $3750000 $0 $0 $0 $3750000
Remove from 2021 TIP
Project will be grouped by
TxDOT in fiscal year 2022
11917 0912-00-559 MUTIPLE 2022 H-GAC
HOUSTON-
GALVESTON
TMA
VA VAREGIONAL FREEWAY INCIDENT
MANAGEMENT - TOWING (FY 2022-2024)7 - STBG $10000000 $0 $0 $0 $10000000
Remove from 2021 TIP
Project will be grouped by
TxDOT in fiscal year 2022
11809 0912-00-604 HARRIS 2022 METROMETRO
SERVICE AREAVA VA METRO STAR VANPOOL (STBG) FY 2022 7 - STBG $1500000 $0 $375000 $0 $1875000
Remove from 2021 TIP
Project will be grouped by
TxDOT in fiscal year 2022
TPC AMENDMENTS - GROUP ELIGIBLE PROJECTS REQUESTED BY TXDOT TO BE REMOVED FROM 2021 TIP
ATTACHMENT C - TPC AMENDMENTS GROUP ELIGIBLE PROJECTS BEING REMOVED FROM 2021 TIPSTIP
5
TPC - ITEM - 10B 01152021
5
MPOID CSJ COUNTYFISCAL
YEAR
PROJECT
SPONSORSTREET FROM TO DESCRIPTION
FUNDING
CATEGORYFEDERAL STATE LOCAL
LOCAL
CONTRIBUTIONS
TOTAL
PROGRAMED H-GAC Comment
TPC AMENDMENTS - GROUP ELIGIBLE PROJECTS REQUESTED BY TXDOT TO BE REMOVED FROM 2021 TIP
7739 0000-00-000 GALVESTON 2023CITY OF
GALVESTON
GALVESTON
CBDVA VA
DOWNTOWN LIVABLE COMMUNITIES
INITIATIVE7 - STBG $3100000 $0 $359716 $0 $3459716
Remove from 2021 TIP
Project will be grouped by
TxDOT in fiscal year 2023
17221 0110-04-202 HARRIS 2023
TXDOT
HOUSTON
DISTRICT
IH 45
S OF
SHENANDOAH
PARK DR
SH 242
RAISE NORTHBOUND AND SOUTHBOUND
FRONTAGE ROADS OPERATIONAL
IMPROVEMENTS AND DRAINAGE
IMPROVEMENTS
7 - STBG $10878482 $2719620 $0 $0 $13598102
Remove from 2021 TIP
Project will be grouped by
TxDOT in fiscal year 2023
17089 0177-05-112 MONTGOMERY 2023
TXDOT
HOUSTON
DISTRICT
IH 69 N LIBERTY CL HARRIS CLINSTALL NEW ITS EQUIPMENT AND
INFRASTRUCTURE
2 - METRO
TMA$11129600 $2782400 $0 $0 $13912000
Remove from 2021 TIP
Project will be grouped by
TxDOT in fiscal year 2023
17099 0050-06-089 HARRIS 2023
TXDOT
HOUSTON
DISTRICT
US 290
MUESCHKE RD
TO
WASHINGTON
CL
AND SH 6
FROM US 290
TO GRIMES
CL
INSTALL NEW ITS EQUIPMENT AND
INFRASTRUCTURE
2 - METRO
TMA$21545600 $5386400 $0 $0 $26932000
Remove from 2021 TIP
Project will be grouped by
TxDOT in fiscal year 2023
18357 0000-00-000 HARRIS 2023 METROMETRO
SERVICE AREAVA VA
METRO STAR VANPOOL PROGRAM STBG
FY 20237 - STBG $3000000 $0 $750000 $0 $3750000
Remove from 2021 TIP
Project will be grouped by
TxDOT in fiscal year 2023
18367 0000-00-000 MUTIPLE 2023 METRO
HOUSTON-
GALVESTON
TMA
VA VAREGIONAL VANPOOL PROGRAM STBGP
FY 20237 - STBG $3000000 $0 $750000 $0 $3750000
Remove from 2021 TIP
Project will be grouped by
TxDOT in fiscal year 2023
18368 0000-00-000 MUTIPLE 2024 METRO
HOUSTON-
GALVESTON
TMA
VA VAREGIONAL VANPOOL PROGRAM STBG FY
20247 - STBG $3000000 $0 $750000 $0 $3750000
Remove from 2021 TIP
Project will be grouped by
TxDOT in fiscal year 2024
18358 0000-00-000 HARRIS 2024 METROMETRO
SERVICE AREAVA VA
METRO STAR VANPOOL PROGRAM STBG
FY 20247 - STBG $3000000 $0 $750000 $0 $3750000
Remove from 2021 TIP
Project will be grouped by
TxDOT in fiscal year 2024
17117 0912-31-318 BRAZORIA 2021HOUSTON-
GALVESTON
CITY OF
PEARLANDVA VA
CONSTRUCT SIDEWALKS INTERSECTION
AND SIGNAGE IMPROVEMENTS IN
VICINITY OF CARLESTON ELEMENTARY
COCKRELL ELEMENTARY AND PEARLAND
JUNIOR HIGH (SAFE ROUTES TO SCHOOL)
9 - TASA $2697600 $0 $674400 $0 $3372000
Remove from 2021 TIP
Project will be grouped by
TxDOT in fiscal year 2021
17087 1685-01-107 HARRIS 2021HOUSTON-
GALVESTONFM 1960 MILLS RD SH 249 CONSTRUCT SHARED USE PATH 9 - TASA $800000 $200000 $0 $0 $1000000
Remove from 2021 TIP
Project will be grouped by
TxDOT in fiscal year 2021
18647 0920-39-026 CHAMBERS 2021HOUSTON-
GALVESTONSH 146 IH 10 WARREN RD
CONSTRUCT CONCRETE SIDEWALKS amp
ACCESSIBLE CURB RAMPS9 - TASA $826060 $0 $206515 $0 $1032575
Remove from 2021 TIP
Project will be grouped by
TxDOT in fiscal year 2021
ATTACHMENT C - TPC AMENDMENTS GROUP ELIGIBLE PROJECTS BEING REMOVED FROM 2021 TIPSTIP
6
TPC - ITEM - 10B 01152021
6
MPOID CSJ COUNTYFISCAL
YEAR
PROJECT
SPONSORSTREET FROM TO DESCRIPTION
FUNDING
CATEGORYFEDERAL STATE LOCAL
LOCAL
CONTRIBUTIONS
TOTAL
PROGRAMED H-GAC Comment
TPC AMENDMENTS - GROUP ELIGIBLE PROJECTS REQUESTED BY TXDOT TO BE REMOVED FROM 2021 TIP
7127 0912-00-560 BRAZORIA 2021HOUSTON-
GALVESTON
CLEAR CREEK
TRAIL
UH CLEAR LAKE
PEARLAND
CAMPUS
N OF HUGHES
RD
ENGINEERING FOR CONSTRUCTION OF 10
FT MULTIUSE TRAIL9 - TASA $788000 $0 $197000 $0 $985000
Remove from 2021 TIP
Project will be grouped by
TxDOT in fiscal year 2021
17123 0912-72-398 HARRIS 2021HOUSTON-
GALVESTON
HCFCD
CHANNEL
DAIRY
ASHFORD RD S
SL 8ARTHUR
STOREY PARK
DESIGN FOR 10-FOOT MULTIUSE TRAIL
AND ASSOCIATED INTERSECTION SAFETY
SIGNAGE AND AMENITIES
(LANDSCAPING BENCHES ETC)
9 - TASA $351200 $0 $87800 $0 $439000
Remove from 2021 TIP
Project will be grouped by
TxDOT in fiscal year 2021
17118 0912-73-215 GALVESTON 2021HOUSTON-
GALVESTONVA
ON SH 96 FM
270 AND FM
2094
SH 146
CONSTRUCT BIKE LANE (MILLING AND
ASPHALT OVERLAY OF SHOULDERS
SHOULDER WIDENING PAVEMENT
MARKINGS STRIPING) WITH SIGNAGE
SIDEWALK AND ASSOCIATED
INTERSECTION IMPROVEMENTS
9 - TASA $1959200 $0 $489800 $0 $2449000
Remove from 2021 TIP
Project will be grouped by
TxDOT in fiscal year 2021
18146 0271-07-323 HARRIS 2022HOUSTON-
GALVESTONWESTCOTT ST COHN ST
CONSTRUCT 10 CONCRETE SHARED USE
PATH INCLUDES STRIPING BRIDGE
RAILING PAVEMENT MARKINGS
SIGNAGE LANDSCAPEHARDSCAPE AS
WELL AS ASSOCIATED INTERSECTION
IMPROVEMENTS
9 - TASA $2579996 $644999 $0 $0 $3224995
Remove from 2021 TIP
Project will be grouped by
TxDOT in fiscal year 2022
18030 0912-72-583 HARRIS 2022HOUSTON-
GALVESTONGALVESTON RD
SIMS BAYOU
NORTH BANK
SIMS BAYOU
SOUTH BANK
Construct pedbike bridge with railings
and signage9 - TASA $589441 $147365 $0 $0 $736806
Remove from 2021 TIP
Project will be grouped by
TxDOT in fiscal year 2022
18024 0271-14-240 HARRIS 2022HOUSTON-
GALVESTON
NORTHWEST
TRANSIT
CONNNECTION
W 12TH ST OLD KATY RD
WIDEN EXISTING SIDEWALK TO 10
INCLUDE 10 WIDE CONCRETE PATH
ALONG THE IH 610 FRONTAGE ROAD
STRIPING PAVEMENT MARKINGS
SIGNAGE LANDSCAPEHARDSCAPE AND
ASSOCIATED INTERSECTION
IMPROVEMENTS
9 - TASA $880000 $220000 $0 $0 $1100000
Remove from 2021 TIP
Project will be grouped by
TxDOT in fiscal year 2022
18049 1685-01-120 HARRIS 2022HOUSTON-
GALVESTON
FM 1960
CYPRESS CREEK
PKWY
SIDEWALKS
SH 249 IH 45CONSTRUCTION OF ADA ACCESSIBLE
SIDEWALKS9 - TASA $6645878 $1661469 $0 $0 $8307347
Remove from 2021 TIP
Project will be grouped by
TxDOT in fiscal year 2022
18018 0912-72-581 HARRIS 2022HOUSTON-
GALVESTON
MKT-WHITE
OAK BAYOU
BICYCLE
PEDESTRIAN
CONNECTION
MKT TRAILWHITE OAK
BAYOU TRAIL
CONSTRUCT 10 SHARED USE PATH
STRIPING BRIDGE RAILING PAVEMENT
MARKINGS SIGNAGE
LANDSCAPEHARDSCAPE AND
ASSOCIATED INTERSECTION
IMPROVEMENTS
9 - TASA $2389791 $597449 $0 $0 $2987240
Remove from 2021 TIP
Project will be grouped by
TxDOT in fiscal year 2022
7641 0912-00-560 BRAZORIA 2022HOUSTON-
GALVESTON
CLEAR CREEK
TRAIL
UH CLEAR LAKE
PEARLAND
CAMPUS
N OF HUGHES
RDCONSTRUCT 10 FOOT MULTIUSE TRAIL 9 - TASA $6478400 $0 $1619600 $0 $8098000
Remove from 2021 TIP
Project will be grouped by
TxDOT in fiscal year 2022
ATTACHMENT C - TPC AMENDMENTS GROUP ELIGIBLE PROJECTS BEING REMOVED FROM 2021 TIPSTIP
7
TPC - ITEM - 10B 01152021
7
MPOID CSJ COUNTYFISCAL
YEAR
PROJECT
SPONSORSTREET FROM TO DESCRIPTION
FUNDING
CATEGORYFEDERAL STATE LOCAL
LOCAL
CONTRIBUTIONS
TOTAL
PROGRAMED H-GAC Comment
TPC AMENDMENTS - GROUP ELIGIBLE PROJECTS REQUESTED BY TXDOT TO BE REMOVED FROM 2021 TIP
17120 0912-72-398 HARRIS 2023HOUSTON-
GALVESTON
HCFCD
CHANNEL
DAIRY
ASHFORD RD S
SL 8ARTHUR
STOREY PARK
CONSTRUCT 10-FOOT MULTIUSE TRAIL
AND ASSOCIATED INTERSECTION SAFETY
SIGNAGE AND AMENITIES
(LANDSCAPING BENCHES ETC)
9 - TASA $2051200 $0 $512800 $0 $2564000
Remove from 2021 TIP
Project will be grouped by
TxDOT in fiscal year 2023
17103 0912-00-542 HARRIS 2023HOUSTON-
GALVESTON
MEMORIAL TO
SAN FELIPE
HIKE amp BIKE
TRAIL
MEMORIAL DRSAN FELIPE
ST
CONSTRUCT 10FT MULTI-USE TRAIL
WITHIN CENTERPOINT UTILITY CORRIDOR9 - TASA $9107200 $0 $2276800 $0 $11384000
Remove from 2021 TIP
Project will be grouped by
TxDOT in fiscal year 2023
17121 0912-37-237 MONTGOMERY 2024HOUSTON-
GALVESTON
ON SH 75 SH
242 FM 1484
FM 2432 FM
3083 AND FM
830
VA VA
CONSTRUCT BIKE LANE (MILLING AND
ASPHALT OVERLAY OF SHOULDERS
SHOULDER WIDENING PAVEMENT
MARKINGS STRIPING) WITH SIGNAGE
AND ASSOCIATED INTERSECTION
IMPROVEMENTS
9 - TASA $5427200 $1356800 $0 $0 $6784000
Remove from 2021 TIP
Project will be grouped by
TxDOT in fiscal year 2024
Total $195869781
ATTACHMENT C - TPC AMENDMENTS GROUP ELIGIBLE PROJECTS BEING REMOVED FROM 2021 TIPSTIP
8
TPC - ITEM - 10B 01152021
8
MPOID CSJ COUNTY FISCAL YEARPROJECT
SPONSORSTREET FROM TO DESCRIPTION
FUNDING
CATEGORYFEDERAL STATE LOCAL
LOCAL
CONTRIBUTIONS
TOTAL
PROGRAMEDTPC ACTION
263 0188-01-016 FORT BEND 2025 2023 TXDOT HOUSTON DISTRICTSH 36 IH 69S FM 2218
WIDEN FROM 2 TO 4 LANES DIVIDED
ROADWAY WITH INTERSECTION
IMPROVEMENTS AND BICYCLE
ACCOMMODATIONS
2 - METRO TMA $23600000 $5900000 $0 $0 $29500000Add project to fiscal year
2023
TXDOT HOUSTON DISTRICT 2 - METRO TMA $45200000 $11300000 $0 $0 $56500000
12 - STRATEGIC $82800000 $20700000 $0 $0 $103500000
18513 LIBERTY 2021 CITY OF DAYTONCITY OF
DAYTONVA VA
COMPLETE NETWORK DIAGNOSTIC
ANALYSIS PRELIMINARY ENGINEERING AND
NEPA DOCUMENTATION
3 - CRISI $700000 $0 $300000 $0 $1000000
Program FY 2019 Federal
Railroad Administration
Consolidated Rail
Infrastructure and Safety
Improvements (CRISI) award
in FY 2021
18606 HARRIS 2021
GREATER
SOUTHEAST
MANAGEMENT
DISTRICT
LONG DR
GRIGGS RD amp
MYKAWA RD
VA VA
COMPLETE ALTERNATIVES ANALYSIS
PRELIMINARY ENGINEERING AND NEPA
DOCUMENTATION
3 - CRISI $666000 $0 $334000 $0 $1000000
Program FY 2019 Federal
Railroad Administration
Consolidated Rail
Infrastructure and Safety
Improvements (CRISI) award
in FY 2021
Total $191500000
12092 0912-00-552 MUTIPLE 2021 H-GAC
HOUSTON-
GALVESTON
TMA
VA VA
CLEAN VEHICLES PROGRAM
(ENGINEVEHICLE REPLACEMENT
ALTERNATE FUELS EDUCATION) FY 2021 -
2022
5 - CMAQ $8000000 0 $2000000 0 $8000000
Replace $2000000
matching funds with
1600000 TDCs
17115 1259-01-044 MONTGOMERY 2021 2022TXDOT HOUSTON
DISTRICTFM 1097 BLUEBERRY HILLS DR
LAKE
CONROE
HILLS DR
RECONSTRUCT AND WIDEN FROM 2 TO 4
LANES WITH CONTINUOUS LEFT TURN LANE
(PMPOID 17091)
2 - METRO TMA $11904000$14880000
$2976000$0 $0 $14880000
Advance to fiscal year 2021
from 2022 and convert
federal funding to 100
state funding
17050 0188-10-021 FORT BEND 2021TXDOT HOUSTON
DISTRICTFM 1463 IH 10
N OF
WESTRIDGE
CREEK LN
WIDEN FROM 2 TO 6 LANES FROM IH10 W
TO SPRING GREEN RD (104 MI)13
AND 2 TO 4 LANES FROM SPRING GREEN TO
N OF WESTRIDGE CREEK LANE (209 MI)
ROADWAY WITH RAISED MEDIAN
INTERSECTION IMPROVEMENTS AND
PEDESTRIAN AND BICYCLE
ACCOMMODATIONS
2 - METRO TMA $34800000$43500000
$8700000$0 $0 $43500000
Convert federal funding to
100 state funding
499 0523-09-009 MONTGOMERY 2021TXDOT HOUSTON
DISTRICTFM 1488 FM 1774
W OF FM
149
WIDEN FROM 2 TO 4-LANES WITH BICYCLE
ACCOMMODATIONS2 - METRO TMA $36832000
$46040000
$9208000$0 $0 $46040000
Convert federal funding to
100 state funding
537 1062-02-009 HARRIS 2021TXDOT HOUSTON
DISTRICTFM 2100 HUFFMAN-CLEVELAND RDFM 1960
RECONSTRUCT AND WIDEN FROM 2 TO 4-
LANE DIVIDED2 - METRO TMA $68800000
$86000000
$17200000$0 $0 $86000000
Convert federal funding to
100 state funding
155 0027-13-201 HARRIS 2021TXDOT HOUSTON
DISTRICTIH 69 SH 288 SP 527
RECONSTRUCT AND WIDEN FROM 6 TO 10
MAIN LANES (NHHIP SEG-3)12 - STRATEGIC $208000000
$260000000
$52000000$0 $0 $260000000
Convert federal funding to
100 state funding
Total $458420000
Projects being added to 2021 TIP Project information being amended
Add project to fiscal year
2023HARRIS0271-16-11118048
CONSTRUCT 4 DIRECT CONNECTORS (EB-SB
WB-SB NB-WB NB-EB)
AT SH 35
NORTHIH 6102026 2023
JANUARY TPC AMENDMENTS REQUESTED BY TXDOT
ATTACHMENT D - TPC AMENDMENTS
TPC - ITEM - 10B 01152021
9
MPOID CSJ COUNTY FISCAL YEARPROJECT
SPONSORSTREET FROM TO DESCRIPTION
FUNDING
CATEGORYFEDERAL STATE LOCAL
LOCAL
CONTRIBUTIONS
TOTAL
PROGRAMEDTPC ACTION
Projects being added to 2021 TIP Project information being amended
JANUARY TPC AMENDMENTS REQUESTED BY TXDOT
2 - METRO TMA $27653600 $6913400 $0 $0 $34567000
6 - BRIDGE $12000000 $3000000 $0 $0 $15000000
16348 0027-08-180 FORT BEND 2022 2025TXDOT HOUSTON
DISTRICTUS 90A AT SH 99
CONSTRUCT GRADE SEPARATION AND
INTERSECTION IMPROVEMENTS2 - METRO TMA $24051687 $6012922 $0 $0 $30064609
Delay to fiscal year 2025
from 2022 and change
project status from TIP to 10-
Year Plan
16336
(NHHIP
SEG - 3)
0500-03-598 HARRIS 2022 2025TXDOT HOUSTON
DISTRICTIH 45 S IH 69 IH 10
CONSTRUCT PARKWAY CONNECTORS INTO
DOWNTOWN HOUSTON AND REMOVE
EXISTING PIERCE ELEVATED (NHHIP SEG - 3)
4 - ST WIDE $194160000 $48540000 $0 $0 $242700000
Delay to fiscal year 2025
from 2022 and change
project status from TIP to 10-
Year Plan
4 - ST WIDE $286664000 $71666000 $0 $0 $358330000
12 - STRATEGIC $405392000 $101348000 $0 $0 $506740000
3 - DESIGN BUILD $222960000 $55940000 $0 $0 $278900000
172 0028-04-077 LIBERTY 2024 2025
TXDOT
BEAUMONT
DISTRICT
US 90 FM 563 FM 160RECONSTRUCT AND WIDEN FROM 2 TO 4
LANE DIVIDED ROADWAY4 - ST WIDE $6590400 $1647600 $0 $0 $8238000
Delay to fiscal year 2025
from 2024 and change
project status from TIP to 10-
Year Plan
16347 0028-04-069 LIBERTY 2024 2025
TXDOT
BEAUMONT
DISTRICT
US 90 FM 160 SH 61RECONSTRUCT AND WIDEN FROM 2 TO 4
LANES DIVIDED ROADWAY4 - ST WIDE $32000000 $8000000 $0 $0 $40000000
Delay to fiscal year 2025
from 2022 and change
project status from TIP to 10-
Year Plan
16344 3256-03-096 HARRIS 2021 2025TXDOT HOUSTON
DISTRICTSL 8 US 90 S OF IH 10 E
WIDEN FROM 6 TO 8 LANES (RE-STRIPE
EXISTING PAVEMENT)
11 - ST DISCT
DISC$400000 $100000 $0 $0 $500000
Delay to fiscal year 2025
from 2021 and change
project status from TIP to 10-
Year Plan
Total $1515039609
IH 45TXDOT HOUSTON
DISTRICT
TXDOT HOUSTON
DISTRICTSH 146
Delay to fiscal year 2025
from 2022 and change
project status from TIP to 10-
Year Plan
2022 2025 AT IH 69 S
16329
(NHHIP
SEG - 3)
0500-03-601 HARRIS
RECONSTRUCT IH45IH69 INTERCHANGE
IH45 REALIGNWIDEN FROM 6 TO 7
MAINLANES (ML)INCLUDING 3 ML NB AND 4
ML SB FROM SAUER ST TO RUNNELS ST
IH69 RECONSTRUCT FROM 8 TO 8 ML FROM
W OF PIERCE ST TO S OF RUNNEL ST W 2
3-LANE CONTINUOUS FRONTAGE ROADS
FM 519 SL 197CONSTRUCT SH 146 RR OVERPASS AND
WIDEN FROM 2 TO 4 LANES
Delay to fiscal year 2025
from 2023 and change
project status from TIP to 10-
Year Plan
467 0389-07-025 GALVESTON 2023 2025
ATTACHMENT D - TPC AMENDMENTS
TPC - ITEM - 10B 01152021
10
MPOID CSJ COUNTYFISCAL
YEARPROJECT SPONSOR STREET FROM TO DESCRIPTION
FUNDING
CATEGORYFEDERAL STATE LOCAL
LOCAL
CONTRIBUTIONS
TOTAL
PROGRAMEDTPC ACTION
18649 GALVESTON 2021 GULF COAST CENTERTEXAS CITYLA MARQUE
UZAVA VA TRANSIT CAPITAL EXPENDITURES FY 2020 5307 $601726 $0 $0 $0 $601726
Split from MPO ID
17096CSJ 0912-72-359 and
add to FY 2028 in the 2045
RTP
18650 GALVESTON 2021 GULF COAST CENTERTEXAS CITYLA MARQUE
UZAVA VA TRANSIT PLANNING EXPENDITURES FY 2020 5307 $225000 $0 $0 $0 $225000
Program Gulf Coast Center
FY 2020 Program of
Projects awarded under FTA
Formula Section 5307
program Program 45000
TDCs in lieu of matching
funds
18651 GALVESTON 2021 GULF COAST CENTERTEXAS CITYLA MARQUE
UZAVA VA TRANSIT OPERATING EXPENDITURES FY 2020 5307 $690535 $0 $0 $0 $690535
Program Gulf Coast Center
FY 2020 Program of
Projects awarded under FTA
Formula Section 5307
program Program 690535
TDCs in lieu of matching
funds
18652 BRAZORIA 2021 GULF COAST CENTER
LAKE
JACKSONANGLETON
UZA
VA VA
TRANSIT CAPITAL EXPENDITURES TO INCLUDE
PROJECT AND CONSTRUCTION MANAGEMENT
FY 2020
5307 $909317 $0 $0 $0 $909317
Program Gulf Coast Center
FY 2020 Program of
Projects awarded under FTA
Formula Section 5307
program Program 181863
TDCs in lieu of matching
funds
18653 BRAZORIA 2021 GULF COAST CENTER
LAKE
JACKSONANGLETON
UZA
VA VA TRANSIT PLANNING EXPENDITURES FY 2020 5307 $137500 $0 $0 $0 $137500
Program Gulf Coast Center
FY 2020 Program of
Projects awarded under FTA
Formula Section 5307
program Program 27500
TDCs in lieu of matching
funds
18655 HARRIS 2021 EAST END DISTRICT LOCKWOOD LRT AREA VA VA Lockwood LRT Area Access to Transit Improvements Sidewalk and handicap ramp improvements around the Lockwood LRT station5310 $322141 $0 $80535 $0 $402676
Program FY 2018
apportioned FTA Section
5310 grant in FY 2021 of the
TIP
18608 MONTGOMERY 2021 CITY OF CONROE CITY OF CONROE VA VA REPLACEMENT OF VEHICLES AND EXPANSION OF FLEET5339 $896000 $0 $224000 $0 $1120000
Program City of Conroe FY
2020 FTA Section 5339 Bus
and Bus Facilities award in
FY 2021 of the TIP
Total $4086754
9410 MONTGOMERY 2021 CITY OF CONROE CITY OF CONROE VA VAREPLACEMENT OF VEHICLES AND EXPANSION OF
FLEET5310 $171248 $0 $0 $0 $171248
Increase FTA Section 5310
funding to actual
apportionment and
program 34250 TDCs as the
match
9730 MONTGOMERY 2021 CITY OF CONROE CITY OF CONROE VA VA
ENHANCED MOBILITY FOR SENIORS AND
INDIVIDUALS WITH DISABILITIES CAPITAL
EXPENDITURES FY 2020
5310 $164556 $0 $0 $0 $164556Replace $41139 matching
funds with 32911 TDCs
Total $335804
TRANIT TPC AMENDMENTS REQUESTED BY TXDOT
PREVIOUS TRANIT ADMINISTRATIVE MODIFICATIONS BEING SUBMITTED TO TXDOT
ATTACHMENT E - APPROVED TRANSIT AMENDMENTS - SUBMITTED TO STIP
11
TPC - ITEM - 10B 01152021
11
HshyGAC Transportation Development Credits Application
Contact InformationName
Sandra Holliday
Phone Number
713shy499shy6617
EshyMail Address
sandrahollidayhshygaccom
Project InformationMPOID
12092
Sponsor Name
HoustonshyGalveston Area Council
TIP Project Description
Clean Vehicle Program shy Alternate Fuels EngineVehicle Replacement EducationThe goal of the program is to reduce air pollution especially nitrogen oxide (NOx) pollution The program provides financial ssistance as an incentiveprogram Both public and privately owned fleets are partially funded to assist in purchasing alternate fueling facilities electric charging stations and fleetenginevehicle replacements
Federal Cost
$8000000
TDC Request
1600000
Is this project currently in the TIP
Yes
TIP Year
2021
Priority Use of TDCsTDC Priority
Other Regionally Significant Project
Please explain how the use of TDCs will help meet the priority established for this project
The use of TDCs for this project will support HshyGACs emission reduction commitment in the State Implementation Plan Documented emission reductions arecounted toward HshyGACs Voluntary Emission Reduction Program commitment in the State Implementation Plan
Maintenance of Local InvestmentRoadway Transit or Other Project
Other Project
Explain and document how TDCs will advance the regional goals established in the Regional Transportation Plan ie Improve Safety MovePeople and Goods efficiently AchieveMaintain State of Good Repair Strengthen regional Economic Competitiveness and Conserve andProtect Natural and Cultural Resources
The TDCs for this project will assist in the conservation and protection of natural and cultural resources by reducing emissions The Clean Vehicle programwill also contribute to the expansion of alternative fuel vehicles and fueling stations
Date Submitted10132020 112144 AM
TPC Agenda Item 10B Mailout ndash 11521
AUTHORIZING AMENDMENTS OF THE 2045 REGIONAL TRANSPORTATION PLAN
(RTP) AND THE 2021-2024 TRANSPORTATION IMPROVEMENT PROGRAM (TIP) FOR
THE HOUSTON-GALVESTON TRANSPORTATION MANAGEMENT AREA
WHEREAS the 2045 Regional Transportation Plan was adopted by the Transportation Policy
Council on April 5 2019 and
WHEREAS the 2021-2024 Transportation Improvement Program for the Houston-Galveston
Transportation Management Area was adopted by the Transportation Policy Council on June 26
2020 and
WHEREAS the proposed revisions to the 2021-2024 Transportation Improvement Program are
consistent with the 2045 Regional Transportation Plan and its finding of conformance with the
State Implementation Plan for air quality and
WHEREAS the proposed revisions to the 2021-2024 Transportation Improvement Program are
consistent with the federal fiscal constraint requirements established for the Transportation
Improvement Program and are consistent with the financially constrained 2045 Regional
Transportation Plan
NOW THEREFORE BE IT RESOLVED BY THE TRANSPORTATION POLICY COUNCIL
(TPC) FOR THE HOUSTON-GALVESTON TRANSPORTATION MANAGEMENT AREA
THAT THE 2045 REGIONAL TRANSPORTATION PLAN AND THE 2021ndash2024
TRANSPORTATION IMPROVEMENT PROGRAM BE AMENDED TO REFLECT THE
REVISIONS IDENTIFIED IN THE TABLE OF JANUARY 2021 TPC AMENDMENTS
BE IT FURTHER RESOLVED THAT FEDERAL FUNDS AUTHORIZED BY THE TPC
FROM THE CONGESTION MITIGATION AND AIR QUALITY (CMAQ) AND SURFACE
TRANSPORTATION BLOCK GRANT (STBG) PROGRAMS REPRESENT A LIMITING
AMOUNT ANY COST OVERRUNS ON PHASES OF WORK AUTHORIZED BY THE TPC
OR COSTS INCURRED ON PHASES OF WORK NOT AUTHORIZED BY THE TPC
SHALL BE THE RESPONSIBILITY OF THE PROJECT SPONSOR IN NO CASE SHALL
FEDERAL PARTICIPATION UNDER THE CMAQ AND STBG PROGRAMS BE
INCREASED WITHOUT CONSULTATION AND THE EXPRESS APPROVAL OF THE
TPC
NO 2021-02
DocuSign Envelope ID C12474B7-06DA-45E3-89C1-933D10F365CD
TPC Agenda Item 10B Mailout ndash 11521
PASSED AND APPROVED this 22nd day of January 2021 at a regularly called meeting of the
Transportation Policy Council
APPROVED ATTEST
Hon Kenneth Clark Chairman Hon Grady Prestage Secretary
Transportation Policy Council Transportation Policy Council
DocuSign Envelope ID C12474B7-06DA-45E3-89C1-933D10F365CD
TPC Agenda Item 10B
Mailout 11521
NO 2021-03
APPROVING THE AWARD OF TRANSPORTATION DEVELOPMENT CREDITS (TDCs) AND
AUTHORIZING RELATED AMENDMENTS TO THE 2045 REGIONAL TRANSPORTATION PLAN (RTP) AND TO THE 2021-2024 TRANSPORTATION IMPROVEMENT PROGRAM (TIP) FOR THE
HOUSTON-GALVESTON TRANSPORTATION MANAGEMENT AREA
WHEREAS Texas Administrative Code Title 43 Subchapter H identifies the purpose goals and
administrative requirements for the Transportation Development Credit Program in the State of Texas
including the sub-allocation of credits to Metropolitan Planning Organizations (MPOs) and
WHEREAS the Texas Department of Transportation has documented the current balance of credits allocated
to H-GAC the MPO for the Houston-Galveston Transportation Management Area and
WHEREAS Texas Administrative Code Title 43 sect5106 establishes requirements for the award of
transportation development credits by MPOs and
WHEREAS the Houston-Galveston Area Council has established a documented process for the evaluation
of applications and the award of credits and
WHEREAS the Houston-Galveston Area Council is in receipt of requests for credits and
WHEREAS the award of credits for these purposes is consistent with the Policy governing the
consideration of requests for credits adopted by the Policy Council on November 20 2020
NOW THEREFORE BE IT RESOLVED BY THE TRANSPORTATION POLICY COUNCIL (TPC)
FOR THE HOUSTON-GALVESTON TRANSPORTATION MANAGEMENT AREA THAT TRANSPORTATION DEVELOPMENT CREDITS BE MADE AVAILABLE TO THE HOUSTON-
GALVESTON AREA COUNCIL (MPO ID 12092 H-GAC CLEAN VEHICLES FY 2021-2022
16M TDCS MPO ID 18758 H-GAC MULTIMODAL NETWORK CONNECTIVITY PILOT
STUDIES 20K TDCS) AND THAT THE TRANSPORTATION DIRECTOR IS DIRECTED TO ENTER INTO ANY NECESSARY PROJECT AGREEMENTS
PASSED AND APPROVED this 22nd day of January 2021 at a regularly called meeting of the Transportation Policy Council
APPROVED ATTEST
Hon Kenneth Clark Chairman Hon Grady Prestage Secretary Transportation Policy Council Transportation Policy Council
DocuSign Envelope ID C12474B7-06DA-45E3-89C1-933D10F365CD
HOUSTON-GALVESTON MPO
2021-2024 TRANSPORTATION IMPROVEMENT PROGRAM
January 2021 TPC Amendments
Projects Affected (MPOID (CSJ))
155 (0027-13-201) 172 (0028-04-077) 263 (0188-01-016) 467 (0389-07-025)
499 (0523-09-009) 537 (1062-02-009) 7127 (0912-00-560) 7641 (0912-00-560)
7739 (NA) 11718 (0912-00-548) 11808 (0912-00-603) 11809 (0912-00-604)
11917 (0912-00-559) 12092 (0912-00-643) 16329 (0500-03-601) 16336 (0500-03-598)
16344 (3256-03-096) 16347 (0028-04-069) 16348 (0027-08-180) 17020 (0912-00-539)
17046 (0389-05-127) 17050 (0188-10-021) 17075 (3510-05-040) 17087 (1685-01-107)
17089 (0177-05-112) 17090 (0598-02-120) 17099 (0050-06-089) 17100 (0187-05-061)
17103 (0912-00-542) 17115 (1259-01-044) 17117 (0912-31-318) 17118 (0912-73-215)
17120 (0912-72-398) 17121 (0912-37-237) 17123 (0912-72-398) 17134 (0912-00-562)
17140 (0912-00-569) 17221 (0110-04-202) 18018 (0912-72-581) 18024 (0271-14-240)
18030 (0912-00-583) 18048 (0271-16-111) 18049 (1685-01-120) 18146 (0271-07-323)
18357 (NA) 18358 (NA) 18366 (NA) 18367 (NA)
18368 (NA) 18647 (0920-39-026) 18259 (NA) 18757 (NA)
18758 (0912-00-597) 18759 (NA)
Summary of Modifications
Modification Type Funding Scope Schedule
Affected Projects 15 1 16
Notes
Financial Constraint Statement This amendment is consistent with fiscal constraint requirements
Air Quality Conformity Statement Projects covered by this amendment are included in the 2045 RTP and the resulting air quality conformity analysis or are exempt from regional emissions analysis
Attachments
1 Summary of Proposed Changes
2 Detailed Project Listing
DocuSign Envelope ID 6B1D98B5-D5D8-4269-8B17-6EC2D164451E
HOUSTON-GALVESTON MPO
2021-2024 TRANSPORTATION IMPROVEMENT PROGRAM
Approved By
Patrick Mandapaka Date
Assistant MPO Director
Houston-Galveston Area Council
Andrew Mao PE Date
Director of Advanced Planning
TxDOT Houston District
__________________________________
Honorable Grady Prestage Date
Secretary
Transportation Policy Council
DocuSign Envelope ID 6B1D98B5-D5D8-4269-8B17-6EC2D164451E
1292021
1292021
1292021
JANUARY 2021
TPC AMENDMENTS
This page is intentionally left blank
2021-2024 TRANSPORTATION IMPROVEMENT PROGRAM
2045 REGIONAL TRANSPORTATION PLAN
HOUSTON-GALVESTON MPO
JANUARY 2021 TPC AMENDMENTS
PROPOSED VERSION
MPOIDCSJ 18259NA FY 2021
REGIONAL TRANSIT FARE COLLECTION SYSTEM IMPLEMENTATION
HOUSTON HARRIS VA T HOUSTON METRO $18462573
VA
VA
LIMITS FROM
TIP
DESCRIPTION
REMARKS
LIMITS TO
REV DATE
Total Project Cost Information
Construction $18462573
Preliminary Engineering ---
Construction Engineering ---
Contingencies ---
Indirects ---
Total Project Cost $18462573
Right Of Way ---
Bond Financing ---
5339FUNDING CATEGORY
MTP REFERENCE
Cost of
Approved
Phases
$18462573
18259MPO PROJECT ID
Authorized Funding by CategoryShare
Federal State Regional Local
Local
Contribution
Funding
By Category
Project History Amendment JAN-2021- 12221 - Program FTA Section 5339 funding for implementation of the Regional Transit Fare Collection System in FY 2021
METRO SERVICE AREASTREET
DISTRICT COUNTY CSJ HWY PHASE CITY PROJECT SPONSOR YOE COST
Sec 5339 $14770058 --- $3692515 $18462573 --- ---
Funding by Share $14770058 $3692515 $18462573 --- --- ---
OLD VERSION
PHASE C=CONSTRUCTION E = ENGINEERING R = ROW T = TRANSFER Thursday December 10 2020
P Page 1
lingala
Highlight
dickinson
Highlight
2021-2024 TRANSPORTATION IMPROVEMENT PROGRAM
2045 REGIONAL TRANSPORTATION PLAN
HOUSTON-GALVESTON MPO
JANUARY 2021 TPC AMENDMENTS
PROPOSED VERSION
MPOIDCSJ 18757NA FY 2021
CITY OF GALVESTON ISLAND TRANSIT BUS SECURITY EQUIPMENT ACQUISITION FY 2020
HOUSTON GALVESTON VA T GALVESTON CITY OF GALVESTON $116225
VA
VA
LIMITS FROM
TIP
DESCRIPTION
REMARKS
LIMITS TO
REV DATE
Total Project Cost Information
Construction $116225
Preliminary Engineering ---
Construction Engineering ---
Contingencies ---
Indirects ---
Total Project Cost $116225
Right Of Way ---
Bond Financing ---
5307FUNDING CATEGORY
MTP REFERENCE
Cost of
Approved
Phases
$116225
18757MPO PROJECT ID
Authorized Funding by CategoryShare
Federal State Regional Local
Local
Contribution
Funding
By Category
Amendment JAN-2021 - 12221 Program the FY20 TXDOT CFP flexed Section 5307 Fleet Replacement award in FY21 which includes 12915 TDCs
CITY OF GALVESTONSTREET
DISTRICT COUNTY CSJ HWY PHASE CITY PROJECT SPONSOR YOE COST
Sec 5307 $64570 --- $51655 $116225 --- ---
Funding by Share $64570 $51655 $116225 --- --- ---
PHASE C=CONSTRUCTION E = ENGINEERING R = ROW T = TRANSFER Thursday December 10 2020
Page 1210
Page 2
dickinson
Highlight
dickinson
Highlight
2021-2024 TRANSPORTATION IMPROVEMENT PROGRAM
2045 REGIONAL TRANSPORTATION PLAN
HOUSTON-GALVESTON MPO
JANUARY 2021 TPC AMENDMENTS
PROPOSED VERSION
MPOIDCSJ 187580912-00-597 FY 2019
MULTIMODAL NETWORK CONNECTIVITY PILOT STUDIES
HOUSTON MULTIPLE 0912-00-597 VA E NONE H-GAC $100000
VA
VA
LIMITS FROM
TIP
DESCRIPTION
REMARKS
LIMITS TO
REV DATE
Total Project Cost Information
Construction ---
Preliminary Engineering $100000
Construction Engineering ---
Contingencies ---
Indirects ---
Total Project Cost $100000
Right Of Way ---
Bond Financing ---
10FUNDING CATEGORY
MTP REFERENCE
Cost of
Approved
Phases
$100000
18758MPO PROJECT ID
Authorized Funding by CategoryShare
Federal State Regional Local
Local
Contribution
Funding
By Category
Project History
HOUSTON-GALVESTON TMASTREET
DISTRICT COUNTY CSJ HWY PHASE CITY PROJECT SPONSOR YOE COST
10-MISC $100000 --- --- $100000 --- ---
Funding by Share $100000 --- $100000 --- --- ---
PHASE C=CONSTRUCTION E = ENGINEERING R = ROW T = TRANSFER Wednesday January 6 2021
AmendJAN-20211222021-Allocate 20000 TDCs to match $100000 FHWA Highway Research and Development Program award that was obligated in FY 2019
lingala
Highlight
2021-2024 TRANSPORTATION IMPROVEMENT PROGRAM
2045 REGIONAL TRANSPORTATION PLAN
HOUSTON-GALVESTON MPO
JANUARY 2021 TPC AMENDMENTS
PROPOSED VERSION
MPOIDCSJ 18759NA FY 2021
CONSTRUCTION EXPENDITURES FOR LAKE JACKSON TRANSIT MAINTENANCE FACILITY
HOUSTON BRAZORIA VA T LAKE JACKSON GULF COAST CENTER $200000
VA
VA
LIMITS FROM
TIP
DESCRIPTION
REMARKS
LIMITS TO
REV DATE
Total Project Cost Information
Construction $200000
Preliminary Engineering ---
Construction Engineering ---
Contingencies ---
Indirects ---
Total Project Cost $200000
Right Of Way ---
Bond Financing ---
5355FUNDING CATEGORY
MTP REFERENCE
Cost of
Approved
Phases
$200000
18759MPO PROJECT ID
Authorized Funding by CategoryShare
Federal State Regional Local
Local
Contribution
Funding
By Category
Project History
LAKE JACKSONANGLETON UZASTREET
DISTRICT COUNTY CSJ HWY PHASE CITY PROJECT SPONSOR YOE COST
Sec 5355 $200000 --- --- $200000 --- ---
Funding by Share $200000 --- $200000 --- --- ---
PHASE C=CONSTRUCTION E = ENGINEERING R = ROW T = TRANSFER Wednesday January 6 2021
AmendJAN-20211222021- Program $200000 of the Governors Apportionment of $3258575 of the CARES Act allocation based on the apportionments posted by the FTA on April 2 2020 TIP programming is required for capital expenditures only
lingala
Highlight
January 2021 TPC Amendments
Remove Group Eligible Projects from 2021 TIP
Page 1
Blank Page
Page 2
2021-2024 TRANSPORTATION IMPROVEMENT PROGRAM
2045 REGIONAL TRANSPORTATION PLAN
HOUSTON-GALVESTON MPO
JANUARY 2021 MODIFICATIONS AND PREVIEWS
PROPOSED VERSION
MPOIDCSJ 4670389-07-025 FY 2025
CONSTRUCT SH 146 RR OVERPASS AND WIDEN FROM 2 TO 4 LANES
HOUSTON GALVESTON 0389-07-025 SH C TEXAS CITY TXDOT HOUSTON DISTRICT $49567000
FM 519
SL 197
LIMITS FROM
TIP
DESCRIPTION
REMARKS
LIMITS TO
REV DATE
Total Project Cost Information
Construction $49567000
Preliminary Engineering $2428783
Construction Engineering $1982680
Contingencies $4956700
Indirects $2518004
Total Project Cost $61733899
Right Of Way $280732
Bond Financing ---
26FUNDING CATEGORY
MTP REFERENCE
Cost of
Approved
Phases
$49567000
467MPO PROJECT ID
Authorized Funding by CategoryShare
Federal State Regional Local
Local
Contribution
Funding
By Category
Project History AmendmentJan-2021-1222021 Delay to FY 2025
SH 146STREET
DISTRICT COUNTY CSJ HWY PHASE CITY PROJECT SPONSOR YOE COST
2-METRO-TMA $27653600 $6913400 --- $34567000 --- ---
6-BRIDGE $12000000 $3000000 --- $15000000 --- ---
Funding by Share $39653600 --- $49567000 --- ---$9913400
MPOIDCSJ 4670389-07-025 FY 2024
OLD VERSION
CONSTRUCT RR OVERPASS AND WIDEN FROM 2 TO 4 LANES
HOUSTON GALVESTON 0389-07-025 SH C TEXAS CITY TXDOT HOUSTON DISTRICT $49567000
FM 519
N OF SL 197
LIMITS FROM
TIP
DESCRIPTION
REMARKS
LIMITS TO
REV DATE
Total Project Cost Information
Construction $49567000
Preliminary Engineering $2428783
Construction Engineering $1982680
Contingencies $4956700
Indirects $2518004
Total Project Cost $61733899
Right Of Way $280732
Bond Financing ---
6FUNDING CATEGORY
MTP REFERENCE
Cost of
Approved
Phases
$49567000
467MPO PROJECT ID
Authorized Funding by CategoryShare
Federal State Regional Local
Local
Contribution
Funding
By Category
Project History
SH 146STREET
DISTRICT COUNTY CSJ HWY PHASE CITY PROJECT SPONSOR YOE COST
2-METRO-TMA $27653600 $6913400 --- $34567000 --- ---
6-BRIDGE $12000000 $3000000 --- $15000000 --- ---
Funding by Share $39653600 --- $49567000 --- ---$9913400
PHASE C=CONSTRUCTION E = ENGINEERING R = ROW T = TRANSFER Sunday January 3 2021
Page 3
2021-2024 TRANSPORTATION IMPROVEMENT PROGRAM
2045 REGIONAL TRANSPORTATION PLAN
HOUSTON-GALVESTON MPO
JANUARY 2021 MODIFICATIONS AND PREVIEWS
PROPOSED VERSION
MPOIDCSJ 71270912-00-560 FY 2021
Amendment JAN-2021 - 12221 - Removed from 2021 TIP at TxDOTrsquos request to group (5000-00-916 Bicycle and Pedestrian) the project to fiscally constrain 2021 STIP
ENGINEERING FOR CONSTRUCTION OF 10 FT MULTIUSE TRAIL
HOUSTON BRAZORIA 0912-00-560 VA E PEARLAND CITY OF PEARLAND $985000
UH CLEAR LAKE PEARLAND CAMPUS
N OF HUGHES RD
LIMITS FROM
TIP
DESCRIPTION
REMARKS
LIMITS TO
REV DATE
Total Project Cost Information
Construction $8023000
Preliminary Engineering $985000
Construction Engineering $404900
Contingencies $809800
Indirects $411378
Total Project Cost $10634078
Right Of Way ---
Bond Financing ---
9FUNDING CATEGORY
7641MTP REFERENCE
Cost of
Approved
Phases
$985000
7127MPO PROJECT ID
Authorized Funding by CategoryShare
Federal State Regional Local
Local
Contribution
Funding
By Category
Project History
CLEAR CREEK TRAILSTREET
DISTRICT COUNTY CSJ HWY PHASE CITY PROJECT SPONSOR YOE COST
9-TASA $788000 --- $197000 $985000 --- ---
Funding by Share $788000 $197000 $985000 --- --- ---
MPOIDCSJ 71270912-00-560 FY 2021
OLD VERSION
ENGINEERING FOR CONSTRUCTION OF 10 FT MULTIUSE TRAIL
HOUSTON BRAZORIA 0912-00-560 VA E PEARLAND CITY OF PEARLAND $985000
UH CLEAR LAKE PEARLAND CAMPUS
N OF HUGHES RD
LIMITS FROM
TIP
DESCRIPTION
REMARKS
LIMITS TO
REV DATE
Total Project Cost Information
Construction $8023000
Preliminary Engineering $985000
Construction Engineering $404900
Contingencies $809800
Indirects $411378
Total Project Cost $10634078
Right Of Way ---
Bond Financing ---
9FUNDING CATEGORY
7641MTP REFERENCE
Cost of
Approved
Phases
$985000
7127MPO PROJECT ID
Authorized Funding by CategoryShare
Federal State Regional Local
Local
Contribution
Funding
By Category
Project History
CLEAR CREEK TRAILSTREET
DISTRICT COUNTY CSJ HWY PHASE CITY PROJECT SPONSOR YOE COST
9-TASA $788000 --- $197000 $985000 --- ---
Funding by Share $788000 $197000 $985000 --- --- ---
PHASE C=CONSTRUCTION E = ENGINEERING R = ROW T = TRANSFER Sunday January 3 2021
Page 4
2021-2024 TRANSPORTATION IMPROVEMENT PROGRAM
2045 REGIONAL TRANSPORTATION PLAN
HOUSTON-GALVESTON MPO
JANUARY 2021 MODIFICATIONS AND PREVIEWS
PROPOSED VERSION
MPOIDCSJ 76410912-00-560 FY 2022
Amendment JAN-2021 - 12221 - Removed from 2021 TIP at TxDOTrsquos request to group (5000-00-916 Bicycle and Pedestrian) the project to fiscally constrain 2021 STIP
CONSTRUCT 10 FOOT MULTIUSE TRAIL
HOUSTON BRAZORIA 0912-00-560 VA CE
(REVIEW)
PEARLAND CITY OF PEARLAND $8098000
UH CLEAR LAKE PEARLAND CAMPUS
N OF HUGHES RD
LIMITS FROM
TIP
DESCRIPTION
REMARKS
LIMITS TO
REV DATE
Total Project Cost Information
Construction $7948000
Preliminary Engineering $1060000
Construction Engineering $404900
Contingencies $809800
Indirects $411378
Total Project Cost
Right Of Way
Bond Financing ---
9FUNDING CATEGORY
MTP REFERENCE
Cost of
Approved
Phases
$8098000
7641MPO PROJECT ID
Authorized Funding by CategoryShare
Federal State Regional Local
Local
Contribution
Funding
By Category
Project History
CLEAR CREEK TRAILSTREET
DISTRICT COUNTY CSJ HWY PHASE CITY PROJECT SPONSOR YOE COST
9-TASA $6478400 --- $1619600 $8098000 --- ---
Funding by Share $6478400 $1619600 $8098000 --- --- ---
MPOIDCSJ 76410912-00-560 FY 2022
OLD VERSION
CONSTRUCT 10 FOOT MULTIUSE TRAIL
HOUSTON BRAZORIA 0912-00-560 VA CE
(REVIEW)
PEARLAND CITY OF PEARLAND $8098000
UH CLEAR LAKE PEARLAND CAMPUS
N OF HUGHES RD
LIMITS FROM
TIP
DESCRIPTION
REMARKS
LIMITS TO
REV DATE
Total Project Cost Information
Construction $7948000
Preliminary Engineering $1060000
Construction Engineering $404900
Contingencies $809800
Indirects $411378
Total Project Cost
Right Of Way
Bond Financing ---
9FUNDING CATEGORY
MTP REFERENCE
Cost of
Approved
Phases
$8098000
7641MPO PROJECT ID
Authorized Funding by CategoryShare
Federal State Regional Local
Local
Contribution
Funding
By Category
Project History
CLEAR CREEK TRAILSTREET
DISTRICT COUNTY CSJ HWY PHASE CITY PROJECT SPONSOR YOE COST
9-TASA $6478400 --- $1619600 $8098000 --- ---
Funding by Share $6478400 $1619600 $8098000 --- --- ---
PHASE C=CONSTRUCTION E = ENGINEERING R = ROW T = TRANSFER Sunday January 3 2021
Page 5
2021-2024 TRANSPORTATION IMPROVEMENT PROGRAM
2045 REGIONAL TRANSPORTATION PLAN
HOUSTON-GALVESTON MPO
JANUARY 2021 MODIFICATIONS AND PREVIEWS
PROPOSED VERSION
MPOIDCSJ 7739NA FY 2023
DOWNTOWN LIVABLE COMMUNITIES INITIATIVE
HOUSTON GALVESTON CS E GALVESTON CITY OF GALVESTON $3459716
VA
VA
LIMITS FROM
TIP
DESCRIPTION
REMARKS
LIMITS TO
REV DATE
Total Project Cost Information
Construction ---
Preliminary Engineering $3459716
Construction Engineering ---
Contingencies ---
Indirects ---
Total Project Cost $3459716
Right Of Way ---
Bond Financing ---
7FUNDING CATEGORY
MTP REFERENCE
Cost of
Approved
Phases
$3459716
7739MPO PROJECT ID
Authorized Funding by CategoryShare
Federal State Regional Local
Local
Contribution
Funding
By Category
Project History
GALVESTON CBDSTREET
DISTRICT COUNTY CSJ HWY PHASE CITY PROJECT SPONSOR YOE COST
7-STBG $3100000 --- $359716 $3459716 --- ---
Funding by Share $3100000 $359716 $3459716 --- --- ---
MPOIDCSJ 7739NA FY 2023
OLD VERSION
DOWNTOWN LIVABLE COMMUNITIES INITIATIVE
HOUSTON GALVESTON CS E GALVESTON CITY OF GALVESTON $3459716
VA
VA
LIMITS FROM
TIP
DESCRIPTION
REMARKS
LIMITS TO
REV DATE
Total Project Cost Information
Construction ---
Preliminary Engineering $3459716
Construction Engineering ---
Contingencies ---
Indirects ---
Total Project Cost $3459716
Right Of Way ---
Bond Financing ---
7FUNDING CATEGORY
MTP REFERENCE
Cost of
Approved
Phases
$3459716
7739MPO PROJECT ID
Authorized Funding by CategoryShare
Federal State Regional Local
Local
Contribution
Funding
By Category
Project History
GALVESTON CBDSTREET
DISTRICT COUNTY CSJ HWY PHASE CITY PROJECT SPONSOR YOE COST
7-STBG $3100000 --- $359716 $3459716 --- ---
Funding by Share $3100000 $359716 $3459716 --- --- ---
PHASE C=CONSTRUCTION E = ENGINEERING R = ROW T = TRANSFER Sunday January 3 2021
Amendment JAN-2021 - 12221 - Removed from 2021 TIP at TxDOTrsquos request to group the project to fiscally constrain 2021 STIP
Amendment JAN-2021 - 12221 - Removed from 2021 TIP at TxDOTrsquos request to group the project to fiscally constrain 2021 STIP
Page 6
2021-2024 TRANSPORTATION IMPROVEMENT PROGRAM
2045 REGIONAL TRANSPORTATION PLAN
HOUSTON-GALVESTON MPO
JANUARY 2021 MODIFICATIONS AND PREVIEWS
PROPOSED VERSION
MPOIDCSJ 117180912-00-548 FY 2021
Amendment JAN-2021 - 12221 - Removed from 2021 TIP at TxDOTrsquos request to group the project to fiscally constrain 2021 STIP Amendment 16 - 102816 - Add CSJ number
METRO STAR VANPOOL (STBG) FY 2020
HOUSTON MULTIPLE 0912-00-548 VA C HOUSTON METRO $3750000
VA
VA
LIMITS FROM
TIP
DESCRIPTION
REMARKS
LIMITS TO
REV DATE
Total Project Cost Information
Construction $3750000
Preliminary Engineering ---
Construction Engineering ---
Contingencies ---
Indirects ---
Total Project Cost $3750000
Right Of Way ---
Bond Financing ---
7FUNDING CATEGORY
MTP REFERENCE
Cost of
Approved
Phases
$3750000
11718MPO PROJECT ID
Authorized Funding by CategoryShare
Federal State Regional Local
Local
Contribution
Funding
By Category
Project History
METRO SERVICE AREASTREET
DISTRICT COUNTY CSJ HWY PHASE CITY PROJECT SPONSOR YOE COST
7-STP-MM $3000000 --- $750000 $3750000 --- ---
Funding by Share $3000000 $750000 $3750000 --- --- ---
MPOIDCSJ 117180912-00-548 FY 2021
OLD VERSION
METRO STAR VANPOOL (STBG) FY 2020
HOUSTON MULTIPLE 0912-00-548 VA C HOUSTON METRO $3750000
VA
VA
LIMITS FROM
TIP
DESCRIPTION
REMARKS
LIMITS TO
REV DATE
Total Project Cost Information
Construction $3750000
Preliminary Engineering ---
Construction Engineering ---
Contingencies ---
Indirects ---
Total Project Cost $3750000
Right Of Way ---
Bond Financing ---
7FUNDING CATEGORY
MTP REFERENCE
Cost of
Approved
Phases
$3750000
11718MPO PROJECT ID
Authorized Funding by CategoryShare
Federal State Regional Local
Local
Contribution
Funding
By Category
Project History
METRO SERVICE AREASTREET
DISTRICT COUNTY CSJ HWY PHASE CITY PROJECT SPONSOR YOE COST
7-STP-MM $3000000 --- $750000 $3750000 --- ---
Funding by Share $3000000 $750000 $3750000 --- --- ---
PHASE C=CONSTRUCTION E = ENGINEERING R = ROW T = TRANSFER Sunday January 3 2021
Page 7
2021-2024 TRANSPORTATION IMPROVEMENT PROGRAM
2045 REGIONAL TRANSPORTATION PLAN
HOUSTON-GALVESTON MPO
JANUARY 2021 MODIFICATIONS AND PREVIEWS
PROPOSED VERSION
MPOIDCSJ 118080912-00-603 FY 2021
Amendment JAN-2021 - 12221 - Removed from 2021 TIP at TxDOTrsquos request to group the project to fiscally constrain 2021 STIP Amendment OCT-2019A - 102519 - Add CSJ 0912-00-603
METRO STAR VANPOOL (STBG) FY 2021
HOUSTON HARRIS 0912-00-603 VA C HOUSTON METRO $3750000
VA
VA
LIMITS FROM
TIP
DESCRIPTION
REMARKS
LIMITS TO
REV DATE
Total Project Cost Information
Construction $3750000
Preliminary Engineering ---
Construction Engineering ---
Contingencies ---
Indirects ---
Total Project Cost $3750000
Right Of Way ---
Bond Financing ---
7FUNDING CATEGORY
MTP REFERENCE
Cost of
Approved
Phases
$3750000
11808MPO PROJECT ID
Authorized Funding by CategoryShare
Federal State Regional Local
Local
Contribution
Funding
By Category
Project History
METRO SERVICE AREASTREET
DISTRICT COUNTY CSJ HWY PHASE CITY PROJECT SPONSOR YOE COST
7-STBG $3000000 --- $750000 $3750000 --- ---
Funding by Share $3000000 $750000 $3750000 --- --- ---
MPOIDCSJ 118080912-00-603 FY 2021
OLD VERSION
METRO STAR VANPOOL (STBG) FY 2021
HOUSTON HARRIS 0912-00-603 VA C HOUSTON METRO $3750000
VA
VA
LIMITS FROM
TIP
DESCRIPTION
REMARKS
LIMITS TO
REV DATE
Total Project Cost Information
Construction $3750000
Preliminary Engineering ---
Construction Engineering ---
Contingencies ---
Indirects ---
Total Project Cost $3750000
Right Of Way ---
Bond Financing ---
7FUNDING CATEGORY
MTP REFERENCE
Cost of
Approved
Phases
$3750000
11808MPO PROJECT ID
Authorized Funding by CategoryShare
Federal State Regional Local
Local
Contribution
Funding
By Category
Project History
METRO SERVICE AREASTREET
DISTRICT COUNTY CSJ HWY PHASE CITY PROJECT SPONSOR YOE COST
7-STBG $3000000 --- $750000 $3750000 --- ---
Funding by Share $3000000 $750000 $3750000 --- --- ---
PHASE C=CONSTRUCTION E = ENGINEERING R = ROW T = TRANSFER Sunday January 3 2021
Page 8
2021-2024 TRANSPORTATION IMPROVEMENT PROGRAM
2045 REGIONAL TRANSPORTATION PLAN
HOUSTON-GALVESTON MPO
JANUARY 2021 MODIFICATIONS AND PREVIEWS
PROPOSED VERSION
MPOIDCSJ 118090912-00-604 FY 2022
Amendment JAN-2021 - 12221 - Removed from 2021 TIP at TxDOTrsquos request to group the project to fiscally constrain 2021 STIP Amendment JAN-2020 - 12420 - Donate $15M of
STBG funding to 117160912-00-546 to cover funding gap available to reimburse eligible expenses
Amendment OCT-2019A - 102519 - Add CSJ 0912-00-604
METRO STAR VANPOOL (STBG) FY 2022
HOUSTON HARRIS 0912-00-604 VA C HOUSTON METRO $1875000
VA
VA
LIMITS FROM
TIP
DESCRIPTION
REMARKS
LIMITS TO
REV DATE
Total Project Cost Information
Construction $1875000
Preliminary Engineering ---
Construction Engineering ---
Contingencies ---
Indirects ---
Total Project Cost $1875000
Right Of Way ---
Bond Financing ---
7FUNDING CATEGORY
MTP REFERENCE
Cost of
Approved
Phases
$1875000
11809MPO PROJECT ID
Authorized Funding by CategoryShare
Federal State Regional Local
Local
Contribution
Funding
By Category
Project History
METRO SERVICE AREASTREET
DISTRICT COUNTY CSJ HWY PHASE CITY PROJECT SPONSOR YOE COST
7-STBG $1500000 --- $375000 $1875000 --- ---
Funding by Share $1500000 $375000 $1875000 --- --- ---
MPOIDCSJ 118090912-00-604 FY 2022
OLD VERSION
METRO STAR VANPOOL (STBG) FY 2022
HOUSTON HARRIS 0912-00-604 VA C HOUSTON METRO $1875000
VA
VA
LIMITS FROM
TIP
DESCRIPTION
REMARKS
LIMITS TO
REV DATE
Total Project Cost Information
Construction $1875000
Preliminary Engineering ---
Construction Engineering ---
Contingencies ---
Indirects ---
Total Project Cost $1875000
Right Of Way ---
Bond Financing ---
7FUNDING CATEGORY
MTP REFERENCE
Cost of
Approved
Phases
$1875000
11809MPO PROJECT ID
Authorized Funding by CategoryShare
Federal State Regional Local
Local
Contribution
Funding
By Category
Project History
METRO SERVICE AREASTREET
DISTRICT COUNTY CSJ HWY PHASE CITY PROJECT SPONSOR YOE COST
7-STBG $1500000 --- $375000 $1875000 --- ---
Funding by Share $1500000 $375000 $1875000 --- --- ---
PHASE C=CONSTRUCTION E = ENGINEERING R = ROW T = TRANSFER Sunday January 3 2021
Page 9
2021-2024 TRANSPORTATION IMPROVEMENT PROGRAM
2045 REGIONAL TRANSPORTATION PLAN
HOUSTON-GALVESTON MPO
JANUARY 2021 MODIFICATIONS AND PREVIEWS
PROPOSED VERSION
MPOIDCSJ 119170912-00-559 FY 2022
Amendment JAN-2021 - 12221 - Removed from 2021 TIP at TxDOTrsquos request to group the project to fiscally constrain 2021 STIP Amendment OCT-2018A - 102618 - Delay to FY 2021
at sponsors request Amendment APR-2017 - 42817 - Apply 1600000 TDCs to satisfy non-
federal match TDCs reduce program admin and TxDOT oversight costs of documentation and
review of in-kind contributions Amendment 25 -121616 - Add CSJ number
REGIONAL FREEWAY INCIDENT MANAGEMENT - TOWING (FY 2022-2024)
HOUSTON MULTIPLE 0912-00-559 VA C NONE H-GAC $10000000
VA
VA
LIMITS FROM
TIP
DESCRIPTION
REMARKS
LIMITS TO
REV DATE
Total Project Cost Information
Construction $10000000
Preliminary Engineering ---
Construction Engineering ---
Contingencies ---
Indirects ---
Total Project Cost $10000000
Right Of Way ---
Bond Financing ---
7FUNDING CATEGORY
MTP REFERENCE
Cost of
Approved
Phases
$10000000
11917MPO PROJECT ID
Authorized Funding by CategoryShare
Federal State Regional Local
Local
Contribution
Funding
By Category
Project History
HOUSTON-GALVESTON TMASTREET
DISTRICT COUNTY CSJ HWY PHASE CITY PROJECT SPONSOR YOE COST
7-STBG $10000000 --- --- $10000000 --- ---
Funding by Share $10000000 --- $10000000 --- --- ---
MPOIDCSJ 119170912-00-559 FY 2022
OLD VERSION
REGIONAL FREEWAY INCIDENT MANAGEMENT - TOWING (FY 2022-2024)
HOUSTON MULTIPLE 0912-00-559 VA C NONE H-GAC $10000000
VA
VA
LIMITS FROM
TIP
DESCRIPTION
REMARKS
LIMITS TO
REV DATE
Total Project Cost Information
Construction $10000000
Preliminary Engineering ---
Construction Engineering ---
Contingencies ---
Indirects ---
Total Project Cost $10000000
Right Of Way ---
Bond Financing ---
7FUNDING CATEGORY
MTP REFERENCE
Cost of
Approved
Phases
$10000000
11917MPO PROJECT ID
Authorized Funding by CategoryShare
Federal State Regional Local
Local
Contribution
Funding
By Category
Project History
HOUSTON-GALVESTON TMASTREET
DISTRICT COUNTY CSJ HWY PHASE CITY PROJECT SPONSOR YOE COST
7-STBG $10000000 --- --- $10000000 --- ---
Funding by Share $10000000 --- $10000000 --- --- ---
PHASE C=CONSTRUCTION E = ENGINEERING R = ROW T = TRANSFER Sunday January 3 2021
Page 10
2021-2024 TRANSPORTATION IMPROVEMENT PROGRAM
2045 REGIONAL TRANSPORTATION PLAN
HOUSTON-GALVESTON MPO
JANUARY 2021 MODIFICATIONS AND PREVIEWS
PROPOSED VERSION
MPOIDCSJ 163480027-08-180 FY 2022
CONSTRUCT GRADE SEPARATION AND INTERSECTION IMPROVEMENTS
HOUSTON FORT BEND 0027-08-180 US C NONE TXDOT HOUSTON DISTRICT $30064609
AT SH 99LIMITS FROM
TIP
DESCRIPTION
REMARKS
LIMITS TO
REV DATE
Total Project Cost Information
Construction $30064609
Preliminary Engineering $1473166
Construction Engineering $1202584
Contingencies $3006461
Indirects $1527282
Total Project Cost $37274102
Right Of Way ---
Bond Financing ---
2FUNDING CATEGORY
MTP REFERENCE
Cost of
Approved
Phases
$30064609
16348MPO PROJECT ID
Authorized Funding by CategoryShare
Federal State Regional Local
Local
Contribution
Funding
By Category
Project History
US 90ASTREET
DISTRICT COUNTY CSJ HWY PHASE CITY PROJECT SPONSOR YOE COST
2-METRO-TMA $24051687 $6012922 --- $30064609 --- ---
Funding by Share $24051687 --- $30064609 --- ---$6012922
MPOIDCSJ 163480027-08-180 FY 2022
OLD VERSION
CONSTRUCT GRADE SEPARATION AND INTERSECTION IMPROVEMENTS
HOUSTON FORT BEND 0027-08-180 US 90A C NONE TXDOT HOUSTON DISTRICT $30064609
AT SH 99LIMITS FROM
TIP
DESCRIPTION
REMARKS
LIMITS TO
REV DATE
Total Project Cost Information
Construction $30064609
Preliminary Engineering $1473166
Construction Engineering $1202584
Contingencies $3006461
Indirects $1527282
Total Project Cost $37274102
Right Of Way ---
Bond Financing ---
2FUNDING CATEGORY
MTP REFERENCE
Cost of
Approved
Phases
$30064609
16348MPO PROJECT ID
Authorized Funding by CategoryShare
Federal State Regional Local
Local
Contribution
Funding
By Category
Project History
US 90ASTREET
DISTRICT COUNTY CSJ HWY PHASE CITY PROJECT SPONSOR YOE COST
2-METRO-TMA $24051687 $6012922 --- $30064609 --- ---
Funding by Share $24051687 --- $30064609 --- ---$6012922
PHASE C=CONSTRUCTION E = ENGINEERING R = ROW T = TRANSFER Sunday January 3 2021
Amendment JAN-2021 - 12221 - Removed from 2021 TIP at TxDOTrsquos request to group the project to fiscally constrain 2021 STIP
Page 11
2021-2024 TRANSPORTATION IMPROVEMENT PROGRAM
2045 REGIONAL TRANSPORTATION PLAN
HOUSTON-GALVESTON MPO
JANUARY 2021 MODIFICATIONS AND PREVIEWS
PROPOSED VERSION
MPOIDCSJ 170200912-00-539 FY 2021
Amendment JAN-2021 - 12221 - Removed from 2021 TIP at TxDOTrsquos request to group the project to fiscally constrain 2021 STIP Amendment APR-2019 - 40519 - Delay from FY 2019
to FY 2021 at sponsors request Amendment MAR-2018A - 32318 - Delay from FY 2018 to
FY 2019 Amendment 12017 - 12717 - Delay to FY 2018 and change work phase to
Construction
REGIONAL FREEWAY INCIDENT MANAGEMENT - TOWING (FY 2017 - 2018)
HOUSTON MULTIPLE 0912-00-539 VA C NONE H-GAC $8000000
VA
VA
LIMITS FROM
TIP
DESCRIPTION
REMARKS
LIMITS TO
REV DATE
Total Project Cost Information
Construction $8000000
Preliminary Engineering ---
Construction Engineering ---
Contingencies ---
Indirects ---
Total Project Cost $8000000
Right Of Way ---
Bond Financing ---
7FUNDING CATEGORY
MTP REFERENCE
Cost of
Approved
Phases
$8000000
17020MPO PROJECT ID
Authorized Funding by CategoryShare
Federal State Regional Local
Local
Contribution
Funding
By Category
Project History
HOUSTON-GALVESTON TMASTREET
DISTRICT COUNTY CSJ HWY PHASE CITY PROJECT SPONSOR YOE COST
7-STP-MM $8000000 --- --- $8000000 --- ---
Funding by Share $8000000 --- $8000000 --- --- ---
MPOIDCSJ 170200912-00-539 FY 2021
OLD VERSION
REGIONAL FREEWAY INCIDENT MANAGEMENT - TOWING (FY 2017 - 2018)
HOUSTON MULTIPLE 0912-00-539 VA C NONE H-GAC $8000000
VA
VA
LIMITS FROM
TIP
DESCRIPTION
REMARKS
LIMITS TO
REV DATE
Total Project Cost Information
Construction $8000000
Preliminary Engineering ---
Construction Engineering ---
Contingencies ---
Indirects ---
Total Project Cost $8000000
Right Of Way ---
Bond Financing ---
7FUNDING CATEGORY
MTP REFERENCE
Cost of
Approved
Phases
$8000000
17020MPO PROJECT ID
Authorized Funding by CategoryShare
Federal State Regional Local
Local
Contribution
Funding
By Category
Project History
HOUSTON-GALVESTON TMASTREET
DISTRICT COUNTY CSJ HWY PHASE CITY PROJECT SPONSOR YOE COST
7-STP-MM $8000000 --- --- $8000000 --- ---
Funding by Share $8000000 --- $8000000 --- --- ---
PHASE C=CONSTRUCTION E = ENGINEERING R = ROW T = TRANSFER Sunday January 3 2021
Page 12
2021-2024 TRANSPORTATION IMPROVEMENT PROGRAM
2045 REGIONAL TRANSPORTATION PLAN
HOUSTON-GALVESTON MPO
JANUARY 2021 MODIFICATIONS AND PREVIEWS
PROPOSED VERSION
MPOIDCSJ 170460389-05-127 FY 2022
Amendment JAN-2021 - 12221 - Removed from 2021 TIP at TxDOTrsquos request to group (5000-00-915 ITS deployment) the project to fiscally constrain 2021 STIP
INSTALL NEW ITS EQUIPMENT AND INFRASTRUCTURE
HOUSTON HARRIS 0389-05-127 SH 146 C LA PORTE TXDOT HOUSTON DISTRICT $3000000
FAIRMONT PKWY W
NASA 1
LIMITS FROM
TIP
DESCRIPTION
REMARKS
LIMITS TO
REV DATE
Total Project Cost Information
Construction $3000000
Preliminary Engineering $147000
Construction Engineering $180000
Contingencies $300000
Indirects $152400
Total Project Cost $3779400
Right Of Way ---
Bond Financing ---
2FUNDING CATEGORY
MTP REFERENCE
Cost of
Approved
Phases
$3000000
17046MPO PROJECT ID
Authorized Funding by CategoryShare
Federal State Regional Local
Local
Contribution
Funding
By Category
Project History
SH 146STREET
DISTRICT COUNTY CSJ HWY PHASE CITY PROJECT SPONSOR YOE COST
2-METRO-TMA $2400000 $600000 --- $3000000 --- ---
Funding by Share $2400000 --- $3000000 --- ---$600000
MPOIDCSJ 170460389-05-127 FY 2022
OLD VERSION
INSTALL NEW ITS EQUIPMENT AND INFRASTRUCTURE
HOUSTON HARRIS 0389-05-127 SH 146 C LA PORTE TXDOT HOUSTON DISTRICT $3000000
FAIRMONT PKWY W
NASA 1
LIMITS FROM
TIP
DESCRIPTION
REMARKS
LIMITS TO
REV DATE
Total Project Cost Information
Construction $3000000
Preliminary Engineering $147000
Construction Engineering $180000
Contingencies $300000
Indirects $152400
Total Project Cost $3779400
Right Of Way ---
Bond Financing ---
2FUNDING CATEGORY
MTP REFERENCE
Cost of
Approved
Phases
$3000000
17046MPO PROJECT ID
Authorized Funding by CategoryShare
Federal State Regional Local
Local
Contribution
Funding
By Category
Project History
SH 146STREET
DISTRICT COUNTY CSJ HWY PHASE CITY PROJECT SPONSOR YOE COST
2-METRO-TMA $2400000 $600000 --- $3000000 --- ---
Funding by Share $2400000 --- $3000000 --- ---$600000
PHASE C=CONSTRUCTION E = ENGINEERING R = ROW T = TRANSFER Sunday January 3 2021
Page 13
2021-2024 TRANSPORTATION IMPROVEMENT PROGRAM
2045 REGIONAL TRANSPORTATION PLAN
HOUSTON-GALVESTON MPO
JANUARY 2021 MODIFICATIONS AND PREVIEWS
PROPOSED VERSION
MPOIDCSJ 170753510-05-040 FY 2022
Amendment JAN-2021 - 12221 - Removed from 2021 TIP at TxDOTrsquos request to group (5000-00-915 ITS deployment) the project to fiscally constrain 2021 STIP Amendment
OCT-2017 - 102717 - Delay from FY2020 to FY2022 modify Cat-2 funding and reflect potential
use of federal funds
INSTALL NEW ITS EQUIPMENT AND INFRASTRUCTURE
HOUSTON HARRIS 3510-05-040 SH 99 C NONE TXDOT HOUSTON DISTRICT $4487000
IH 10
FORT BEND CL
LIMITS FROM
TIP
DESCRIPTION
REMARKS
LIMITS TO
REV DATE
Total Project Cost Information
Construction $4487000
Preliminary Engineering $219863
Construction Engineering $269220
Contingencies $448700
Indirects $227940
Total Project Cost $5652723
Right Of Way ---
Bond Financing ---
2FUNDING CATEGORY
MTP REFERENCE
Cost of
Approved
Phases
$4487000
17075MPO PROJECT ID
Authorized Funding by CategoryShare
Federal State Regional Local
Local
Contribution
Funding
By Category
Project History
SH 99STREET
DISTRICT COUNTY CSJ HWY PHASE CITY PROJECT SPONSOR YOE COST
2-METRO-TMA $3589600 $897400 --- $4487000 --- ---
Funding by Share $3589600 --- $4487000 --- ---$897400
MPOIDCSJ 170753510-05-040 FY 2022
OLD VERSION
INSTALL NEW ITS EQUIPMENT AND INFRASTRUCTURE
HOUSTON HARRIS 3510-05-040 SH 99 C NONE TXDOT HOUSTON DISTRICT $4487000
IH 10
FORT BEND CL
LIMITS FROM
TIP
DESCRIPTION
REMARKS
LIMITS TO
REV DATE
Total Project Cost Information
Construction $4487000
Preliminary Engineering $219863
Construction Engineering $269220
Contingencies $448700
Indirects $227940
Total Project Cost $5652723
Right Of Way ---
Bond Financing ---
2FUNDING CATEGORY
MTP REFERENCE
Cost of
Approved
Phases
$4487000
17075MPO PROJECT ID
Authorized Funding by CategoryShare
Federal State Regional Local
Local
Contribution
Funding
By Category
Project History
SH 99STREET
DISTRICT COUNTY CSJ HWY PHASE CITY PROJECT SPONSOR YOE COST
2-METRO-TMA $3589600 $897400 --- $4487000 --- ---
Funding by Share $3589600 --- $4487000 --- ---$897400
PHASE C=CONSTRUCTION E = ENGINEERING R = ROW T = TRANSFER Sunday January 3 2021
Page 14
2021-2024 TRANSPORTATION IMPROVEMENT PROGRAM
2045 REGIONAL TRANSPORTATION PLAN
HOUSTON-GALVESTON MPO
JANUARY 2021 MODIFICATIONS AND PREVIEWS
PROPOSED VERSION
MPOIDCSJ 170871685-01-107 FY 2021
Amendment JAN-2021 - 12221 - Removed from 2021 TIP at TxDOTrsquos request to group (5000-00-916 Bicycle and Pedestrian) the project to fiscally constrain 2021 STIP Amendment AUG-2019A - 82319
- Delay from FY 2020 to FY 2021 due to design per TXDOT Amendment 16 - 102816 - Add CSJ
number Amendment 2040-3 - 42216 - Program in FY 2020 with STP-TAP funding
CONSTRUCT SHARED USE PATH
HOUSTON HARRIS 1685-01-107 FM 1960 C HOUSTON CITY OF HOUSTON - PARKS amp RECREATION DEP $1000000
MILLS RD
SH 249
LIMITS FROM
TIP
DESCRIPTION
REMARKS
LIMITS TO
REV DATE
Total Project Cost Information
Construction $1000000
Preliminary Engineering $49000
Construction Engineering $60000
Contingencies $100000
Indirects $50800
Total Project Cost $1259800
Right Of Way ---
Bond Financing ---
9FUNDING CATEGORY
MTP REFERENCE
Cost of
Approved
Phases
$1000000
17087MPO PROJECT ID
Authorized Funding by CategoryShare
Federal State Regional Local
Local
Contribution
Funding
By Category
Project History
FM 1960STREET
DISTRICT COUNTY CSJ HWY PHASE CITY PROJECT SPONSOR YOE COST
9-TASA $800000 $200000 --- $1000000 --- ---
Funding by Share $800000 --- $1000000 --- ---$200000
MPOIDCSJ 170871685-01-107 FY 2021
OLD VERSION
CONSTRUCT SHARED USE PATH
HOUSTON HARRIS 1685-01-107 FM 1960 C HOUSTON CITY OF HOUSTON - PARKS amp RECREATION $1000000
MILLS RD
SH 249
LIMITS FROM
TIP
DESCRIPTION
REMARKS
LIMITS TO
REV DATE
Total Project Cost Information
Construction $1000000
Preliminary Engineering $49000
Construction Engineering $60000
Contingencies $100000
Indirects $50800
Total Project Cost $1259800
Right Of Way ---
Bond Financing ---
9FUNDING CATEGORY
MTP REFERENCE
Cost of
Approved
Phases
$1000000
17087MPO PROJECT ID
Authorized Funding by CategoryShare
Federal State Regional Local
Local
Contribution
Funding
By Category
Project History
FM 1960STREET
DISTRICT COUNTY CSJ HWY PHASE CITY PROJECT SPONSOR YOE COST
9-TASA $800000 $200000 --- $1000000 --- ---
Funding by Share $800000 --- $1000000 --- ---$200000
PHASE C=CONSTRUCTION E = ENGINEERING R = ROW T = TRANSFER Sunday January 3 2021
Page 15
2021-2024 TRANSPORTATION IMPROVEMENT PROGRAM
2045 REGIONAL TRANSPORTATION PLAN
HOUSTON-GALVESTON MPO
JANUARY 2021 MODIFICATIONS AND PREVIEWS
PROPOSED VERSION
MPOIDCSJ 170890177-05-112 FY 2023
Amendment JAN-2021 - 12221 - Removed from 2021 TIP at TxDOTrsquos request to group (5000-00-915 ITS deployment) the project to fiscally constrain 2021 STIP
INSTALL NEW ITS EQUIPMENT AND INFRASTRUCTURE
HOUSTON MONTGOMERY 0177-05-112 IH 69 C SPLENDORA TXDOT HOUSTON DISTRICT $13912000
LIBERTY CL
HARRIS CL
LIMITS FROM
TIP
DESCRIPTION
REMARKS
LIMITS TO
REV DATE
Total Project Cost Information
Construction $13912000
Preliminary Engineering $681688
Construction Engineering $695600
Contingencies $1391200
Indirects $706730
Total Project Cost $17387218
Right Of Way ---
Bond Financing ---
2FUNDING CATEGORY
MTP REFERENCE
Cost of
Approved
Phases
$13912000
17089MPO PROJECT ID
Authorized Funding by CategoryShare
Federal State Regional Local
Local
Contribution
Funding
By Category
Project History
IH 69 NSTREET
DISTRICT COUNTY CSJ HWY PHASE CITY PROJECT SPONSOR YOE COST
2-METRO-TMA $11129600 $2782400 --- $13912000 --- ---
Funding by Share $11129600 --- $13912000 --- ---$2782400
MPOIDCSJ 170890177-05-112 FY 2023
OLD VERSION
INSTALL NEW ITS EQUIPMENT AND INFRASTRUCTURE
HOUSTON MONTGOMERY 0177-05-112 IH 69 C SPLENDORA TXDOT HOUSTON DISTRICT $13912000
LIBERTY CL
HARRIS CL
LIMITS FROM
TIP
DESCRIPTION
REMARKS
LIMITS TO
REV DATE
Total Project Cost Information
Construction $13912000
Preliminary Engineering $681688
Construction Engineering $695600
Contingencies $1391200
Indirects $706730
Total Project Cost $17387218
Right Of Way ---
Bond Financing ---
2FUNDING CATEGORY
MTP REFERENCE
Cost of
Approved
Phases
$13912000
17089MPO PROJECT ID
Authorized Funding by CategoryShare
Federal State Regional Local
Local
Contribution
Funding
By Category
Project History
IH 69 NSTREET
DISTRICT COUNTY CSJ HWY PHASE CITY PROJECT SPONSOR YOE COST
2-METRO-TMA $11129600 $2782400 --- $13912000 --- ---
Funding by Share $11129600 --- $13912000 --- ---$2782400
PHASE C=CONSTRUCTION E = ENGINEERING R = ROW T = TRANSFER Sunday January 3 2021
Page 16
2021-2024 TRANSPORTATION IMPROVEMENT PROGRAM
2045 REGIONAL TRANSPORTATION PLAN
HOUSTON-GALVESTON MPO
JANUARY 2021 MODIFICATIONS AND PREVIEWS
PROPOSED VERSION
MPOIDCSJ 170900598-02-120 FY 2022
Amendment JAN-2021 - 12221 - Removed from 2021 TIP at TxDOTrsquos request to group (5000-00-915 ITS deployment) the project to fiscally constrain 2021 STIP
INSTALL NEW ITS EQUIPMENT AND INFRASTRUCTURE
HOUSTON BRAZORIA 0598-02-120 SH 288 C IOWA COLONY TXDOT HOUSTON DISTRICT $8032000
SH 6
FM 1462
LIMITS FROM
TIP
DESCRIPTION
REMARKS
LIMITS TO
REV DATE
Total Project Cost Information
Construction $8032000
Preliminary Engineering $393568
Construction Engineering $401600
Contingencies $803200
Indirects $408026
Total Project Cost $10038394
Right Of Way ---
Bond Financing ---
2FUNDING CATEGORY
MTP REFERENCE
Cost of
Approved
Phases
$8032000
17090MPO PROJECT ID
Authorized Funding by CategoryShare
Federal State Regional Local
Local
Contribution
Funding
By Category
Project History
SH 288STREET
DISTRICT COUNTY CSJ HWY PHASE CITY PROJECT SPONSOR YOE COST
2-METRO-TMA $6425600 $1606400 --- $8032000 --- ---
Funding by Share $6425600 --- $8032000 --- ---$1606400
MPOIDCSJ 170900598-02-120 FY 2022
OLD VERSION
INSTALL NEW ITS EQUIPMENT AND INFRASTRUCTURE
HOUSTON BRAZORIA 0598-02-120 SH 288 C IOWA COLONY TXDOT HOUSTON DISTRICT $8032000
SH 6
FM 1462
LIMITS FROM
TIP
DESCRIPTION
REMARKS
LIMITS TO
REV DATE
Total Project Cost Information
Construction $8032000
Preliminary Engineering $393568
Construction Engineering $401600
Contingencies $803200
Indirects $408026
Total Project Cost $10038394
Right Of Way ---
Bond Financing ---
2FUNDING CATEGORY
MTP REFERENCE
Cost of
Approved
Phases
$8032000
17090MPO PROJECT ID
Authorized Funding by CategoryShare
Federal State Regional Local
Local
Contribution
Funding
By Category
Project History
SH 288STREET
DISTRICT COUNTY CSJ HWY PHASE CITY PROJECT SPONSOR YOE COST
2-METRO-TMA $6425600 $1606400 --- $8032000 --- ---
Funding by Share $6425600 --- $8032000 --- ---$1606400
PHASE C=CONSTRUCTION E = ENGINEERING R = ROW T = TRANSFER Sunday January 3 2021
Page 17
2021-2024 TRANSPORTATION IMPROVEMENT PROGRAM
2045 REGIONAL TRANSPORTATION PLAN
HOUSTON-GALVESTON MPO
JANUARY 2021 MODIFICATIONS AND PREVIEWS
PROPOSED VERSION
MPOIDCSJ 170990050-06-089 FY 2023
Amendment JAN-2021 - 12221 - Removed from 2021 TIP at TxDOTrsquos request to group (5000-00-915 ITS deployment) the project to fiscally constrain 2021 STIP Amendment
OCT-2017 - 102717 - Delay from FY2022 to FY2023 modify limits to reflect entire ITS
corridor project modify Cat-2 funding and reflect potential use of federal funds
INSTALL NEW ITS EQUIPMENT AND INFRASTRUCTURE
HOUSTON HARRIS 0050-06-089 US 290 C NONE TXDOT HOUSTON DISTRICT $26932000
MUESCHKE RD TO WASHINGTON CL
AND SH 6 FROM US 290 TO GRIMES CL
LIMITS FROM
TIP
DESCRIPTION
REMARKS
LIMITS TO
REV DATE
Total Project Cost Information
Construction $26932000
Preliminary Engineering $1319668
Construction Engineering $1077280
Contingencies $2693200
Indirects $1368146
Total Project Cost $33390294
Right Of Way ---
Bond Financing ---
2FUNDING CATEGORY
MTP REFERENCE
Cost of
Approved
Phases
$26932000
17099MPO PROJECT ID
Authorized Funding by CategoryShare
Federal State Regional Local
Local
Contribution
Funding
By Category
Project History
US 290STREET
DISTRICT COUNTY CSJ HWY PHASE CITY PROJECT SPONSOR YOE COST
2-METRO-TMA $21545600 $5386400 --- $26932000 --- ---
Funding by Share $21545600 --- $26932000 --- ---$5386400
MPOIDCSJ 170990050-06-089 FY 2023
OLD VERSION
INSTALL NEW ITS EQUIPMENT AND INFRASTRUCTURE
HOUSTON HARRIS 0050-06-089 US 290 C NONE TXDOT HOUSTON DISTRICT $26932000
MUESCHKE RD TO WASHINGTON CL
AND SH 6 FROM US 290 TO GRIMES CL
LIMITS FROM
TIP
DESCRIPTION
REMARKS
LIMITS TO
REV DATE
Total Project Cost Information
Construction $26932000
Preliminary Engineering $1319668
Construction Engineering $1077280
Contingencies $2693200
Indirects $1368146
Total Project Cost $33390294
Right Of Way ---
Bond Financing ---
2FUNDING CATEGORY
MTP REFERENCE
Cost of
Approved
Phases
$26932000
17099MPO PROJECT ID
Authorized Funding by CategoryShare
Federal State Regional Local
Local
Contribution
Funding
By Category
Project History
US 290STREET
DISTRICT COUNTY CSJ HWY PHASE CITY PROJECT SPONSOR YOE COST
2-METRO-TMA $21545600 $5386400 --- $26932000 --- ---
Funding by Share $21545600 --- $26932000 --- ---$5386400
PHASE C=CONSTRUCTION E = ENGINEERING R = ROW T = TRANSFER Sunday January 3 2021
Page 18
2021-2024 TRANSPORTATION IMPROVEMENT PROGRAM
2045 REGIONAL TRANSPORTATION PLAN
HOUSTON-GALVESTON MPO
JANUARY 2021 MODIFICATIONS AND PREVIEWS
PROPOSED VERSION
MPOIDCSJ 171000187-05-061 FY 2023
INSTALL NEW ITS EQUIPMENT AND INFRASTRUCTURE
HOUSTON FORT BEND 0187-05-061 SS 10 C ROSENBERG TXDOT HOUSTON DISTRICT $4451601
SH 36 N
IH 69
LIMITS FROM
TIP
DESCRIPTION
REMARKS
LIMITS TO
REV DATE
Total Project Cost Information
Construction $4451601
Preliminary Engineering $218128
Construction Engineering $267096
Contingencies $445160
Indirects $226141
Total Project Cost $5608127
Right Of Way ---
Bond Financing ---
2FUNDING CATEGORY
MTP REFERENCE
Cost of
Approved
Phases
$4451601
17100MPO PROJECT ID
Authorized Funding by CategoryShare
Federal State Regional Local
Local
Contribution
Funding
By Category
Project History
SS 10STREET
DISTRICT COUNTY CSJ HWY PHASE CITY PROJECT SPONSOR YOE COST
2-METRO-TMA $3561281 $890320 --- $4451601 --- ---
Funding by Share $3561281 --- $4451601 --- ---$890320
MPOIDCSJ 171000187-05-061 FY 2023
OLD VERSION
INSTALL NEW ITS EQUIPMENT AND INFRASTRUCTURE
HOUSTON FORT BEND 0187-05-061 SH 36 C ROSENBERG TXDOT HOUSTON DISTRICT $4451601
AUSTIN CL
IH 69
LIMITS FROM
TIP
DESCRIPTION
REMARKS
LIMITS TO
REV DATE
Total Project Cost Information
Construction $4451601
Preliminary Engineering $218128
Construction Engineering $267096
Contingencies $445160
Indirects $226141
Total Project Cost $5608127
Right Of Way ---
Bond Financing ---
2FUNDING CATEGORY
MTP REFERENCE
Cost of
Approved
Phases
$4451601
17100MPO PROJECT ID
Authorized Funding by CategoryShare
Federal State Regional Local
Local
Contribution
Funding
By Category
Project History
SH 36SS 10STREET
DISTRICT COUNTY CSJ HWY PHASE CITY PROJECT SPONSOR YOE COST
2-METRO-TMA $3561281 $890320 --- $4451601 --- ---
Funding by Share $3561281 --- $4451601 --- ---$890320
PHASE C=CONSTRUCTION E = ENGINEERING R = ROW T = TRANSFER Sunday January 3 2021
Amendment JAN-2021 - 12221 - Removed from 2021 TIP at TxDOTrsquos request to group (5000-00-915 ITS deployment) the project to fiscally constrain 2021 STIP
Page 19
2021-2024 TRANSPORTATION IMPROVEMENT PROGRAM
2045 REGIONAL TRANSPORTATION PLAN
HOUSTON-GALVESTON MPO
JANUARY 2021 MODIFICATIONS AND PREVIEWS
PROPOSED VERSION
MPOIDCSJ 171030912-00-542 FY 2023
CONSTRUCT 10FT MULTI-USE TRAIL WITHIN CENTERPOINT UTILITY CORRIDOR
HOUSTON HARRIS 0912-00-542 VA C HOUSTON CITY OF HOUSTON - PARKS amp RECREATION DEP $11384000
MEMORIAL DR
SAN FELIPE ST
LIMITS FROM
TIP
DESCRIPTION
REMARKS
LIMITS TO
REV DATE
Total Project Cost Information
Construction $11384000
Preliminary Engineering $557816
Construction Engineering $569200
Contingencies $1138400
Indirects $578307
Total Project Cost $14227723
Right Of Way ---
Bond Financing ---
9FUNDING CATEGORY
MTP REFERENCE
Cost of
Approved
Phases
$11384000
17103MPO PROJECT ID
Authorized Funding by CategoryShare
Federal State Regional Local
Local
Contribution
Funding
By Category
Project History
MEMORIAL TO SAN FELIPE HIKE amp BIKE TRAILSTREET
DISTRICT COUNTY CSJ HWY PHASE CITY PROJECT SPONSOR YOE COST
9-TASA $9107200 --- $2276800 $11384000 --- ---
Funding by Share $9107200 $2276800 $11384000 --- --- ---
MPOIDCSJ 171030912-00-542 FY 2021
OLD VERSION
CONSTRUCT 10FT MULTI-USE TRAIL WITHIN CENTERPOINT UTILITY CORRIDOR
HOUSTON HARRIS 0912-00-542 VA C HOUSTON CITY OF HOUSTON - PARKS amp RECREATION $11384000
MEMORIAL DR
SAN FELIPE ST
LIMITS FROM
TIP
DESCRIPTION
REMARKS
LIMITS TO
REV DATE
Total Project Cost Information
Construction $11384000
Preliminary Engineering $557816
Construction Engineering $569200
Contingencies $1138400
Indirects $578307
Total Project Cost $14227723
Right Of Way ---
Bond Financing ---
9FUNDING CATEGORY
MTP REFERENCE
Cost of
Approved
Phases
$11384000
17103MPO PROJECT ID
Authorized Funding by CategoryShare
Federal State Regional Local
Local
Contribution
Funding
By Category
Project History
MEMORIAL TO SAN FELIPE HIKE amp BIKE TRAILSTREET
DISTRICT COUNTY CSJ HWY PHASE CITY PROJECT SPONSOR YOE COST
9-TASA $9107200 --- $2276800 $11384000 --- ---
Funding by Share $9107200 $2276800 $11384000 --- --- ---
PHASE C=CONSTRUCTION E = ENGINEERING R = ROW T = TRANSFER Sunday January 3 2021
Amendment JAN-2021 - 12221 - Removed from 2021 TIP at TxDOTrsquos request to group (5000-00-916 Bicycle and Pedestrian) the project to fiscally constrain 2021 STIP
Page 20
2021-2024 TRANSPORTATION IMPROVEMENT PROGRAM
2045 REGIONAL TRANSPORTATION PLAN
HOUSTON-GALVESTON MPO
JANUARY 2021 MODIFICATIONS AND PREVIEWS
PROPOSED VERSION
MPOIDCSJ 171170912-31-318 FY 2021
Amendment JAN-2021 - 12221 - Removed from 2021 TIP at TxDOTrsquos request to group (5000-00-916 Bicycle and Pedestrian) the project to fiscally constrain 2021 STIP Amendment
JUL-2019A - 72619 - Assign CSJ number 0912-31-318 (Engineering phase authorized for design
review costs only)
CONSTRUCT SIDEWALKS INTERSECTION AND SIGNAGE IMPROVEMENTS IN VICINITY OF
CARLESTON ELEMENTARY COCKRELL ELEMENTARY AND PEARLAND JUNIOR HIGH (SAFE ROUTES
TO SCHOOL)
HOUSTON BRAZORIA 0912-31-318 CS CE
(REVIEW)
PEARLAND CITY OF PEARLAND $3372000
VA
VA
LIMITS FROM
TIP
DESCRIPTION
REMARKS
LIMITS TO
REV DATE
Total Project Cost Information
Construction $3297000
Preliminary Engineering $240228
Construction Engineering $202320
Contingencies $337200
Indirects $171298
Total Project Cost $4248046
Right Of Way ---
Bond Financing ---
9FUNDING CATEGORY
MTP REFERENCE
Cost of
Approved
Phases
$3372000
17117MPO PROJECT ID
Authorized Funding by CategoryShare
Federal State Regional Local
Local
Contribution
Funding
By Category
Project History
CITY OF PEARLANDSTREET
DISTRICT COUNTY CSJ HWY PHASE CITY PROJECT SPONSOR YOE COST
9-TASA $2697600 --- $674400 $3372000 --- ---
Funding by Share $2697600 $674400 $3372000 --- --- ---
MPOIDCSJ 171170912-31-318 FY 2021
OLD VERSION
CONSTRUCT SIDEWALKS INTERSECTION AND SIGNAGE IMPROVEMENTS IN VICINITY OF
CARLESTON ELEMENTARY COCKRELL ELEMENTARY AND PEARLAND JUNIOR HIGH (SAFE ROUTES
TO SCHOOL)
HOUSTON BRAZORIA 0912-31-318 CS CE
(REVIEW)
PEARLAND CITY OF PEARLAND $3372000
VA
VA
LIMITS FROM
TIP
DESCRIPTION
REMARKS
LIMITS TO
REV DATE
Total Project Cost Information
Construction $3297000
Preliminary Engineering $240228
Construction Engineering $202320
Contingencies $337200
Indirects $171298
Total Project Cost $4248046
Right Of Way ---
Bond Financing ---
9FUNDING CATEGORY
MTP REFERENCE
Cost of
Approved
Phases
$3372000
17117MPO PROJECT ID
Authorized Funding by CategoryShare
Federal State Regional Local
Local
Contribution
Funding
By Category
Project History
CITY OF PEARLANDSTREET
DISTRICT COUNTY CSJ HWY PHASE CITY PROJECT SPONSOR YOE COST
9-TASA $2697600 --- $674400 $3372000 --- ---
Funding by Share $2697600 $674400 $3372000 --- --- ---
PHASE C=CONSTRUCTION E = ENGINEERING R = ROW T = TRANSFER Sunday January 3 2021
Page 21
2021-2024 TRANSPORTATION IMPROVEMENT PROGRAM
2045 REGIONAL TRANSPORTATION PLAN
HOUSTON-GALVESTON MPO
JANUARY 2021 MODIFICATIONS AND PREVIEWS
PROPOSED VERSION
MPOIDCSJ 171180912-73-215 FY 2022
Amendment JAN-2021 - 12221 - Removed from 2021 TIP at TxDOTrsquos request to group (5000-00-916 Bicycle and Pedestrian) the project to fiscally constrain 2021 STIP
CONSTRUCT BIKE LANE (MILLING AND ASPHALT OVERLAY OF SHOULDERS SHOULDER
WIDENING PAVEMENT MARKINGS STRIPING) WITH SIGNAGE SIDEWALK AND ASSOCIATED
INTERSECTION IMPROVEMENTS
HOUSTON GALVESTON 0912-73-215 VA C LEAGUE CITY CITY OF LEAGUE CITY $2449000
ON SH 96 FM 270 AND FM 2094
SH 146
LIMITS FROM
TIP
DESCRIPTION
REMARKS
LIMITS TO
REV DATE
Total Project Cost Information
Construction $2449000
Preliminary Engineering $120001
Construction Engineering $146940
Contingencies $244900
Indirects $124409
Total Project Cost $3085250
Right Of Way ---
Bond Financing ---
9FUNDING CATEGORY
MTP REFERENCE
Cost of
Approved
Phases
$2449000
17118MPO PROJECT ID
Authorized Funding by CategoryShare
Federal State Regional Local
Local
Contribution
Funding
By Category
Project History
VASTREET
DISTRICT COUNTY CSJ HWY PHASE CITY PROJECT SPONSOR YOE COST
9-TASA $1959200 $489800 --- $2449000 --- ---
Funding by Share $1959200 --- $2449000 --- ---$489800
MPOIDCSJ 171180912-73-215 FY 2021
OLD VERSION
CONSTRUCT BIKE LANE (MILLING AND ASPHALT OVERLAY OF SHOULDERS SHOULDER
WIDENING PAVEMENT MARKINGS STRIPING) WITH SIGNAGE SIDEWALK AND ASSOCIATED
INTERSECTION IMPROVEMENTS
HOUSTON GALVESTON 0912-73-215 C LEAGUE CITY CITY OF LEAGUE CITY $2449000
ON SH 96 FM 270 AND FM 2094
SH 146
LIMITS FROM
TIP
DESCRIPTION
REMARKS
LIMITS TO
REV DATE
Total Project Cost Information
Construction $2449000
Preliminary Engineering $120001
Construction Engineering $146940
Contingencies $244900
Indirects $124409
Total Project Cost $3085250
Right Of Way ---
Bond Financing ---
9FUNDING CATEGORY
MTP REFERENCE
Cost of
Approved
Phases
$2449000
17118MPO PROJECT ID
Authorized Funding by CategoryShare
Federal State Regional Local
Local
Contribution
Funding
By Category
Project History
VASTREET
DISTRICT COUNTY CSJ HWY PHASE CITY PROJECT SPONSOR YOE COST
9-TASA $1959200 $489800 --- $2449000 --- ---
Funding by Share $1959200 --- $2449000 --- ---$489800
PHASE C=CONSTRUCTION E = ENGINEERING R = ROW T = TRANSFER Sunday January 3 2021
Page 22
2021-2024 TRANSPORTATION IMPROVEMENT PROGRAM
2045 REGIONAL TRANSPORTATION PLAN
HOUSTON-GALVESTON MPO
JANUARY 2021 MODIFICATIONS AND PREVIEWS
PROPOSED VERSION
MPOIDCSJ 171200912-72-398 FY 2023
Amendment JAN-2021 - 12221 - Removed from 2021 TIP at TxDOTrsquos request to group (5000-00-916 Bicycle and Pedestrian) the project to fiscally constrain 2021 STIP Amendment
8 - 102816 - Change Sponsor to the City of Houston
CONSTRUCT 10-FOOT MULTIUSE TRAIL AND ASSOCIATED INTERSECTION SAFETY SIGNAGE
AND AMENITIES (LANDSCAPING BENCHES ETC)
HOUSTON HARRIS 0912-72-398 VA C HOUSTON CITY OF HOUSTON $2564000
DAIRY ASHFORD RD S
SL 8ARTHUR STOREY PARK
LIMITS FROM
TIP
DESCRIPTION
REMARKS
LIMITS TO
REV DATE
Total Project Cost Information
Construction $2564000
Preliminary Engineering $125636
Construction Engineering $153840
Contingencies $256400
Indirects $130251
Total Project Cost $3230127
Right Of Way ---
Bond Financing ---
9FUNDING CATEGORY
MTP REFERENCE
Cost of
Approved
Phases
$2564000
17120MPO PROJECT ID
Authorized Funding by CategoryShare
Federal State Regional Local
Local
Contribution
Funding
By Category
Project History
HCFCD CHANNELSTREET
DISTRICT COUNTY CSJ HWY PHASE CITY PROJECT SPONSOR YOE COST
9-TASA $2051200 --- $512800 $2564000 --- ---
Funding by Share $2051200 $512800 $2564000 --- --- ---
MPOIDCSJ 171200912-72-398 FY 2023
OLD VERSION
CONSTRUCT 10-FOOT MULTIUSE TRAIL AND ASSOCIATED INTERSECTION SAFETY SIGNAGE
AND AMENITIES (LANDSCAPING BENCHES ETC)
HOUSTON HARRIS 0912-72-398 VA C HOUSTON CITY OF HOUSTON $2564000
DAIRY ASHFORD RD S
SL 8ARTHUR STOREY PARK
LIMITS FROM
TIP
DESCRIPTION
REMARKS
LIMITS TO
REV DATE
Total Project Cost Information
Construction $2564000
Preliminary Engineering $125636
Construction Engineering $153840
Contingencies $256400
Indirects $130251
Total Project Cost $3230127
Right Of Way ---
Bond Financing ---
9FUNDING CATEGORY
MTP REFERENCE
Cost of
Approved
Phases
$2564000
17120MPO PROJECT ID
Authorized Funding by CategoryShare
Federal State Regional Local
Local
Contribution
Funding
By Category
Project History
HCFCD CHANNELSTREET
DISTRICT COUNTY CSJ HWY PHASE CITY PROJECT SPONSOR YOE COST
9-TASA $2051200 --- $512800 $2564000 --- ---
Funding by Share $2051200 $512800 $2564000 --- --- ---
PHASE C=CONSTRUCTION E = ENGINEERING R = ROW T = TRANSFER Sunday January 3 2021
Page 23
2021-2024 TRANSPORTATION IMPROVEMENT PROGRAM
2045 REGIONAL TRANSPORTATION PLAN
HOUSTON-GALVESTON MPO
JANUARY 2021 MODIFICATIONS AND PREVIEWS
PROPOSED VERSION
MPOIDCSJ 171210912-37-237 FY 2024
CONSTRUCT BIKE LANE (MILLING AND ASPHALT OVERLAY OF SHOULDERS SHOULDER
WIDENING PAVEMENT MARKINGS STRIPING) WITH SIGNAGE AND ASSOCIATED INTERSECTION
IMPROVEMENTS
HOUSTON MONTGOMERY 0912-37-237 VA C WILLIS CITY OF CONROE $6784000
VA
VA
LIMITS FROM
TIP
DESCRIPTION
REMARKS
LIMITS TO
REV DATE
Total Project Cost Information
Construction $6784000
Preliminary Engineering $332416
Construction Engineering $339200
Contingencies $678400
Indirects $344627
Total Project Cost $8478643
Right Of Way ---
Bond Financing ---
9FUNDING CATEGORY
MTP REFERENCE
Cost of
Approved
Phases
$6784000
17121MPO PROJECT ID
Authorized Funding by CategoryShare
Federal State Regional Local
Local
Contribution
Funding
By Category
Project History
ON SH 75 SH 242 FM 1484 FM 2432 FM 3083 AND FM 830STREET
DISTRICT COUNTY CSJ HWY PHASE CITY PROJECT SPONSOR YOE COST
9-TASA $5427200 $1356800 --- $6784000 --- ---
Funding by Share $5427200 --- $6784000 --- ---$1356800
MPOIDCSJ 171210912-37-237 FY 2024
OLD VERSION
CONSTRUCT BIKE LANE (MILLING AND ASPHALT OVERLAY OF SHOULDERS SHOULDER
WIDENING PAVEMENT MARKINGS STRIPING) WITH SIGNAGE AND ASSOCIATED INTERSECTION
IMPROVEMENTS
HOUSTON MONTGOMERY 0912-37-237 VA C WILLIS CITY OF CONROE $6784000
VA
VA
LIMITS FROM
TIP
DESCRIPTION
REMARKS
LIMITS TO
REV DATE
Total Project Cost Information
Construction $6784000
Preliminary Engineering $332416
Construction Engineering $339200
Contingencies $678400
Indirects $344627
Total Project Cost $8478643
Right Of Way ---
Bond Financing ---
9FUNDING CATEGORY
MTP REFERENCE
Cost of
Approved
Phases
$6784000
17121MPO PROJECT ID
Authorized Funding by CategoryShare
Federal State Regional Local
Local
Contribution
Funding
By Category
Project History
ON SH 75 SH 242 FM 1484 FM 2432 FM 3083 AND FM 830STREET
DISTRICT COUNTY CSJ HWY PHASE CITY PROJECT SPONSOR YOE COST
9-TASA $5427200 $1356800 --- $6784000 --- ---
Funding by Share $5427200 --- $6784000 --- ---$1356800
PHASE C=CONSTRUCTION E = ENGINEERING R = ROW T = TRANSFER Sunday January 3 2021
Amendment JAN-2021 - 12221 - Removed from 2021 TIP at TxDOTrsquos request to group (5000-00-916 Bicycle and Pedestrian) the project to fiscally constrain 2021 STIP
Page 24
2021-2024 TRANSPORTATION IMPROVEMENT PROGRAM
2045 REGIONAL TRANSPORTATION PLAN
HOUSTON-GALVESTON MPO
JANUARY 2021 MODIFICATIONS AND PREVIEWS
PROPOSED VERSION
MPOIDCSJ 171230912-72-398 FY 2021
Amendment JAN-2021 - 12221 - Removed from 2021 TIP at TxDOTrsquos request to group (5000-00-916 Bicycle and Pedestrian) the project to fiscally constrain 2021 STIP Amendment MAR-2018A - 32318 - Delay to FY2020
DESIGN FOR 10-FOOT MULTIUSE TRAIL AND ASSOCIATED INTERSECTION SAFETY SIGNAGE AND
AMENITIES (LANDSCAPING BENCHES ETC)
HOUSTON HARRIS 0912-72-398 VA E HOUSTON CITY OF HOUSTON - PARKS amp RECREATION DEP $439000
DAIRY ASHFORD RD S
SL 8ARTHUR STOREY PARK
LIMITS FROM
TIP
DESCRIPTION
REMARKS
LIMITS TO
REV DATE
Total Project Cost Information
Construction $2564000
Preliminary Engineering $439000
Construction Engineering ---
Contingencies ---
Indirects ---
Total Project Cost $3003000
Right Of Way ---
Bond Financing ---
9FUNDING CATEGORY
17120MTP REFERENCE
Cost of
Approved
Phases
$439000
17123MPO PROJECT ID
Authorized Funding by CategoryShare
Federal State Regional Local
Local
Contribution
Funding
By Category
Project History
HCFCD CHANNELSTREET
DISTRICT COUNTY CSJ HWY PHASE CITY PROJECT SPONSOR YOE COST
9-TASA $351200 --- $87800 $439000 --- ---
Funding by Share $351200 $87800 $439000 --- --- ---
MPOIDCSJ 171230912-72-398 FY 2021
OLD VERSION
DESIGN FOR 10-FOOT MULTIUSE TRAIL AND ASSOCIATED INTERSECTION SAFETY SIGNAGE AND
AMENITIES (LANDSCAPING BENCHES ETC)
HOUSTON HARRIS 0912-72-398 VA E HOUSTON CITY OF HOUSTON - PARKS amp RECREATION $439000
DAIRY ASHFORD RD S
BW 8ARTHUR STOREY PARK
LIMITS FROM
TIP
DESCRIPTION
REMARKS
LIMITS TO
REV DATE
Total Project Cost Information
Construction $2564000
Preliminary Engineering $439000
Construction Engineering ---
Contingencies ---
Indirects ---
Total Project Cost $3003000
Right Of Way ---
Bond Financing ---
9FUNDING CATEGORY
17120MTP REFERENCE
Cost of
Approved
Phases
$439000
17123MPO PROJECT ID
Authorized Funding by CategoryShare
Federal State Regional Local
Local
Contribution
Funding
By Category
Project History
HCFCD CHANNELSTREET
DISTRICT COUNTY CSJ HWY PHASE CITY PROJECT SPONSOR YOE COST
9-TASA $351200 --- $87800 $439000 --- ---
Funding by Share $351200 $87800 $439000 --- --- ---
PHASE C=CONSTRUCTION E = ENGINEERING R = ROW T = TRANSFER Sunday January 3 2021
Page 25
2021-2024 TRANSPORTATION IMPROVEMENT PROGRAM
2045 REGIONAL TRANSPORTATION PLAN
HOUSTON-GALVESTON MPO
JANUARY 2021 MODIFICATIONS AND PREVIEWS
PROPOSED VERSION
MPOIDCSJ 171340912-00-562 FY 2021
Amendment JAN-2021 - 12221 - Removed from 2021 TIP at TxDOTrsquos request to group the project to fiscally constrain 2021 STIP Amendment APR-2019 - 40519 - Change sponsor from
H-GAC to Metro and delay from FY 2019 to FY 2020 at the sponsors request
REGIONAL VANPOOL PROGRAM STBG FY 2019
HOUSTON MULTIPLE 0912-00-562 VA C NONE METRO $3750000
VA
VA
LIMITS FROM
TIP
DESCRIPTION
REMARKS
LIMITS TO
REV DATE
Total Project Cost Information
Construction $3750000
Preliminary Engineering ---
Construction Engineering ---
Contingencies ---
Indirects ---
Total Project Cost $3750000
Right Of Way ---
Bond Financing ---
7FUNDING CATEGORY
MTP REFERENCE
Cost of
Approved
Phases
$3750000
17134MPO PROJECT ID
Authorized Funding by CategoryShare
Federal State Regional Local
Local
Contribution
Funding
By Category
Project History
HOUSTON-GALVESTON TMASTREET
DISTRICT COUNTY CSJ HWY PHASE CITY PROJECT SPONSOR YOE COST
7-STP-MM $3000000 --- $750000 $3750000 --- ---
Funding by Share $3000000 $750000 $3750000 --- --- ---
MPOIDCSJ 171340912-00-562 FY 2021
OLD VERSION
REGIONAL VANPOOL PROGRAM STBG FY 2019
HOUSTON MULTIPLE 0912-00-562 VA C NONE METRO $3750000
VA
VA
LIMITS FROM
TIP
DESCRIPTION
REMARKS
LIMITS TO
REV DATE
Total Project Cost Information
Construction $3750000
Preliminary Engineering ---
Construction Engineering ---
Contingencies ---
Indirects ---
Total Project Cost $3750000
Right Of Way ---
Bond Financing ---
7FUNDING CATEGORY
MTP REFERENCE
Cost of
Approved
Phases
$3750000
17134MPO PROJECT ID
Authorized Funding by CategoryShare
Federal State Regional Local
Local
Contribution
Funding
By Category
Project History
HOUSTON-GALVESTON TMASTREET
DISTRICT COUNTY CSJ HWY PHASE CITY PROJECT SPONSOR YOE COST
7-STP-MM $3000000 --- $750000 $3750000 --- ---
Funding by Share $3000000 $750000 $3750000 --- --- ---
PHASE C=CONSTRUCTION E = ENGINEERING R = ROW T = TRANSFER Sunday January 3 2021
Page 26
2021-2024 TRANSPORTATION IMPROVEMENT PROGRAM
2045 REGIONAL TRANSPORTATION PLAN
HOUSTON-GALVESTON MPO
JANUARY 2021 MODIFICATIONS AND PREVIEWS
PROPOSED VERSION
MPOIDCSJ 171400912-00-569 FY 2021
Amendment JAN-2021 - 12221 - Removed from 2021 TIP at TxDOTrsquos request to group the project to fiscally constrain 2021 STIP Amendment SEP-2019A - 92719 - Change sponsor from H-GAC to Metro Amendment 22 - 121616 - Program FYs
2019 and 2020 Air Quality Program funding
REGIONAL VANPOOL STBG FY 2020
HOUSTON MULTIPLE 0912-00-569 VA C NONE METRO $3750000
VA
VA
LIMITS FROM
TIP
DESCRIPTION
REMARKS
LIMITS TO
REV DATE
Total Project Cost Information
Construction $3750000
Preliminary Engineering ---
Construction Engineering ---
Contingencies ---
Indirects ---
Total Project Cost $3750000
Right Of Way ---
Bond Financing ---
7FUNDING CATEGORY
MTP REFERENCE
Cost of
Approved
Phases
$3750000
17140MPO PROJECT ID
Authorized Funding by CategoryShare
Federal State Regional Local
Local
Contribution
Funding
By Category
Project History
HOUSTON-GALVESTON TMASTREET
DISTRICT COUNTY CSJ HWY PHASE CITY PROJECT SPONSOR YOE COST
7-STBG $3000000 --- $750000 $3750000 --- ---
Funding by Share $3000000 $750000 $3750000 --- --- ---
MPOIDCSJ 171400912-00-569 FY 2021
OLD VERSION
REGIONAL VANPOOL STBG FY 2020
HOUSTON MULTIPLE 0912-00-569 VA C NONE METRO $3750000
VA
VA
LIMITS FROM
TIP
DESCRIPTION
REMARKS
LIMITS TO
REV DATE
Total Project Cost Information
Construction $3750000
Preliminary Engineering ---
Construction Engineering ---
Contingencies ---
Indirects ---
Total Project Cost $3750000
Right Of Way ---
Bond Financing ---
7FUNDING CATEGORY
MTP REFERENCE
Cost of
Approved
Phases
$3750000
17140MPO PROJECT ID
Authorized Funding by CategoryShare
Federal State Regional Local
Local
Contribution
Funding
By Category
Project History
HOUSTON-GALVESTON TMASTREET
DISTRICT COUNTY CSJ HWY PHASE CITY PROJECT SPONSOR YOE COST
7-STBG $3000000 --- $750000 $3750000 --- ---
Funding by Share $3000000 $750000 $3750000 --- --- ---
PHASE C=CONSTRUCTION E = ENGINEERING R = ROW T = TRANSFER Sunday January 3 2021
Page 27
2021-2024 TRANSPORTATION IMPROVEMENT PROGRAM
2045 REGIONAL TRANSPORTATION PLAN
HOUSTON-GALVESTON MPO
JANUARY 2021 MODIFICATIONS AND PREVIEWS
PROPOSED VERSION
MPOIDCSJ 172210110-04-202 FY 2023
RAISE NORTHBOUND AND SOUTHBOUND FRONTAGE ROADS OPERATIONAL IMPROVEMENTS
AND DRAINAGE IMPROVEMENTS
HOUSTON HARRIS 0110-04-202 C TXDOT HOUSTON DISTRICT $13598102
S OF SHENANDOAH PARK DR
SH 242
LIMITS FROM
TIP
DESCRIPTION
REMARKS
LIMITS TO
REV DATE
Total Project Cost Information
Construction $13598102
Preliminary Engineering $666307
Construction Engineering $679905
Contingencies $1359810
Indirects $690784
Total Project Cost $16994908
Right Of Way ---
Bond Financing ---
7FUNDING CATEGORY
MTP REFERENCE
Cost of
Approved
Phases
$13598102
17221MPO PROJECT ID
Authorized Funding by CategoryShare
Federal State Regional Local
Local
Contribution
Funding
By Category
Project History
IH 45STREET
DISTRICT COUNTY CSJ HWY PHASE CITY PROJECT SPONSOR YOE COST
7-STBG $10878482 $2719620 --- $13598102 --- ---
Funding by Share $10878482 --- $13598102 --- ---$2719620
MPOIDCSJ 172210110-04-202 FY 2035
OLD VERSION
RAISE NORTHBOUND AND SOUTHBOUND FRONTAGE ROADS OPERATIONAL IMPROVEMENTS
AND DRAINAGE IMPROVEMENTS
HOUSTON HARRIS 0110-04-202 C TXDOT HOUSTON DISTRICT $13598102
S OF SHENANDOAH PARK DR
SH 242
LIMITS FROM
TIP
DESCRIPTION
REMARKS
LIMITS TO
REV DATE
Total Project Cost Information
Construction $13598102
Preliminary Engineering $666307
Construction Engineering $679905
Contingencies $1359810
Indirects $690784
Total Project Cost $16994908
Right Of Way ---
Bond Financing ---
FUNDING CATEGORY
MTP REFERENCE
Cost of
Approved
Phases
$13598102
17221MPO PROJECT ID
Authorized Funding by CategoryShare
Federal State Regional Local
Local
Contribution
Funding
By Category
Project History
IH 45STREET
DISTRICT COUNTY CSJ HWY PHASE CITY PROJECT SPONSOR YOE COST
7-STBG $10878482 $2719620 --- $13598102 --- ---
Funding by Share $10878482 --- $13598102 --- ---$2719620
PHASE C=CONSTRUCTION E = ENGINEERING R = ROW T = TRANSFER Sunday January 3 2021
Amendment JAN-2021 - 12221 - Removed from 2021 TIP at TxDOTrsquos request to group the project to fiscally constrain 2021 STIP
Page 28
2021-2024 TRANSPORTATION IMPROVEMENT PROGRAM
2045 REGIONAL TRANSPORTATION PLAN
HOUSTON-GALVESTON MPO
JANUARY 2021 MODIFICATIONS AND PREVIEWS
PROPOSED VERSION
MPOIDCSJ 180180912-72-581 FY 2022
Amendment JAN-2021 - 12221 - Removed from 2021 TIP at TxDOTrsquos request to group (5000-00-916 Bicycle and Pedestrian) the project to fiscally constrain 2021 STIP Amendment
JAN-2020 - 12420 - Program 2018 CFP TASA funded project in the TIP with the City of Houston as
the sponsor
CONSTRUCT 10 SHARED USE PATH STRIPING BRIDGE RAILING PAVEMENT MARKINGS SIGNAGE
LANDSCAPEHARDSCAPE AND ASSOCIATED INTERSECTION IMPROVEMENTS
HOUSTON HARRIS 0912-72-581 TRAIL CER HOUSTON CITY OF HOUSTON - HOUSTON PUBLIC WORKS $2987240
MKT TRAIL
WHITE OAK BAYOU TRAIL
LIMITS FROM
TIP
DESCRIPTION
REMARKS
LIMITS TO
REV DATE
Total Project Cost Information
Construction $2280684
Preliminary Engineering $111754
Construction Engineering $136841
Contingencies $228068
Indirects $115859
Total Project Cost $2987240
Right Of Way $114034
Bond Financing ---
9FUNDING CATEGORY
MTP REFERENCE
Cost of
Approved
Phases
$2987240
18018MPO PROJECT ID
Authorized Funding by CategoryShare
Federal State Regional Local
Local
Contribution
Funding
By Category
Project History
MKT-WHITE OAK BAYOU BICYCLE PEDESTRIAN CONNECTIONSTREET
DISTRICT COUNTY CSJ HWY PHASE CITY PROJECT SPONSOR YOE COST
9-TASA $2389791 $597449 --- $2987240 --- ---
Funding by Share $2389791 --- $2987240 --- ---$597449
MPOIDCSJ 180180912-72-581 FY 2022
OLD VERSION
CONSTRUCT 10 SHARED USE PATH STRIPING BRIDGE RAILING PAVEMENT MARKINGS SIGNAGE
LANDSCAPEHARDSCAPE AND ASSOCIATED INTERSECTION IMPROVEMENTS
HOUSTON HARRIS 0912-72-581 TRAIL CER HOUSTON CITY OF HOUSTON - HOUSTON PUBLIC WO $2987240
MKT TRAIL
WHITE OAK BAYOU TRAIL
LIMITS FROM
TIP
DESCRIPTION
REMARKS
LIMITS TO
REV DATE
Total Project Cost Information
Construction $2280684
Preliminary Engineering $111754
Construction Engineering $136841
Contingencies $228068
Indirects $115859
Total Project Cost $2987240
Right Of Way $114034
Bond Financing ---
9FUNDING CATEGORY
MTP REFERENCE
Cost of
Approved
Phases
$2987240
18018MPO PROJECT ID
Authorized Funding by CategoryShare
Federal State Regional Local
Local
Contribution
Funding
By Category
Project History
MKT-WHITE OAK BAYOU BICYCLE PEDESTRIAN CONNECTIONSTREET
DISTRICT COUNTY CSJ HWY PHASE CITY PROJECT SPONSOR YOE COST
022020
9-TASA $2389791 $597449 --- $2987240 --- ---
Funding by Share $2389791 --- $2987240 --- ---$597449
PHASE C=CONSTRUCTION E = ENGINEERING R = ROW T = TRANSFER Sunday January 3 2021
Page 29
2021-2024 TRANSPORTATION IMPROVEMENT PROGRAM
2045 REGIONAL TRANSPORTATION PLAN
HOUSTON-GALVESTON MPO
JANUARY 2021 MODIFICATIONS AND PREVIEWS
PROPOSED VERSION
MPOIDCSJ 180240271-14-240 FY 2022
WIDEN EXISTING SIDEWALK TO 10 INCLUDE 10 WIDE CONCRETE PATH ALONG THE IH 610
FRONTAGE ROAD STRIPING PAVEMENT MARKINGS SIGNAGE LANDSCAPEHARDSCAPE AND
ASSOCIATED INTERSECTION IMPROVEMENTS
HOUSTON HARRIS 0271-14-240 TRAIL CER HOUSTON TXDOT HOUSTON DISTRICT $1100000
W 12TH ST
OLD KATY RD
LIMITS FROM
TIP
DESCRIPTION
REMARKS
LIMITS TO
REV DATE
Total Project Cost Information
Construction $839823
Preliminary Engineering $41151
Construction Engineering $50389
Contingencies $83982
Indirects $42663
Total Project Cost $1100000
Right Of Way $41991
Bond Financing ---
9FUNDING CATEGORY
MTP REFERENCE
Cost of
Approved
Phases
$1100000
18024MPO PROJECT ID
Authorized Funding by CategoryShare
Federal State Regional Local
Local
Contribution
Funding
By Category
Project History
NORTHWEST TRANSIT CONNNECTIONSTREET
DISTRICT COUNTY CSJ HWY PHASE CITY PROJECT SPONSOR YOE COST
9-TASA $880000 $220000 --- $1100000 --- ---
Funding by Share $880000 --- $1100000 --- ---$220000
MPOIDCSJ 180240271-14-240 FY 2022
OLD VERSION
WIDEN EXISTING SIDEWALK TO 10 INCLUDE 10 WIDE CONCRETE PATH ALONG THE IH 610
FRONTAGE ROAD STRIPING PAVEMENT MARKINGS SIGNAGE LANDSCAPEHARDSCAPE AND
ASSOCIATED INTERSECTION IMPROVEMENTS
HOUSTON HARRIS 0271-14-240 TRAIL CER HOUSTON TXDOT HOUSTON DISTRICT $1100000
W 12TH ST
OLD KATY RD
LIMITS FROM
TIP
DESCRIPTION
REMARKS
LIMITS TO
REV DATE
Total Project Cost Information
Construction $839823
Preliminary Engineering $41151
Construction Engineering $50389
Contingencies $83982
Indirects $42663
Total Project Cost $1100000
Right Of Way $41991
Bond Financing ---
9FUNDING CATEGORY
MTP REFERENCE
Cost of
Approved
Phases
$1100000
18024MPO PROJECT ID
Authorized Funding by CategoryShare
Federal State Regional Local
Local
Contribution
Funding
By Category
Project History
NORTHWEST TRANSIT CONNNECTIONSTREET
DISTRICT COUNTY CSJ HWY PHASE CITY PROJECT SPONSOR YOE COST
022020
9-TASA $880000 $220000 --- $1100000 --- ---
Funding by Share $880000 --- $1100000 --- ---$220000
PHASE C=CONSTRUCTION E = ENGINEERING R = ROW T = TRANSFER Sunday January 3 2021
Amendment JAN-2021 - 12221 - Removed from 2021 TIP at TxDOTrsquos request to group (5000-00-916 Bicycle and Pedestrian) the project to fiscally constrain 2021 STIP
Page 30
2021-2024 TRANSPORTATION IMPROVEMENT PROGRAM
2045 REGIONAL TRANSPORTATION PLAN
HOUSTON-GALVESTON MPO
JANUARY 2021 MODIFICATIONS AND PREVIEWS
PROPOSED VERSION
MPOIDCSJ 180300912-72-583 FY 2022
Amendment JAN-2021 - 12221 - Removed from 2021 TIP at TxDOTrsquos request to group (5000-00-916 Bicycle and Pedestrian) the project to fiscally constrain 2021 STIP Amendment JAN-2020 - 12420 - Program 2018 CFP selection in the TIP
CONSTRUCT PEDBIKE BRIDGE WITH RAILINGS AND SIGNAGE
HOUSTON HARRIS 0912-72-583 CS CER HOUSTON CITY OF HOUSTON - HOUSTON PUBLIC WORKS $736806
SIMS BAYOU NORTH BANK
SIMS BAYOU SOUTH BANK
LIMITS FROM
TIP
DESCRIPTION
REMARKS
LIMITS TO
REV DATE
Total Project Cost Information
Construction $549937
Preliminary Engineering $26947
Construction Engineering $49494
Contingencies $54994
Indirects $27937
Total Project Cost $736806
Right Of Way $27497
Bond Financing ---
9FUNDING CATEGORY
MTP REFERENCE
Cost of
Approved
Phases
$736806
18030MPO PROJECT ID
Authorized Funding by CategoryShare
Federal State Regional Local
Local
Contribution
Funding
By Category
Project History
GALVESTON RDSTREET
DISTRICT COUNTY CSJ HWY PHASE CITY PROJECT SPONSOR YOE COST
9-TASA $589441 $147365 --- $736806 --- ---
Funding by Share $589441 --- $736806 --- ---$147365
MPOIDCSJ 180300912-72-583 FY 2022
OLD VERSION
CONSTRUCT BIKE LANE BY WIDENING BRIDGE INSTALLING PHYSICAL BARRIER AND 48 BRIDGE
RAILING WITH SIGNAGE
HOUSTON HARRIS 0912-72-583 CS CER HOUSTON CITY OF HOUSTON - HOUSTON PUBLIC WO $736806
SIMS BAYOU NORTH BANK
SIMS BAYOU SOUTH BANK
LIMITS FROM
TIP
DESCRIPTION
REMARKS
LIMITS TO
REV DATE
Total Project Cost Information
Construction $549937
Preliminary Engineering $26947
Construction Engineering $49494
Contingencies $54994
Indirects $27937
Total Project Cost $736806
Right Of Way $27497
Bond Financing ---
9FUNDING CATEGORY
MTP REFERENCE
Cost of
Approved
Phases
$736806
18030MPO PROJECT ID
Authorized Funding by CategoryShare
Federal State Regional Local
Local
Contribution
Funding
By Category
Project History
GALVESTON RDSTREET
DISTRICT COUNTY CSJ HWY PHASE CITY PROJECT SPONSOR YOE COST
022020
9-TASA $589441 $147365 --- $736806 --- ---
Funding by Share $589441 --- $736806 --- ---$147365
PHASE C=CONSTRUCTION E = ENGINEERING R = ROW T = TRANSFER Sunday January 3 2021
Page 31
2021-2024 TRANSPORTATION IMPROVEMENT PROGRAM
2045 REGIONAL TRANSPORTATION PLAN
HOUSTON-GALVESTON MPO
JANUARY 2021 MODIFICATIONS AND PREVIEWS
PROPOSED VERSION
MPOIDCSJ 180370598-02-114 FY 2023
CONSTRUCT GRADE SEPARATION
HOUSTON BRAZORIA 0598-02-114 SH 288 C IOWA COLONY TXDOT HOUSTON DISTRICT $16000000
AT CR 64LIMITS FROM
TIP
DESCRIPTION
REMARKS
LIMITS TO
REV DATE
Total Project Cost Information
Construction $16000000
Preliminary Engineering $784000
Construction Engineering $800000
Contingencies $1600000
Indirects $812800
Total Project Cost $19996800
Right Of Way ---
Bond Financing ---
2FUNDING CATEGORY
MTP REFERENCE
Cost of
Approved
Phases
$16000000
18037MPO PROJECT ID
Authorized Funding by CategoryShare
Federal State Regional Local
Local
Contribution
Funding
By Category
Project History
SH 288STREET
DISTRICT COUNTY CSJ HWY PHASE CITY PROJECT SPONSOR YOE COST
2-METRO-TMA $12800000 $3200000 --- $16000000 --- ---
Funding by Share $12800000 --- $16000000 --- ---$3200000
MPOIDCSJ 180370598-02-114 FY 2023
OLD VERSION
CONSTRUCT GRADE SEPARATION
HOUSTON BRAZORIA 0598-02-114 SH 288 C NONE TXDOT HOUSTON DISTRICT $16000000
CR 64LIMITS FROM
TIP
DESCRIPTION
REMARKS
LIMITS TO
REV DATE
Total Project Cost Information
Construction $16000000
Preliminary Engineering $784000
Construction Engineering $800000
Contingencies $1600000
Indirects $812800
Total Project Cost $19996800
Right Of Way ---
Bond Financing ---
4FUNDING CATEGORY
MTP REFERENCE
Cost of
Approved
Phases
$16000000
18037MPO PROJECT ID
Authorized Funding by CategoryShare
Federal State Regional Local
Local
Contribution
Funding
By Category
Project History
SH 288STREET
DISTRICT COUNTY CSJ HWY PHASE CITY PROJECT SPONSOR YOE COST
2-METRO-TMA $12800000 $3200000 --- $16000000 --- ---
Funding by Share $12800000 --- $16000000 --- ---$3200000
PHASE C=CONSTRUCTION E = ENGINEERING R = ROW T = TRANSFER Sunday January 3 2021
Amendment JAN-2021 - 12221 - Removed from 2021 TIP at TxDOTrsquos request to group the project to fiscally constrain 2021 STIP
Page 32
2021-2024 TRANSPORTATION IMPROVEMENT PROGRAM
2045 REGIONAL TRANSPORTATION PLAN
HOUSTON-GALVESTON MPO
JANUARY 2021 MODIFICATIONS AND PREVIEWS
PROPOSED VERSION
MPOIDCSJ 180491685-01-120 FY 2022
Amendment JAN-2021 - 12221 - Removed from 2021 TIP at TxDOTrsquos request to group (5000-00-916 Bicycle and Pedestrian) the project to fiscally constrain 2021 STIP Amendment
JAN-2020 - 12420 - Program 2018 CFP award in FY 2021 of the TIP with Cat-9 TASA funding
CONSTRUCTION OF ADA ACCESSIBLE SIDEWALKS
HOUSTON HARRIS 1685-01-120 TRAIL CER HOUSTON HARRIS COUNTY $8307347
SH 249
IH 45
LIMITS FROM
TIP
DESCRIPTION
REMARKS
LIMITS TO
REV DATE
Total Project Cost Information
Construction $6391250
Preliminary Engineering $313171
Construction Engineering $319563
Contingencies $639125
Indirects $324676
Total Project Cost $8307347
Right Of Way $319563
Bond Financing ---
9FUNDING CATEGORY
MTP REFERENCE
Cost of
Approved
Phases
$8307347
18049MPO PROJECT ID
Authorized Funding by CategoryShare
Federal State Regional Local
Local
Contribution
Funding
By Category
Project History
FM 1960 CYPRESS CREEK PKWY SIDEWALKSSTREET
DISTRICT COUNTY CSJ HWY PHASE CITY PROJECT SPONSOR YOE COST
9-TASA $6645878 $1661469 --- $8307347 --- ---
Funding by Share $6645878 --- $8307347 --- ---$1661469
MPOIDCSJ 180491685-01-111 FY 2022
OLD VERSION
CONSTRUCTION OF ADA ACCESSIBLE SIDEWALKS
HOUSTON HARRIS 1685-01-111 TRAIL CER HOUSTON HARRIS COUNTY $8307347
SH 249
IH 45
LIMITS FROM
TIP
DESCRIPTION
REMARKS
LIMITS TO
REV DATE
Total Project Cost Information
Construction $6391250
Preliminary Engineering $313171
Construction Engineering $319563
Contingencies $639125
Indirects $324676
Total Project Cost $8307347
Right Of Way $319563
Bond Financing ---
9FUNDING CATEGORY
MTP REFERENCE
Cost of
Approved
Phases
$8307347
18049MPO PROJECT ID
Authorized Funding by CategoryShare
Federal State Regional Local
Local
Contribution
Funding
By Category
Project History
FM 1960 CYPRESS CREEK PKWY SIDEWALKSSTREET
DISTRICT COUNTY CSJ HWY PHASE CITY PROJECT SPONSOR YOE COST
022020
9-TASA $6645878 $1661469 --- $8307347 --- ---
Funding by Share $6645878 --- $8307347 --- ---$1661469
PHASE C=CONSTRUCTION E = ENGINEERING R = ROW T = TRANSFER Sunday January 3 2021
Page 33
2021-2024 TRANSPORTATION IMPROVEMENT PROGRAM
2045 REGIONAL TRANSPORTATION PLAN
HOUSTON-GALVESTON MPO
JANUARY 2021 MODIFICATIONS AND PREVIEWS
PROPOSED VERSION
MPOIDCSJ 181460271-07-323 FY 2022
Amendment JAN-2021 - 12221 - Removed from 2021 TIP at TxDOTrsquos request to group (5000-00-916 Bicycle and Pedestrian) the project to fiscally constrain 2021 STIP
sponsor
CONSTRUCT 10rsquo CONCRETE SHARED USE PATH INCLUDES STRIPING BRIDGE RAILING PAVEMENT
MARKINGS SIGNAGE LANDSCAPEHARDSCAPE AS WELL AS ASSOCIATED INTERSECTION
IMPROVEMENTS
HOUSTON HARRIS 0271-07-323 CER HOUSTON CITY OF HOUSTON - HOUSTON PUBLIC WORKS $3224995
WESTCOTT ST
COHN ST
LIMITS FROM
TIP
DESCRIPTION
REMARKS
LIMITS TO
REV DATE
Total Project Cost Information
Construction $2462204
Preliminary Engineering $120648
Construction Engineering $147732
Contingencies $246220
Indirects $125080
Total Project Cost $3224995
Right Of Way $123110
Bond Financing ---
9FUNDING CATEGORY
MTP REFERENCE
Cost of
Approved
Phases
$3224995
18146MPO PROJECT ID
Authorized Funding by CategoryShare
Federal State Regional Local
Local
Contribution
Funding
By Category
Project History
MEMORIAL PARK BICYCLE PEDESTRIAN CONNNECTIONSTREET
DISTRICT COUNTY CSJ HWY PHASE CITY PROJECT SPONSOR YOE COST
9-TASA $2579996 $644999 --- $3224995 --- ---
Funding by Share $2579996 --- $3224995 --- ---$644999
MPOIDCSJ 181460271-07-323 FY 2022
OLD VERSION
CONSTRUCT 10rsquo CONCRETE SHARED USE PATH INCLUDES STRIPING BRIDGE RAILING PAVEMENT
MARKINGS SIGNAGE LANDSCAPEHARDSCAPE AS WELL AS ASSOCIATED INTERSECTION
IMPROVEMENTS
HOUSTON HARRIS 0271-07-323 CER HOUSTON CITY OF HOUSTON - HOUSTON PUBLIC WO $3224995
WESTCOTT ST
COHN ST
LIMITS FROM
TIP
DESCRIPTION
REMARKS
LIMITS TO
REV DATE
Total Project Cost Information
Construction $2462204
Preliminary Engineering $120648
Construction Engineering $147732
Contingencies $246220
Indirects $125080
Total Project Cost $3224995
Right Of Way $123110
Bond Financing ---
9FUNDING CATEGORY
MTP REFERENCE
Cost of
Approved
Phases
$3224995
18146MPO PROJECT ID
Authorized Funding by CategoryShare
Federal State Regional Local
Local
Contribution
Funding
By Category
Project History
MEMORIAL PARK BICYCLE PEDESTRIAN CONNNECTIONSTREET
DISTRICT COUNTY CSJ HWY PHASE CITY PROJECT SPONSOR YOE COST
022020
9-TASA $2579996 $644999 --- $3224995 --- ---
Funding by Share $2579996 --- $3224995 --- ---$644999
PHASE C=CONSTRUCTION E = ENGINEERING R = ROW T = TRANSFER Sunday January 3 2021
Page 34
2021-2024 TRANSPORTATION IMPROVEMENT PROGRAM
2045 REGIONAL TRANSPORTATION PLAN
HOUSTON-GALVESTON MPO
JANUARY 2021 MODIFICATIONS AND PREVIEWS
PROPOSED VERSION
MPOIDCSJ 18357NA FY 2023
METRO STAR VANPOOL PROGRAM STBG FY 2023
HOUSTON HARRIS VA T HOUSTON METRO $3750000
VA
VA
LIMITS FROM
TIP
DESCRIPTION
REMARKS
LIMITS TO
REV DATE
Total Project Cost Information
Construction $3750000
Preliminary Engineering ---
Construction Engineering ---
Contingencies ---
Indirects ---
Total Project Cost $3750000
Right Of Way ---
Bond Financing ---
7FUNDING CATEGORY
MTP REFERENCE
Cost of
Approved
Phases
$3750000
18357MPO PROJECT ID
Authorized Funding by CategoryShare
Federal State Regional Local
Local
Contribution
Funding
By Category
Project History
METRO SERVICE AREASTREET
DISTRICT COUNTY CSJ HWY PHASE CITY PROJECT SPONSOR YOE COST
7-STBG $3000000 --- $750000 $3750000 --- ---
Funding by Share $3000000 $750000 $3750000 --- --- ---
MPOIDCSJ 18357NA FY 2023
OLD VERSION
METRO STAR VANPOOL (STBG) FY 2023
HOUSTON HARRIS VA T HOUSTON METRO $3750000
VA
VA
LIMITS FROM
TIP
DESCRIPTION
REMARKS
LIMITS TO
REV DATE
Total Project Cost Information
Construction $3750000
Preliminary Engineering ---
Construction Engineering ---
Contingencies ---
Indirects ---
Total Project Cost $3750000
Right Of Way ---
Bond Financing ---
7FUNDING CATEGORY
MTP REFERENCE
Cost of
Approved
Phases
$3750000
18357MPO PROJECT ID
Authorized Funding by CategoryShare
Federal State Regional Local
Local
Contribution
Funding
By Category
Project History
METRO SERVICE AREASTREET
DISTRICT COUNTY CSJ HWY PHASE CITY PROJECT SPONSOR YOE COST
7-STBG $3000000 --- $750000 $3750000 --- ---
Funding by Share $3000000 $750000 $3750000 --- --- ---
PHASE C=CONSTRUCTION E = ENGINEERING R = ROW T = TRANSFER Sunday January 3 2021
Amendment JAN-2021 - 12221 - Removed from 2021 TIP at TxDOTrsquos request to group the project to fiscally constrain 2021 STIP
Page 35
2021-2024 TRANSPORTATION IMPROVEMENT PROGRAM
2045 REGIONAL TRANSPORTATION PLAN
HOUSTON-GALVESTON MPO
JANUARY 2021 MODIFICATIONS AND PREVIEWS
PROPOSED VERSION
MPOIDCSJ 18358NA FY 2024
METRO STAR VANPOOL PROGRAM STBG FY 2024
HOUSTON HARRIS VA T HOUSTON METRO $3750000
VA
VA
LIMITS FROM
TIP
DESCRIPTION
REMARKS
LIMITS TO
REV DATE
Total Project Cost Information
Construction $3750000
Preliminary Engineering ---
Construction Engineering ---
Contingencies ---
Indirects ---
Total Project Cost $3750000
Right Of Way ---
Bond Financing ---
7FUNDING CATEGORY
MTP REFERENCE
Cost of
Approved
Phases
$3750000
18358MPO PROJECT ID
Authorized Funding by CategoryShare
Federal State Regional Local
Local
Contribution
Funding
By Category
Project History
METRO SERVICE AREASTREET
DISTRICT COUNTY CSJ HWY PHASE CITY PROJECT SPONSOR YOE COST
7-STBG $3000000 --- $750000 $3750000 --- ---
Funding by Share $3000000 $750000 $3750000 --- --- ---
MPOIDCSJ 18358NA FY 2024
OLD VERSION
METRO STAR VANPOOL (STBG) FY 2024
HOUSTON HARRIS VA T HOUSTON METRO $3750000
VA
VA
LIMITS FROM
TIP
DESCRIPTION
REMARKS
LIMITS TO
REV DATE
Total Project Cost Information
Construction $3750000
Preliminary Engineering ---
Construction Engineering ---
Contingencies ---
Indirects ---
Total Project Cost $3750000
Right Of Way ---
Bond Financing ---
7FUNDING CATEGORY
MTP REFERENCE
Cost of
Approved
Phases
$3750000
18358MPO PROJECT ID
Authorized Funding by CategoryShare
Federal State Regional Local
Local
Contribution
Funding
By Category
Project History
METRO SERVICE AREASTREET
DISTRICT COUNTY CSJ HWY PHASE CITY PROJECT SPONSOR YOE COST
7-STBG $3000000 --- $750000 $3750000 --- ---
Funding by Share $3000000 $750000 $3750000 --- --- ---
PHASE C=CONSTRUCTION E = ENGINEERING R = ROW T = TRANSFER Sunday January 3 2021
Amendment JAN-2021 - 12221 - Removed from 2021 TIP at TxDOTrsquos request to group the project to fiscally constrain 2021 STIP
Page 36
2021-2024 TRANSPORTATION IMPROVEMENT PROGRAM
2045 REGIONAL TRANSPORTATION PLAN
HOUSTON-GALVESTON MPO
JANUARY 2021 MODIFICATIONS AND PREVIEWS
PROPOSED VERSION
MPOIDCSJ 18366NA FY 2022
REGIONAL VANPOOL STBG FY 2022
HOUSTON MULTIPLE VA T NONE METRO $3750000
VA
VA
LIMITS FROM
TIP
DESCRIPTION
REMARKS
LIMITS TO
REV DATE
Total Project Cost Information
Construction $3750000
Preliminary Engineering ---
Construction Engineering ---
Contingencies ---
Indirects ---
Total Project Cost $3750000
Right Of Way ---
Bond Financing ---
7FUNDING CATEGORY
MTP REFERENCE
Cost of
Approved
Phases
$3750000
18366MPO PROJECT ID
Authorized Funding by CategoryShare
Federal State Regional Local
Local
Contribution
Funding
By Category
Project History
HOUSTON-GALVESTON TMASTREET
DISTRICT COUNTY CSJ HWY PHASE CITY PROJECT SPONSOR YOE COST
7-STBG $3750000 --- --- $3750000 --- ---
Funding by Share $3750000 --- $3750000 --- --- ---
MPOIDCSJ 18366NA FY 2022
OLD VERSION
REGIONAL VANPOOL STBG FY 2022
HOUSTON MULTIPLE VA T NONE METRO $3750000
VA
VA
LIMITS FROM
TIP
DESCRIPTION
REMARKS
LIMITS TO
REV DATE
Total Project Cost Information
Construction $3750000
Preliminary Engineering ---
Construction Engineering ---
Contingencies ---
Indirects ---
Total Project Cost $3750000
Right Of Way ---
Bond Financing ---
7FUNDING CATEGORY
MTP REFERENCE
Cost of
Approved
Phases
$3750000
18366MPO PROJECT ID
Authorized Funding by CategoryShare
Federal State Regional Local
Local
Contribution
Funding
By Category
Project History
HOUSTON-GALVESTON TMASTREET
DISTRICT COUNTY CSJ HWY PHASE CITY PROJECT SPONSOR YOE COST
7-STBG $3750000 --- --- $3750000 --- ---
Funding by Share $3750000 --- $3750000 --- --- ---
PHASE C=CONSTRUCTION E = ENGINEERING R = ROW T = TRANSFER Sunday January 3 2021
Amendment JAN-2021 - 12221 - Removed from 2021 TIP at TxDOTrsquos request to group the project to fiscally constrain 2021 STIP
Page 37
2021-2024 TRANSPORTATION IMPROVEMENT PROGRAM
2045 REGIONAL TRANSPORTATION PLAN
HOUSTON-GALVESTON MPO
JANUARY 2021 MODIFICATIONS AND PREVIEWS
PROPOSED VERSION
MPOIDCSJ 18367NA FY 2023
REGIONAL VANPOOL PROGRAM STBGP FY 2023
HOUSTON MULTIPLE VA T NONE METRO $3750000
VA
VA
LIMITS FROM
TIP
DESCRIPTION
REMARKS
LIMITS TO
REV DATE
Total Project Cost Information
Construction $3750000
Preliminary Engineering ---
Construction Engineering ---
Contingencies ---
Indirects ---
Total Project Cost $3750000
Right Of Way ---
Bond Financing ---
7FUNDING CATEGORY
MTP REFERENCE
Cost of
Approved
Phases
$3750000
18367MPO PROJECT ID
Authorized Funding by CategoryShare
Federal State Regional Local
Local
Contribution
Funding
By Category
Project History
HOUSTON-GALVESTON TMASTREET
DISTRICT COUNTY CSJ HWY PHASE CITY PROJECT SPONSOR YOE COST
7-STBG $3000000 --- $750000 $3750000 --- ---
Funding by Share $3000000 $750000 $3750000 --- --- ---
MPOIDCSJ 18367NA FY 2023
OLD VERSION
REGIONAL VANPOOL STBGP FY 2023
HOUSTON MULTIPLE VA T NONE METRO $3750000
VA
VA
LIMITS FROM
TIP
DESCRIPTION
REMARKS
LIMITS TO
REV DATE
Total Project Cost Information
Construction $3750000
Preliminary Engineering ---
Construction Engineering ---
Contingencies ---
Indirects ---
Total Project Cost $3750000
Right Of Way ---
Bond Financing ---
7FUNDING CATEGORY
MTP REFERENCE
Cost of
Approved
Phases
$3750000
18367MPO PROJECT ID
Authorized Funding by CategoryShare
Federal State Regional Local
Local
Contribution
Funding
By Category
Project History
HOUSTON-GALVESTON TMASTREET
DISTRICT COUNTY CSJ HWY PHASE CITY PROJECT SPONSOR YOE COST
7-STBG $3000000 --- $750000 $3750000 --- ---
Funding by Share $3000000 $750000 $3750000 --- --- ---
PHASE C=CONSTRUCTION E = ENGINEERING R = ROW T = TRANSFER Sunday January 3 2021
Amendment JAN-2021 - 12221 - Removed from 2021 TIP at TxDOTrsquos request to group the project to fiscally constrain 2021 STIP
Page 38
2021-2024 TRANSPORTATION IMPROVEMENT PROGRAM
2045 REGIONAL TRANSPORTATION PLAN
HOUSTON-GALVESTON MPO
JANUARY 2021 MODIFICATIONS AND PREVIEWS
PROPOSED VERSION
MPOIDCSJ 18368NA FY 2024
REGIONAL VANPOOL PROGRAM STBG FY 2024
HOUSTON MULTIPLE VA T NONE METRO $3750000
VA
VA
LIMITS FROM
TIP
DESCRIPTION
REMARKS
LIMITS TO
REV DATE
Total Project Cost Information
Construction $3750000
Preliminary Engineering ---
Construction Engineering ---
Contingencies ---
Indirects ---
Total Project Cost $3750000
Right Of Way ---
Bond Financing ---
7FUNDING CATEGORY
MTP REFERENCE
Cost of
Approved
Phases
$3750000
18368MPO PROJECT ID
Authorized Funding by CategoryShare
Federal State Regional Local
Local
Contribution
Funding
By Category
Project History
HOUSTON-GALVESTON TMASTREET
DISTRICT COUNTY CSJ HWY PHASE CITY PROJECT SPONSOR YOE COST
7-STBG $3000000 --- $750000 $3750000 --- ---
Funding by Share $3000000 $750000 $3750000 --- --- ---
MPOIDCSJ 18368NA FY 2024
OLD VERSION
REGIONAL VANPOOL STBG FY 2024
HOUSTON MULTIPLE VA T NONE METRO $3750000
VA
VA
LIMITS FROM
TIP
DESCRIPTION
REMARKS
LIMITS TO
REV DATE
Total Project Cost Information
Construction $3750000
Preliminary Engineering ---
Construction Engineering ---
Contingencies ---
Indirects ---
Total Project Cost $3750000
Right Of Way ---
Bond Financing ---
7FUNDING CATEGORY
MTP REFERENCE
Cost of
Approved
Phases
$3750000
18368MPO PROJECT ID
Authorized Funding by CategoryShare
Federal State Regional Local
Local
Contribution
Funding
By Category
Project History
HOUSTON-GALVESTON TMASTREET
DISTRICT COUNTY CSJ HWY PHASE CITY PROJECT SPONSOR YOE COST
7-STBG $3000000 --- $750000 $3750000 --- ---
Funding by Share $3000000 $750000 $3750000 --- --- ---
PHASE C=CONSTRUCTION E = ENGINEERING R = ROW T = TRANSFER Sunday January 3 2021
Amendment JAN-2021 - 12221 - Removed from 2021 TIP at TxDOTrsquos request to group the project to fiscally constrain 2021 STIP
Page 39
2021-2024 TRANSPORTATION IMPROVEMENT PROGRAM
2045 REGIONAL TRANSPORTATION PLAN
HOUSTON-GALVESTON MPO
JANUARY 2021 MODIFICATIONS AND PREVIEWS
PROPOSED VERSION
MPOIDCSJ 184040187-05-062 FY 2026
INSTALL ITS EQUIPMENT AND INFRASTRUCTURE
HOUSTON FORT BEND 0187-05-062 SH 36 C ORCHARD HOUSTON TRANSTAR $9908400
AUSTIN CL
SS 10
LIMITS FROM
TIP
DESCRIPTION
REMARKS
LIMITS TO
REV DATE
Total Project Cost Information
Construction $9908400
Preliminary Engineering $485512
Construction Engineering $495420
Contingencies $990840
Indirects $503347
Total Project Cost $12383518
Right Of Way ---
Bond Financing ---
2FUNDING CATEGORY
MTP REFERENCE
Cost of
Approved
Phases
$9908400
18404MPO PROJECT ID
Authorized Funding by CategoryShare
Federal State Regional Local
Local
Contribution
Funding
By Category
Project History
SH 36STREET
DISTRICT COUNTY CSJ HWY PHASE CITY PROJECT SPONSOR YOE COST
2-METRO-TMA $7926720 $1981680 --- $9908400 --- ---
Funding by Share $7926720 --- $9908400 --- ---$1981680
MPOIDCSJ 184040187-05-062 FY 9908400
OLD VERSION
INSTALL ITS EQUIPMENT AND INFRASTRUCTURE
HOUSTON FORT BEND 0187-05-062 C HOUSTON TRANSTAR $9908400
AUSTIN CL
SS 10
LIMITS FROM
TIP
DESCRIPTION
REMARKS
LIMITS TO
REV DATE
Total Project Cost Information
Construction $9908400
Preliminary Engineering $485512
Construction Engineering $495420
Contingencies $990840
Indirects $503347
Total Project Cost $12383518
Right Of Way ---
Bond Financing ---
FUNDING CATEGORY
MTP REFERENCE
Cost of
Approved
Phases
$9908400
18404MPO PROJECT ID
Authorized Funding by CategoryShare
Federal State Regional Local
Local
Contribution
Funding
By Category
Project History
SH 36STREET
DISTRICT COUNTY CSJ HWY PHASE CITY PROJECT SPONSOR YOE COST
2-METRO-TMA $7926720 $1981680 --- $9908400 --- ---
Funding by Share $7926720 --- $9908400 --- ---$1981680
PHASE C=CONSTRUCTION E = ENGINEERING R = ROW T = TRANSFER Sunday January 3 2021
Amendment JAN-2021 - 12221 - Removed from 2021 TIP at TxDOTrsquos request to group (5000-00-915 ITS deployment) the project to fiscally constrain 2021 STIP
Page 40
2021-2024 TRANSPORTATION IMPROVEMENT PROGRAM
2045 REGIONAL TRANSPORTATION PLAN
HOUSTON-GALVESTON MPO
JANUARY 2021 MODIFICATIONS AND PREVIEWS
PROPOSED VERSION
MPOIDCSJ 186470920-39-026 FY 2021
CONSTRUCT CONCRETE SIDEWALKS amp ACCESSIBLE CURB RAMPS
BEAUMONT CHAMBERS 0920-39-026 SH 146 C MONT BELVIEU CITY OF MONT BELVIEU $938297
IH 10
WARREN RD
LIMITS FROM
TIP
DESCRIPTION
REMARKS
LIMITS TO
REV DATE
Total Project Cost Information
Construction $938297
Preliminary Engineering $45977
Construction Engineering $84447
Contingencies $93830
Indirects $47665
Total Project Cost $1210215
Right Of Way ---
Bond Financing ---
9FUNDING CATEGORY
MTP REFERENCE
Cost of
Approved
Phases
$938297
18647MPO PROJECT ID
Authorized Funding by CategoryShare
Federal State Regional Local
Local
Contribution
Funding
By Category
Project History
SH 146STREET
DISTRICT COUNTY CSJ HWY PHASE CITY PROJECT SPONSOR YOE COST
9-STP-TAP $750637 --- $187660 $938297 --- ---
Funding by Share $750637 $187660 $938297 --- --- ---
MPOIDCSJ 186470920-39-026 FY 2021
OLD VERSION
CONSTRUCT CONCRETE SIDEWALKS amp ACCESSIBLE CURB RAMPS
BEAUMONT CHAMBERS 0920-39-026 SH 146 C MONT BELVIEU CITY OF MONT BELVIEU $938297
IH 10
WARREN RD
LIMITS FROM
TIP
DESCRIPTION
REMARKS
LIMITS TO
REV DATE
Total Project Cost Information
Construction $938297
Preliminary Engineering $45977
Construction Engineering $84447
Contingencies $93830
Indirects $47665
Total Project Cost $1210215
Right Of Way ---
Bond Financing ---
9FUNDING CATEGORY
MTP REFERENCE
Cost of
Approved
Phases
$938297
18647MPO PROJECT ID
Authorized Funding by CategoryShare
Federal State Regional Local
Local
Contribution
Funding
By Category
Project History
SH 146STREET
DISTRICT COUNTY CSJ HWY PHASE CITY PROJECT SPONSOR YOE COST
9-STP-TAP $750637 --- $187660 $938297 --- ---
Funding by Share $750637 $187660 $938297 --- --- ---
PHASE C=CONSTRUCTION E = ENGINEERING R = ROW T = TRANSFER Sunday January 3 2021
Amendment JAN-2021 - 12221 - Removed from 2021 TIP at TxDOTrsquos request to group (5000-00-916 Bicycle and Pedestrian) the project to fiscally constrain 2021 STIP
Page 41
January 2021 TPC Amendments
Additions and Removals
Page 1
Blank Page
Page 2
2021-2024 TRANSPORTATION IMPROVEMENT PROGRAM
2045 REGIONAL TRANSPORTATION PLAN
HOUSTON-GALVESTON MPO
JANUARY 2021 MODIFICATIONS AND PREVIEWS
PROPOSED VERSION
MPOIDCSJ 1550027-13-201 FY 2022
Amendment JAN-2021-1222021-Convert federal funding to 100 state funding at TxDOTs request Amendment NOV-2019A - 112219 - Delay from FY 2020 to FY
2022 and clarify project description Amendment JAN-2018 - 12618 - Add NHHIP
project segment to the TIP Funding committed by TxDOT at the Mar 2017 Commission
meeting
RECONSTRUCT AND WIDEN FROM 6 TO 10 MAIN LANES (NHHIP SEG-3)
HOUSTON HARRIS 0027-13-201 IH 69 C HOUSTON TXDOT HOUSTON DISTRICT $260000000
SH 288
SP 527
LIMITS FROM
TIP
DESCRIPTION
REMARKS
LIMITS TO
REV DATE
Total Project Cost Information
Construction $260000000
Preliminary Engineering $12740000
Construction Engineering $10400000
Contingencies $26000000
Indirects $13208000
Total Project Cost $377548000
Right Of Way $55200000
Bond Financing ---
12FUNDING CATEGORY
MTP REFERENCE
Cost of
Approved
Phases
$260000000
155MPO PROJECT ID
Authorized Funding by CategoryShare
Federal State Regional Local
Local
Contribution
Funding
By Category
Project History
IH 69 SSTREET
DISTRICT COUNTY CSJ HWY PHASE CITY PROJECT SPONSOR YOE COST
12-STRATEGIC --- $260000000 --- $260000000 --- ---
Funding by Share --- --- $260000000 --- ---$260000000
MPOIDCSJ 1550027-13-201 FY 2022
OLD VERSION
RECONSTRUCT AND WIDEN FROM 6 TO 10 MAIN LANES (NHHIP SEG-3)
HOUSTON HARRIS 0027-13-201 IH 69 C HOUSTON TXDOT HOUSTON DISTRICT $260000000
SH 288
SP 527
LIMITS FROM
TIP
DESCRIPTION
REMARKS
LIMITS TO
REV DATE
Total Project Cost Information
Construction $260000000
Preliminary Engineering $12740000
Construction Engineering $10400000
Contingencies $26000000
Indirects $13208000
Total Project Cost $377548000
Right Of Way $55200000
Bond Financing ---
12FUNDING CATEGORY
MTP REFERENCE
Cost of
Approved
Phases
$260000000
155MPO PROJECT ID
Authorized Funding by CategoryShare
Federal State Regional Local
Local
Contribution
Funding
By Category
Project History
IH 69 SSTREET
DISTRICT COUNTY CSJ HWY PHASE CITY PROJECT SPONSOR YOE COST
12-STRATEGIC $208000000 $52000000 --- $260000000 --- ---
Funding by Share $208000000 --- $260000000 --- ---$52000000
PHASE C=CONSTRUCTION E = ENGINEERING R = ROW T = TRANSFER Sunday January 3 2021
Page 3
lingala
Highlight
lingala
Highlight
2021-2024 TRANSPORTATION IMPROVEMENT PROGRAM
2045 REGIONAL TRANSPORTATION PLAN
HOUSTON-GALVESTON MPO
JANUARY 2021 MODIFICATIONS AND PREVIEWS
PROPOSED VERSION
MPOIDCSJ 1720028-04-077 FY 2025
RECONSTRUCT AND WIDEN FROM 2 TO 4 LANE DIVIDED ROADWAY
BEAUMONT LIBERTY 0028-04-077 US 90 C LIBERTY TXDOT BEAUMONT DISTRICT $8238000
FM 563
FM 160
LIMITS FROM
TIP
DESCRIPTION
REMARKS
LIMITS TO
REV DATE
Total Project Cost Information
Construction $8238000
Preliminary Engineering $403662
Construction Engineering $411900
Contingencies $823800
Indirects $418490
Total Project Cost $10295852
Right Of Way ---
Bond Financing ---
4FUNDING CATEGORY
MTP REFERENCE
Cost of
Approved
Phases
$8238000
172MPO PROJECT ID
Authorized Funding by CategoryShare
Federal State Regional Local
Local
Contribution
Funding
By Category
Project History
US 90STREET
DISTRICT COUNTY CSJ HWY PHASE CITY PROJECT SPONSOR YOE COST
4-ST-WIDE $6590400 $1647600 --- $8238000 --- ---
Funding by Share $6590400 --- $8238000 --- ---$1647600
MPOIDCSJ 1720028-04-077 FY 2024
OLD VERSION
RECONSTRUCT AND WIDEN FROM 2 TO 4 LANE DIVIDED ROADWAY
BEAUMONT LIBERTY 0028-04-077 US 90 C LIBERTY TXDOT BEAUMONT DISTRICT $8238000
FM 563
FM 160
LIMITS FROM
TIP
DESCRIPTION
REMARKS
LIMITS TO
REV DATE
Total Project Cost Information
Construction $8238000
Preliminary Engineering $403662
Construction Engineering $411900
Contingencies $823800
Indirects $418490
Total Project Cost $10295852
Right Of Way ---
Bond Financing ---
4FUNDING CATEGORY
MTP REFERENCE
Cost of
Approved
Phases
$8238000
172MPO PROJECT ID
Authorized Funding by CategoryShare
Federal State Regional Local
Local
Contribution
Funding
By Category
Project History
US 90STREET
DISTRICT COUNTY CSJ HWY PHASE CITY PROJECT SPONSOR YOE COST
4-ST-WIDE $6590400 $1647600 --- $8238000 --- ---
Funding by Share $6590400 --- $8238000 --- ---$1647600
PHASE C=CONSTRUCTION E = ENGINEERING R = ROW T = TRANSFER Sunday January 3 2021
Amendment JAN-2021-12221-Delay from FY 2024 in 2021 TIP to FY 2025 10Y Plan at TxDOTs request to fiscally constrain 2021 STIP Approved 1- 062620 - Program project in the 2021-2024 TIP in FY 2024 with Cat-4 funding
Page 4
lingala
Highlight
2021-2024 TRANSPORTATION IMPROVEMENT PROGRAM
2045 REGIONAL TRANSPORTATION PLAN
HOUSTON-GALVESTON MPO
JANUARY 2021 MODIFICATIONS AND PREVIEWS
PROPOSED VERSION
MPOIDCSJ 2630188-01-016 FY 2023
RECONSTRUCT AND WIDEN FROM 4 TO 6 LANES DIVIDED
HOUSTON FORT BEND 0188-01-016 SH 36 C ROSENBERG TXDOT HOUSTON DISTRICT $29500000
IH 69 S
FM 2218
LIMITS FROM
TIP
DESCRIPTION
REMARKS
LIMITS TO
REV DATE
Total Project Cost Information
Construction $29500000
Preliminary Engineering $1445500
Construction Engineering $1180000
Contingencies $2950000
Indirects $1498600
Total Project Cost $36574100
Right Of Way ---
Bond Financing ---
2FUNDING CATEGORY
MTP REFERENCE
Cost of
Approved
Phases
$29500000
263MPO PROJECT ID
Authorized Funding by CategoryShare
Federal State Regional Local
Local
Contribution
Funding
By Category
Project History
SH 36STREET
DISTRICT COUNTY CSJ HWY PHASE CITY PROJECT SPONSOR YOE COST
2-METRO-TMA $23600000 $5900000 --- $29500000 --- ---
Funding by Share $23600000 --- $29500000 --- ---$5900000
OLD VERSION
PHASE C=CONSTRUCTION E = ENGINEERING R = ROW T = TRANSFER Sunday January 3 2021
Amendment JAN-2021-12221-Program in FY 2023 with Cat-3 funding at TxDOTs request (2021 STIP fiscal constraint) Amendment OCT-2017- 102717 - Delay from FY 2021 to FY 2023 modify Cat-2 funding and reflect potential use of federal funds
Page 5
lingala
Highlight
2021-2024 TRANSPORTATION IMPROVEMENT PROGRAM
2045 REGIONAL TRANSPORTATION PLAN
HOUSTON-GALVESTON MPO
JANUARY 2021 MODIFICATIONS AND PREVIEWS
PROPOSED VERSION
MPOIDCSJ 4990523-09-009 FY 2021
Amendment JAN-2021-12221-Convert federal funding to 100 sate funding Approved 1- 062620 - Program in the 2021-2024 TIP in FY 2021 with Cat-2 funding Amendment JAN-2018 - 12618 - ADVANCE TO FY 2023 AND UPDATE CAT 2
FUNDING
WIDEN FROM 2 TO 4-LANES WITH BICYCLE ACCOMMODATIONS
HOUSTON MONTGOMERY 0523-09-009 FM 1488 C MAGNOLIA TXDOT HOUSTON DISTRICT $46040000
FM 1774
W OF FM 149
LIMITS FROM
TIP
DESCRIPTION
REMARKS
LIMITS TO
REV DATE
Total Project Cost Information
Construction $46040000
Preliminary Engineering $2255960
Construction Engineering $1841600
Contingencies $4604000
Indirects $2338832
Total Project Cost $62043189
Right Of Way $4962797
Bond Financing ---
2FUNDING CATEGORY
MTP REFERENCE
Cost of
Approved
Phases
$46040000
499MPO PROJECT ID
Authorized Funding by CategoryShare
Federal State Regional Local
Local
Contribution
Funding
By Category
Project History
FM 1488STREET
DISTRICT COUNTY CSJ HWY PHASE CITY PROJECT SPONSOR YOE COST
2-METRO-TMA --- $46040000 --- $46040000 --- ---
Funding by Share --- --- $46040000 --- ---$46040000
MPOIDCSJ 4990523-09-009 FY 2021
OLD VERSION
WIDEN FROM 2 TO 4-LANES WITH BICYCLE ACCOMMODATIONS
HOUSTON MONTGOMERY 0523-09-009 FM 1488 C MAGNOLIA TXDOT HOUSTON DISTRICT $46040000
FM 1774
W OF FM 149
LIMITS FROM
TIP
DESCRIPTION
REMARKS
LIMITS TO
REV DATE
Total Project Cost Information
Construction $46040000
Preliminary Engineering $2255960
Construction Engineering $1841600
Contingencies $4604000
Indirects $2338832
Total Project Cost $62043189
Right Of Way $4962797
Bond Financing ---
2FUNDING CATEGORY
MTP REFERENCE
Cost of
Approved
Phases
$46040000
499MPO PROJECT ID
Authorized Funding by CategoryShare
Federal State Regional Local
Local
Contribution
Funding
By Category
Project History
FM 1488STREET
DISTRICT COUNTY CSJ HWY PHASE CITY PROJECT SPONSOR YOE COST
2-METRO-TMA $36832000 $9208000 --- $46040000 --- ---
Funding by Share $36832000 --- $46040000 --- ---$9208000
PHASE C=CONSTRUCTION E = ENGINEERING R = ROW T = TRANSFER Sunday January 3 2021
Page 6
lingala
Highlight
lingala
Highlight
2021-2024 TRANSPORTATION IMPROVEMENT PROGRAM
2045 REGIONAL TRANSPORTATION PLAN
HOUSTON-GALVESTON MPO
JANUARY 2021 MODIFICATIONS AND PREVIEWS
PROPOSED VERSION
MPOIDCSJ 5371062-02-009 FY 2021
Amendment JAN-2021-12221-Convert federal funding to 100 state funding at TxDOTs request Approved 1- 062620 - Program carryover project in 2021-2024 TIP in FY 2021 with Cat-2 funding Amendment OCT-2017 - 102717 - DELAY FROM 2021 TO
2022 UPDATE LIMIT AND MODIFY FUNDING TO REFLECT POTENTIAL USE OF
FEDERAL FUNDING
RECONSTRUCT AND WIDEN FROM 2 TO 4-LANE DIVIDED
HOUSTON HARRIS 1062-02-009 FM 2100 C NONE TXDOT HOUSTON DISTRICT $86000000
HUFFMAN-CLEVELAND RD
FM 1960
LIMITS FROM
TIP
DESCRIPTION
REMARKS
LIMITS TO
REV DATE
Total Project Cost Information
Construction $86000000
Preliminary Engineering $4214000
Construction Engineering $3440000
Contingencies $8600000
Indirects $4368800
Total Project Cost $106622800
Right Of Way ---
Bond Financing ---
2FUNDING CATEGORY
MTP REFERENCE
Cost of
Approved
Phases
$86000000
537MPO PROJECT ID
Authorized Funding by CategoryShare
Federal State Regional Local
Local
Contribution
Funding
By Category
Project History
FM 2100STREET
DISTRICT COUNTY CSJ HWY PHASE CITY PROJECT SPONSOR YOE COST
2-METRO-TMA --- $86000000 --- $86000000 --- ---
Funding by Share --- --- $86000000 --- ---$86000000
MPOIDCSJ 5371062-02-009 FY 2021
OLD VERSION
RECONSTRUCT AND WIDEN FROM 2 TO 4-LANE DIVIDED
HOUSTON HARRIS 1062-02-009 FM 2100 C NONE TXDOT HOUSTON DISTRICT $86000000
HUFFMAN-CLEVELAND RD
FM 1960
LIMITS FROM
TIP
DESCRIPTION
REMARKS
LIMITS TO
REV DATE
Total Project Cost Information
Construction $86000000
Preliminary Engineering $4214000
Construction Engineering $3440000
Contingencies $8600000
Indirects $4368800
Total Project Cost $106622800
Right Of Way ---
Bond Financing ---
2FUNDING CATEGORY
MTP REFERENCE
Cost of
Approved
Phases
$86000000
537MPO PROJECT ID
Authorized Funding by CategoryShare
Federal State Regional Local
Local
Contribution
Funding
By Category
Project History
FM 2100STREET
DISTRICT COUNTY CSJ HWY PHASE CITY PROJECT SPONSOR YOE COST
2-METRO-TMA $68800000 $17200000 --- $86000000 --- ---
Funding by Share $68800000 --- $86000000 --- ---$17200000
PHASE C=CONSTRUCTION E = ENGINEERING R = ROW T = TRANSFER Sunday January 3 2021
Page 7
lingala
Highlight
lingala
Highlight
2021-2024 TRANSPORTATION IMPROVEMENT PROGRAM
2045 REGIONAL TRANSPORTATION PLAN
HOUSTON-GALVESTON MPO
JANUARY 2021 MODIFICATIONS AND PREVIEWS
PROPOSED VERSION
MPOIDCSJ 163290500-03-601 FY 2025
Amendment JAN-2021-12221-Delay from FY 2024 in 2021 TIP to FY 2025 10Y Plan at TxDOTs request to fiscally constrain 2021 STIP Amendment MAY-2020A
- 52920 - Clarify project description
RECONSTRUCT IH45IH69 INTERCHANGE IH45 REALIGNWIDEN FROM 6 TO 7 MAINLANES
(ML)INCLUDING 3 ML NB AND 4 ML SB FROM SAUER ST TO RUNNELS ST IH69 RECONSTRUCT
FROM 8 TO 8 ML FROM W OF PIERCE ST TO S OF RUNNEL ST W 2 3-LANE CONTINUOUS
FRONTAGE ROADS
HOUSTON HARRIS 0500-03-601 IH C HOUSTON TXDOT HOUSTON DISTRICT $1143770000
AT IH 69 SLIMITS FROM
TIP
DESCRIPTION
REMARKS
LIMITS TO
REV DATE
Total Project Cost Information
Construction $1143770000
Preliminary Engineering $56044730
Construction Engineering $45750800
Contingencies $114377000
Indirects $58103516
Total Project Cost $1841646046
Right Of Way $423600000
Bond Financing ---
3412FUNDING CATEGORY
MTP REFERENCE
Cost of
Approved
Phases
$1143770000
16329MPO PROJECT ID
Authorized Funding by CategoryShare
Federal State Regional Local
Local
Contribution
Funding
By Category
Project History
IH 45STREET
DISTRICT COUNTY CSJ HWY PHASE CITY PROJECT SPONSOR YOE COST
3-DB $222960000 $55740000 --- $278700000 --- ---
4-ST-WIDE $286664000 $71666000 --- $358330000 --- ---
12-STRATEGIC $405392000 $101348000 --- $506740000 --- ---
Funding by Share $915016000 --- $1143770000 --- ---$228754000
MPOIDCSJ 163290500-03-601 FY 2022
OLD VERSION
RECONSTRUCT INTERCHANGE INCLUDING IH 45 amp IH 69 MAINLANES (NHHIP SEG-3)
HOUSTON HARRIS 0500-03-601 IH 45 C HOUSTON TXDOT HOUSTON DISTRICT $1143770000
AT IH 69 SLIMITS FROM
TIP
DESCRIPTION
REMARKS
LIMITS TO
REV DATE
Total Project Cost Information
Construction $1143770000
Preliminary Engineering $56044730
Construction Engineering $45750800
Contingencies $114377000
Indirects $58103516
Total Project Cost $1841646046
Right Of Way $423600000
Bond Financing ---
3412FUNDING CATEGORY
MTP REFERENCE
Cost of
Approved
Phases
$1143770000
16329MPO PROJECT ID
Authorized Funding by CategoryShare
Federal State Regional Local
Local
Contribution
Funding
By Category
Project History
IH 45STREET
DISTRICT COUNTY CSJ HWY PHASE CITY PROJECT SPONSOR YOE COST
3-DB $222960000 $55740000 --- $278700000 --- ---
4-ST-WIDE $286664000 $71666000 --- $358330000 --- ---
12-STRATEGIC $405392000 $101348000 --- $506740000 --- ---
Funding by Share $915016000 --- $1143770000 --- ---$228754000
PHASE C=CONSTRUCTION E = ENGINEERING R = ROW T = TRANSFER Sunday January 3 2021
Page 8
lingala
Highlight
2021-2024 TRANSPORTATION IMPROVEMENT PROGRAM
2045 REGIONAL TRANSPORTATION PLAN
HOUSTON-GALVESTON MPO
JANUARY 2021 MODIFICATIONS AND PREVIEWS
PROPOSED VERSION
MPOIDCSJ 163360500-03-598 FY 2025
Amendment JAN-2021-12221-Delay from FY 2024 in 2021 TIP to FY 2025 10Y Plan at TxDOTs request to fiscally constrain 2021 STIP Amendment JAN-2018
- 12618 - Add NHHIP Develop Authority project to the RTP
CONSTRUCT PARKWAY CONNECTORS INTO DOWNTOWN HOUSTON AND REMOVE EXISTING
PIERCE ELEVATED (NHHIP SEG-3)
HOUSTON HARRIS 0500-03-598 IH 45 C HOUSTON TXDOT HOUSTON DISTRICT $242000000
IH 69
IH 10
LIMITS FROM
TIP
DESCRIPTION
REMARKS
LIMITS TO
REV DATE
Total Project Cost Information
Construction $242000000
Preliminary Engineering $11858000
Construction Engineering $9680000
Contingencies $24200000
Indirects $12293600
Total Project Cost $314631600
Right Of Way $14600000
Bond Financing ---
34FUNDING CATEGORY
MTP REFERENCE
Cost of
Approved
Phases
$242000000
16336MPO PROJECT ID
Authorized Funding by CategoryShare
Federal State Regional Local
Local
Contribution
Funding
By Category
Project History
IH 45 SSTREET
DISTRICT COUNTY CSJ HWY PHASE CITY PROJECT SPONSOR YOE COST
3-DB --- $42000000 --- $42000000 --- ---
4-ST-WIDE $160000000 $40000000 --- $200000000 --- ---
Funding by Share $160000000 --- $242000000 --- ---$82000000
MPOIDCSJ 163360500-03-598 FY 2022
OLD VERSION
CONSTRUCT PARKWAY CONNECTORS INTO DOWNTOWN HOUSTON AND REMOVE EXISTING
PIERCE ELEVATED (NHHIP SEG - 3)
HOUSTON HARRIS 0500-03-598 IH 45 C HOUSTON TXDOT HOUSTON DISTRICT $242000000
IH 69
IH 10
LIMITS FROM
TIP
DESCRIPTION
REMARKS
LIMITS TO
REV DATE
Total Project Cost Information
Construction $242000000
Preliminary Engineering $11858000
Construction Engineering $9680000
Contingencies $24200000
Indirects $12293600
Total Project Cost $314631600
Right Of Way $14600000
Bond Financing ---
4FUNDING CATEGORY
MTP REFERENCE
Cost of
Approved
Phases
$242000000
16336MPO PROJECT ID
Authorized Funding by CategoryShare
Federal State Regional Local
Local
Contribution
Funding
By Category
Project History
IH 45 SSTREET
DISTRICT COUNTY CSJ HWY PHASE CITY PROJECT SPONSOR YOE COST
3-DB --- $42000000 --- $42000000 --- ---
4-ST-WIDE $160000000 $40000000 --- $200000000 --- ---
Funding by Share $160000000 --- $242000000 --- ---$82000000
PHASE C=CONSTRUCTION E = ENGINEERING R = ROW T = TRANSFER Sunday January 3 2021
Page 9
lingala
Highlight
2021-2024 TRANSPORTATION IMPROVEMENT PROGRAM
2045 REGIONAL TRANSPORTATION PLAN
HOUSTON-GALVESTON MPO
JANUARY 2021 MODIFICATIONS AND PREVIEWS
PROPOSED VERSION
MPOIDCSJ 163443256-03-096 FY 2025
Amendment JAN-2021-12221-Delay from FY 2024 in 2021 TIP to FY 2025 10Y Plan at TxDOTs request to fiscally constrain 2021 STIP Amendment JAN-2018 - 12618 - Add to TIP
Re-striping project to eliminate capacity bottleneck Funding committed by TxDOT Houston District (Cat 11)
WIDEN FROM 6 TO 8 LANES (RE-STRIPE EXISTING PAVEMENT)
HOUSTON HARRIS 3256-03-096 SL 8 C NONE TXDOT HOUSTON DISTRICT $500000
US 90
S OF IH 10 E
LIMITS FROM
TIP
DESCRIPTION
REMARKS
LIMITS TO
REV DATE
Total Project Cost Information
Construction $500000
Preliminary Engineering $24500
Construction Engineering $45000
Contingencies $50000
Indirects $25400
Total Project Cost $644900
Right Of Way ---
Bond Financing ---
11FUNDING CATEGORY
MTP REFERENCE
Cost of
Approved
Phases
$500000
16344MPO PROJECT ID
Authorized Funding by CategoryShare
Federal State Regional Local
Local
Contribution
Funding
By Category
Project History
SL 8STREET
DISTRICT COUNTY CSJ HWY PHASE CITY PROJECT SPONSOR YOE COST
11-ST DIST DISC $400000 $100000 --- $500000 --- ---
Funding by Share $400000 --- $500000 --- ---$100000
MPOIDCSJ 163443256-03-096 FY 2021
OLD VERSION
WIDEN FROM 6 TO 8 LANES (RE-STRIPE EXISTING PAVEMENT)
HOUSTON HARRIS 3256-03-096 SL 8 C NONE TXDOT HOUSTON DISTRICT $500000
US 90
S OF IH 10 E
LIMITS FROM
TIP
DESCRIPTION
REMARKS
LIMITS TO
REV DATE
Total Project Cost Information
Construction $500000
Preliminary Engineering $24500
Construction Engineering $45000
Contingencies $50000
Indirects $25400
Total Project Cost $644900
Right Of Way ---
Bond Financing ---
11FUNDING CATEGORY
MTP REFERENCE
Cost of
Approved
Phases
$500000
16344MPO PROJECT ID
Authorized Funding by CategoryShare
Federal State Regional Local
Local
Contribution
Funding
By Category
Project History
SL 8STREET
DISTRICT COUNTY CSJ HWY PHASE CITY PROJECT SPONSOR YOE COST
11-ST DIST DISC $400000 $100000 --- $500000 --- ---
Funding by Share $400000 --- $500000 --- ---$100000
PHASE C=CONSTRUCTION E = ENGINEERING R = ROW T = TRANSFER Sunday January 3 2021
Page 10
lingala
Highlight
2021-2024 TRANSPORTATION IMPROVEMENT PROGRAM
2045 REGIONAL TRANSPORTATION PLAN
HOUSTON-GALVESTON MPO
JANUARY 2021 MODIFICATIONS AND PREVIEWS
PROPOSED VERSION
MPOIDCSJ 163470028-04-069 FY 2025
Amendment JAN-2021-12221-Convert federal funding to 100 state funding at TxDOTs request Approved 1- 062620 - Program project in the 2021-2024 TIP in FY 2024 with Cat-4 funding
RECONSTRUCT AND WIDEN FROM 2 TO 4 LANES DIVIDED ROADWAY
BEAUMONT LIBERTY 0028-04-069 US 90 C DEVERS TXDOT BEAUMONT DISTRICT $40000000
FM 160
SH 61
LIMITS FROM
TIP
DESCRIPTION
REMARKS
LIMITS TO
REV DATE
Total Project Cost Information
Construction $40000000
Preliminary Engineering $1960000
Construction Engineering $1600000
Contingencies $4000000
Indirects $2032000
Total Project Cost $49592000
Right Of Way ---
Bond Financing ---
4FUNDING CATEGORY
MTP REFERENCE
Cost of
Approved
Phases
$40000000
16347MPO PROJECT ID
Authorized Funding by CategoryShare
Federal State Regional Local
Local
Contribution
Funding
By Category
Project History
US 90STREET
DISTRICT COUNTY CSJ HWY PHASE CITY PROJECT SPONSOR YOE COST
4-ST-WIDE $32000000 $8000000 --- $40000000 --- ---
Funding by Share $32000000 --- $40000000 --- ---$8000000
MPOIDCSJ 163470028-04-069 FY 2024
OLD VERSION
RECONSTRUCT AND WIDEN FROM 2 TO 4 LANES DIVIDED ROADWAY
BEAUMONT LIBERTY 0028-04-069 US 90 C DEVERS TXDOT BEAUMONT DISTRICT $40000000
FM 160
SH 61
LIMITS FROM
TIP
DESCRIPTION
REMARKS
LIMITS TO
REV DATE
Total Project Cost Information
Construction $40000000
Preliminary Engineering $1960000
Construction Engineering $1600000
Contingencies $4000000
Indirects $2032000
Total Project Cost $49592000
Right Of Way ---
Bond Financing ---
4FUNDING CATEGORY
MTP REFERENCE
Cost of
Approved
Phases
$40000000
16347MPO PROJECT ID
Authorized Funding by CategoryShare
Federal State Regional Local
Local
Contribution
Funding
By Category
Project History
US 90STREET
DISTRICT COUNTY CSJ HWY PHASE CITY PROJECT SPONSOR YOE COST
4-ST-WIDE $32000000 $8000000 --- $40000000 --- ---
Funding by Share $32000000 --- $40000000 --- ---$8000000
PHASE C=CONSTRUCTION E = ENGINEERING R = ROW T = TRANSFER Sunday January 3 2021
Page 11
lingala
Highlight
2021-2024 TRANSPORTATION IMPROVEMENT PROGRAM
2045 REGIONAL TRANSPORTATION PLAN
HOUSTON-GALVESTON MPO
JANUARY 2021 MODIFICATIONS AND PREVIEWS
PROPOSED VERSION
MPOIDCSJ 170500188-10-021 FY 2021
Amendment JAN-2021-12221-Convert federal funding to 100 state funding at TxDOTs request Approved 1- 062620 - Program carryover project in 2021-2024 TIP in FY 2024 with Cat-2 fundingAmendment FEB-2020 - 22820 - Increase funding
to cover increase costs of storm sewers detention pond ITS noise walls and unit price of
pavement Clarify description of work
WIDEN FROM 2 TO 6 LANES FROM IH10 W TO SPRING GREEN RD (104 MI)
AND 2 TO 4 LANES FROM SPRING GREEN TO N OF WESTRIDGE CREEK LANE (209 MI) ROADWAY
WITH RAISED MEDIAN INTERSECTION IMPROVEMENTS AND PEDESTRIAN AND BICYCLE
ACCOMMODATIONS
HOUSTON FORT BEND 0188-10-021 FM C KATY TXDOT HOUSTON DISTRICT $43500000
IH 10
N OF WESTRIDGE CREEK LN
LIMITS FROM
TIP
DESCRIPTION
REMARKS
LIMITS TO
REV DATE
Total Project Cost Information
Construction $43500000
Preliminary Engineering $2131500
Construction Engineering $1740000
Contingencies $4350000
Indirects $2209800
Total Project Cost $57621300
Right Of Way $3690000
Bond Financing ---
2FUNDING CATEGORY
MTP REFERENCE
Cost of
Approved
Phases
$43500000
17050MPO PROJECT ID
Authorized Funding by CategoryShare
Federal State Regional Local
Local
Contribution
Funding
By Category
Project History
FM 1463STREET
DISTRICT COUNTY CSJ HWY PHASE CITY PROJECT SPONSOR YOE COST
2-METRO-TMA --- $43500000 --- $43500000 --- ---
Funding by Share --- --- $43500000 --- ---$43500000
MPOIDCSJ 170500188-10-021 FY 2021
OLD VERSION
WIDEN FROM 2 TO 6 LANES FROM IH10 W TO SPRING GREEN RD (104 MI)
AND 2 TO 4 LANES FROM SPRING GREEN TO N OF WESTRIDGE CREEK LANE (209 MI) ROADWAY
WITH RAISED MEDIAN INTERSECTION IMPROVEMENTS AND PEDESTRIAN AND BICYCLE
ACCOMMODATIONS
HOUSTON FORT BEND 0188-10-021 FM 1463 C KATY TXDOT HOUSTON DISTRICT $43500000
IH 10
N OF WESTRIDGE CREEK LN
LIMITS FROM
TIP
DESCRIPTION
REMARKS
LIMITS TO
REV DATE
Total Project Cost Information
Construction $43500000
Preliminary Engineering $2131500
Construction Engineering $1740000
Contingencies $4350000
Indirects $2209800
Total Project Cost $57621300
Right Of Way $3690000
Bond Financing ---
2FUNDING CATEGORY
MTP REFERENCE
Cost of
Approved
Phases
$43500000
17050MPO PROJECT ID
Authorized Funding by CategoryShare
Federal State Regional Local
Local
Contribution
Funding
By Category
Project History
FM 1463STREET
DISTRICT COUNTY CSJ HWY PHASE CITY PROJECT SPONSOR YOE COST
072018
2-METRO-TMA $34800000 $8700000 --- $43500000 --- ---
Funding by Share $34800000 --- $43500000 --- ---$8700000
PHASE C=CONSTRUCTION E = ENGINEERING R = ROW T = TRANSFER Sunday January 3 2021
Page 12
lingala
Highlight
lingala
Highlight
2021-2024 TRANSPORTATION IMPROVEMENT PROGRAM
2045 REGIONAL TRANSPORTATION PLAN
HOUSTON-GALVESTON MPO
JANUARY 2021 MODIFICATIONS AND PREVIEWS
PROPOSED VERSION
MPOIDCSJ 171151259-01-044 FY 2021
Amendment JAN-2021-12221-Advance from FY 2022 to 2021 and convert federal funding to 100 state funding at TxDOTrsquos request to fiscally constrain 2021 STIP Approved 1- 062620 - Program carryover project in 2021-2024 TIP in FY 2022 with Cat-2 funding Amendment OCT-2017 - 102717 - Add missing
segment to the RTP Project evaluated and selected under the 2015 Call for Projects
RECONSTRUCT AND WIDEN FROM 2 TO 4 LANES WITH CONTINUOUS LEFT TURN LANE (PMPOID
17091)
HOUSTON MONTGOMERY 1259-01-044 FM 1097 C NONE TXDOT HOUSTON DISTRICT $14880000
BLUEBERRY HILLS DR
LAKE CONROE HILLS DR
LIMITS FROM
TIP
DESCRIPTION
REMARKS
LIMITS TO
REV DATE
Total Project Cost Information
Construction $14880000
Preliminary Engineering $729120
Construction Engineering $744000
Contingencies $1488000
Indirects $755904
Total Project Cost $22237024
Right Of Way $3640000
Bond Financing ---
2FUNDING CATEGORY
MTP REFERENCE
Cost of
Approved
Phases
$14880000
17115MPO PROJECT ID
Authorized Funding by CategoryShare
Federal State Regional Local
Local
Contribution
Funding
By Category
Project History
FM 1097STREET
DISTRICT COUNTY CSJ HWY PHASE CITY PROJECT SPONSOR YOE COST
2-METRO-TMA --- $14880000 --- $14880000 --- ---
Funding by Share --- --- $14880000 --- ---$14880000
MPOIDCSJ 171151259-01-044 FY 2022
OLD VERSION
RECONSTRUCT AND WIDEN FROM 2 TO 4 LANES WITH CONTINUOUS LEFT TURN LANE (PMPOID
17091)
HOUSTON MONTGOMERY 1259-01-044 FM 1097 C NONE TXDOT HOUSTON DISTRICT $14880000
BLUEBERRY HILLS DR
LAKE CONROE HILLS DR
LIMITS FROM
TIP
DESCRIPTION
REMARKS
LIMITS TO
REV DATE
Total Project Cost Information
Construction $14880000
Preliminary Engineering $729120
Construction Engineering $744000
Contingencies $1488000
Indirects $755904
Total Project Cost $22237024
Right Of Way $3640000
Bond Financing ---
2FUNDING CATEGORY
MTP REFERENCE
Cost of
Approved
Phases
$14880000
17115MPO PROJECT ID
Authorized Funding by CategoryShare
Federal State Regional Local
Local
Contribution
Funding
By Category
Project History
FM 1097STREET
DISTRICT COUNTY CSJ HWY PHASE CITY PROJECT SPONSOR YOE COST
2-METRO-TMA $11904000 $2976000 --- $14880000 --- ---
Funding by Share $11904000 --- $14880000 --- ---$2976000
PHASE C=CONSTRUCTION E = ENGINEERING R = ROW T = TRANSFER Sunday January 3 2021
Page 13
lingala
Highlight
lingala
Highlight
lingala
Highlight
2021-2024 TRANSPORTATION IMPROVEMENT PROGRAM
2045 REGIONAL TRANSPORTATION PLAN
HOUSTON-GALVESTON MPO
JANUARY 2021 MODIFICATIONS AND PREVIEWS
PROPOSED VERSION
MPOIDCSJ 180480271-16-111 FY 2023
CONSTRUCT 4 DIRECT CONNECTORS (SB-EB SB-WB WB-NB EB-NB)
HOUSTON HARRIS 0271-16-111 IH 610 C HOUSTON TXDOT HOUSTON DISTRICT $160000000
AT SH 35LIMITS FROM
TIP
DESCRIPTION
REMARKS
LIMITS TO
REV DATE
Total Project Cost Information
Construction $160000000
Preliminary Engineering $7840000
Construction Engineering $6400000
Contingencies $16000000
Indirects $8128000
Total Project Cost $198368000
Right Of Way ---
Bond Financing ---
212FUNDING CATEGORY
MTP REFERENCE
Cost of
Approved
Phases
$160000000
18048MPO PROJECT ID
Authorized Funding by CategoryShare
Federal State Regional Local
Local
Contribution
Funding
By Category
Project History AmendmentJAN-2021 1222021- Program in FY 2023 of the TIP
IH 610STREET
DISTRICT COUNTY CSJ HWY PHASE CITY PROJECT SPONSOR YOE COST
2-METRO-TMA $45200000 $11300000 --- $56500000 --- ---
12-STRATEGIC $82800000 $20700000 --- $103500000 --- ---
Funding by Share $128000000 --- $160000000 --- ---$32000000
OLD VERSION
PHASE C=CONSTRUCTION E = ENGINEERING R = ROW T = TRANSFER Sunday January 3 2021
Page 14
lingala
Highlight
HOUSTON-GALVESTON MPO
2021-2024 TRANSPORTATION IMPROVEMENT PROGRAM
2045 REGIONAL TRANSPORTATION PLAN
JANUARY 2021 MODIFICATIONS AND PREVIEWS
PROPOSED VERSION
MPOIDCSJ 120920912-00-643 FY 2021
Amendment DEC-2020- 121820 Replace $2000000 matching funds with 1600000 TDCs Amendment OCT - 2020A Change CSJ from 0912-00-552 to 0912-00-643 OCT-2018 - 102618 - Program the H-GAC Clean Vehicles Program for FYs 2021-2022
CLEAN VEHICLES PROGRAM (ENGINEVEHICLE REPLACEMENT ALTERNATE FUELS EDUCATION)
FY 2021-2022
HOUSTON MULTIPLE 0912-00-643 VA C NONE H-GAC $8000000
VA
VA
LIMITS FROM
TIP
DESCRIPTION
REMARKS
LIMITS TO
REV DATE
Total Project Cost Information
Construction $8000000
Preliminary Engineering ---
Construction Engineering ---
Contingencies ---
Indirects ---
Total Project Cost $8000000
Right Of Way ---
Bond Financing ---
5FUNDING CATEGORY
MTP REFERENCE
NOx (KGDAY) 39539 VOC (KGDAY) 1079
Cost of
Approved
Phases
$8000000
12092MPO PROJECT ID
Authorized Funding by CategoryShare
Federal State Regional Local
Local
Contribution
Funding
By Category
Project History
HOUSTON-GALVESTON TMASTREET
DISTRICT COUNTY CSJ HWY PHASE CITY PROJECT SPONSOR YOE COST
5-CMAQ $8000000 --- --- $8000000 --- ---
Funding by Share $8000000 --- $8000000 --- --- ---
MPOIDCSJ 120920912-00-552 FY 2021
OLD VERSION
CLEAN VEHICLES PROGRAM (ENGINEVEHICLE REPLACEMENT ALTERNATE FUELS EDUCATION)
FY 2021 - 2022
HOUSTON MULTIPLE 0912-00-552 VA C NONE H-GAC $10000000
VA
VA
LIMITS FROM
TIP
DESCRIPTION
REMARKS
LIMITS TO
REV DATE
Total Project Cost Information
Construction $10000000
Preliminary Engineering ---
Construction Engineering ---
Contingencies ---
Indirects ---
Total Project Cost $10000000
Right Of Way ---
Bond Financing ---
5FUNDING CATEGORY
MTP REFERENCE
NOx (KGDAY) 39539 VOC (KGDAY) 1079
Cost of
Approved
Phases
$10000000
12092MPO PROJECT ID
Authorized Funding by CategoryShare
Federal State Regional Local
Local
Contribution
Funding
By Category
Project History
HOUSTON-GALVESTON TMASTREET
DISTRICT COUNTY CSJ HWY PHASE CITY PROJECT SPONSOR YOE COST
5-CMAQ $8000000 --- $10000000 --- ---
Funding by Share $8000000 $2000000 $10000000 --- --- ---
PHASE C=CONSTRUCTION E = ENGINEERING R = ROW T = TRANSFER Thursday December 10 2020
$2000000
Page 15
lingala
Highlight
lingala
Highlight
lingala
Highlight
lingala
Highlight
- Jan2021-TPC Amendment -Detail -TDCspdf
-
- Jan2021-TPC-TDC Amendment Resolutions-Signed-1pdf
-
- ITEM-10-1-TPC Amendments-Backgroundpdf
- ITEM-10A-2-TPC Amendments Summary Table
- ITEM-10A-3-TDC Application-HGAC-Measuring Multimodal Network Connectivity Pilots Program
- ITEM-10A-4-METRO Request Letter for TIP Amendment
- ITEM-10A-5-Galveston FTA 5307-Amendment-Request Letter
- ITEM-10A-6-Galveston FTA 5307-Amendment-Award Letter
- ITEM-10A-7-GCC-CARES-5307 Award-Letter
- ITEM-10B-2-Amendments to 2021-2024 TIP-Attachments
- ITEM-10B-3-TDC Application-Clean Vehicles
- Item 10B-Amendment Resolution-Signed
- Item 10B-TDC Resolution-Signed
-
- Jan2021-TPC Amendments-Signature Page-Signed-2
- Jan2021-TPC Amendment Detail Pages-3
-
- TPC Amendment Movement Detail Pages
-